Loading...
HomeMy WebLinkAboutResolution - 050875E - Pavement Improvements - Lubbock Asphalt Products - Burlington Industrial Add - 05_08_1975MV37545- RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUES AS ISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City dinance 1331, the subdivider of Burlington Industrial Addition No. 2, made rangements with Lubbock Asphalt Products, Inc., for the construction of ving improvements on certain streets dedicated in said subdivision under the ovisions of said Ordinance prior to the recording of the subdivision plat of rlington Industrial Addition No. 2, including the following streets: outh part of East 44th Street from its intersection with the West line of Lot , Block 9, to its intersection with the East line of Lot 3, Block 9, Burlingt ndustrial Addition No. 2, known and designated as New Subdivision Sub -Unit umber 99 of Unit Number 2014. ickory Avenue from its intersection with the North Lip Line of East 40th treet to its intersection with the North Right-of-way of Forth Worth and enver Railroad North of East 40th Street, known and designated as New Sub- ivision Sub -Unit Number 7 of Unit Number 2016. st 47th Street from its intersection with a line 13.50 feet East of East operty Line of Globe Avenue to its intersection with a line 900.00 feet East East Property Line of Globe Avenue, known and designated as New Subdivision b-Unit Number 51 of Unit Number 2016. rth part of East 47th Street from its intersection with a line 900.00 feet st of East Property Line of Globe Avenue to its intersection with a line .50 feet West of West Property Line of Locust Avenue (concrete only), known d designated as New Subdivision Sub -Unit Number 51A of Unit Number 2016. outh part of East 44th Street from its intersection with the West line of of 4, Block 9, to its intersection with the East line of Lot 4, Block 9, Bur- ington Industrial Addition No. 2, known and designated as New Subdivision ub-Unit Number 65 of Unit Number 2017. AND WHEREAS, the construction of the above improvements on the above- ntioned streets was performed under the supervision of the City Engineer, d said improvements have been completed and have been inspected and found have been constructed in accordance with City specifications and in accor- nce with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned streets be nd the same are hereby accepted and the City Engineer be and he is hereby uthorized to direct the payment of the City's portion of the cost and to elease escrow money. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 8TH DAY OF MAY, 1975. SS ROY BAS , MAYOR ATTEST: Treva 7:Phillips, Cit/ Secretary . Watson, City Engineer AS TO FORM: ed 0. Sente'r, Jr., Ci CONSOLIDATED FINAL ESTIMATE BURLINGTON INDUSTRIAL ADDITION NO. 2 Accepted May 8, 1975 UANTITIES S.Y. S.Y. Caliche S.Y. L.F. Unit & Paving L.F. Base Re-sur- Paving Sub -Unit Location 6" Base C & G Only facing Adjustment 2014-99 South part of E. 44th 300.00 300.00 St. from W. Line of Lot 3, Block 9, to E. Line of Lot 3, Block 9, Bur- lington Industrial Addn. No. 2. 2016-7 Hickory Ave. from NLL 1390.93 553.40 261.60 of E. 40th St. to N. ROW of FW&D RR N of E. 40th St. 2016-51 E. 47th St. from 13.50' 4722.13 1769.30 32.00 E of EPL of Globe Ave. to 900-00' E. of EPL of Globe Ave. 2016-51A E-47th St. from 900' E 644.80 of EPL of Globe Ave. to 13.50' W of WPL of Locust Ave. 2017-65 S. part of E. 44th St. 449.00 449.00 from W. line of Lot 4, Block 9 to E. line of Lot 4, Block 9, Burling- ton Industrial Addn. No. 2 TOTALS 6113.06 3716.50 261.60 32.00 749.00 COST ESTIMATE 6113.06 S.Y. Paving 6" Base @ $2.50 $15,282.65 3716.50 L.F. Curb & Gutter @ $2.50 $ 9,291.25 749.00 L.F. Paving Adjustment @ $1.00 $ 749.00 261.60 S.Y. 6" Caliche Base Only @ $1.50 $ 392.40 32.00 S.Y. Resurface @ $1.00 $ 32.00 CONTRACT COST $25,747.31 CONSOLIDATED FINAL ESTIMATE BURLINGTON INDUSTRIAL ADDITION NO. 2 Accepted May 8, 1975 COST DISTRIBUTION Unit & Contract Sub -Unit Cost 2014-99 $ 1,050.00 2016-7 5,253.23 2016-51 16,260.58 2016-51A 1,612.00 2017-65 1,571.50 Developer Cost $ 1,050.00 5,253.23 16,260.58 1,612.00 1,571.50 TOTAL $25,747.31 $25,747.31