Loading...
HomeMy WebLinkAboutResolution - 050875A - Pavement Improvements - WD Turner Construction Co - Potomac Park Lots - 05_08_1975RPNOUTTTnN RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Potomac Park Lots 140-288, made arrangements with W. D. TURNER CONSTRUCTION COMPANY for the construction of paving improve- ments on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Potomac Park Lots 140-288, including the following streets: North 1/2 of 90th Street (concrete only) from its intersection with a line 13 feet East of East Property Line of Indiana Avenue to its intersection with the East Lip Line of Geneva Drive (including cul-de-sac, paving and concrete), known and designated as New Subdivision Sub -Unit Number 12 of Unit Number 2017 Geneva Drive from its intersection with the North Lip Line of 90th Street to its intersection with a line 7.00 feet North of the North Property Line of the Alley North of 87th Street, known and designated as New Subdivision Sub -Unit Number 13 of Unit Number 2017. Hartford Avenue from its intersection with a line 12.87 feet Northeast of the Northeast Property Line of 86th Street to its intersection with a line 30 feet South of the South Property Line of 84th Street, known and designated as New Subdivision Sub -Unit Number 14 of Unit Number 2017. 86th Street from its intersection with a line 27 feet East of the East Lip Line of Indiana Avenue to its intersection with a line 7.00 feet East of East Property Line of Alley East of Hartford Avenue,known and designated as New Subdivision Sub -Unit Number 15 of Unit Number 2017. 87th Street from its intersection with a line 27.00 feet East of East Lip Line of Indiana Avenue to its intersection with the West Lip Line of Geneva Drive including cul-de-sac, known and designated as New Subdivision Sub -Unit Number 16 of Unit Number 2017. 88th Street from its intersection with a line 27.00 feet East of East Lip Line of Indiana Avenue to its intersection with the West Lip Line of Geneva Drive, known and designated as New Subdivision Sub -Unit Number 17 of Unit Number 2017 89th Street from its intersection with the South Lip Line of 88th Street to its intersection with a line 45 feet East of East Property Line of Indiana Avenue, known and designated as New Subdivision Sub -Unit Number 18 of Unit Number 2017. Hartford Avenue from its intersection with the North Lip Line of 86th Street to its intersection with the end of cul-de-sac, known and designated as New Subdivision Number 19 of Unit Number 2017. AND WHEREAS, the construction of the above improvements on the above - mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found tohave been constructed in accordance with City specifications.and in accor- dance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost. II. This resolution shall take effect and be in force from and after its assage. PASSED AND APPROVED THIS 8TH DAY OF MAY, 1975. 1?W ROY BASS37 MAYOR Ti Philrips, City/16ecretary . Watson, City Engineer AS TO FORM: 0. Seriter, Jr., CitfjAt h CONSOLIDATED FINAL ESTIMATE POTOMAC PARK LOTS:.140-288 Accepted May 8, 1975 UANTITIES S.Y. S.Y. S.Y. Unit & Paving L.F. Alley Valley Sub -Unit Location 6" Base C & G Return Gutter 2017-12 N 1/2 of 90th St. from 737.40 1128.34 20.64 52.54 13 ft. E of EPL of Indiana Ave. to ELL of Geneva Dr. including cul-de-sac. 2017-13 Geneva Drive from NLL 2844.72 1792.54 136.45 17.38 of 90th St. to 7.00' N of NPL of Alley N of 87th St. 2017-14 Hartford Ave. from 12.87' 1881.96 1058.60 NE of NEPL of 86th St. to 30.00' S of SPL of 84th St. 2017-15 86th St. from 27.00' E 4206.41 2206.84 40.40 of ELL of Indiana Ave. to 7.00' E of EPL of alley E of Hartford Ave. 2017-16 87th St. from 27.00' E 4927.00 2638.00 52.49 of ELL of Indiana Ave. to WLL of Geneva Drive including cul-de-sac. 2017-17 88th St. from 27.00' E 3606.93 1974.60 47.46 of ELL of Indiana Ave. to WLL of Geneva Drive 2017-18 89th St. from SLL of 2104.19 1114.74 40.40 88th St. to 45.00' E of EPL of Indiana Ave. 2017-19 Hartford Ave. from NLL 1772.98 937.42 20.20 52.54 of 86th St. to end of cul-de-sac. TOTALS 22,081.59- 12,851.08 258.09 222.41 CONSOLIDATED FINAL ESTIMATE POTOMAC PARK LOTS 140-288 Accepted May 8, 1975 COST ESTIMATE 22,081.59 S.Y. Paving 6" Base 12,851.08 L.F. Curb & Gutter 6" 258.09 S.Y. Alley Return & Drainage Channel 222.41 S.Y. Valley Gutter 0 COST DISTRIBUTION @ $2.24 $49,462.76 @ $2.49 $31,999.19 @ $11.00 $ 2,838.99 @ $11.00 $ 2,446.51 CONTRACT COST $86,747.45 Unit & Contract Developer Sub -Unit Cost Cost 2017-12 $5,266.33 $5,266.33 2017-13 $12,527.72 $12,527.72 2017-14 $6,851.50 $6,851.50 2017-15 $15,361.79 $15,361.79 2017-16 $18,182.49 $18,182.49 2017-17 $13,518.34 $13,518.34 2017-18 $7,933.49 .$7,933.49 2017-19 $7,105.79 $7,105.79 TOTAL $86,747.45 $86,747.45