HomeMy WebLinkAboutResolution - 042475H - Change Order 2 - H.B. Zachry Company - Runway At LBK Regional Airport - 04_24_1975KJ:rnt RESOLUTION D y2e175 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 2 to an agreement between the City of Lubbock and H. B. Zachry Company covering the construction of a concrete overlay to the E f W Runway at Lubbock Regional Airport by deducting VIVE`:THOUSAND ONE HUNDRED SIXTY-THREE DOLLARS ($5,163. 00) from the amount of such contract, such Change Order being attached hereto and which"shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 24 day of April , 1975. ROY B SS, MAYOR ATTEST: Treva Phillips, -'City ecretary-Treasurer APPROVED AS TO FORM: Fred O. Senter, Jr. , lqy Attorney CITY OF LUBBOCK MEMO TO: --Mrs. Treva Phillips, City Secretary DATE: April 23, 1975 FROM: Mr. Marvin W. Coffee, Director of Aviation su6JEcr: Change Order #2 to H.B. Zachry Company Contract Enclosed please find eleven (11) copies of Change Order #2 in reference to A.D.A.P. Project No. 8-48-0138-06. This change order has been executed on behalf of the contractor and consulting engineer and when executed by the City please return all copies to our office for execution by the F.A.A. We will return a fully executed copy for your records. Thank you. Sincerely, Marvin W. Coffee Director of Aviation MWC:lh 1-2-4 CHANGE ORDER NO. 2 Runway 8-26 Improvements Lubbock Regional Airport Lubbock, Texas ADAP Project No. 8-48-0138-06 TO: H. B. Zachry Company P. 0. Box 21130 San Antonio, Texas 78285 General description of work included in contract: The construction of approximately 125,000 square yards of rigid overlap pavements on existing runway, construction of taxiway connections, installation of new high inten- sity runway lighting system, installation of VASI-4 system, installation of NDB (non -directional beacon), removal of existing pavement and other inci- dental items of work. Original amount of contract . . . . . . . . . $3,248,108.00 Change Ordge No. 1 . . . . . . (No. Change) -0- Change Order No. 2 . . . . . (Deduct) 5,163.00 Adjusted Contract Price . . . . . . . . . . $3,242,945.00 Adjustment in Construction Time . . . . . -0- WHEREAS, it is desirable to make changes in the installation of dowel bars to be constructed under this project to provide for removing and replac- ing dowels in preformed holes. THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage gained, the Owner and the Contractor agree to the changes indicated below and further agree that the amount of the contract shall be adjusted by the amount shown above. 1. On page 5-15, Paragraph 5-3.10(a)(3) Dowel Bars, the following shall be inserted following the last sentence on the page: "Installation of smooth dowel bars in construction joints by removing and replacing dowels in preformed holes will be permitted providing the following requirements are met. Alinement of the dowels shall be as specified above. Dowel bars shall be greased on the end to be inside the forms and secured in proper position and alinement prior to placement of concrete within the forms. As the concrete begins to set, bars shall be rotated to prevent bonding of concrete to the bars. This shall be done carefully to prevent damage to the concrete and displacement of dowels. After the concrete has set for at least 12 hours, the dowels may CHANGE ORDER NO. 2 Page 1 of 2 be removed to allow removal of the forms. Removal shall be done carefully to prevent damage to the concrete. Dowels shall be regreased and replaced in the formed holes at least 500 feet ahead of concrete placement to allow inspection of dowel alinement. All preformed holes shall be thoroughly cleaned prior to replacement of the dowels." There shall be no change in the contract unit prices for the items of work affected by the changes in installation of dowel bars. The aforementioned changes, and work affected thereby, are subject to all contract stipulations and covenants The Owner and the Contractor agree that there will not be an adjustment to the time allowed for completion of the project for the above listed changes. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 24 day of April , 1975. RECOMMENDED PARKHILL, SMITH & COOPER, INC., Consulting Engineers 1975 APPROVED: H. B. ZACHRY COMPANY, ContractBy 1975 L M. KREIJSEL, SENIOR VICE PRESIDENT APPROVED: '.CITY C , TEXAS, Owner MISS i BY S t 1975 ATTEST APPROVEDf FEDERAL AVIATION A ISTRA ON , By 1975 Approved as to form: Fred O. Senter, Jr., City ttl�w_,)y CHANGE ORDER NO. 2 Page 2 of 2