HomeMy WebLinkAboutResolution - 092260F - Pavement Improvements - Kerr Paving Co - Broadmoor Addition - 09_22_1960 J RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR
AVENUES AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of Broadmoor Addition made arrangements
with Kerr Paving Company for the construction of paving improvements on certain
streets dedicated in said subdivision under the provisions of said Ordinance
prior to the recording of the subdivision plat of Broadmoor Addition including
the following streets:
Peoria Avenue from its intersection with a line 15 feet South of the South
Property Line of 62nd Street to its intersection with a line 3 feet South of
the South-Property Line of the alley South of 62nd Street, known and designated
as New Subdivision Unit Number 829.
62nd Street and Orlando Avenue from its intersection with the West end of the
cul-de-sac East of Quaker Avenue to its intersection with a line 16 feet South
of the South Property Line of 60th Street, known and designated as New
Subdivision Unit Number 832.
Ek Quaker Avenue (concrete only) from its intersection with a line 3 feet South
of the South Property Line of the alley South of 61st Street to its intersectiol
with a line 3 feet South of the South Property Line of the alley South of 62nd
Street, known and designated as New Subdivision Unit Number 896.
AND WHEREAS, the construction of the above improvements on the above
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND-APPROVED THIS 22ND DAY OF SEPTEMBER, 1960.
David C. Casey, Mayor
ATTEST:
Uvenid Lowe, City S cretary
�1;! I /
L
LjZhn T. Hickerson, City Engineer
APW0_VED,;_
Fred O. Senter, Jr., City At rney
CITY OF LUBBOCK
TEXAS
September 22, 1960
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by
Kerr Paving Company, paving contractor, under their contract with
the subdividers of Soradmoor Addition and find the improvements on
Peoria Avenue, 62nd. Street and Orlando, and East half of Quaker
(concrete only) as listed on the final estimate sheet to have been
completed in accordance with the plans and specifications and recommend
that you accept the improvements on said streets and/or avenues, authorizing
payment to the contractor the amount shown on the attached consolidated
final estimate sheet as due him by the City of Lubbock.
Yours very��truly,
John T. Hickerson
City Engineer
ell-
CONSOLIDATED FINAL ESTIl�=
BRA ADDITION
Accepted September 22, 1960
u UITIES
S.Y. S.Y. Special
unit & S.Y. L.F. Alley Drainage Drainag
Sub-Unit Location Paving C&G Ret. ..Channel Block
14S 829 Peoria Ave. from 15' S. of the S.P,L. 349.56 280.00 21,11
of 62nd,to 31 S. of alley S.of 62nd_
NS 832 62nd St. & Orlando from cul-de-sac 4743.85 2652.26 33.04
E. of Quaker to 16' S. of the S.P.L.
of 60th St.
NS 896 Ek of Quaker from 31 S. of the alley 338.38 10.07 5.07 1
S. of 61st St. to 3' S. of the alley
S. of 62nd St. (concrete only)
TOTALS 5093,41 3270.64 31,18 38.13 1
COST ESTtKM
5,093.41 S.Y. Paving @ 1.45 $ 70385.44
3,270.64 L.F. Curb & Gutter @ 1,43 40677:02
31.18 S.Y. .Al.ley Return @ 4.50 140,31
38.13 S.Y. Drainage Channel @ 4.50 171,58
1 Special Drainage Block @ 25.00 25,00
CONTRACT COST $12,399.35
COST DISTRIBUTION
Contract Property Owner
unit cost Cost
NS 829 1,002.26 1,002.26
NS 832 10,820.08 10,820.08
NS 896 577.01 577.01
TOTALS 12,399.35 12,399.35