Loading...
HomeMy WebLinkAboutResolution - 041075D - Street Improvements - Commercial Concrete Construction Co - Multiple Locations - 04_10_19756y/0%J D RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF ALLEYS AS LISTED BELOW ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMENTS LEVIED. WHEREAS, the City of Lubbock heretofore passed various street improvement dinances and resolutions and entered into contract with Commercial Concrete nstruction Company (GWO 10,836-A) for the making and construction of alley provements on portions of numerous alleys in said City including among other e following: ast-West Alley between 22nd & 23rd Streets from East property line of Indiana venue to West lip line of Hartford Avenue, known and designated as Sub -Unit umber 2 of Unit Number A-459. ast-West Alley between 56th & 57th Streets from West property line of Univer- ity Avenue Access Road to East property line of Boston Avenue, known and esignated as Sub -Unit Number 3 of Unit Number A-459. AND WHEREAS, the improvements upon the said portions of the abovementione lleys have been inspected and found to have been constructed in accordance ith terms of said contract GWO 10,836-A. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned alleys be the same are hereby accepted, and the City Engineer be and he is hereby orized to direct payment of the City's portion of the cost. II. That the Mayor and City Secretary be, and they are hereby instructed to .ute and deliver certificates in evidence of the assessments levied against pracels of property abutting upon the said portions of the alleys, listed ,e and against the owners of such property in accordance with law and in manner provided in said contract, and the proceedings with reference to I improvements and assessments where such assessments were levied. III. This --resolution shall take effect and be in force from and after its pass+ PASSED AND -APPROVED THIS LOTH DAY OF APRIL, 1975. T. _ f�s Phillips, City S retary ROY BA , MAYOR �ED: - ApAuwpd %jns to tetrhj d . Watson, City Engineer t?:. Jr., city Agorwy Acceptance Date:4-10-75 FINAL PAVING ASSESSMENT GWO 10,836-A City of Lubbock E-W ALLEY BETWEEN 22ND & 23RD STREETS Sheet No. 1 of 1 Sub -Unit No. 2 of Unit No. A-459 Width 10 Feet From EPL of Indiana Avenue to the WLL of Hartford Avenue Paving $2.93 Rate/L.F. TOTAL Owner Lot Block Addition No. Ft. COST SOUTH SIDE J. 0. Gilbreath 1 8 Tech Terrace Addition 105.0 307.65 E. H. Armstrong 2 8 Tech Terrace Addition 100.0 293.00 Joe N. Nislar 3 8 Tech Terrace Addition 100.0 293.00 Joe Hodges 4 8 Tech Terrace Addition 100.0 293.00 Mrs. Howard J. Hampton 5 8 Tech Terrace Addition 100.0 293.00 Marion Sanford 6 8 Tech Terrace Addition 100.0 293.00 NORTH SIDE L. E. James 25 3 Central Heights Addition 75.0 219.75 Maurice Dale Deason 26 3 Central Heights Addition 75.0 219.75 L. L. Kinsey West 50' of 27 3 Central Heights Addition 50.0 146.50 Gerald Whatley East 25' of 27 & West 25' of 28 3 Central Heights Addition 50.0 146.50 Paul Rountree East 50' of 28 3 Central Heights Addition 50.0 146.50 0. J. Sexton 29 3 Central Heights Addition 75.0 219.75 R. C. Pace 30 3 Central Heights Addition 75.0 219.75 Ivean I. Bell 31 3 Central Heights Addition 75.0 219.75 Robert M. Winn 32 3 Central Heights Addition 75.0 219.75 TOTAL PROPERTY OWNER COST $3,530.65 CITY'S SHARE 3,768.58 TOTAL FINAL SUB -UNIT COST $7,299.23 Acceptance Date: 4-1U-/S GWO 10,836-A FINAL PAVING ASSESSMENT Sheet No. 1 of •2 Sub -Unit No. 3 of Unit No. A-459 City of Lubbock E-W ALLEY BETWEEN 57TH & 56TH STREET Width 10 Feet From WPL of University Avenue Access Road to the EPL of Boston Avenue Paving $2.43 Rate/L.F. TOTAL Owner Lot Block Addition No. Ft. COST NORTH SIDE Rodney Shaw 465 Caprock Addition 71.44 209.32 James Wagner 466 Caprock Addition 80.0 234.40 Edward Portwood 467 Caprock Addition 80.0 234.40 Faye Winginton 468 Caprock Addition 80.0 234.40 W. G. Newton 469 Caprock Addition 80.0 234.40 R. B. Wills 470 Caprock Addition 80.0 234.40 Robert L. Densford 471 Caprock Addition 80.0 234.40 Ernest Allison 472 Caprock Addition 80.0 234.40 Nolan Swain, Jr. 473 Caprock Addition 80.0 234.40 James H. Hayes 474 Caprock Addition 80.0 234.40 SOUTH SIDE Mrs. C. N. Kennon 475 Caprock Addition 80.0 234.40 Joe F. Robbins 476 Caprock Addition 80.0 234.40 Roy Bass 477,478 Caprock Addition 160.0 468.80 Louis B. Holder 479 Caprock Addition 80.0 234.40 Rudolph Rice 480 & W. 15' of Lot 481 Caprock Addition 95.0 278.35 Roy C. Bumar E. 65' of Lot 481 & W. 31.44' of Lot 482 Caprock Addition 96.44 282.57 Acceptance Date: 4-10-75 FINAL PAVING ASSESSMENT GWO 10,836-A City of Lubbock E-W ALLEY BETWEEN 57TH & 56TH STREETS Sheet No. 2 of 2 Sub -Unit No. 3 of Unit No. A-459 Width 10 Feet From WPL of University Avenue Access Road to the EPL of Boston Avenue Paving $2.93 Rate/L.F. TOTAL Owner Lot Block Addition No. Ft. COST SOUTH SIDE (Cont'd.) Howard W. Grey E. 48.56' of Lot 482 & W. 51.44' of Lot 483 Caprock Addition 100.00 293.00 Clifford Coke Hopping E. 28.56' of Lot 483 & Lot 484 Caprock Addition 100.00 293.00 TOTAL PROPERTY OWNER COST $4,637.84 CITY'S SHARE 4,545.43 TOTAL FINAL SUB -UNIT COST $9,183.27 71