RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Burlington Industrial Addition made arrange-
ments with Zahn Pavers, Inc., for the construction of paving improvements on
certain street dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of Burlington Industrial Addition including
the following street:
est half of Locust Avenue from its intersection with a line 13.5 feet North
f the North Property Line of East 40th Street (West Leg) to its intersection
ith a line 7.5 feet North of the North Property Line of the alley North of
ast 40th Street, known and designated as Sub -Unit Number 8-A of Unit Number
229.
AND WHEREAS, the construction of the above improvements on the above -
mentioned street was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in accor-
dance with'the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned street be
nd the same are hereby accepted and the City Engineer be and he is hereby
uthorized to direct the payment of the City's portion of the cost.
II.
Tliii resolution'--ehall take effect and be in force from and after its passa
PASSED AND APPItOVED THIS a2ND DAY OF AUGUST, 1974.
TTEST:
reva Phillips, City ecretary ROY BASS, MAYOR
kP VED': ° 4pz- -a
qilfbT,P. Watson, :,City Engineer
kPP^ROVED AS TO FORM:
Fred 0. $enter, Jr., Attorney
CONSOLIDATED FINAL ESTIMATE
BURLINGTON INDUSTRIAL ADDITION
Accepted August h, 10�4
QUANTITIES
S.Y. S.Y.
Unit & Paving L.F. Alley
Sub -Unit Location 6" Base C & G Return
2229-8A West half of Locust Avenue 1931.34 623.75 20.20
from 13.5' N. of the NPL
of E. 40th Street (W. leg)
to 7.5' N. of the NPL of the
alley N. of E. 40th Street.
COST ESTIMATE
1931.34 S.Y. Paving 6" Base
633.75 L.F. Curb & Gutter
20.20 S.Y. Alley Return
COST DISTRIBUTION
@ $2.25 $4,345.52
@ $2.25 1,403.44
@ $8.00 161.60
CONTRACT COST $5,910.56
Unit & Contraitoperty Property
Sub -Unit Cost Owner Cost
2229-8A $5,910.56 $5,910.56