RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BE LOW :
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331,the subdivider of Brentwood Club Addition, Lots 1-41, made
arrangements with W. 0. Turner Construction Company for the construction of
paving improvements on certain street dedicated in said subdivision under the
provisions of said Ordinance prior to the recording of the subdivision plat
of 'Brentwood Club Addition, Lots 1-41 including the following street:
19th Street from its intersection with a line 3.0 feet East of the East
Property Line of the alley East of Brentwood Circle to its intersection with
a line 3.0 feet West of the West Property Line of the alley West of Brent-
wood Circle (alley stubs only) known and designated as New Subdivision
Sub -Unit Number 53 A of Unit Number 2015
AND WHEREAS, the construction of the above improvements on the above -
mentioned street was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in accord
ance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street
be and the same are hereby accepted and the City Engineer be and he is here-
by authorized to direct the payment of the City's portion of the cost.
II.
This resolution shall take effect and be in force from and after its
passage
.PASSE]D-AND APPROVED THIS
ATTEST:
Treva Phillips, Ci Secretary
11TH DAY OF JULY, 1974.
APPR VED:
Wi IV D. Watson, City Engineer
110 &S
Roy Bass, Mayor
APPROVED AS TO FORM:
x"
Fred 0. Senter, Jr.40ty Attorney
CONSOLIDATED FINAL ESTIMATE
Brentwood Club Addition - Lots 1- 41
Accepted July 11, 1974
QUANTITIES
S.Y.
L. F.
L. F.
Unit & L.F.
Alley
Paving
C & G
Sub -Unit Location C & G
Return
Repair
Removal
NS 2015-53-A 19th Street, from 37.68
33.00
73.8
73.8
5.5' E. of the E.P.L.
of the alley E. of
Brentwood Circd& to
5.5' W. of the W.P.L.
of the alley W. of
Brentwood Circle
(concrete alley stubs
only)
COST ESTIMATE
37.68
33.00
73.80
73.80
COST DISTRIBUTION
Unit &
Sub-Uni t
NS 2015 -53 -A
L. F. Curb & Gutter (@ $2.15 $81.01
S. Y. Alley Return @ $8.00 $264.00
L. F. Paving Repair $1.00 $73.80
L. F. C & G Removal $1.00 $73.80
CONTRACT COST $492.61
Contract
Cost
$492.61