Loading...
HomeMy WebLinkAboutResolution - 071174I - Pavement Improvements - WD Turner Construction Co - Brentwood Club Addition - 07_11_1974�L 6711741.Z- RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BE LOW : WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331,the subdivider of Brentwood Club Addition, Lots 1-41, made arrangements with W. 0. Turner Construction Company for the construction of paving improvements on certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of 'Brentwood Club Addition, Lots 1-41 including the following street: 19th Street from its intersection with a line 3.0 feet East of the East Property Line of the alley East of Brentwood Circle to its intersection with a line 3.0 feet West of the West Property Line of the alley West of Brent- wood Circle (alley stubs only) known and designated as New Subdivision Sub -Unit Number 53 A of Unit Number 2015 AND WHEREAS, the construction of the above improvements on the above - mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accord ance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is here- by authorized to direct the payment of the City's portion of the cost. II. This resolution shall take effect and be in force from and after its passage .PASSE]D-AND APPROVED THIS ATTEST: Treva Phillips, Ci Secretary 11TH DAY OF JULY, 1974. APPR VED: Wi IV D. Watson, City Engineer 110 &S Roy Bass, Mayor APPROVED AS TO FORM: x" Fred 0. Senter, Jr.40ty Attorney CONSOLIDATED FINAL ESTIMATE Brentwood Club Addition - Lots 1- 41 Accepted July 11, 1974 QUANTITIES S.Y. L. F. L. F. Unit & L.F. Alley Paving C & G Sub -Unit Location C & G Return Repair Removal NS 2015-53-A 19th Street, from 37.68 33.00 73.8 73.8 5.5' E. of the E.P.L. of the alley E. of Brentwood Circd& to 5.5' W. of the W.P.L. of the alley W. of Brentwood Circle (concrete alley stubs only) COST ESTIMATE 37.68 33.00 73.80 73.80 COST DISTRIBUTION Unit & Sub-Uni t NS 2015 -53 -A L. F. Curb & Gutter (@ $2.15 $81.01 S. Y. Alley Return @ $8.00 $264.00 L. F. Paving Repair $1.00 $73.80 L. F. C & G Removal $1.00 $73.80 CONTRACT COST $492.61 Contract Cost $492.61 Property Owner Cost $492.61