Loading...
HomeMy WebLinkAboutResolution - 5993 - Amendment To Agreement - Delta Airport Consultants Inc. - 09_10_1998Resolution No. 5993 Item No. 24 September 10, 1998 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Amendment No. 2 to the Engineering Agreement dated May 22, 1997, by and between the City of Lubbock and Delta Airport Consultants Inc., and related documents. Said contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 1 otlhday of sent_emher 1998. E"MIS1A Ka ie Darnell City Secretary APPROVED AS TO CONTENT: rle of Aviation APPROVED AS TO FORM: William de Haas Competition and Contracts Manager Ccdocs/Delta Consultants Inc. Amendment No. 2.Res September 10, 1998 Resolution No. 5993 Item No. 24 September 10. 1998 AMENDMENT NO. TWO (2) TO THE ENGINEERING AGREEMENT BETWEEN CITY OF LUBBOCK, TEXAS the OWNER AND DELTA AIRPORT CONSULTANTS, INC. the ENGINEER DATE: JULY 24, 1998 DELTA PROJECT NO. TX 98065 TASK 3 - RUNWAY 17R-35L CENTERLINE AND TOUCHDOWN ZONE LIGHTS (Design Phase Services) 4004 AMENDMENT NO. TWO (2) TO THE ENGINEERING AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES JULY 24, 1998 TASK 3 RUNWAY 17R-35L CENTERLINE AND TOUCHDOWN ZONE LIGHTS (Design Phase Services) This AMENDMENT NO. TWO (2), dated July 24, 1998, is made a part of the Engineering Agreement dated May 22, 1997, between the City of Lubbock, Texas, the OWNER, and Delta Airport Consultants, Inc., the ENGINEER, for work at Lubbock International Airport, Lubbock, Texas. The following revisions and/or additions are made to the original Engineering Agreement: ADD the following paragraphs to Article 7: 7.9 Task 3 - Basic and Additional Services for design phase services shall be compensated on a lump sum basis. The lump sum fee will be $40,589 unless a major change or addition to the scope of work is required or extensions of time for completion of the project are required (not caused by Engineer) in which case an amendment to this agreeement will be negotiated by the participating parties. The lump sum fee is based on cost breakdowns shown in Attachments Amd 2-1 and Amd 2-2. 7.10 Task 3 - Nonsalary and reimbursable expenses for design phase services shall be compensated on a unit price plus fixed fee basis. Compensation shall be limited to a budget amount of $3,600 unless written authorization has been received from the Owner. The budget amount is based upon an estimated cost of $3,300 and a fixed fee of $300. 7.12 The ENGINEER will proceed on the project after a notice -to -proceed from the OWNER.The ENGINEER will endeavor to complete the design within 90 calendar days of issuance of the notice - to -proceed from the OWNER. The following attachments are made part of this Amendment: Attachment "Amd 2-1": Workhour Summary Attachment "Amd 2-2": Fee Summary All other provisions of the original Agreement remain unchanged. OWNER: City of Lubbock 1625 13th Street, Suite L-04 Lubb k, Texa L U D40 k794 Afl Windy Sitton Mayor Date: September 10, 1998 ATTEST: I &- -� APPROVED AS TO CONTENT: M Earle, Director of Aviation 80654004.ao2 2 ENGINEER: Delta Airport Consultants, Inc. 320 Decker Drive, Suite 100 Irvin , Texas 75062 Susan E. Winslow, P.E. Vice President Date: 7Idmz ,.0' •���.,: JARED ALAN FLEISCHER Notary :� "°rery Puma STATE of TEXAS '�, ►��,. �Ct•�' Cownm ssim Expires 02I20= 1 APPROVED AS TO FORM: ATTACHMENT "AMD 2-V WORKHOUR SUMMARY F ATTACHMENT "AMD 2 - 1" Estimated Workhours - Article 7.9 Task 3 - RW 17R-35L CL & TCHDZ Lights - Design Phase Services Lubbock intematlonal Airport Lubbock, Texas AIP Project No. 3-48-0138-pending Delta Project No. TX 98065 Date: July 24, 1998 SR PM PM PE TECH CLER DescdDtion No. (hr) (hr) (hr) (hr) (hr) PLANS Cover Sheet 1 0 1 2 4 0 Quantities & Alternates 1 0 2 12 8 1 General Layout & Phasing 1 2 4 0 12 1 Electrical Layout 8 8 48 16 120 0 Vault Layout 3 2 32 6 90 0 Electrical Details 3 2 8 12 24 0 Miscellaneous Details 1 0 2 2 8 0 DESIGN Predesign Meeting 1 4 18 0 0 4 Electrical & Control Design 0 24 24 0 0 Quantities & Estimates 0 4 12 0 0 Specifications 2 12 24 0 12 FAA Coordination 0 8 4 0 4 Design Meeting/Site Visit 0 12 0 0 2 Design Engineering Report 2 2 4 0 4 QC Review 4 4 2 0 0 Basic Service Hours Subtotal: 26 181 120 266 28 ADDITIONAL SERVICES Coord. w/Owner 2 4 0 0 2 Project Application 0 2 2 0 2 FAA Pay Request 3 0 12 0 0 6 Additional Service Hours Subtotal: 2 18 2 0 10 FILE: 8065FE03.WK4 ATTACHMENT "AMD 2-2" FEE SUMMARY I ATTACHMENT "AMD 2 - 2" Summary of Fees - Article 7.9 Task 3 - RW WR-351- CL & TCHDZ Lights - Design Phase Services Lubbock International Airport Lubbock, Texas AIP Project No. 3-48-0138-pending Delta Project No. TX 98065 Date: July 24, 1998 Est Est Fixed hrs rate Cost Fee Totals 1) Work Hour Cost (w/Overhead) a) Basic Services Principal 26 $99 2,574 386 Proj Engineer 1 181 $75 13,575 2,036 Proj Engineer 2 120 $48 5,760 864 Technician 266 $39 10,374 1,556 Clerical 28 $36 1,008 151 Subtotal: 621 $33,291 $4,993 $38,284 15% b) Additional Services Principal 2 $99 198 30 Proj Engineer 1 18 $75 1,350 203 Proj Engineer 2 2 $48 96 14 Technician 0 $39 0 0 Clerical 10 $36 360 54 Subtotal: 32 $2,004 $301 $2,305 15% Total Basic & Additional Services : $35,295 $5,294 $40,589 Article 7.9 Lump Sum Fee: $40,589 1) Direct Nonsalary Expenses Travel, Meals, & Misc. Printing 2) Estimate Cost & Fixed Fee 2,000 200 1,000 100 $3,000 $300 $3,300 10% $3,000 $300 $3,300 10% $300 $0 $300 $3,300 $300 $3,600 Article 7.10 Budget Amount: $3,600 FILE: 8065FE03. WK4