Loading...
HomeMy WebLinkAboutResolution - 022874L - Change Order 2 - Anthony Mechanical Inc - Southeast Water Reclamation Plant - 02_28_1974RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directe to execute for and on behalf of the City of Lubbock CHANGE ORDER NO. 2 to the ontract between the City of Lubbock and Anthony Mechanical, Inc., covering the Engine Generator at the Southeast Water Reclamation Plant attached herewith Fowhich shall be spread upon the minutes of the Council and as spread upon the min- esof this Council shall constitute and be a part of this Resolution as if fully pied herein in detail. Passed by the City Council this 28th day of February 1974. MORRIS W. TURNER, MAYOR TTEST: Phillips, City Se r PPROVED AS TO FORM: � le"t � nter, Jr. , Treasurer ttorney _l a CHANGE ORDER NO. 2 Water Reclamation Facilities Southeast Plant, Lubbock, Texas Power Generation Facility Project WPC-TEX-542 (Contract No. 3) February 14, 1974 TO: ANTHONY MECHANICAL, INC P. 0. Box 2706 Lubbock, Texas 79408 Original Amount of Contract. - $188,000.00 Change Order No. 1 (ADD) .970.00 Change Order No. 2 . ... (ADD) 2,257.67. Adjusted Contract Price .$191,227.67 Adjustment in Contract Time ADD 37 days WHEREAS, it is desirable to make certain changes in the work included in this project: THIS AGREEMENT WITNESSETH: In consideration of the mutual advan- tage gained, the Owner and the Contractor agree to the changes indicated below and further agree that the amount of the contract shall be r adjusted by the amount shown above. 1. Add gas pressure regulator on natural gas line at gas meter. ADD $151.82 2. Add gas pressure regulator on natural gas line to unit heaters in Engine -Generator Building. ADD 49.25 3. Add flow switch and additional electrical wiring at engine intercooler water line. ADD $333.04 4. Modify piping at Diesel fuel oil -storage tank fill line. ADD $115.56 5. Furnish and install a monitoring relay in existing annunciator panel. ADD $120.62 6. Adjust the laboratory equipment allowance provided in , Item 5, Addendum No. 1 to the.specifications. ADD $109.00 7. Adjust the allowance for electrical work accomplished by Lubbock Power & Light as provided in_Item 5, Addendum No. 1 to the specifications. DEDUCT $(125.00) CHANGE ORDER NO. 2 Page 1 of 2 I 8. Furnish and install 15 gallon oil resevoir and oil level controller for gas compressor. ADD $397.27 9. Furnish and install additional outside alarm horn and light and connect alarm system to separate 110 volt power supply. ADD $336.52 I ! 10. Insulate new hot water piping in three•digester heater buildings. ADD $737.14 11. Furnish additional stainless -steel screen for 4-inch strainer. ADD $.32.45 12. Extend construction time in accordance with paragraph GC-32 and GC-42 of the contract. See attachment. ADD 37 days IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this 14th day of February, 1974. ---------------------------------------------- RECOMMENDED: PARKH#L, SMITH & CQ PER, INC., Consulting Engineers g > ,February 14, 1974 1. APPROVED: ANTHONY MECHANIC IN Contractor By - `,- `'. February 14 1974 � � , APPROVED: CITY OF LUBBOCK TEXAS, Owner BYE,February 14, 1974 r � ATTEST:,mac✓ City Secretary CHANGE ORDER NO. 2 Page 2 of 2 ATTACHMENT TO: CHANGE ORDER NO. 2. Water Reclamation Facilities Southeast Plant, Lubbock, Texas Power Generation Facility Project WPC-TEX-542 (Contract No. 3) TIME EXTENSION: The date of substantial completion of this project was.delayed due to shortages of materials which developed subsequent to award of the Contract. The Contractor's records indicate that purchase orders were placed in a timely manner after award of the Contract and that reasonable efforts were made.to expedite deliveries. Particularly involved were such items as steel pipe fittings, flanges, etc. Due to the nature of the project, it was impractical -for the Contractor to proceed with the rather extensive piping work until substantially all of these items had been delivered. This, in our opinion, consti- tutes delays beyond the control of the Contractor as provided in paragraph GC-32 and GC-42 of the Contract and we therefore recommend that a 37 day extension of time be authorized. ' PARKHILL,.SMITH & COOPER, INC. B Chester A: Green, P. E.