Loading...
HomeMy WebLinkAboutResolution - 022874K - Pavement Improvements - Walter V. Jarnagin - Buster Long Addition - 02_28_1974OZZ-97q RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Buster Long Addition, Lots 10, 102, 103, 116, and 117, made arrangements with Walter V. Jarnagin for the construction of paving improvements on certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Buster Long Addition, Lots 10, 102, 103, 116, and 117 , including the following streets: North one half of 51st Street from its intersection with a line 441.6 feet West of the west property line of Slide Road to its intersection with a line 19.00 feet East of the west property line of Slide Road known and designated as New Subdivision Sub -Unit Number 42 and 42A of Unit Number 2014. South one half of 50th Street from its intersection with a line 151.2 feet West of the west property line of Slide Road to its intersection with a line 441.60 feet West of the west property line of Slide Road known and designat- ed as New Subdivision Sub -Unit Number 78 of Unit Number 2016. West property owner's Part of Slide Road from its intersection with a line 17.0 feet South of the south property line of 51st Street to its intersection with a line 334.87 feet South of the south property line of 51st Street known and designated as New Subdivision Sub -Unit Number 92 of Unit Number 2016. AND WHEREAS, the construction of the above improvements on the above - mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in ac- cordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. That the Improvements on said portions of the above -mentioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost and to release escrow money. L S This resolution shall take effect and be in force from and after its passage. Passed and approved this 28th day of February, 1974. MORRIS W. TURNER, MAYOR ATTEST: l t Treva Phillips, City ecretary APPROVED: .- Watson, City Engineer APPROVED: red 0. Senter, Jr., Cit torney J CONSOLIDATED FINAL ESTIMATE Buster Long Addition Lots 102, 103, 116, & 117 Accepted February 28, 1974 UANTITIES S.Y. S.Y. Unit & Paving Paving L.F. Sub -Unit Location 9" Base 6" Base C & G 2014-42 North z of 51st Street 609.06 288.5 from 151.2' W of WPL of Slide Rd. to 441.6' W of WPL of Slide Rd. 2016-78 South k of 50th Street from 151.2' W of WEL of Slide Rd. to 441.60' W of WPL of Slide Rd. 2016-92 West Property Owners part of Slide Rd. from 17.0' S of SPL of 51st Street to 334.87' S of SPL of 51st St. Total Lots 102 & 103 Total Lots 116 & 117 TOTAL 737.08 288.6 601.80 318.60 601.80 318.60 1,346.14 577.10 601.80 1,346.14 895.70 COST DISTRIBUTION Unit & Contract Property Sub -Unit Cost Owner Cost Part of 2014-42 $2,171.78 2016-78 2,492.05 2016-92 20222.35 Total Lots 102&-103 $2,221.35 $2,221.35 Total Lots 116017 $4,663.83 $4,663.83 TOTAL $6,885.18 $6,885.18 CONSOLIDATED FINAL ESTIMATE Buster Long Addition Lots 102, 003, 116, & 117 Accepted February 28, 1974 COST ESTIMATE 1346.14 S.Y. Paving 6" Base 601.80 S.Y. Paving 9" Base 895.70 L.F. Curb & Gutter @ $2.50 $3,365.35 @ $ 2.50 1,504.50 @ $2.25 2,015.33 CONTRACT COST $6,885.18 CONSOLIDATED FINAL ESTIMATE Buster Long Addition, Lot 10 Accepted February 28, 1974 UANTITIES S.Y. S.Y. Unit & Paving L.F. Valley Sub -Unit Location 6" Base C & G Gutter 2014-42A North 2 of 51st Street 348.76 143.2 19.42 from 439.7' W of WPL of Slide Rd. to 19.00' E of WPL of Slide Rd: COST ESTIMATE 348.76 143.2 19.42 S.Y. Paving 6" Base L.F. Curb & Gutter S.Y. Valley Gutter @ $2.50 $ 871.90 @1'42.25 $ 322.20 @ $7.50 $ 145.65 CONTRACT COST $1,339.75 COST DISTRIBUTION Unit & Contract Property City to Sub -Unit Cost Owner Cost Contractor 2014-42A $1,339.75 _$958.65., $381,10