HomeMy WebLinkAboutResolution - 022874K - Pavement Improvements - Walter V. Jarnagin - Buster Long Addition - 02_28_1974OZZ-97q
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Buster Long Addition, Lots 10, 102, 103,
116, and 117, made arrangements with Walter V. Jarnagin for the construction
of paving improvements on certain street dedicated in said subdivision under
the provisions of said Ordinance prior to the recording of the subdivision
plat of Buster Long Addition, Lots 10, 102, 103, 116, and 117 , including
the following streets:
North one half of 51st Street from its intersection with a line 441.6 feet
West of the west property line of Slide Road to its intersection with a line
19.00 feet East of the west property line of Slide Road known and designated
as New Subdivision Sub -Unit Number 42 and 42A of Unit Number 2014.
South one half of 50th Street from its intersection with a line 151.2 feet
West of the west property line of Slide Road to its intersection with a line
441.60 feet West of the west property line of Slide Road known and designat-
ed as New Subdivision Sub -Unit Number 78 of Unit Number 2016.
West property owner's Part of Slide Road from its intersection with a line
17.0 feet South of the south property line of 51st Street to its intersection
with a line 334.87 feet South of the south property line of 51st Street known
and designated as New Subdivision Sub -Unit Number 92 of Unit Number 2016.
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in ac-
cordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
That the Improvements on said portions of the above -mentioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to
release escrow money.
L
S
This resolution shall take effect and be in force from and after its
passage.
Passed and approved this 28th day of February, 1974.
MORRIS W. TURNER, MAYOR
ATTEST: l
t
Treva Phillips, City ecretary
APPROVED:
.- Watson, City Engineer
APPROVED:
red 0. Senter, Jr., Cit torney
J
CONSOLIDATED FINAL ESTIMATE
Buster Long Addition
Lots 102, 103, 116, & 117
Accepted February 28, 1974
UANTITIES
S.Y. S.Y.
Unit & Paving Paving L.F.
Sub -Unit Location 9" Base 6" Base C & G
2014-42 North z of 51st Street 609.06 288.5
from 151.2' W of WPL of
Slide Rd. to 441.6' W of
WPL of Slide Rd.
2016-78 South k of 50th Street
from 151.2' W of WEL of
Slide Rd. to 441.60' W
of WPL of Slide Rd.
2016-92 West Property Owners
part of Slide Rd. from
17.0' S of SPL of 51st
Street to 334.87' S of
SPL of 51st St.
Total Lots 102 & 103
Total Lots 116 & 117
TOTAL
737.08 288.6
601.80 318.60
601.80 318.60
1,346.14 577.10
601.80 1,346.14 895.70
COST DISTRIBUTION
Unit & Contract Property
Sub -Unit Cost Owner Cost
Part of
2014-42 $2,171.78
2016-78 2,492.05
2016-92 20222.35
Total
Lots 102&-103 $2,221.35 $2,221.35
Total
Lots 116017 $4,663.83 $4,663.83
TOTAL $6,885.18 $6,885.18
CONSOLIDATED FINAL ESTIMATE
Buster Long Addition
Lots 102, 003, 116, & 117
Accepted February 28, 1974
COST ESTIMATE
1346.14 S.Y. Paving 6" Base
601.80 S.Y. Paving 9" Base
895.70 L.F. Curb & Gutter
@ $2.50 $3,365.35
@ $ 2.50 1,504.50
@ $2.25 2,015.33
CONTRACT COST $6,885.18
CONSOLIDATED FINAL ESTIMATE
Buster Long Addition, Lot 10
Accepted February 28, 1974
UANTITIES
S.Y. S.Y.
Unit & Paving L.F. Valley
Sub -Unit Location 6" Base C & G Gutter
2014-42A North 2 of 51st Street 348.76 143.2 19.42
from 439.7' W of WPL
of Slide Rd. to 19.00'
E of WPL of Slide Rd:
COST ESTIMATE
348.76
143.2
19.42
S.Y. Paving 6" Base
L.F. Curb & Gutter
S.Y. Valley Gutter
@ $2.50 $ 871.90
@1'42.25 $ 322.20
@ $7.50 $ 145.65
CONTRACT COST $1,339.75
COST DISTRIBUTION
Unit & Contract Property City to
Sub -Unit Cost Owner Cost Contractor
2014-42A $1,339.75 _$958.65., $381,10