RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES
AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Times Square Addition, Lots 153-198,
made arrangements with W.D. Turner Construction Company for the construction
of paving improvements on certain streets dedicated in said subdivision under
the provisions of said Ordinance prior to the recording of the subdivision
plat of Times Square Addition, Lots 153-198, including the following streets:
The East i of Elgin Avenue from its intersection with a line 7.00 feet North
of the North Property Line of the alley North of 74th Street to its inter-
section with a line 7.00 feet South of the South Property Line of the alley
South of 75th Street (concrete only) known and designated as New Subdivision
Sub -Unit Number 20 of Unit Number 2017.
74th Street from its intersection with a line 8.50 feet West of the East
Property Line of Elgin Avenue to its intersection with a line 15.00 feet
West of the West Property Line of Canton Avenue known and designated as
New Subdivision Sub -Unit Number 21 of Unit Number 2017.
Detroi t Avenue from i is i ntersection wi th the South Li p Li ne of 74th Street
to its intersection with the North Lip Line of 75th Street known and desi gnat d
as New Subdivision Sub -Unit Number 22 of Unit Number 2017.
75th Street from its intersection with the East Lip Line of Elgin Avenue to
its intersection with the West Property Line of the alley East of Detroit
Avenue (South Leg) known and designated as New Subdivision Sub -Unit Number
233of Unit Number 2017.
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
j.5
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is
hereby authorized to direct the payment of the City's portion of the cost.
III
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 28TH DAY OF FEBRUARY, 1974.
Morris W. Turner, Mayor
ATTEST:
01
i40�- '1� or-.=32
Treva Phi 11 ps, Ci r
ecretary
API
. Watson, City Engineer
APPROVED:
Fred 0. Senter, Jr., C' Attorney
CONSOLIDATED FINAL ESTIMATE
Times Square Addition
Lots 153 -198
Accepted February 28, 1974
QUANTITIES
S.Y.
S.Y.
Unit b
Paving
L.F.
Alley
Sub-Uni t
Location
6" Base
C & G
Return
NS 2917-20
The East Jr of Elgin Avenue
597.44
60.60
from 7.0' N. of the N.P.L.
of the alley N. of 74th St.
to 7.0' S. of the S.P.L. of
the alley S. of 75th St.
(concrete only)
NS 2017-21
74th St. from 8.50' West
3809.32
2064.35
80.00
of the E.P.L. of Elgin
Ave. to 15.00' W. of the
W.P.L. of Canton Avenue
NS 2017-22
Detroit Ave. from the S.L.L.
1133.28
642.28
40.40
of 74th St. to the N.L.L. of
75th Street
NS 2017-23
75th St. from the E.L.L. of
2802.30
1495.28
Elgin Ave. to the W.P.L. of
the alley East of Detroit
Avenue (South Leg)
TOTAL
7744.90
4799.35
181.00
COST ESTIMATE
7744.90
S. Y. Paving 6" Base
@ $2.15
$16,651.54
4799.35
L. F. Curb & Gutter
@ $2.25
$10,798.54
181.00
S. Y. Alley Return
@ $8.25
$ 1,493.25
CONTRACT COST
$28,943.33
COST DISTRIBUTION
Unit & `
Contract
Property
Sub -Unit
Cost
Owner Cost
NS 2017p-20
$1,844.19
$1,844.19
NS 2017;-21
$13,494.83
$13,494.83
NS 2017`-22
$4,214.98
$4,214.98
NS 2017-23
$9,389.33
$9,389.33
TOTAL
$28,943.33