Loading...
HomeMy WebLinkAboutResolution - 021474J - Accept Paving Improvements - Kerr Co - Lots 1-12, Villa West Addition - 02_14_1974o ?-J441741,T RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTION OF STREETS AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City rdinance 1331, the subdivider of Villa West Addition, Lots 1-12, made arrange- ents with KERR CONSTRUCTION COMPANY for the construction of paving improve- ents on certain streets dedicated in said subdivision under the provisions of aid Ordinance prior to the recording of the subdivision plat of Villa West ddition including the following streets: Oth Street from the East Lip Line.of Bangor Avenue to the East Property Line f Cul-de-sac East of Bangor Avenue known and designated as New Sub Unit No. 017-28. 1st Street from the East Lip Line of Bangor Avenue to 285.40 feet East of East roperty Line of Bangor Avenue known and designated as New Sub Unit No. 2017-29 AND WHEREAS, the construction of the above improvements on the abovementi treets was performed under the supervision of the City Engineer, and said im- rovements have been completed and have been inspected and found to have been onstructed in accordance with City specifications and in accordance with the rovisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be an he same are hereby accepted and the City Engineer be and he is hereby authoriz d o direct the payment of the City's portion of the cost and to release escrow oney. II. _.This resolution shall take effect and be in force from and after its passa e. PASSED AND APPROVED THIS 14TH DAY OF FEBRUARY, 1974. TTEST: vc-e MORRIS W. TURNER, MAYOR reva Phillips, City ecretary ;PR D: ilf d . Watson, City Engineer MIZWWAM red • . �� • CONSOLIDATED FINAL ESTIMATE VILLA WEST ADDITION, Lots 1-12 Accepted 2-14-74 QUANTITIES S.Y. S.Y. S.Y. C&G Removal Unit & Paving L.F. Alley Valley and Sub -Unit Location 6" Base C&G Return Gutter Re -surfacing NS 2017=28 20th Street from ELL of Bangor Avenue to EPL of Cul-de-sac East of Bangor Avenue 909.78 461.70 52.54 89.50 NS 2017-29 21st Street from ELL of Bangor Avenue to 285.40 feet East of EPL of Bangor Avenue 1169.07 726.94 18.61 52.54 118.40 TOTALS 2078.85 1188.64 18.61 105.08 207.90 COST ESTIMATE 2078.85 S.Y. Paving 6" Base @ $2.24 1188.64 L.F. Curb & Gutter @ $2.18 18.61 S.Y. Alley Return @ $8.40 105.08 S.Y. Valley Gutter @ $8.40 207.90 L.F. C&G Removal & Paving Repair @ $2.00 CONTRACT COST COST DISTRIBUTION Property UNIT & Contract Owner Sub -Unit Cost Cost NS 2017-28 $3,664.76 $3,664.76 NS 2017-29 $5,037.91 $5,037.91 TOTAL $8,702.67 $8,702.67 $4656.63 $2591.25 $ 156.32 $ 882.67 415.80 8702.67