HomeMy WebLinkAboutResolution - 021474F - Accept Paving Improvements - WD Turner Co. - Clayton-Carter_Clayton-Coffey Add - 02_14_1974 (2)0z/ 4746
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUES
AS LISTED BELOW:
WHEREAS, the Urban Renewal Agency of the City of Lubbock made arrange-
ments with W.D. Turner Construction Company for the construction of paving
improvements on certain streets in Clayton -Carter, Carter -Coffey and other
additions including the following streets:
East Ursuline Street from its intersection with a line 13.00 feet East of
the East Property Line of North Ivory Avenue to its intersection with the
West Lip Line of North Quirt Avenue known and designated as Sub -Unit Number
23 of Unit Number 2226,
East Tulan19 Street from its intersection with a line 13.00 feet East of the
East Property Line of North Ivory Avenue to its intersection with the West
Lip Line of North Quirt Avenue known and designated as Sub -Unit Number 24
of Unit Number 2226.
East Stanford Street from its intersection with a line 13.00 feet East of the
East Property Line of North Ivory Avenue to its intersection with the West
Lip Line of North Quirt Avenue known and designated as Sub -Unit Number 25
of Unit Number 2226,
East Rice Street from its intersection with a 1 i ne 13.00 feet East of the
East Property Line of North Ivory Avenue to its intersection with the West
Lip Line of North Quirt Avenue known and designated as Sub -Unit Number 26
of Unit Number 2226,
East Queens Street from its intersection with a line 13.00 feet East of the
East Property Line of North Ivory Avenue to its intersection with the West
Lip Line of North Quirt Avenue known and designated as Sub -Unit Number 27
of Unit Number 2226.
The West half of North Quirt Avenue from its intersection with a line 47.10
feet South of the South Property Line of East Queens Street to its intersec-
tion with a line 53.00 feet North of the North Property Line of East Ursuline
Street known and designated as Sub -Unit Number 28 of Unit Number 2226,
North King Avenue from its intersection with the South Lip Line of East
Ursuline Street to its intersection with the North Lip Line of East Tulane
Street known and designated as Sub -Unit Number 29 of Unit Number 2226,
North King Avenue from its intersection with the South Lip Line of East
Tulane Street to its intersection with the North Lip Line of East Stanford
Street known and designated as Sub -Unit Number 3 of Unit Number 2227.
North Ktng Avenue from its intersection with (the South Lip Line of East
Stanford Street to its intersection with the North Lip Line of East Rice
Street known and designated as Sub -Unit Number 4 of Unit Number 2227.
North King Avenue from its intersection with the South Lip Line of East
Rice Street to its'intersection with the North Lip Line of East Queens
Street known and designated as Sub-UnattNumber 5 of Unit Number 2227.
North Magnolia Avenue from its intersection with the South Lip Line of East
Ursul i ne Street to its intersection with the North Lip Line of East Tulane
Street known and designated as Sub -Unit Number 6 of Unit Number 2227.
North Magnolia Avenue from its intersection with the South Lip Line of East
Tulane Street to its intersection with the North Lip Line of East Stanford
Street known and designated as Sub -Unit Number 7 of Unit Number 2227.
North Magnolia Avenue from its intersection with the South Lip Line of East
Stanford Street to its intersection with the North Lip Line of East Rice
Street known and designated as Sub -Unit Number 8 of Unit Number 2227.
North Magnolia Avenue from its intersection with the South Lip Line of East
Rice Street to its intersection with the North Lip Line of East Queens
Street known and designated as Sub -Unit Number 9 of Unit Number 2227.
North Oak Avenue from its intersection with the South Lip Line of East
Ursul i ne Street to its Intersection with the North Lip Line of East Tulane
Street known and designated as Sub -Unit Number 10 of Unit Number 2227.
North Oak Avenue from its. intersection with the South Lip Line of East
Tulane Street to its intersection with the North Lip Line of East Stanford
Street known and designated as Sub -Unit Number 11 of Unit Number 2227.
North Oak Avenue from i is i ntersection wi th the South Li p Li ne of East
�o Stanford Street of its intersection with the North Lip Line of East Rice
Street known and designated as Sub -Unit Number 12 of Unit Number 2227.
North Oak Avenue from its intersection with the South Lip Line of East Rice
Street to its intersection with the North Lip Line of East Queens Street
known and designated as Sub -Unit Number 13 of Unit Number 2227.
Concrete sidewalks, approaches, and adjustments throughout the area bound
by North Quirt Avenue, North Ivory Avenue, East Queens Street and East
Ursul i ne Street known and designated as Sub -Unit Number 15 of Unit Number
2227.
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications.
M
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted.
This resolution shall takd effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 14TH DAY OF FEBRUA RY, 1974
orris W. Turner, Mayor
A TTE$T:
Treva Phillips, City 14cretary
APPR
Fred O.-Fte-nter, jr. Attorney
� f Y f p �• N
762-6411
P. O. Box 2000
LUBBOCK, TEXAS 79457
February 14, 1974
Honorable Mayor and Ci ty Counci 1
C i ty of Lubbock
Lubbock, Texas
Gentlemen:
1 submit herewith the closing documents for Street Paving Improvements
in the Clayton -Carter, Carter -Coffey Area, Phase 11 NAP Tex A-14(c), GOWO
231.
Final inspection has been made on the abovementioned improvements and
said improvements have been constructed In accordance with plans, speci-
fications and contract documents.
I therefore recommend acceptance of the improvements.
Ver. truly yours,
V
D. Watson
gineer
CONSOLIDATED FINAL ESTIMATE
Clayton -Carter, Carter -Coffey Additions
Accepted February 14, 1974
QUANTITIES
S.Y. S.Y. S.Y. S.Y. S.Y.
Unit and Paving Paving L.F. Ailey Valley Extra
Sub -Unit Location 9" Base 6" Base C b G Return Gutter Base
2226-23 E. Ursaline St. from 9094.32 4808.54
13.0' E. of the E.P.L.
of N. Ivory Ave. to
the WLL of N. Quirt
Ave.
2226-24
E. Tulane St. from
8944.99
4550.54
53.33
13.0' E. of the EPL of
N. Ivory Ave. to the
WLL of N. Quirt Ave.
2226-25
E. Stanford St. from
8962.76
4550.54
35.56
13.0' E. of the EPL of
N. Ivory Ave. to the
WLL of N. Quirt Ave.
2226-26
E. Rice St. from 13.0'
8909.43
4550.54
88.89
E. of the EPL of N.
Ivory Ave. to the WLL
of N. Quirt Ave.
2226-27
E. Queens St. from
8980.54
4808.54
17.78
13.0' E. of the EPL of
N. Ivory Ave. to the
WLL of N. Quirt Ave.
2226-28
N. Quirt Ave. from 6138.22
1050.78
4'50.8o
47.1' S. of the SPL of
E. Queens St. to 53.0'
N. of the NPL of E.
Ursullne St.
2226-29
N. King Ave. from the
1193.48
685.92
40.40
17.38
SLL of E. Ursuline St.
to the NLL of E. Tu-
lane St.
2227-3
N. King Ave. from the
1140.94
685.92
40.40
69.92
SLL of E. Tulane St.
to the NLL of E. Stan-
ford St.
136.61
CONSOLIDATED FINAL ESTIMATE
Clayton -Carter, Carter -Coffey Additions
Accepted February 14, 1974
UANTITIES
S.Y.
S.Y.
S.Y.
S.Y. S.Y.
Unit and
Paving
Paving
L.F.
Alley
Valley Extra
Sub -Unit
Location 911 Base
6" Base
C 6 G
Return
Gutter Base
2227-4
N. King Ave. from the
1068.05
644.92
40.40
69.92
SLL of E. Stanford St.
to the NLL of E. Rice
St.
2227-5
N. King Ave. from the
1068.05
644.92
40.40
69.92
.SLL of E. Rice St. to
the NLL of E. Queens
St.
2227-6
N. Magnolia Ave. from
1176.10
685.92
40.40
34.76
the SLL of E. Ursuline
St. to the NLL of E.
Tulane St.
2227-7
N. Magnolia Ave. from
1141.33
685.92
40.40
69.53
the SLL of E. Tulane
St. to the NLL of E.
Stanford St.
2227-8
N. Magnolia Ave. from
1068.44
644.92
40.40
69.53
the SLL of E. Stanford
St. to the NLL of E.
Rice St.
2227-9
N. Magnolia Ave. from
1085.83
644.92
40.40
52.15
the SLL of E. Rice St.
to the NLL of E. Queens
St.
2227-10
N. Oak Ave. from the
1210.86
685.92
4o.4o
SLL of E. Ursuline St.
to the NLL of E. Tulane
St.
2227-11
N. Oak Ave. from the
1210'.86
685.92
40.40
SLL of E. Tulane St. to
the NLL of E. Stanford
St.
2227-12
N. Oak Ave. from the
1103.21.
644.92
40.40
34.76
SLL of E. Stanford St.
to the NLL of E. Rice
St.
CONSOLIDATED FINAL ESTIMATE
Clayton -Carter, Carter -Coffey Additions
Accepted February 14, 1974
QUANTITIES
S.Y.
S.Y.
S.Y.
S.Y. S.Y.
Unit and Paving
Paving
L.F. Alley
Valley Extra
Sub -Unit Location 911 Base
6" Base
C 6 G Return
Gutter Base
2227-13 N. Oak Ave. from the
1050.67
644.92 40.40
91.99
SLL of E. Rice St. to
the NLL of E. Queens
St.
TOTALS 6138.22 58,409.86 32,304.52 . 565.76 775.42 136.61
CONSOLIDATED FINAL ESTIMATE
Clayton -Carter, Carter -Coffey Additions
Accepted February 14, 1974
QUANTITIES
Unit and
S.Y.
S.Y.
S.Y.
Sub -Unit
Location
Sidewalks
Approaches Adjustments
2227-15
Concrete sidewalks, approaches
12,171.62
388•29
732.39
and adjustments throughout the
area bound by N. Quirt Ave.,
N. Ivory Ave., E. Queens St.,
.and E..Ur.suline.St.
L.F.
Each
S.Y. L.F.
Unit and
311, 61" & 81"
Wet
L.F.
Alley C & G
Sub -Unit
Location Waterline
Tie -Ins
C & G
Return Removal
Miscellaneous water 843.5
20
line adjustments prior
to paving
Change Order No. 1 - 246.0 676.o 220.0
All at 2nd Street
between Ave. "P" and
Ave. "'0"'
TOTALS 843.5 20 246.0 676.o 220.0
CONSOLIDATED FINAL. ESTIMATE
Clayton -Carter, Carter -Coffey Additions
Accepted February 14, 1974
COST ESTIMATE
58,409.86
S.
Y.
Paving 61, Base
C'
$1.77
$103,385.45
6,138.22
S.
Y.
Paving 911 Base
(@
$2.25
$
13,811.00
136.61
S.
Y.
Extra 911 Base
@
$1.35
$
184.42
32,304.52
L.
F.
Curb & Gutter
@
$1.80
$
58,148.14
565.76
S.
Y.
Alley Return
$7.50
$
4,242.00
775.42
S.
Y.
Valley Gutter
$7.50
$
5.815.65
11,712.33
S.
Y.
Sidewalks
$3.80
$
44,506.85
388.29
S.
Y.
Approaches
$4.00
$
1,553.16
732.39
S.
Y.
Adjustments
$4.00
$
2.929.56
246.0
L.
F.
1811 Curb
Cf
$1.75
430.50
220.0
L.
F.
Removal of Curb
@
$1.00
$
220.00
676.0
S.
Y.
Alley Return
@
$8.00
$
5,408.00
843.5
L.
F.
311, 611 & 8" Waterlines
@
$7.00
$
5,904.50
20
Each
Wet tie-ins
@
$150.00
$
3,000.00
CONTRACT COST
$249,539.23
DISTRIBUTION
Contract
Cost
Urban Renewal
Cost
$249,539.23 $249,539.23