HomeMy WebLinkAboutResolution - 5880 - CO #1 To Contract - D E Rice Construction Co - WTRDF - 06_11_1998Resolution No. 5880 Item No. 20 June 11, 1998 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order Number 1 of the construction contract for the West Texas Regional Disposal Facility, by and between the City of Lubbock and D.E. Rice Construction Co., and related documents. Said contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this i i thday of June 1998. ATTEST: - Kajr#6 Daniell City'Secretary w APPROVED AS TO CONTENT: J 1 D. flart, Jr., P.E. Landfill Special Projects Engineer APPROVED AS TO FORM: William de Haas Municipal Contracts Attorney MAX L. LINCE MAYOR PRO TEM Ccdocs/Change Order Number 1, Construction Contract for the West Texas Regional Disposal Facilit}r,Res June 11, 1998 Y Resolution No.5880 Item No. 20 • CHANGE ORDER June 11, 1998 ggstructions on second page) No. 1 PROJECT: West Texas Region Disposal Facility DATE OF ISSUANCE: 5/28/98 Phase 1 Facility Development OWNER: City of Lubbock, Texas OWNER's Project No. Bid #97300 CONTRACTOR: D.E. Rice Construction Co., Inc. ENGINEER: PSC/HDR CONTRACT FOR: Municipal Solid Waste ENGINEER's Project No. 01-1907-97 Disposal Facility You are directed to make the following changes in the Contract Documents. Description: (See Attached) Attachments: (I1st documents supporting change) CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME: Original Contract Price Original Contract Time $ 5,264,398.66 $ 240 calendar days days or date Previous Change Orders No. to No. Net change from previous Change Orders $ N/A $ N/A days or date Contract Price prior to this Change Order Contract Time prior to this Change Order $ 5,264,398.66 $ 240 calendar days days or date Net Increase (dear) of this Change Order Net Increase (decrease) of this Change Order $ 1,005,603.14 $ - ,o days or date Contract Price with all approved Change Orders Contract Time with all approved Change Ord 3� $ 6,270,001.80 $ calendar days days or date RECONEAENDED: APPROVED: APPROVED: By. By: By: ��. ;MAY PROJTEM Contractor Date: Date: �%i12G �/' �99� Date: 6JCDC No. 191 noea EdItion1 ATTEST: Prepared by the F.ngineom' Joint Contract Documsrxs Committee and endorsed by The Ass •eted Geennerd Cornractore of America. A,pMuA eMe ' „ '�I�i��7[�'.. Kay hie Darnell, Citf Secretary' . CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Time. Changes that have been initiated by a Work Directive Change must be incorporated into a subsequent Change Order if they affect Price or Time. Changes that affect Contract Price or Contract Time should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the administrative burden may lead to unnecessary disputes. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Time, a Field Order may be used. B. COMPLETING THE CHANGE ORDER FORM Engineer initiates the form, including a description of the changes involved and attachments basal upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Contractor for approval. After approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. If a change only applies to price or to time, cross out the part of the tabulation that does not apply. West Texas Region Disposal Facility Phase I Facility Development City of Lubbock Bid No. 97300 Change Order No. I - INNIS' etrM�,� aCS war, So WWW". C01-1 Excavation Price Reduction of $0.02/c.y. on contract excavation Deduction < $35,497.40 > quantity. 1,774,870 c.y. QP $0.02/c.y. COI-2 Increase excavation into Cell IB at unit cost of $0.90/c.y. 1,351,730 c.y. Addition $1,216,557.00 $0.90/c.y. COI-3 Deduct Tri-Planer Geocomposite Drainage Layer. Deduction < $444,308.60 > 653,395 s.f. @ $0.68/s.f. COI-4 Add Bi-Planer Geocomposite Drainage Layer. (Alt. Bid Item E) Addition $269,852.14 653,395 s.f. @ $0.413/s.f. COI-5 Building pad revisions due to high PI clay subgrade. Addition $9,000.00 C01-6 Deduct cost,of Tree Installation Deduction <$10,000.00> Total Addition of Change Order 1 $1,005,603.14 rki-Mt D.E. RICE CONSTRUCTION CO INC PHONE NO. : 806 274 3262 May. 20 19% 08:57AM P4 3300 S. CEDAR P.O. BOX 3344 R=CE BORGER, TEXAS 79007 BORGER, TEXAS 79008 806 - 274.7187 FAX: 806 - 274-3262 To: THE CXTY OF sr•806/747-7657 MR. HART RE- REVISED LETTr&R P.X CHANGE ORDERS 3- of _ t**�tttirtMitk**�rbift'�'tt********t*'�+M+N�MtM1�'M****t******'�'1"L"M11r1M'�'tr'�tCtk144tkM* May 20, 1998 Dear Jere: Accompanying this cover page is the revised letter you and I discussed this morning. Please allow me to compare the requested change orders (my letter of 5/18/98 in regard to excavation quantities and my letter of 5/20/98 in regard to three change order items) with my letter of 2/10/98 (addressed to Victor Kilman). Excavation Per 5/18/98 Proposal - 3,126,600 cy a $0.90/cy 92.$13.940.00 Per 2/10/99 Letter - 1,774,870 cy 0 $0.92/cy, 1,632,880.40 - 1,351,730 cy 4D $0.88/cy ' 1.189.522.40 2,822,402.80 Additional Decrease in Cast - 5/18/98 Proposal t <$_462_ 0> Alternative E : As originally Bid - 653,39S sf cat $0 .44,3 $ 289,451.99 Per 5/20/98 Proposal - 653, 39.5 of a $0.413 Decrease from Amount Originally Bid SCJ.601.85 As discussed yesterday, my letter of 2/10/98 noted that our subcontractor felt that they could decrease the cost of this material to Rice Construction to $0.40 / Of. We have to include our costs in the pricing provided to the City. These costs include costs of supervision during installation, cutting and backfilling of anchor trenches, unloading of material when it arrives on site and other administrative expenses. Our pricing at $0.413 / of allows only 3.2Sk to cover these costs. Please give me a call if you have any questions. Thank you. Sincerely, Mike Williams Business Manager 14T ip1 D. E. R I CE CONSTRUCT 1 ON CO I NC PHONE NO. 806 274 3262 May. 20 1998 08: 57AM P3 'w 3300 S. CEDAR P.O. BOX 3344 R=CE BORGER, TEXAS 79007 BORGER, TEXAS 79008 806 - 274-7187 FAX: 806 - 274-3262 May 20, 1998 The City of Lubbock Attn: Mr. Jere Hart, Jr, P.S. P.O. Box 2000 Lubbock, TX 79457 RE: West Texas Region Disposal Facility - Request for Change Orders. Dear Mr. Hart: As previously discussed, we would like to request the issuance of change orders in three areas. They are as follows: Alternative Bid Item E: The original bid included Alternative Bid Item 9 which provided for an alternative geocomposite drainage layer (with transmissivity of 4.5 x 10-5). This alternate geocomposite drainage layer would be installed instead of the material originally specified and included in bid item #5. Use of the Alternate E material will result in a substantial savings to the City of Lubbock. Following is a•recap of the savings associated with this alternative: Deletion of Bid Item #5 653,395 S.F. @ $0.68 c$444,308.62� Addition of Alt. E 653,395 S.F. cat $0.413 269, 652 ,14 Net Decrease in Contract Amount <S174.456.4C> Building Pad Excavations__ Material with a high P.I. was noted when soil samples were taken from the building pad areas. Due to concerns of this high P.I. material swelling at some point in time and causing problems with the foundations, etc-, the engineer made the decision to overexcavate the areas underneath the building pads and replace the material excavated with a material which was more suitable. In addition, a plastic skirt is to be placed around each foundation to prevent water from corning in contact with the imported material underneath each foundation. Following is our lump such Cost for performing this additional. work: Building Pad Revisions Lump Sum Amount S 9.000.00 4ROM D. E. RICE CONSTRUCTION CO INC •J 1 May 20, 1998 PHONE NO. : B06 274 3262 May. 20 199B 0B:5GAM P2 Page 2 Trge Installation: As you are aware, we were not able to start the project early enough to meet the suggested planting date for the trees and we anticipate completing this project well before the next planting season. This being the case, we would like to request that this work be deleted from our contract. Following is the related decrease in contract cost: Deletion of Tree Planting Lump Sum Amount cS IQ. 000.00!> None of these changes will require an extension of contract time. Please give me a call if you have any questions. Thank you_ Sincerely, Mike Williams Business Manager