HomeMy WebLinkAboutResolution - 121373K - Street Improvements - WD Turner Construction Co - GWO 54Th Street - 12_13_1973/2,/ 373k
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMENTS
LEVIED.
WHEREAS, The City of Lubbock heretofore passed various street improvemen
ordinances and resolutions and entered into contract with W. D. Turner
Construction Company G.W.O. 10,790 for the making and construction of street
and/or alley improvements on portions of numerous alleys, streets and/or
avenues in said City including among others the following:
54th Street from its intersection with a line 11.00 feet East of the East
Property Line of Utica Avenue (South Side) to its intersection with a line
16.00 feet West of the West Property Line of Salem Avenue (South Side) known
and designated as Sub -Unit Number 30 of Unit Number 2226.
AND WHEREAS, the improvements upon the said portion of the above -
mentioned street has been inspected and found to have been constructed in
accordance with terms of said contract G.W.O. 10,790.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portion of the abovementioned street be
and the same is hereby accepted, and the City Engineer be and he is hereby
authorized to direct payment of the City's portion of the cost.
II.
That the Mayor and City Secretary be, and they are hereby instructed to
execute and deliver certificates in evidence of the assessments levied against
the parcels of property abutting upon the said portion of the street listed
above and against the owners of such property in accordance with law and in
the manner provided in said contract, and the proceedings with reference to
said improvements and assessments where such assessments were levied.
This resolution shall take effect and be in force from and after it@
passage.
PASSED AND APPROVED THIS 13TH DAY OF DECEMBER, 197 .
"L�•
orris W. Turner, Mayor
ATTEST:
�,fLr ct. oz<
Lavenia Lowe, City Secretary
APPROVED:
Wi rd . Watson, City Engineer
APPRO DJ:.
Fred 0. Senter, Jr., City Aoelorney
CONSOLIDATED FINAL ESTIMATE
G.W.O. 10,790
Accepted December 13, 1973
S. Y.
L.F. S. Y.
Unit &
Paving
C & G Re-sur-
Sub-Unit Location
6" Base
facing
2226-30 54th Street from
11'
4402.49
1987.40 $ 17.07
E. of the EPL of
Utica
Avenue (S. Side)
to 16'
W. of the WPL of
Salem
Avenue (S. Side)
COST ESTIMlATE
4402.49
S.
Y.
Paving 6 " Base
@
$1.75
$
7,704.36
1887.40
L.
F.
Curb & Gutter
@
$1.75
$
3,302.95
17.07
S.
Y.
Resurface
@
$0.60
$
10.24
CONTRACT COST $11,017.55
COST DISTRIBUTION
Unit & Contract
Property
Pre -Paid
Previous
Sub -Unit Cost
Owner Cost
Paving
Monthly
To Be Paid
To Be
Payments
From Paving
Released
Assessments
Receivable
2226-30 $11,017.55
$5,299.61
$1,835.56
- $3,882.38
FINAL PAVING ASSESSMENT 54TH STREET
City of Lubbock
Width 36 Feet From 11.00' E. of the EPL of Utica Avenue (S Leg) to
1600' W. of the WPL of Salem Avenue (S Leg)
30.1671
Acceptance Date 12-13-73
G. W. 0. 10,790
Sheet No. 1 of 3
Sub -Unit No. 30
Unit No. 2226
Owner
Lots Block Addition
Paving
$3.74 Rate/L.F.
No. Ft. Cost
Curb & Gutter
$1.94 Rate/L.F. Total
Cost Cost
NORTH SIDE
No Assessment -Prepaid Paving
Tract A Villa Sonora
No Assessment
Existing
J. C. Davis
Beginning at a point which is 1295.00 feet
50.00 187.00
92.00 $ 279.00
South and 2005.00 feet West of the North-
east corner of Section 9, Block E-2,
Lubbock County, Texas, said point being in
the North right-of-way line at 54th Street;
thence East along the North right-of-way
line of 54th Street a distance of 50.00
feet to a point; thence North a distance
of 150.00 feet to a point; thence West
parallel to the North right-of-way line of
54th Street a distance of 50.00 feet to a
point; thence South a distance of 150.00
feet to the point of beginning.
Dewie V. Rothwell
Beginning at a point which is 1295.00 feet
305.00 1140.70
561.20 $1701.90
South and 1955.00 feet West of the North-
east corner of Section 9, Block E-2,
Lubbock County, Texas; said point being in
the North right-of-way line of 54th street;
thence East along the North right-of-way
line of 54th Street a distance of 305.00
feet to a point; thence North a distance of
125.00 feet to a point; thence West a
distance of 305.00 feet parallel to the
North right-of-way line of 54th Street to a
point; thence South a distance of 125.00
feet to the point of beginning.
FINAL PAVING ASSESSMENT 54TH STREET Acceptance Date 12-13-73
City of Lubbock G. W. 0. 10,790
Sheet No. 2 of 3
Width 36 Feet From 11' E. of the EPL of Utica Avenue (S Leg) to Sub -Unit No. 30
1600' W. of the WPL of Salem Avenue (S. Leg) Unit No. 2226
Owner
Paving Curb & Gutter
$3.74 Rate/L.F. $1.84 Rate/L.F. Total
Lots Block Addition No. Ft. Cost Cost Cost
NORTH SIDE
J. B. Ewing
Beginning at a point which is 1295.00 feet 300.00
1122.00 552.00 $ 1674.00
South and 1650.00 feet West of the Northeast
corner of Section 9, Block E-2, Lubbock
County, Texas said point being in the North
right-of-way line of 54th Street; thence
East afdistance of 300.00 feet along the
North right-of-way line of 54th Street to a
point in the West right-of-way line of
Salem Avenue; thence North along the West
right-of-way line of Salem Avenue a distance
of 125.00 feet to a point; thence West a
distance of 300.00 feet to a point; thence
South a distance of 125.00 feet to the point
of beginning.
SOUTH SIDE
Dewie V. Rothwell
Beginning at a point which is 1345.00 feet 1260.00
4712.40 2318.40 7030.80
South and 2610.00 feet West of the Northwest
corner of Section 9, Block E-2, Lubbock
County, Texas, said point being the inter-
section of the South right-of-way line of 54th
Street and the East right-of-way line of Utica
Avenue; thence East along the South right-of-
way line of 54th Street a distance of 1245.00
feet to a point; thence South a distance of 3.00
feet to a point, said point being the beginning
of a 15.00 foot curve to the right the radius
_
point of which bears South 15.00 feet, and
r
having a tangent of 15.00 feet and an arc length
of 23.56 feet; thence around said 15.00 foot
curve to the right an arc length distance of
23.56 feet to a point; said point being in the
West right-of-way line off'.64&em Avenue;
(Continued on page 3)
FINAL PAVING ASSESSMENT 54th STREET
City of Lubbock
From 11.00' E. of the EPL of Utica Avenue (S Leg) to
Width 36 Feet 16.00' W. of the WPL of Salem Avenue (S. Leg)
Paving
$3.74 Rate/L.F.
Owner Lots Block Addition No. Ft. Cost
thence South 132.00 feet to a point; thence
West a distance of 1260.00 feet parallel to
the South right-of-way line of 54th Street
to a point, said point being in the East
right-of-way line of Utica Avenue; thence
North a distance of 150.00 feet along the
East right-of-way line of Utica Avenue to
the point of beginning.
j0.Lb/L
Acceptance Date 12-13-73
G. W. 0. 10,790
Sheet No. 2 of 3
Sub -Unit No. 30
Unit No. 2226
Curb & Gutter
$ 1.84 Rate/L.F. Total
Cost Cost
TOTAL PROPERTY OWNER COST $10,685.70
CITY'S SHARE 882.73
TOTAL (FINAL) SUB UNIT COST $11,568.43