Loading...
HomeMy WebLinkAboutResolution - 121373K - Street Improvements - WD Turner Construction Co - GWO 54Th Street - 12_13_1973/2,/ 373k RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMENTS LEVIED. WHEREAS, The City of Lubbock heretofore passed various street improvemen ordinances and resolutions and entered into contract with W. D. Turner Construction Company G.W.O. 10,790 for the making and construction of street and/or alley improvements on portions of numerous alleys, streets and/or avenues in said City including among others the following: 54th Street from its intersection with a line 11.00 feet East of the East Property Line of Utica Avenue (South Side) to its intersection with a line 16.00 feet West of the West Property Line of Salem Avenue (South Side) known and designated as Sub -Unit Number 30 of Unit Number 2226. AND WHEREAS, the improvements upon the said portion of the above - mentioned street has been inspected and found to have been constructed in accordance with terms of said contract G.W.O. 10,790. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portion of the abovementioned street be and the same is hereby accepted, and the City Engineer be and he is hereby authorized to direct payment of the City's portion of the cost. II. That the Mayor and City Secretary be, and they are hereby instructed to execute and deliver certificates in evidence of the assessments levied against the parcels of property abutting upon the said portion of the street listed above and against the owners of such property in accordance with law and in the manner provided in said contract, and the proceedings with reference to said improvements and assessments where such assessments were levied. This resolution shall take effect and be in force from and after it@ passage. PASSED AND APPROVED THIS 13TH DAY OF DECEMBER, 197 . "L�• orris W. Turner, Mayor ATTEST: �,fLr ct. oz< Lavenia Lowe, City Secretary APPROVED: Wi rd . Watson, City Engineer APPRO DJ:. Fred 0. Senter, Jr., City Aoelorney CONSOLIDATED FINAL ESTIMATE G.W.O. 10,790 Accepted December 13, 1973 S. Y. L.F. S. Y. Unit & Paving C & G Re-sur- Sub-Unit Location 6" Base facing 2226-30 54th Street from 11' 4402.49 1987.40 $ 17.07 E. of the EPL of Utica Avenue (S. Side) to 16' W. of the WPL of Salem Avenue (S. Side) COST ESTIMlATE 4402.49 S. Y. Paving 6 " Base @ $1.75 $ 7,704.36 1887.40 L. F. Curb & Gutter @ $1.75 $ 3,302.95 17.07 S. Y. Resurface @ $0.60 $ 10.24 CONTRACT COST $11,017.55 COST DISTRIBUTION Unit & Contract Property Pre -Paid Previous Sub -Unit Cost Owner Cost Paving Monthly To Be Paid To Be Payments From Paving Released Assessments Receivable 2226-30 $11,017.55 $5,299.61 $1,835.56 - $3,882.38 FINAL PAVING ASSESSMENT 54TH STREET City of Lubbock Width 36 Feet From 11.00' E. of the EPL of Utica Avenue (S Leg) to 1600' W. of the WPL of Salem Avenue (S Leg) 30.1671 Acceptance Date 12-13-73 G. W. 0. 10,790 Sheet No. 1 of 3 Sub -Unit No. 30 Unit No. 2226 Owner Lots Block Addition Paving $3.74 Rate/L.F. No. Ft. Cost Curb & Gutter $1.94 Rate/L.F. Total Cost Cost NORTH SIDE No Assessment -Prepaid Paving Tract A Villa Sonora No Assessment Existing J. C. Davis Beginning at a point which is 1295.00 feet 50.00 187.00 92.00 $ 279.00 South and 2005.00 feet West of the North- east corner of Section 9, Block E-2, Lubbock County, Texas, said point being in the North right-of-way line at 54th Street; thence East along the North right-of-way line of 54th Street a distance of 50.00 feet to a point; thence North a distance of 150.00 feet to a point; thence West parallel to the North right-of-way line of 54th Street a distance of 50.00 feet to a point; thence South a distance of 150.00 feet to the point of beginning. Dewie V. Rothwell Beginning at a point which is 1295.00 feet 305.00 1140.70 561.20 $1701.90 South and 1955.00 feet West of the North- east corner of Section 9, Block E-2, Lubbock County, Texas; said point being in the North right-of-way line of 54th street; thence East along the North right-of-way line of 54th Street a distance of 305.00 feet to a point; thence North a distance of 125.00 feet to a point; thence West a distance of 305.00 feet parallel to the North right-of-way line of 54th Street to a point; thence South a distance of 125.00 feet to the point of beginning. FINAL PAVING ASSESSMENT 54TH STREET Acceptance Date 12-13-73 City of Lubbock G. W. 0. 10,790 Sheet No. 2 of 3 Width 36 Feet From 11' E. of the EPL of Utica Avenue (S Leg) to Sub -Unit No. 30 1600' W. of the WPL of Salem Avenue (S. Leg) Unit No. 2226 Owner Paving Curb & Gutter $3.74 Rate/L.F. $1.84 Rate/L.F. Total Lots Block Addition No. Ft. Cost Cost Cost NORTH SIDE J. B. Ewing Beginning at a point which is 1295.00 feet 300.00 1122.00 552.00 $ 1674.00 South and 1650.00 feet West of the Northeast corner of Section 9, Block E-2, Lubbock County, Texas said point being in the North right-of-way line of 54th Street; thence East afdistance of 300.00 feet along the North right-of-way line of 54th Street to a point in the West right-of-way line of Salem Avenue; thence North along the West right-of-way line of Salem Avenue a distance of 125.00 feet to a point; thence West a distance of 300.00 feet to a point; thence South a distance of 125.00 feet to the point of beginning. SOUTH SIDE Dewie V. Rothwell Beginning at a point which is 1345.00 feet 1260.00 4712.40 2318.40 7030.80 South and 2610.00 feet West of the Northwest corner of Section 9, Block E-2, Lubbock County, Texas, said point being the inter- section of the South right-of-way line of 54th Street and the East right-of-way line of Utica Avenue; thence East along the South right-of- way line of 54th Street a distance of 1245.00 feet to a point; thence South a distance of 3.00 feet to a point, said point being the beginning of a 15.00 foot curve to the right the radius _ point of which bears South 15.00 feet, and r having a tangent of 15.00 feet and an arc length of 23.56 feet; thence around said 15.00 foot curve to the right an arc length distance of 23.56 feet to a point; said point being in the West right-of-way line off'.64&em Avenue; (Continued on page 3) FINAL PAVING ASSESSMENT 54th STREET City of Lubbock From 11.00' E. of the EPL of Utica Avenue (S Leg) to Width 36 Feet 16.00' W. of the WPL of Salem Avenue (S. Leg) Paving $3.74 Rate/L.F. Owner Lots Block Addition No. Ft. Cost thence South 132.00 feet to a point; thence West a distance of 1260.00 feet parallel to the South right-of-way line of 54th Street to a point, said point being in the East right-of-way line of Utica Avenue; thence North a distance of 150.00 feet along the East right-of-way line of Utica Avenue to the point of beginning. j0.Lb/L Acceptance Date 12-13-73 G. W. 0. 10,790 Sheet No. 2 of 3 Sub -Unit No. 30 Unit No. 2226 Curb & Gutter $ 1.84 Rate/L.F. Total Cost Cost TOTAL PROPERTY OWNER COST $10,685.70 CITY'S SHARE 882.73 TOTAL (FINAL) SUB UNIT COST $11,568.43