Loading...
HomeMy WebLinkAboutResolution - 5796 - Supplemental Agreement - HDR Engineering Inc.- West Texas Disposal Facility - 03_26_1998RESOLUTION No. 5796 Item #19 March 26, 1998 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Supplemental Agreement Number 3 for the development of the West Texas Disposal Facility, by and between the City of Lubbock and HDR Engineering, Inc. and related documents. Said supplemental. agreement is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 26th day of March 1998. WINDY SITT TY�R ATTEST: / U&- I 'AWX& Ka Darnell City Secretary APPROVED AS TO CONTENT: �A & x Mildred Cox Director of Transportation Services APPROVED AS TO FORM: William de Haas Assistant City Attorney ccdocs/HDR Supl. Agmt, No. Ires March 26, 1998 RESOLUTION Item #19 March 26, NO.5796 1998 March 11, 1998 Ms. Mildred Cox Director of Transportation City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 Subject: Supplemental Agreement No. 3 Additional Services for Design, Bid, and Construction West Texas Region Disposal Facility Dear Ms. Cox: HDR Engineering, Inc. (HDR) and Parkhill, Smith and Cooper (PSC) are pleased to resubmit this contract amendment for professional engineering services related to the development of the West Texas Region Disposal Facility. These services represent the additional support required during the facility design and bid services phases of the project and anticipate the testing services during the construction phase. Please note the following additional services: 1. Phase Two was modified to redesign the access road alignment and relocate the maintenance and gate house facilities. 2. Phase Two was also modified to include two permit modification requests. 3. Phase Three was modified to extend the bid services timeframe. 4. Phase Four was modified to include the fees for geotechnical foundation testing, monitor well and gas probe surveying, monitor well and gas probe installation, water well rehabilitation, and construction testing services. If this contract amendment is acceptable to the City, please arrange for the execution of all appropriate number of copies and return two executed originals to HDR. Thank you for the opportunity to further assist you in bringing the West Texas Region Disposal Facility into operation. We look forward to hearing from you at your earliest convenience regarding this contract amendment. Please contact us if we can assist you in any other way. Sincerely, HDR Engineering, Inc. William R. Hindman, P.E. Senior Vice President Enclosure: Supplemental Agreement No. 3 HDR Engineering, Inc. Suite 125 Telephone 12700 1-1111crest Road 972 960-4000 Dallas, Texas Fax Employee -owned 75230-2096 972 960-4471 SUPPLEMENTAL AGREEMENT NO.3 TO THE AGREEMENT DATED OCTOBER 8, 1992 AND SUPPLEMENTAL AGREEMENT NO. 1 DATED DECEMBER 9, 1993 AND SUPPLEMENTAL AGREEMENT NO.2 DATED APRIL 24, 1997 BETWEEN CITY OF LUBBOCK, TEXAS OWNER AND HDR ENGINEERING, INC. ENGINEER FOR PROFESSIONAL ENGINEERING SERVICES FOR THE WEST TEXAS REGION LANDFILL CONSTRUCTION PLANS AND SPECIFICATIONS BID ADMINISTRATION u` e CONSTRUCTION RELATED SERVICES PROJECT March 23, 1998 1 SUPPLEMENTAL AGREEMENT NO.3 TO THE AGREEMENT DATED OCTOBER 8, 1992 AND SUPPLEMENTAL AGREEMENT NO. 1 DATED DECEMBER 9, 1993 And SUPPLEMENTAL AGREEMENT NO.2 DATED APRIL 24, 1997 BETWEEN CITY OF LUBBOCK, TEXAS OWNER AND HDR ENGINEERING, INC. ENGINEER FOR PROFESSIONAL ENGINEERING SERVICES FOR THE WEST TEXAS REGION LANDFILL CONSTRUCTION PLANS AND SPECIFICATIONS BID ADMINISTRATION AND CONSTRUCTION RELATED SERVICES PROJECT THIS SUPPLEMENTAL AGREEMENT NO.3, made as of March 26 , 1998 between the City of Lubbock, Texas and HDR Engineering, Inc. for modifications to the AGREEMENT BETWEEN CITY OF LUBBOCK, TEXAS AND HDR ENGINEERING, INC. FOR PROFESSIONAL ENGINEERING SERVICES dated October 8, 1992. OWNER and ENGINEER, in consideration of the mutual covenants contained herein, agree to modifications to the agreement as follows: Amend Attachment A - Phase II - A. SITE PERMITTING - Part V Construction Documents to reflect the attached Scope of Services 2 PART V - CONSTRUCTION DOCUMENTS AND SERVICES OBJECTIVE OF THE PROJECT The following Scope of Services represents a contract amendment to the City of Lubbock for engineering and related services associated with the design and construction of the West Texas Region Disposal Facility. Our purpose is to provide those services required to advance the approved permit -level design through the point of opening the facility for waste disposal operations in accordance with the Project schedule. We propose to implement this project by providing the following professional services. PHASE ONE - CONCEPTUAL DESIGN No Revisions PHASE TWO - DETAILED DESIGN (PLANS AND SPECIFICATIONS) OBJECTIVE To develop plans and specifications for each of the landfill facilities (roads, buildings and disposal cells) identified in the conceptual design and to coordinate the Texas Natural Resources Conservation Commission (TNRCC), Texas Department of Transportation (TxDOT) and Texas Department of Licensing and Regulation Agency (Agency) approval of these plans. Task One - Detailed Design Of Roads and Utilities Activities The HDR Team will prepare drawings showing the design details for construction of an access road, replacement water well and utility crossings. Access roads will include improvements to access roads off -site (to include the deceleration and turning lane from the State highway) and interior roads from the public roadway to the first cell in the landfill development sequence. The HDR Team will also include in the detailed design, access to scale facilities, gate house, office, maintenance facilities, wash rack, refueling station, groundwater monitoring wells, gas probes and any other ancillary facilities identified in the conceptual design. Task Two, Three, Four & Five No Revisions 3 Task Six - Regulatory Submittals Activities The HDR Team will prepare documentation to support two separate permit modification submittals to the TNRCC and work with the TNRCC to secure the approval of these submittals. Task Seven - Compliance Management Tools No Revisions DELIVERABLES, KEY UNDERSTANDINGS, MEETINGS No Revisions PHASE THREE - BID ADMINISTRATION OBJECTIVE To support the City in identifying and contracting with a qualified landfill construction contractor. Task One & Two No Revisions Task Three - Bid Services Activities This Task was modified to provide for the HDR Team assisting the City during the bid process that was extended over a five month period ( two months longer than was originally anticipated). Understanding, Meetings No Revisions PHASE FOUR - CONSTRUCTION SERVICES OBJECTIVES To provide the City with an environmentally secure landfill disposal cell (Cell 1A), built in accordance with the construction plans, and the facilities to support the landfill operation. Task One, Two, Three & Four No Revisions Task Five - Cell Construction Quality Assurance Activities This Task is modified to include the fees for the construction testing services including the preliminary foundation geotechnical testing. Task Six & Seven NO REVISIONS Task Eight - Environmental Monitoring Installations Activities This Task is modified to include the fees for surveying and installing the monitor wells and gas probes. In addition, fees are included to rehabilitate the facility water well. KEY UNDERSTANDINGS, MEETINGS No Revisions KEY PROJECT PROFESSIONALS No Revisions PROJECT SCHEDULE PHASE FOUR - CONSTRUCTION SERVICES No Revisions PROFESSIONAL SERVICE FEES We propose that the original compensation plan, outlined in Supplemental Agreement No. 2 be modified to address the additional scope of services outlined above. This compensation will continue to be invoiced on a per diem basis. The Phase One, Conceptual Plan was completed within the estimated fee of Thirty -Seven Thousand Six Hundred and Seventy -Seven Dollars ($37,677) and no change is proposed in this fee. Phase Two development the Construction Plans and Specifications, as modified above, will require an additional fee of Thirty -Two Thousand Nine Hundred and fifteen Dollars ($32,915) for a total fee of One Hundred Ninety -Seven Thousand Four Hundred and Fifty -Four Dollars ($197,454). Phase Three, the Bid Services, as modified above, will require an additional Fourteen Thousand Dollars ($14,000) for a total fee of Thirty -Four Thousand Three Hundred and Fifty -Four Dollars ($34,354). Phase Four, covering the Construction Services including the additional services identified above, can be completed for an estimated fee of Three Hundred Fifty -Eight Thousand Six Hundred Twelve Dollars ($358,612). The total, revised, not -to -exceed project budget is Six 5 Hundred Twenty -Eight Thousand Ninety -Seven Dollars ($628,097) without further City authorization. Invoices will continue to be submitted monthly and will include a project progress report, anticipated effort for the next month and a comparison of the project per cent complete versus the per cent of fee invoiced. The labor charges for this project will be calculated based the salaries of individuals and the time they actually work on the project, multiplied by a factor for overhead and profit. Expenses will be invoiced as outlined in the original contract with fees for sub -contractors representing a direct pass through expense. Except as modified herein, all other provisions of the Agreement remain unchanged. IN WITNESS WHEREOF, the parties have executed this supplemental Agreement as of the day and year first written above. CITY OF LUBBOCK, TEXAS P010, WaYPEal%17 . ,'' = 1625 13th Street Lubbock, Texas . _79457 A Kayt ' Damell, City Secretary Approved As To Content: ,--A At'.Q aK Mildred Cox, Director of Transportation Approved As To Form: William de Haas, Assistant City Attorney HDR ENGINEERING, INC. William R. Hindman, P.E. Senior Vice President 12700 Hillcrest Road, Suite 125 Dallas, Texas 75230-2096 R