Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 101173C - Pavement Improvements - Harold Stotts Earth Mover - Rushland Park Addition - 10_11_1973
/b #73 C RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREET AND/OR AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Rushland Park Addition, 13th Install- ment, made arrangements with Harold Stotts Earth Mover for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Rushland Park Addition including the following streets: 8th Street from its intersection with a line 16.00 feet East of the East pro- perty line of Toledo Avenue to its intersection with the West lip line of Salem Avenue known and designated as New Subdivision Unit Number 2015-94. Salisbury Avenue from its intersection with a line 3.0 feet North of the North property line of the alley South of 8th Street to its intersection with a line 3.0 feet North of the North property line of the alley North of 8th Street (less intersection at 8th Street) known and designated as New Subdivision Unit Number 2015-95. AND WHEREAS, the construction of the above improvements on the abov - mentioned streets was performed under the supervision of the City Engineer and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City .Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvement on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby' authorized to direct the payment of the City's portion of the cost. passage. II. This resolution shall take effect and be in force from and after i PASSED AND APPROVED THIS 11TH DAY OF OCTOBER, 197 ATTES :� enla Lowe,City Secretary APPROVED: orris W. Turner, Mayor Ilford''. Watson, City Engineer red U. 5enter, Jr.,V:,%�y �r - a CONSOLIDATED FINAL ESTIMATE RUSHLAND PARK ADDITION, INSTALLMENT THIRTEEN Accepted October 11, 1973 QUANTI TI TES S.Y. L.E. S.Y. S.Y. Vni t Pavi ng Curb Al ley Re -sur Sub -Unit Location 6" Base Gutter Return facing NS 2015-94 8th Street from 16.0' East of the EPL of Toledo Avenue to the WLL of Salem Avenue. NS 2015-95 Salisbury Avenue from 3.0' North of the NPL of the alley South of 8th Street to 3.0' North of the NPL of the alley North of 8th Street. TOTALS COST ESTIMATE 5,711.77 S.Y. Paving 61, Base 3,058.85 L.F. Curb & Gutter 20.00 S.Y. Alley Return 36.89 S.Y. Re -surface COST DISTRIBUTION 4512.18 1199.59 5711.77 Unit h Contract Property Sub -Unit Cost Owner Cost NS 2015 -94 $15,743.01 NS 2015-95 $ 4,502.80 $20,246.51 $15,743.71 $ 4,502.80 $20,246.51 692.74 3058.85 20.00 26.22 10.67 20.00 36.89 @ $2.30 $13,137.07 $2.25 $ 6,882.41 @ $8.40 $ 168.00 $1.60 $ 59.03 CONTRACT COST$2©,246.51