HomeMy WebLinkAboutResolution - 111055L - Paving Improvements - West Texas Contruction, Inc. - Highland Place Add - 11_10_1955 Iris Low
[C RESOLUTION
RESOLUTION ACCEPTING IMPROVEKENTS ON PORTIONS OF STREETS, IND/OR
AVENUES AS LISTED BELOW. .
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdividers of the Highland Place Addition, Installment
No. 4 made arrangements with West Texas Construction, Incorporated, Paving
Contractor, for the construction of paving improvements on certain streets
dedicated in said subdivision under the provisions of said Ordinance prior to
the recording of the subdivision plat of the Highland Place Addition..
Installment No. 4, including the following streets and avenues:
East 1/2 of Quaker Avenue from its intersection with a line 2.5 feet South of
of the South Property Line of the Alley North of 38th Street to its inter-
,section with h'-line 30 'feet North of the North Property Line of 38th Street,
known and designated as Unit Number X-S 190.
East 1/2 of Quaker Avenue from its intersection with a line 20 feet South of
the South Property Line of 38th Street to its intersection with a line 2.5
feet South of the South Property_Line of the. Alley South of 38th Street, known
and designated as Unit Number N-S. 191.
Peoria Avenue from its intersection with the South Property Line of 38th
Street, to its intersection with a line 2.5 feet South of the South Property
.Line of the Alley South of 38th Street, known and designated as Unit Number
N-S 1920
38th Street from its intersection with a line 31 feet West of the East Property
Line of Quaker Avenue, to its intersection with the West Gutter Line of Orland
Avenue, known and designated as Unit gumber NHS 193.
AND WHEREAS, the construction of the above improvements on the above-
mentioned.streets and avenues was performed wader the supervision of the City
Engineer, and said improvements have been completed and have been inspected
and found to have been constructed in accordance with City Specifications and
in 'accordance with the provisions of City Ordinance Number 1331.
NOW THEREFORE, BE rf RESOLVED BY THE CITY COMMISSION OF THE CITY OF
LUBBOCK:
I.
That the improvements on said portions of the abovemnentioned streets
and avenues be, and the same are hereby accepted and the City Engineer be and
is 'hereby authorized to direct the payment of the Cityte portion of cost.
II.
This resolution shall take effect and be in force from and after its
passage.
AND IT IS SO ORDERED.
Passed and approved this loth day of November, 1955.
R TR , �r
CITY OF LUBBOCK I loss LW
r f
� b
TEXAS
November 10, 1955
Honorable Mayor and City Ccmmiesion
Lubbock,
Texas
Getntlemen t
I have examined the paving improvements constructed
by Vast Texas Construction, Incorporated, mnder their
contract with the subdivider of the Highland Place Addition,
Installment Na■ 4 in accordance with. Ordinance No. 1331
and find that the improvements on the streets mWoor avenues
designated as Now Subdivision Unite 190, 191, 192, and 193,
as listed on the attached final estimate sheet to have been
completed in accordance with plans and specifications on
said streets and/or avenues and recemabd the payment to
the contractor the amonat shorn on the attached consolidated
final estimate sheet as being due hits from the City of Lubbock,
TW7 tnLIY yMWsLt
ohn T. Hickerson
City Sbginmw
!l 1 LOW
CONSOLMATED FINAL ESTRZE EM LITS
ACCEPT 2 JOVF EAR_190 ,12251, ANC
PLACE ALDITION. G.W.O. 1191
ANT 1T
S.Y. S.Y. L.F.Curb S,Y. S.Y. Valley
unit location Paving Subgr, & Gutter Alley Gutter
Prep, Slab
190 Quaker Ave. NFL 38th St, to
alley N. of 38th 261.11 308,19 135,50 9044
191 ' Quaker Ave. SPL 38th Ste to
alley S. of 38th St. 334.75 391,03 168.64 9.44
192 Peoria Ave, SPL 38th St. to
alley S, of 38th St. 352.87 463.84 284.42 31.96
193 38th St. EPL Quaker to WGL
Orlando2,361.27
Totals 6,712.16 7,751.51 29949.83 50.84 169.11
COST M=FS
6,712.16 S,Y. Paving 0 1.15 7,718.99
7, 151.51. S.Y. ►Sllbgr. Prep. ® ,20 — 1,550.30
2,949.83 L.F. Curb & Getter .® 1.50 — 49424.74
50.84 S.Y. Alley Slab 0 3.75 = 190.64
169.11 S.Y. Valley Glitter 0 3.50 = ...- 5�91.8_9
Contract Cost $149,476.56
10% Engr, 1.�G�7.66
Total Cost $159924.22
COST DISTRIBUTION
Total City to Contract Credit
IIni.t No. Total Cost P.O.Cost City Cost La Contra 22st Ens. 22RIN
190 660,62 341.80 318,82 258,76 600,56 60,o6
191 826.68 593.36 233.32 158.17 751.53 75.15
192 19149,56 19045.05 104,51 0O,00 19045.05 104,51
193 0=036 I NlmiQ A0191AM
$ 15,924.22 113,085.64 .4,838,58 3,390.92 14,476.56 1,447.66
Y till-
Laveiia Love, City ecretary
APPROVED:
LZohn T. Hickerson, City Engineer
APPROVED:
aughn E. Wilson, City Att rney