HomeMy WebLinkAboutResolution - 111055L - Paving Improvements - West Texas Contruction, Inc. - Highland Place Add - 11_10_1955 Iris Low [C RESOLUTION RESOLUTION ACCEPTING IMPROVEKENTS ON PORTIONS OF STREETS, IND/OR AVENUES AS LISTED BELOW. . WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdividers of the Highland Place Addition, Installment No. 4 made arrangements with West Texas Construction, Incorporated, Paving Contractor, for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the Highland Place Addition.. Installment No. 4, including the following streets and avenues: East 1/2 of Quaker Avenue from its intersection with a line 2.5 feet South of of the South Property Line of the Alley North of 38th Street to its inter- ,section with h'-line 30 'feet North of the North Property Line of 38th Street, known and designated as Unit Number X-S 190. East 1/2 of Quaker Avenue from its intersection with a line 20 feet South of the South Property Line of 38th Street to its intersection with a line 2.5 feet South of the South Property_Line of the. Alley South of 38th Street, known and designated as Unit Number N-S. 191. Peoria Avenue from its intersection with the South Property Line of 38th Street, to its intersection with a line 2.5 feet South of the South Property .Line of the Alley South of 38th Street, known and designated as Unit Number N-S 1920 38th Street from its intersection with a line 31 feet West of the East Property Line of Quaker Avenue, to its intersection with the West Gutter Line of Orland Avenue, known and designated as Unit gumber NHS 193. AND WHEREAS, the construction of the above improvements on the above- mentioned.streets and avenues was performed wader the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City Specifications and in 'accordance with the provisions of City Ordinance Number 1331. NOW THEREFORE, BE rf RESOLVED BY THE CITY COMMISSION OF THE CITY OF LUBBOCK: I. That the improvements on said portions of the abovemnentioned streets and avenues be, and the same are hereby accepted and the City Engineer be and is 'hereby authorized to direct the payment of the Cityte portion of cost. II. This resolution shall take effect and be in force from and after its passage. AND IT IS SO ORDERED. Passed and approved this loth day of November, 1955. R TR , �r CITY OF LUBBOCK I loss LW r f � b TEXAS November 10, 1955 Honorable Mayor and City Ccmmiesion Lubbock, Texas Getntlemen t I have examined the paving improvements constructed by Vast Texas Construction, Incorporated, mnder their contract with the subdivider of the Highland Place Addition, Installment Na■ 4 in accordance with. Ordinance No. 1331 and find that the improvements on the streets mWoor avenues designated as Now Subdivision Unite 190, 191, 192, and 193, as listed on the attached final estimate sheet to have been completed in accordance with plans and specifications on said streets and/or avenues and recemabd the payment to the contractor the amonat shorn on the attached consolidated final estimate sheet as being due hits from the City of Lubbock, TW7 tnLIY yMWsLt ohn T. Hickerson City Sbginmw !l 1 LOW CONSOLMATED FINAL ESTRZE EM LITS ACCEPT 2 JOVF EAR_190 ,12251, ANC PLACE ALDITION. G.W.O. 1191 ANT 1T S.Y. S.Y. L.F.Curb S,Y. S.Y. Valley unit location Paving Subgr, & Gutter Alley Gutter Prep, Slab 190 Quaker Ave. NFL 38th St, to alley N. of 38th 261.11 308,19 135,50 9044 191 ' Quaker Ave. SPL 38th Ste to alley S. of 38th St. 334.75 391,03 168.64 9.44 192 Peoria Ave, SPL 38th St. to alley S, of 38th St. 352.87 463.84 284.42 31.96 193 38th St. EPL Quaker to WGL Orlando2,361.27 Totals 6,712.16 7,751.51 29949.83 50.84 169.11 COST M=FS 6,712.16 S,Y. Paving 0 1.15 7,718.99 7, 151.51. S.Y. ►Sllbgr. Prep. ® ,20 — 1,550.30 2,949.83 L.F. Curb & Getter .® 1.50 — 49424.74 50.84 S.Y. Alley Slab 0 3.75 = 190.64 169.11 S.Y. Valley Glitter 0 3.50 = ...- 5�91.8_9 Contract Cost $149,476.56 10% Engr, 1.�G�7.66 Total Cost $159924.22 COST DISTRIBUTION Total City to Contract Credit IIni.t No. Total Cost P.O.Cost City Cost La Contra 22st Ens. 22RIN 190 660,62 341.80 318,82 258,76 600,56 60,o6 191 826.68 593.36 233.32 158.17 751.53 75.15 192 19149,56 19045.05 104,51 0O,00 19045.05 104,51 193 0=036 I NlmiQ A0191AM $ 15,924.22 113,085.64 .4,838,58 3,390.92 14,476.56 1,447.66 Y till- Laveiia Love, City ecretary APPROVED: LZohn T. Hickerson, City Engineer APPROVED: aughn E. Wilson, City Att rney