Loading...
HomeMy WebLinkAboutResolution - 091373G - Street Improvements - WD Turner Construction Co - GWO Fordham St. - 09_13_19730q/3734 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS,AND/OR AVENUES AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENC OF ASSESSMENTS LEVIED. WHEREAS, the City of Lubbock heretofore passed various street improvement ordinances and resolutions and entered into contract with W.D. Turner Construction Company G.W.O. 10,790 for the making and construction of street improvements on portions of numerous streets and/or avenues in said City including among others the following: Fordham Street from 5 feet East of the East Property Line of Knoxville Avenu to 6.77 feet East of the West Property Line of Indiana Avenue, known and de- signated as Sub -Unit Number 34 of Unit Number 2226. Kemper Street from its intersection with the East Lip Line of Utica Avenue to its intersection with a line 150.00 feet West of the West Property Line of Salem Avenue (North leg) known and designated as Sub -Unit Number 35 of Unit Number 2226. Jarvis Street from its intersection with a line 11.00 feet West of the East Property Line of Utica Avenue to its intersection with a line 15.00 feet Wes of the West Property Line of Salem Avenue (North leg) known and designated as Sub -Unit Number 36 of Unit Number 2226. The East half of Utica Avenue from its intersection with a line 15.00 feet North of the North Property Line of Kemper Street to its intersection with a line 15 feet North of North Property Line of Itasca Street known and designs ted as Sub -Unit Number 37 of Unit Number 2226. Salem Avenue from its intersection with a line 15.00 feet North of the North Property Line of Kemper Street (West leg) to its intersection with a line 15.00 feet North of North Property Line of Jarvis Street (West leg) known an designated as Sub -Unit Number 38 of Unit Number 2226. Harvard Street from its intersection with the East Lip Line of Utica Avenue to its intersection with the West lip line of Salem Avenue known and desig- nated as Sub -Unit Number 49 of Unit Number 2226. East half of Utica Avenue from its intersection with a line 15.00 feet North of the North Property Line of Itasca Street (East side) to its intersection With a line 15.00 feet South of the South Property Line of Harvard Street (East side) known and designated as Sub -Unit Number 50 of Unit Number 2226., Salem Avenue from its intersection with a line 15.00 feet South of the South Property Line of Harvard Street (West leg) to its intersection with a line 15.00 feet South of the South Property Line of Itasca Street known and designated as Sub -Unit Number 51 of Unit Number 2226. Salem Avenue from its intersection with a line .15 teet North of*the •North Property Line of 1 06Cd Street to its intersection with .a line 15 feet North of the'North Property Line of Jarvis Street (West side) known and designated as Sub7bn'it Number 52 of Unit Number 2226. AND WHEREAS, the improvements upon the said portions of the abovemen;tioned streets and/or avenues, have been inspected and found to have been constructed in accordance with terms of said contract G.W.O. 10,790. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned st and/or avenues be and the same are hereby accepted, and the City Engineer be and he is hereby authorized to direct payment of the City's portion of the cost. II. That the Mayor and Ci'ty•Secretary be, and they are hereby in- structed to execute and deliver certificates in evidence of the assessments leviedlagainst the parcels of property abutting upon the said portions of.th alleys streets and/or avenues listed above and against the owners of such proper y in accordance with law and in the manner provided in said contract and th� proceedings with reference to said improvements and assessments wher such ia�sessments were levied. III. This resolution shall take effect and be in force from and afte its passage. PASSED AND APPROVED THIS 13th DAY OF SEPTEMBER 1973. is W. Turner, Mayor ATTEST: i Lakv4ii Lowe,City Secretary AP PRO D : APPPR�OA�VED : Alld ' - — i o D atson, City Enginee , Fred. 0. Senter, Jr ity At CONSOLIDATED FINAL ESTIMATE G.W.O. 10,790 Accepted September 13, 1973 Unit & Sub -Unit S.Y. Paving Location 6" Base L.F. Curb & Gutter S.Y. S.Y. Alley Valley Returns Gutter 2226-34 Fordham Street from 5 feet 3,522.52 1,981.49 East of the East Property Line of Knoxville Avenue to 6.77 feet East of the West Property Line of Indiana Avenue. 2226-35 2226-35 Kemper Street from its in- 4,333.36 2,442.50 tersection with the East lip line of Utica Avenue to its intersection with a line 15.00 feet West of the West Property Line of Salem Avenue (North leg). 2226-36 Jarvis Street from its inter- 4,790.50 2,699.64 section with a line 11.00 feet West of the East Property Line of Utica Avenue to its inter- section with a line 15.00 feet West or the West Property Line of Salem Avenue (North leg). 2226-37 The East half of Utica Avenue 1,346.67 450.00 24.44 from its intersection with a line 15.00 feet North of the. North Property Line of Kemper Street to its intersection with a line 15.00 feet North of'North Property Line of Itasca Street. 2226-38 Salem Avenue from its intersec-1,412.14 645.16 .26.67 67.89 tion with a line 15.00 feet North of the North Property Line of Kemper Street (West leg) to its intersection with a line 15.00 feet North of North Property Line of Jarvis Street (West leg). 2226-49 Harvard Street from its inter- 5,090.76 2,903.08 section with the East Lipe Line of Utica Avenue to its inter- section with the West lip line of Salem Avenue. 52.54 S.Y. L.F. S. . S.Y. Unit & Paving Curb & Alley Valley Sub -Unit Location 6" Base Gutter Returns Gutter 2226-50 East half of Utica Avenue 864.44 225.00 12.22 from its intersection with a line 1.5.00 feet North of the North Property Line of Itasca Street (East side) to its intersection with a line 15.00 feet South of the South Property Line of Harvard Street (East side). 2226-51 Salem Avenue from its in- 1,077.33 540.00 26.67 tersection with a line 15.00 feet South of the South Property Line of Harvard Street (West leg) to its intersection with a line 15.00 feet South of the South Property Line of Itasca Street. 2226-52 Salem Avenue from its in- 1,360.06 621ZO 26.67 67.89 tersection with a line 15 feet North of the North Property Line of Itasca Street to its intersection with a line 15 feet North of the North Property Line of Jarvis Street. (West leg) TOTALS 23,797.78 12,508.00 116.67 188.32 COST ESTIMATE 23,797.78 S.Y. Paving, 6" Base 12,508.00 L.F. Curb & Gutter 116.67 S.Y. Alley Return 188.32 S.Y. Valley Gutter @ $1.75 $41,646.12 @ $1.75 $21,889.00 @ $8.00 $ 933.37 @ $8.00 $ 1,506.57 CONTRACT COST $65,975.06 COST DISTRIBUTION Unit & Contract Property Owner City City to Con- *PrevioT Sub -Unit Cost Cost Cost tractor from Monthl Trust & Agency Paymen Fund 2226-34 $ 9,631.90 $ 11,041.72 -$1,409.82 $ 5,874. 2226-35 $11,857.76 $ 13,551.31 -$1,693.55 $ 7,259.. 2226-36 $13,107.75 $ 14,986.15 -$1,876.40 $ 7,237. 2226-37 $ 3,339.69 $ 1,481.19 $1,090.99 767.51 $ 2,051. 2226-38 $ 4,356.76 $ 2,140.48 $2,216.28 $ 3,413. 2226-49 $14,409.54 $15,668.64 -$1,259.10 $ 8,617. 2226-50 $ 2,004.28 $ 493.73 743.04 767.51 $ 1,191. 2226-51 $ 3,043.69 $ 2,377.08 $ 66Z.61 $ 2,117. 22 City to Contractor From Trust *Previous Unit &.... Contract ..Property Owner City & Agency Monthly - Sub -Unit Cost Cost Cost Fund Payment 2226-52 $ 4,223.b9 TOTAL $65,9/5.06 TOTAL CONTRACT COST *LESS PREVIOUS PAYMENTS CITY TO CONTRACTOR NOW $ 1,891.60 $ 2,332.09 $ 3,179.6 $ 63,631.90 $ 808.14 $1,535.02 $40,942.4 $65,975.06 $40, 942.4533 $25,032.61 3U.1743 'Acceptance Date September 13,1973 FINAL PAVING ASSESSMENT .G.W.O. 10,790 City of Lubbock F0RDHAM STREET Sheet No. 1 of Sub -Unit No. 34 of Width 36 feet From 5 feet East of EPL of Knoxville Avenue to 15 feet West of WPL of Indiana Avenue Unit No. 2226 Paving $� Rate/L.F. .Curb & Gutter Total Owner Lots Block Addition No. Fe. $5.74Cost $1.84 Rate/L.F. Cost Cost NORTH SIDE 4 Agnes Bashore 2 2 North Tech 65.00 243.10 119.60 $ 362.70 W.H. Hicks/Jesse Martinez 3 2 North Tech 60.00 224.40 110.40 $ 334.80 John Cruz 4 2 North Tech 60.00 224.40 110.40 $ 334.80 W.H. Hicks 5 2 North Tech 60.00 '224.40 110.40 $ 334.80 Pauline C. ChaYez/W.H. Hicks 6 2 North Tech 60.00 224.40 110.40, $ 334.80 John Cruz 7 2 North Tech 65.00 243.10 119.60 $362.70 (Rel.1-26-73) John Cruz 8 2 North Tech 65.00 243.10 119.60 $ 362.70 (Rel. 10-2-72) John Cruz 9 2 North Tech 60.00 224.40 110.40 $ 334.80 (Rel. 10-2-72) John Cruz 10 2 North Tech 60.00 224.40 110.40 $ 334.80 (Rel. 10-2-72) John Cruz 11 2 North Tech 60.00 224.40 110.40 $ 334.80 (Rel. 10-2-72) John Olguin 12 2 North Tech 65.00 243.10 119.60 $ 362.70 j John Cruz 13 2 North Tech 65.00 243.10 .. 119.60 $ 362.70 (rel. 1U-2-72) John Cruz 14 . 2 North Tech 60.00 224.40 110.40 $ 334.80 (rel. 10-2-72) John Cruz 15 2 North Tech 60..00 224.40 110.40 $ 334.80 (ref. 10-2-72) John Cruz 16 2 North Tech 60.00 2224.40 110.40 $ 334.80 (rel. 10-2-72) r iLViL MV IMU ehhshhMENT 30.1743 City of Lubbock Acceptance Date September 13, 1973 - FORDHAM STREET G.W.O. 10,790 Sheet No. 2 of 3 Sub -Unit No. 34 of Width 36 feet 5 feet East of EPL of Knoxville Avenue to the 15 feet West of WPL of Indiana Avenue Unit No. 2226 Paving Curb & Gutter $3,74. Rate/L.F. $1.84 Rate/L.F. Total Owner Lots Block Addition No -Ft. $3.14 Cost $1.84 Cost Cost NORTH SIDE W.H. Hicks 17 2 North Tech 64.40 $240.86 $118.50 $ 359.36 SOUTH SIDE D.P. Trammel 18 1 North Tech 64.40 $240.86 $118.50 $ 359.36 D.P. Trammel 19 1 North Tech 60.00 $224.40 $110.40 $ 334.80 H.H. Trammel 20 1 North Tech 60.00 $224.40 $110.40 $ 334.80 H.H. Trammel 21 1 North Tech 60.00 $224.40 $110.40 $ 334.80 H.C. Trammel 22 1 North Tech 65.00 243.10 $ $119.60 $ 362.70 H.C. Trammel 23 1 North Tech 65.00 $243.10 $11g.60 $ 362.70 Ethyl Herriage 24 1 North Tech 60.00 $224.40 $110.40 $334. 80 Ethyl Herria.ge 25 1 North Tech 60.00 $224.40 $110.40 $ 334.80 Trammel's partnership 26 1 North Tech 60.00 $224.40 $110.40 $ 334.80 Trammel's Partnership 27 1 North Tech 65.00 $243.10 $119.60 $ 362.70 Chapman & Sons 28 1 North Tech 65.00 $243.10 $119.60 $ 362.70 Trammel's Partnership 29 1 North Tech 60.00 $224.40. $110.40 $ 334.80 Henrietta Thorpe 30 1 North Tech 60.00 $224.40 $110.40 $ 334.80 1enrietta Thorpe 31 1 North Tech 60.00 $224.40 $110.40 $ 334.80 Jerry Pearsey 32 1 North Tech 60.00 $224.40 $110.40 $ 334.80 Leo E. Brown 33 1 North Tech 65.00 $243.10 $119.60 $ 362.70 TOTAL PROPERTY OWNER COST $11;041.72 CITY'S SHARE $ 928.22 TOTAL FINAL SUB UNIT COST $10,113.50 FINAL PAVING ASSESSMENT 30,1740 City of Lubbock KEMPER STREET Acceptance Date September 13, 1973 G.W.O. 10,790 Width 36 feet East lip line of Utica Avenue to the- 15' West of the Ue Sheet No. 1 of 3 (North leg) Sub -Unit No. 35 of Unit No. Paving Curb & Gutter $3.74 Rate/L.F. $!$W Rate/L.F. Total. Owner Lots Block Addition No.Ft. :r_ 71}-Cost fi .T4' Cost Cost NORTH SIDE Don Haynie 158 - DePauw-McLarty 107.39 $401.64 $197.60 $ 599.24 Don Haynie 159 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 D.J. Ward 160 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 G.J. Patterson 161 - DePauw-McLarty 68.00 $254.32 .$125.12 $ 379.44 Dewie V. Rothwelln 162 - DePauw-McLarty 68.00_ $254,32_ $125.12 I Dewie V. Rothwell 163 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 164 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 165 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 166 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell lb7 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 168 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V..Rothwell 169 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 170 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 171 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 172 - DePauw-McLarty 66.00 $254.32 $125.12 $ 379.44 Edwin Sowell 173 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 W.L. Lowrimore Jr. 174 - DePauw-McLarty 75.00 $280.50 $138.00 $ 418.50 FINAL PAVING ASSESSMENT 30.1740 City of Lubbock KEMPER STREET Acceptance Date September 13, 1973 G.W.O. 10,790 Width 36 feet East lip line of Utica Avenue to the 15 feet West of,9bb:�1 fp,�jlumf(Iitn leg) Sheet No.-2 of 3 Avenue (North leg) Sub -Unit No. 35 of Unit No. 2226 Paving Curb & Gutter $3.74 Rate/L.F. $1.84 Rate/L.F. Total Owner Lots Block Addition No.. Ft. Cost No. Ft. Cost Cost SOUTH SIDE Collier Adams Jr. 175 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 176 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 177 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 178 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 179 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 180 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 181 - DePauw-McLarty 66.00 $254.32 $125.12 $ 379.44 Harry Frederick 182 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Harry Frederick 183 - DePauw-McLarty ,f 70.00 $161.80 $128.60 $ 390.60, M.A. Coats 184, - DePauw-McLarty 70.00 $261.80 $128.80 $ 390.60 M.A. Coats 185 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 186 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 187 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Dewie V. Rothwell 188 - DePauw-McLarty 68.00 $254.32 $125.12 $ 379.44 Robert E. Burgess 189 - DePauw-McLarty 68.00 $254.32 $125.12 $ 375.44 Katherine Craig 190 - DePauw-McLarty 70.00 $261.80 $128.80 $ 390.60 Katherine Craig 191 - DePauw-McLarty 75.00 $280.50 $138.00 $ 418.50 Katherine Craig 192 - DePauw-McLarty 57.16 $213.78 $105.17 $ 318.95 FINAL PAVING ASSESSMENT City of Lubbock Width 36 feet 30.1740 KEMPER STREET Acceptance Date September 13, 1973 G.W.O. 10,790 Sheet No.3 of 3 East lip line of Utica Avenue to 15 feet West of St.h1e­:Wi*7Vjig0f(t MNTnleg) Sub -.Unit No. 35 of Avenue (North le ) Unit No. 2226 ' 9 Paving Curb & Gutter $3.74 Rate/L.F. $1.84 Rate/L.F. Total TOTAL PROPERTY OWNER COST $13,551.31 CITY'S SHARE - $ 1,100.66 TOTAL IF-F- 4ZTED SUB -UNIT COST $12,450.65 FINAL PAVING ASSESSMENT City of Lubbock Width 36 feet 11.00 Salem feet West of the EPL of Avenue North le SARVIS STREET Utica Avenue to 15.00 feet West of the WPL of 3U.1/4V Acceptance Date September 13,1973 G.W.O. 10,790 Sheet No. 1 of 3 Sub -Unit No. 36 of Unit No. 2226 Paving Curb & Gutter $3.74 Rate/L.F. $1.84 Rate/L.F. Total Owner Lots Addition No. Ft. Cost Cost Cost NORTH SIDE William Williamson 240 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 William Williamson 239 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Dewie V. Rothwell 238 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Dewie V. Rothwell 237 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Dewie V. Rothwell 236 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Cleo I. Thomas 235 (rel.2/9/73) DePauw-McLarty 68.00 $254.32 $125.12 $379.44 David W. Gilbert 234 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 David W. Gilbert 233 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Dewie V. Rothwell 232 DePauw-McLarty 70.00 $261.80 $126.80 $390.60 Royce E. Deborn 231 DePauw-McLarty 70.00 $261.80. $126.80 $390.60 Dewie V. Rothwell 230 DePauw-McLarty 67.00 $250.58 $123.28 $373.86 Dewie V. Rothwell 229 DePauw-McLarty 67.00 $250.58 $123.28 $373.86 Walter D. Sanders 228 & W.1/2 of 227 DePauw-McLarty 100.50 $375.87 $184.92 $560.79 Claude Critz E. 1/2 of 227 & 226 DePauw-McLarty 100.50 $375.87 $184.92 $560.79 FINAL PAVING ASSESSMENT City of Lubbock JARVIS STREET Width 36 feet 11.00 feet West of the EPL of Utica Avenue to 15.00 feet West of the WPL of Salem Avenue (North leg) .lV. "! ' Acceptance Date September 13,197 G.W.O. 10,790 Sheet No. 2 of 3 Sub -Unit No. 36 of Unit No. 222b Paving Curb & Gutter $3.74 Rate/L.F. $1.84 Rate/L.F. Total Owner Lots Addition No.Ft. Cost Cost Cost M.L. Lang 225 DePauw-McLarty 67.00 $250.58 $123.28 $373.86 Virgil Craig 224 DePauw-McLarty 699 00 25 0p 12b 9b 3� 02 02 Vi rgi 1 Craig 223 DePauw-McLarty 69.00 525ti,�06 $126.96 $$38 Virgil Craig 22 �2 DePauw-McLarty 107.01 $400.22 $196.90 $579.12 SOUTH SIDE G.W. White 241 DePauw-McLarty b8.00 $254.32 $125.12 $379.44 G.W. White 242 DePauw-McLarty 68.00 $254.32 $125.12 $3/9.44 Dewie V. Rothwell 243 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Dewie V. Rothwell 244 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Dewie V. Rothwell 245 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Dewie V. Rothwell 24b DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Dewie V. Rothwell 247 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Dewie V. Rothwell 24b DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Dewie V. Rothwell 249 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Ray C. Hageman 250 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Ray C. Hageman 251 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 FINAL PAVING ASSESSMENT Acceptance. Date September 13,197 City of Lubbock JARVIS STREET G.W.O. 10,790 Sheet No. 3 of 3 Width 36 feet 11.00 West of the WPL of Utica Avenue to 15.00 feet West of the WPL of Salem Avenue Sub -Unit No. 36 of _..._ _.......... _(North_ leg)_,..., _ ___ .. _ .. Unit.No. 2226 Paving Curb & Gutter._. _. ..$3.7.4 RateJL.F. $1.b4 Rate/L.F. Total . Owner Lots Addition No. Ft Cost Cost Cost Dewie V. Rothwell 252 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Ruth Clark Hayslip 253 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 SOUTH SIDE Patrick Henry Forson 254 DePauw-McLarty 68.00 $254.32 $125.12 $379"44 Patrick Henry Forson 255 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Jim E. McDonald 256 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 Jim E. McDonald 257 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 L. Marshall Nagle, Jr. 258 DePauw-McLarty 68.00 $254.32 $125.12 $379.44 L. Marshall Nagle, Jr. 259 DePauw-McLarty b8.00 $254.32 $125.12 $379.44 Kenneth A. Hannah 260 DePauw-McLarty 62.bt3 $234.42 $115.33 $349.75 TOTAL PROPERTY OWNER COST $14,986.15 CITY'S SHARE -$ 1,223.01 TOTAL HEf.NXCtTF: SUB UNIT COST $13, 763.14 FINAL PAVING ASSESSMENT 30.1761 City of Lubbock EAST 1/2 of NORTH UTICA AVENUE Accepted September 13, 1973 G. W.O. 10, 790 Width 42 feet 15 feet North of NPL of Kemper Street to fl­ 15 feet North of NPL of Itasca Street Sheet No. 1 of 1 Sub -Unit No. 37 of Unit No. 2226 Owner EAST SIDE J. Collier Adams William Williamson G. W. White Paving Curb & Gutter $2. 51 Rate/L.F. $1. 84 Rate/L. F. Total Lots Addition No. Ft. Cost Cost Cost 175 DePauw-McLarty 113.50 $284.89 $208.84 $493.73 2240 DePauw-McLarty 113.50 $284.89 $208.84 $493.73 241 DePauw-McLarty 113.50 $284.89 $208.84 $493.73 TOTAL PROPERTY OWNER COST $1, 481.19 CITY'S SHARE $2, 025. 48 TOTAL, SffJWAUiS111r-0CET0ST $3, 506. 67 FINAL PAVING ASSESSMENT Accepted September 13, 1973 City of Lubbock SALEM AVENUE G. W. O. 10, 790 Sheet No. 1 of 1 Sub -Unit No. 38 of Width 36 feet 15. 00 feet North of the NPL of Jarvis Street (West leg) to the 15. 00 feet North Unit No. 2226 of the NPL of Kemper Str eet (West leg) Owner Lots Addition $2. 50 Rate/L.F. No. Ft. Cost $1. 84 Rate/L. F. Cost Total Cost WEST SIDE Virgil Craig 222 DePauw-McLarty 123.30 $308.25 $226.87 $535.12 Katherine Craig 192 DePauw-McLarty 123.30 $308.25 $226.87 $535.12 EAST SIDE J. W. Montgomery 221 DePauw-McLarty 123.30 $308.25 $226.87 $535.12 Mable Stinson 193 DePauw-McLarty 123.30 $308.25 $226.87 $535.12 TOTAL PROPERTY OWNER COST $2, 140. 48 CITY'S SHARE $2, 434.12 TOTAL FPJMUS,1l1r-UN1'T'00ST $4, 574. 60 FINAL PAVING ASSESSMENT 30.1645 City of Lubbock SALEM AVENUE Accepted September 13, 1973 G.'W, O. 10,790 Sheet No. 1 of 2 Sub -Unit No. 39 of Unit No. 2226 Width 36 feet From 18. 00 feet South of the SPL of 53rd Street (East leg) to 15. 00 feet North of the NPL of 54th Street (W"t leg) Paving Curb & Gutter Rate/L. F. $1. 84 Rate/L. F. Total Owner Lots Block No. Addition No. Ft. Diff. Rate Cost Cost Cost EAST SIDE Robert H. Whitaker Robert H. Whitaker 10 (rel.5/25/73) 5 11(rel.7/19/73) 5 J. B. Ewing Beginning at a point, said point being 60. 00 feet West and 130. 00 feet South of the Northwest corner of Lot 11, Block 5, Sylvan Dell Heights Addition to the City of Lubbock; thence North along the West right-of-way line of Salem Avenue a distance of 125. 00 feet to a point; thence SVetA a distance of 300. 00 feet to a point;thence South a distance of 125.00 feet to a point; thence East along the North right-of-way line of 54th Street kodistance of 300. 00 feet to the poin#of beginning. Sylvan Dell Heights 130. 00 Sylvan Dell Heights 127. 00 2.50 325.00 239.20 564.20 2.50 317.50 233.68 551.18 125.00 3.74 467.50 230.00 697.50 FINAL PAVING ASSESSMENT SALEM AVENUE City of Lubbock .Width 36 feet From 18.00 feet South of the SPL of 53rd Street (East leg) to 15.00 feet North of the NPL of 54th Street (East leg) 30.1645 Accepted September 13, 1973 G.WQO. 10,790 Sheet No. 2 of 2 Sub -Unit No. 39 of Unit No. 2226 Paving Curb & Gutter Rate/L.F. $1.84 Rate/L.F. Total Owner Lots Block No. Addition No.Ft.Diff.Rate Cost Cost Cost WEST SIDE J.B. Ewing Beginning at a point, said point being 60.00 feet West and 5.00 feet South of the Northwest corner of Lot 11, Block 5, Sylvan Dell Heights Addition to the City of Lubbock;;thence North along the West right of way line of Salem Avenue a distance of 130' to a point; thence South 87036'53" West a distance of 240.51 feet to a point; thence South a distance of 120.00 feet to a point; thence East to a Distance of 240.00 feet to the point of beginning. 130.00 3.74 486.20 239.20 725.40 TOTAL PROPERTY OWNER COST $2,538.28 CITY"S SHARE $ 54.96 TOTAL FINAL SUB -UNIT COST $2,593.24 FINAL PAVING ASSESSMENT 30.1761 City of Lubbock Acceptance Date _September 13, 1973 HARVARD STREET G.W.O. 10,790 Sheet No. 1 of 3 Sub -Unit No. 49 of Unit No. 2226 Width 36 feet From East lip line of Utica Avenue to the West lip line of Salem Avenue Paving Curb & Gutter $3.74 Rate/L.F. $1.84 Rate/L.F. Total Owner Lots addition No.Ft. Cost Cost Cost H.E. Bennett & Betty Jo Bennett 348 DePauw-McLarty 80.00 a99.20 147.20 $446.40 H.E. Bennett 349 DePauw-McLarty 69.00 258.06 126.96 $385.02 Duffy Granville 350 DePauw-McLarty 69.00 258.06 226.96 $385.02 Eva Maly 351 DePauw-McLarty 69.00 258.06 126.96 $385.02 Eva Maly 352 DePauw-McLarty 69.00 258.06 126.96 $385.02 Dewie V. Rothwell 353 DePauw-McLarty 69.00 258.06 126.96 $385.02 Dewie V. Rothwell 354 DePauw-McLarty 69.00 258.06 126.96 $385.02 Norvall M. Johnstone 355 DePauw-McLarty 69.00 258.06 126.96 $385.02 George Helmstetler 356 DePauw-McLarty 69.00 258.96 126.96 $385.02 Dewie V. Rothwell 357 DePauw-McLarty 70.00 261.80 128.80 $390.60 Dewie V. Rothwell 358 DePauw-McLarty 70.00 261.80 128.80 $390.60 o! Dewie V. Rothwell 359 DePauw-McLarty 69.00 258.06 1263.89b =- $385.02 Dewie V. Rothwell 360 DePauw-McLarty 69.00 258.06 126.96 $385.02 66 Dewie V. Rothwell 361 DePauw-McLarty 69.00 258,04 126.96 $385.02 Dewie V. Rothwell 362 DePauw-McLarty 69.00 258.06 126.96 $385.02 Sam Day 363 DePauw-McLarty 69.00 258.06 126.96 $385.02 Sam Day- 364 DePauw-McLarty 69.00 258.06 126.96 $385.02 FINAL PAVING ASSESSMENT City of Lubbock HARVARD STREET Width 36 feet From East lip line of Utica Avenue to the West lip line of Salem Avenue Owner NORTH SIDE (Continued Dewie V. Rothwell Dewie V. Rothwell Dewie V. Rothwell SOUTH SIDE Baptist Foundation of Texas Baptist Foundation of Texas Dewie V. Rothwell Dewie V. Rothwell Dewie V. Rothwell Dewie V. Rothwell Dewie V. Rothwell Dewie V. Rothwell Dewie V. Rothwell Dewie V. Rothwell Dewie V. Rothwell 365 DePauw-McLarty 366 DePauw-McLarty 367 DePauw-McLarty 368 DePauw-McLarty 369 DePauw-McLarty 370 DePauw-McLarty 371 DePauw-McLarty 372 DePauw-McLarty 373 DePauw-McLarty 374 DePauw-McLarty 375 DePauw-McLarty 376 DePauw-McLarty 377 DePauw-McLarty 378 DePauw-McLarty Paving $3.74 Rate/L.F. No. Ft. Cost 69.00 258.06 69.00 258.06 80.00 299.20 81.00 302.94 69.00 258.06 69.00 258.06 69.00 258.06 69.00 258.06 69.00 258.06 69.00 258.06 69.00 258.06 69.00 258.06 69.00 258.06 69.00 258.06 30.1761 Acceptance Date September 13, 1973 G.W.O. 10,790 Sheet No. 2 of 3 Sub -Unit No. 49 of Unit No. 2226 Curb & Gutter $1.84 Rate/L.F. Cost 126.96 126.96 147.20 149.04 126.96 126.96 126.96 126.96 126.96 126.96 126.96 126.96 126.96 126.56 Total Cost $385.02 $385.02 $446.40 $451.98 $385.02 $385.02 $385.02 $385.02 $385.02 $385.02 $385.02 $385.02 $385.02 $385.02 FINAL PAVING ASSESSMENT 30.1761 City of Lubbock Acceptance Date September 13, 1973 HARVARD STREET G.W.O. 10,790 Sheet No. 3 of 3 -Width 36 feet From East lip. line of Utica Avenue to. .the West lip line of Salem Avenue Sub -Unit No. 49 of _ Unit No. 2226 $3-.74 Rate/L.F. Curb & Gutter Paving .:. $1.84 Rate/L.F. Total Owner Lots Addition No. Ft Cost Cost Cost SOUTH SIDE.(Continued Buckner Baptist Benevolences379 DePauw-McLarty 69.00 258.06 126.96 $385.02 W.G. Rogers & J.P. Rogers 380 DePauw-McLarty 69.00 258.06 126.96 $385.02 W.G. Rogers & J.P. Rogers 381 DePauw-McLarty 69.00 258.06 126.96 $385.02 Leonard Fallin 382 DePauw-McLarty 69.00 258.06 126.96 $385.02 Dewie V. Rothwell 383 DePauw-McLarty 69.00 258.06 126.96 $385.02 M.M. & Vesta Glasscock 384 DePauw-McLarty 69.00 258.06 126.96 $385.02 M.M. & Vesta Glasscock 385 DePauw-McLarty 69.00 258.06 126.96 $385.02 Joe Bullock 386 DePauw-McLarty 69.00 258.06 126.96 $385.02 Dewie V. Rothwell 387 DePauw-McLarty 81.00 302.94 1499044 $451.98 TOTAL PROPERTY OWNER COST $15,668.64 CITY'S SHARE - 538.62 TOTAL FINAL SUB UNIT COST $15,130.02 FINAL PAVING ASSESSMENT Accepted September 13, 1973 City of Lubbock EAST 1/2 OF NORTH UTICA AVENUE G. W. O.' 10, 790 Sheet No. 1 of 1 Sub -Unit No. 50 of Width 42 feet from 15 feet North of NPL of Itasca Street to the 15 feet South of SPL of Harvard Unit No. 2226 Street raving t;uro & cutter Rate/L. F. $1. 84 Rate/L. F. Total Owner Lots Addition No. Ft. Diff. Rate Cost Cost Cost EAST SIDE Dewie V. Rothwell 367 DePauw-McLarty 113.50 2.51 $284.89 $208.84 $493.73 TOTAL PROPERTY OWNER COST CITY'S SHARE TOTAL FINAL SUB UNIT COST $493. 73 $1610. 76 $2104. 49 FINAL PAVING ASSESSMENT Accepted September 13, 1973 City of Lubbock SALEM AVENUE G. W, O, 10, 790 Sheet No. 1 of 1 Sub -Unit No. 51 of Unit No. 2226 Width 36 feet from 15. 00 feet South of SPLaf Harvard Street (West leg) to 15 feet South of SPL of Itasca Street Paving Curb & Gutter Rate/L.F. $1.84 Rate/L.F. Total Owner Lots Addition No. Ft. Diff. Rate Cost Cost Cost WEST SIDE H. E. Bennett & 348 DePauw-McLarty 113. 50 $2. 50 283. 75 208.W. 492.59 Betty Jo Bennett Arlie F. Jobe EAST SIDE J. R. Chandler D.A. & S. Oil Well Service Inc.. c/o John DePauw 332 DePauw-McLarty 98.50 $2. 50cJ346. 25 333 DePauw-McLarty 98.50 $2.50246.25 Beginning at a point, said point being 20. 00 feet South 1048' West of Southwest corner of Lot 333 DePauw-McLarty Addition to, the City of Lubbock; thence South 10 48' West along the East right- of-way line of Salem Avenue a distance of 184. 50 feet to a point; thence South 880 12' East a dis- tance of 150. 00 feet to a point; thence North 10 48E East a distance of 184. 50 feet to a point, said point being on the South right-of-way line of the alley South of Itasca Street; thence North 880 12' West along the South right-of-way line a distance of 150.00 feet to the point of beginning. 184.50 $3. 74 690. 03 TOTAL PROPERTY OWNER COST CITY'S SHARE TOTAL FINAL SUB -UNIT COST 181.24 427.49 181.24 _ 427.49 339.4Q 1029.51 J2377. 08 818.79 $3195. 87 30.1742 FINAL PAVING ASSESSMENT %ccepted September 13, 1973 City of Lubbock SALEM AVENUE G. W.O. 10, 790 Sheet No. 1 of 1 - Sub -Unit No. 5a of Unit No. 2226 Width 36 feet From 15. 00 feet North of the NPL of Itasca Street to 15. 00 feet North of the NPL of Jarvis Street (West leg) Paving Curb & Gutter $2.50 Rate/L.F. $1.84 Rate/L.F. Total Owner Lots Addition No. Ft. Cost Cost Cost WEST SIDE Alma B. Tiner 293 DePauw-McLarty 99.07 247.68 182.29 429.97 Kenneth A. Hannah 260 DePauw-McLarty 119.55 298.88 219.97 518.85 EAST SIDE Edwin Germany 292 DePauw-McLarty 98.91 247.28 181.99 429.27 Donald Robertson 261 DePauw-McLarty 118.32 295.80 217.71 513.51 TOTAL PROPERTY OWNER COST $1, 891. 60 CITY'S SHARE $2, 543. 27 TOTAL FINAL SUB UNIT COST $4, 434. 87