Loading...
HomeMy WebLinkAboutResolution - 080973I - Pavement Improvements - WD Turner Construction Co - Brentwood Club Addition - 08_09_1973t,�fi V�UJ{f RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Brentwood Club Addition Lots 1-41, made arrangements with W.D. Turner Construction Company for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Brentwood Club Addition Lots 1-41 including the following streets: Brentwood Circle adjacent to Lots 1-41, Brentwood Club Addition known and designated as New Subdivision Unit Number 2015 -52. Brentwood Circle from its intersection with the North lip line of 19th Street to its intersection with a line 172.00 feet North of the North lip line of 19 Street known and designated as New Subdivision Unit Number 2015-53. AND WHEREAS, the construction of the above improvements on the above - mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accor dance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby acceed and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 9 TH DAY OF AUGUST, 1973. A TtE-S T Lav nia Lowe, Ci Ey Secretary APPR Wi lfo\r-. Watson, City Engineer rris W. Turner, Mayor APPMVED : Fred 0. Senter, Jr., Ci ttdrney CONSOLIDATED FINAL ESTIMATE BRENTWOOD CLUB ADDITION, Lots 1-41 Accepted August 9, 1973 Unit & Sub -Unit Location L.F. Curb & Gutter Removal S.Y. Paving 6" Base L.F. Curb & Gutter S.Y. Al ley Return & Drainage Channels S.Y. -TAI;py Gutter L.F. Re-sur :' facing L Each Pipe Barricade S.Y. Surface Only 2015-52 Brentwood Circle adja- 8115.65 3996.66 298.86 1 40.89 cent bo Lots 1-41 Brentwood Club Addition. 2015-53 Brentwood Circle from 109.00 862.45 566.48 130.64 109.QG.` o, the NLL of 19th Street - to 172.0' North of the NLL of 19th Street. TOTALS 109.00 8978.10 4563.14 298.86 130.64 109.00 1 40.89 8,978.10 S.Y. Paving 6" Base 4,563.14 L.F. Curb and Gutter 298.86 S.Y. Alley Return DrainagelChannels 130.64 S.Y. Valley Gutter 109.00 INF. Re -surface 109.00 L.F. Curb & Gutter Removal 1 Each Pipe Barricade 40.89 S.Y. Surface CONTRACT COST: Unit & Sub -Unit NS 2015-52 NS 2015-53 NS @ $ 1.99 @ $ 2.15 Q $ 8.00 @ $ 8.00 @ $ 1.00 @ $ 1.00 @ $350.00 @ $ 1.00 Contract Cost $ 17,866.42 9,810.75 2?,390.88 1,045.12 109.00 109.00 350.00 40.89 $31,722.06 Property Owner Cost $27,524.73 $27,524.73 $ 4,197.33 4,197.33 TOTALS: $31,722.06 $31,722.06