Loading...
HomeMy WebLinkAboutResolution - 080973F - Pavement Improvements - Kerr Contruction Co - Multiple Locations - 08_09_19736701 ??3 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS, the Urban Renewal Agency of the City of Lubbock made arrange- ments with Kerr Construction Company for the construction of paving improvement on certain streets in Clayton -Carter, Carter -Coffey, and other additions in- cluding the following streets: Ursuline Street from its intersection with a line 40.00 feet West of the East property line of North Ash Avenue to its intersection with a line 13.00 feet East of the East property line of Ivory Avenue known and designated as Sub -Unit Number P of Unit Number 2226. Tulane Street from its intersection with the East paving line of North Ash Avenue to its intersection with a line 13.00 feet East of the East property line of Ivory Avenue known and designated as Sub -Unit Number 2 of Unit Number 2226. Stanford Street from its intersection with the East paving line of N. Ash Avenue to its intersection with a line 13.00 feet East of the East property line of Ivory Avenue known and designated as Sub -Unit Number 3 of Unit Number 2226. Rice Street from its intersection with the East paving line of North Ash Avenue to its intersection with a line 14.00 feet East of the West property line of Globe Avenue known and designated as Sub -Unit Number 4 of Unit Number 2226. Queens Street from its intersection with the East paving line of North Ash - Avenue to its intersection with a line 13.00 feet East of the East property line of Ivory Avenue known and designated as Sub -Unit Number 5 of Unit Number 2226. Cedar Avenue from its intersection with the North lip line of Queens Street to its intersection with the South lip line of Rice Street known and designated as Sub -Unit Number 6 of UnicnNumber 2226. Cedar Avenue from its intersection with the North lip line of Rice Street to its intersection with the South lip line of Stanford Street known and designate Frs Sub -Unit Number 7 of Unit Number 2226. Cedar Avenue from its intersection with the North lip line of Stanford Street to its intersection with the South lip line of Tulane Street' known Ltnd desig- nated as $ua _�Uni t-Rumlwrr 8;,pf., _ni;t 'Number 2226. Cedar Avenue from its intersection with the North lip line of Tulane Street to its intersection with the South lip line of Urseline Street known and designate as Sub -Unit Number 9 of Unit Number 2226. Elm Avenue from its intersection with the North lip line of Queens Street to i.,its intersection with the South lip line of Rice Street known and designated * Number 10 of Unit Number 2226. Elm Avenue from its intersection with the North lip line of Rice Street to its intersection with the South lip line of Stanford Street known and designated as Sub -Unit Number 11 of Unit Number 2226. Elm Avenue from its intersection with the North lip line of Stanford Street to its intersection with the South lip line of Tulane Street known and desig- nated as Sub -Unit Number 12 of Unit Number 2226. Elm Avenue from its intersection with the North lip line of Tulane Street to its intersection with the South lip line of Ursuline Street known and designa- ted as Sub -Unit Number 13 of Unit Number 2226. Globe Avenue from its intersection with the North lip line of Queens Street t its intersection with the South lip line of Stanford Street known and designa ted as Sub -Unit Number 14 of Unit Number 2226. Globe Avenue from its intersection with the North lip line of Stanford Street to its intersection with the South lip line of Tulane Street known and desig- nated as Sub -Unit Number 15 of Unit Number 2226. Globe Avenue from its intersection with the North lip line of Tulare Street to its intersection with the South lip line of Ursuline Street known and de- signated as Sub -Unit Number 16 of Unit Number 2226. IvoryAAvenue from its intersection with the North lip line of Queens Street t its intersection with the South lip line of Stanford Street known and designa ted as Sub -Unit Number 17 of Unit Number 2226. Ivory Avenue from its intersection with the North lip line of Stanford Street to its intersection with the South lip line of Tulane Street known and desig- nated as Sub -Unit Number 18 of Unit Number 2226. Ivory Avenue'from its intersection with the North lip line of Tulane Street t its intersection with the South lip line of Ursuline Street known and designa ted as Sub -Unit Number 19 of Unit Number 2226. Canton Avenue from its intersection with the South property line of Amherst Street to its intersection with the North property line of 1st Street known and designated as Sub -Unit Number 20 of Unit Number 2226. Canton Avenue from its intersection with the South property line of 1st Place to its intersection with the North property line of 2nd Street known and de- signated as Sub -Unit Number 21 of Unit Number 2226. Avenue "S" from its intersection with the North property line of 1st Street to its intersection with the North lip line of Clovis Road known and desig- nated as Sub -Unit Number 22 of Unit Number 2226. Concrete sidewalks throughout the Clayton -Carter, Carter -Coffey grrea between Ash Avenue and Cedar Avenue known and designated as Sub -Unit Number 23 of Unit Number 2226. AND WHEREAS, the construction of the above improvements on the above - mentioned streets was performed under the sppervision of the City Engineer, and said improvements have been completed and have been inspected and found have been constructed in accordance with City specifications and in accordan with the provisions of City Ordinance 1331. TIBEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS, I. That the improvements on said portions of the above mentioned streets be and the same are hereby accepted. II, This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 9TH DAY OF AUGUST, 1973. orris W. Turner, Mayor A T -``1 � Lavenia Lowe.,-Ci y Secretary APPR VED: Wilfo Watson, City Engineer APPROVED: red 0. Senter, Jr., C W Attorney I CONSOLIDATED FINAL ESTIMATE Atcepted August 9,1973 S.Y.; S.Y. L.F. S.Y. L.F. Alley Ret. S.Y. Concrete S.Y. L.F. Curb & Unit & 'Paving S.Y. � Curb & & Drainage valley Slab Concrete S.Y. Concrete Gutter Sub -Unit Location 6" Base Resurface•, Gutter Channels Gutter Removal Sidewalk Approaches Conduit Special Reconst. Cost NS 2226-1 Ursuline street from its 10,117.57 :` 5,074.00 15.56 $27071.6 intersection with a line 40.00 feet West of the East property line of North Ash Avenue to its intersection with a line 13.00 feet East of the East property line of Ivory Avenue. NS 2226-2 Tulane Street from its in- 16,073.83 4,742.90 31.11 27,160 5 tersection with the East paving line of North Ash Avenue to its intersection with a line 13.0 feet East of the East property line e.. of Ivory Avenue. NS 2226-3 Stanford Street from its 10,090.07 4,744.70 31.11 27,200.2 intersection with the East paving line of North Ash Avenue to its intersection with a line 13.00 feet East of the East property line of Ivory- Avenue. NS 2226-4 Rice Street from its in- 7,408.08 3,677.80 31.11 20,413.2 tersection with the East paving line of North Ash Avenue to its intersection with a line 14.00 feet East ; of the West property line i %., of Globe Avenue. 0.1. L.r. n".y A%.,. .a. VVu .. ra. u.a. •. .. .. Unit & Paving S.Y. Curb & & Drainage Valley Slab Concrete S.Y. Concrete Gutter Sub -unit Location 6" Base Resurface Gutter Channels Gutter Removal Sidewalk Approaches Conduit Special Reconst. Cost NS 2226-5 Queens Street from its 10,459.87 4,547.14 32.91 $27.458.5 intersection with the East paving line of North Ash Avenue to its intersection with a line 13.00 feet East of the East property line of Ivory Avenue. ! NS 2226-6 Cedar Avenue from its in- 1,.137.97 644.92 40.40 tersection with the North lip line of Queens Street to its intersection with the South lip line of Rice Street. NS 2226-7 Cedar Avenue from its inter- 1,137.97 644.92 40.40 section with the North lip line of Rice Street to its intersection with the South lip line of Stanford Street. NS 2226-8 Cedar Avenue from its in- 1,210.86 685.92 40.40 tersection with the North lip line of Stanford Street ' to its intersection with the South lip line of Tulane Street. NS 2226-9 Cedar Avenue from its in- 1,210.86 685.92 40.40 tersection with the North lip line of Tulane Street to its intersection.with!$he South lip line of Ursuline Street. NS 2226-10 Elm Avenue from its inter- 1,137.97 644.92 40.40 section with the North lip line of Queens Street to its intersection with the South lip line of Rice Street. 3,570.11 3,•570.1 A 3,778.14 3,1778.1 S.Y. S.Y. L.F. S.Y. L.F. Alley Ret. S.Y. 'Concrete S.Y. L.F. Curb & Init & Paving S.Y. Curb & & Drainage Valley Slab Concrete S.Y. Concrete Gutter ,ub-Unit Location 6" Base Resurface Gutter Channels Gutter Removal Sidewalk Approaches Conduit Special Reconst. Cost 4S 2226-11 Elm Avenue from its inter- 1,137.97. 644.92 40.40i 3,570.11 section with the North lip line of Rice Street to its , intersection with the South lip line of Stanford Street. IS 2226-12 Elm Avenue from its intersee- 1,158.32 685.92 I 40.40� 52.54 4,093.88 tion with the North lip line of Stanford Street to its in- tersection with the South lip line of Tulane Street. IS 2226-13 Elm Avenue from its inter- 1,158.32 685.92 40.40 52.54 4,003.88 section with the North lip line of Tulane Street to its intersection with the South lip line of Ursuline Street. dS 2226-14 Globe Avenue from its inter- 2,629.29 1,211.91 52.69 7,382.89 section with the North lip line of Queens Street to its intersection with the South ' lip line of Stanford Street. IS 2226-15 Globe Avenue from its inter- 1,210.86 685.92 40.40 3,778.12 section with the North lip line of Stanford Street to its intersection with the South lip line of Tulane Street. IS 2226-16 Globe Avenue from its.inter- 1,210.86 685.92 40.40 3,778.12 section with the North lip line of Tulane Street to its intersection with the South lip line of Ursuline Street. _ 1S 2226-17 Ivory Avenue from its inter- 2,574.65 1,290.45 52.69. 185.40 89880:18 section with the North lip line of Queens Street to. its inter-__._ section with the South lip line of Stanford Street. f S.Y. L.F. Alley Ret. S.Y. Concrete S.Y. nit & Paving S.Y. Curb & & Drainage Valley Slab Concrete ub-Unit Location 6" Base Resurface Gutter Channels Gutter ° Removal Sidewalk S 2226-18 Ivory Avenue from its inter- 1,105.78 685.92 40.40! 105.08 section with the North lip line of Stanford Street to its intersection with the , South lip line of Tulane Street. { S 2226-19 Ivory Avenue from its in- 1,105.78 685.92 40.40! 105.08 tersection with the North lip line of Tulane Street to its intersection with the South lip line of Ursuline Street. S 2226-20 Canton Avenue from its in- 999.46 tersection with the South property line of Amherst Street to its intersection with the north property line of 1st Street. S 2226-21 Canton Avenue from its 1,225.33 intersection with the South property line of 1st Place to its intersection with the North ro ert line of 2nd 550.0 15.56 22.78 605.70 31.11 27.12 P P Y Street. S 2226-22(A)Avenue S from its- inter- 2,076.79 570.56 ;631.00 section with the North property line of 1st Street to its intersection with the North lip line of Clovis Road. S 2226-22 Mixcellaneous alleys 126.90 L.r. L.F. Curb & S.Y. Concrete Gutter 4,409.65 4,409.65;j 3,12`5.20 E� 3782.641 6,342.8611 102.00 767.141 S 2226-23 Concrete sidewalks throughout 1,503.57 10,418.78 474.64 459124.71 the Clayton-Carter,Carter-, Coffey area between Ash Avenue ^ and Cedar Avenue. 2226-24 Drainage structures 26.11 4.90 Q� 8,830,891 y TOTALS 71,578.46 570.56 35,206.64 810.32 ' 703.55 1,503.57 10,418.78 474.64 24.90 8,267.49 102.00 260,640.7f- 60.00 31.67 COST' MDR —To 71L,S78.46 S.Y. Paving 6" Base @ $ 1.74 $124,546.52 $70,56 S.Y. Resurfacing $ .87 406.39 3$,206.64 L,F. Curb and Cutter t $ 1.98 69,709.15 610.32. S.X. Alley Return $ 1.7$ 6,279,00 703.35 S.Y. Valley Putte; $ 1.73 5,452.51 1,503.57 S.Y. concrete Slab Removal 0 $ 1.00 1,$03.$7 10,416.78 SPY. Concrete Sidevalk 0 8 4.00 41,615.12 474.64 SPY. Approaches Cd $ 4.10 1.946.02 24.90 L.F. Concrete Conduit 1$ $14.50 361.05 1.839.98 special ;a) L.F. @ $ 232 4.636.75 19.00 (b) Lump Bum 0$100.00 1,900.00 4,269.13 (4) LAS Q 6 0.30 1,280.74 3 (4) 'gip S,m► O$150.00 450.00 102,00 L.F. Curb & Cutter Recoastructioo?$ 3.9S j 2,.jQ Unit & CONT COST $260,640.70 Contract urban Renewal 2226-1 27,771.68 21,771.46 2226-2 27.160.51 27.160.51 2226-3 27,200.25 27,200.25 2226-4 20,413.21 20,413.21 2226-5 27,458.56 27.438.56 2226-6 3,570.11 3,570.11 222E-7 3,510111 3,510.11 2226-8 3.978.12 3,178.12 2226-9 3,778.12 3,778.12 2226-10 3,570.11 3,570.11 2226-11 3,570.11 3,S70.11 2226-12 4,093.88 4,093.88 2226-13 4,093.88 4,093.88 2226-t4 7,382.89 7,382.89 2226-15 3.778.12 3,778.12 2226-16 3,776.12 3,178.12 2226-17 8,880.10 8,880.10 2226.18 4,409.65 4,409.65 2226-19 4,409.65 4,409.65 2226-20 3,125.20 3,123.20 2226-21 3,782.64 3,782.64 2226-22(A) 6.342.86 6,342.66 2226-22 767.14 767.14 2226-23 45,124.71 45,124.11 2226-24 8.630.89 6,030.69 Totals 260,640.70 260.6b0.70 762-6411 P. O. Box 2000 LUBBOCK, TEXAS 79457 August 9, 1973 Honorable Mayor & City Council City of Lubbock Lubbock, Texas Gentlemen: I submit herewith the closing documents for Street Paving improvements in the Clayton -Carter, Carter -Coffey Area, NDP TEX A-14(c), GOWO 163. Final inspection has been made on the abovementioned improvements and said improvements have been constructed in accordance with plans, speci- fications and contract documents. I therefore recommend acceptance of the improvements. Wilfo D. Watson City ngineer