RESOLUTION
RESOLUTION ACCEPTING IEPROVEMTS ON PORTIONS OF STREETS, AND/OR AVENUES
AS LISTED BELO11.
8-18-55 WHEREAS, in conformance with the paving requirement provisions of City
Copy to Ordinance 1331, the subdivider of Rushland Park Addition, Installments Number
City Fnrr-Dq bTwo and Number Three made arrangements with Elliott Taylor, Paving Contractor,
for the construction of paving improvements on certain streets dedicated in
said subdivisions under the provisions of said Ordinance prior to the recording
of the subdivision plats of Rashland Park Addition, Installments Number Two and
Number Three, including the following streets and avenues:
Salem Avenue from its intersection with the South Property Line of the Alley
South of 16th Street to its intersection with the North Property Line of the
Alley North of 16th Street known and designated as New Subdivision Unit
Number 176-A.
Toledo Avenue from its intersection with the South Property Line of the Alley
South of 16th Street to its intersection with the North Property Line of the
Alley North of 16th Street known and designated as New Subdivision Unit
Number 177.
16th Street from its intersection with the Fast Line of Lot 1, Block 10, Rush-
land Park Addition Second Installment to its intersection with the East Gutter
Line of Toledo Avenue known and designated as New Subdivision Unit Number 178.
16th Street from its intersection with the West Gutter Line of Toledo Avenue to
its intersection with the East Gutter Line of Utica Avenue and the alley return
on the East side of Utica Avenue and at the alley North of 16th Street known
and designated as New Subdivision Unit Number 182.
AND WHEREAS, the construction of the above improvements on the above-
mentioned streets and avenues was performed under the supervision of the City
Engineer, and said improvements have been completed and have been inspected and
found to have been constructed in accordance with City Specifications and in
accordance with the provisions of City Ordinance Number 1331.
NOV THEREFORE, BE IT RESOLVED BY THE CITY COMMSION OF THE CITY OF
LUBBOCK:
I.
That the improvements on said portions of the abovementioned streets and
avenues be, and the same are hereby accepted and the City Engineer be and is
hereby authorized to direct the payment of the Cityls portion of cost.
II.
This resolution shall take effect and be in force from and after its
passage.
AND IT IS SO ORDERED.
1
CITY OF LUBBOCK i
TEXAS
August 11, 1955
Honorable Mayor and City Commission
Lubbock,
Texas
Gentlemen:
I have examined the paving improvements constructed by
Elliott Taylor, Paving Contractor, under his contract With
the subdivider of, Rushland Park Addition, Installments Number
Two and Number Three in accordance With Ordinance Number 1331
and find that the improvements on the streets and/or avenues
designated as New Subdivision Units 176-A, 177, 178, and 182,
as listed on the attached final estimate sheet to have been
completed in accordance with plans and specifications on
said streets and/or avenues, and recommend the payment to the
contractor the amount shown on the attahced consolidated final
estimate sheet as being due him from the City of Lubbock.
Very truly yours,
W. B. Holmes
Director of Public Works
SPP:jb
y V
cell 0
Passed and approved this llth day of August, 1955.
I
r . AIPP
ATTEST:
i
Lav nia Lowe, Cj&y Secretary
APPROVED:
W. B. Holmes, City Engineer '
-COVED �
> e��L/' em
• I
I
Vaughn0E. Wil on, City Attorney
i
I
i
i
i
I
I
I
i
i
l
CONSOLIDATED FINAL ESTIMATE FOR
RUSHLAND PARK SECOND AND THIRD INSTALLWWTS
G. W. 0. 1154
QUANTITIES
N-S S.Y. of S.Y. of L.F. of S.Y. of S.Y. of Cone.
Unit No. Location Paving .Sub. Prep. C. & G. Alley Slab Valley Gutter
176-A Salem Ave.-Alley S. of 16th St. 1331.02 1613.92 814- 2 76.67
to Alley N. of 16th St.
177 Toledo Ave.-Alley S. of 16th St. 1969.19 223.6,.01 756.57 56.66
to Alley N. of 16th St.
178 16th St.-E.--Line Lot 1, Block 10, 3071.19 3511.03 1583.41
Rushland Park Inst. #2 to EGL
Toledo Ave.
182 16th St.WGL Toledo Ave. to EGL 1996.50 2339.18 1164.11 - 19.28
Utica Ave.
TOTALS 8347.90 9700.14 4318.51 152.61 -0-
COST ESTIMATE
8,347.90 S.Y. Paving ® 1.10 = 90182.69
9,700.14 S. Y. Subg. Prep @ 0.20 = 1,940.03
49318.51 L.F. Curb & Gutter 0 1.45 = 62261.84
152.61 S.Y. Cone. Alley Slab @ 3.25 = 495.98
TOTAL CONTRACT COST 6 17,880.54
10% Engineering 1,788.05
TOTAL ESTIMATE COST 192668.59
COST DISTRIBUTION
A-S Total Subdividers Escrow to City to Total Contract Credit
Unit No. Est. Cost Cost Contractor Contractor Cost Engr. Dent.
176-A 3,514.49 3,151.66 -0- 43.33 3,194.996 319.50
177 40283.94 2,977.32 -0- 917.17* 3,894.49 389.45
178 7,014.11 6,317.24 -0- 59.22 6,376.46 637.65
182 4,856.06 4,414.60 -0- -0- 4,41-4.60 441.46
19,668.60 16,860.82 6 4019.72 17,880.54 4788.06
City's extra width on Toledo Avenue.