HomeMy WebLinkAboutResolution - 071273D - Water_Sewer Improvements - Panhandle Construction Co - Rushland Park Addition - 07_12_1973RESOLUTION
Resolution accepting water and sewer system improvements for Lots 5-8,
Block 23, Lots 7-13, Block 24, Lots 1-7, Block 25, and Lots 1-4, Block 26,
Rushland Park Addition.
WHEREAS, the developer of Lots 5-8, Block 23, Lots 7-13, Block 24,
Lots 1-7, Block 25, and Lots 1-4, Block 26, Rushland Park Addition has
complied with the provisions of the City of Lubbock Code, Chapter 34, Article
2, by providing the water and sewer improvements for said addition in
accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total uti 1 i ty cost to the developer is $11,230.11 with
the improvements constructed by Panhandle Construction Company having a
value of $5,685.17 as determined by the unit prices established by said
Chapter 34, and $5,544.94 cash (engineering, wet tie-ins, paving repair,
difference in Pro Rata and actual cost) paid to the City, with Rushland
Park, Incorporated, the developer, to receive a refund of $none in
accordance with Chapter 34 of ;the Code of the City of Lubbock and a refund
of deposit in the amount of $none and,
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improve-
ments have been completed in accordance with the City of Lubbock's plans
and specifications,
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 12th DAY OF JULY 1973.
orris W. Turner, Mayor
Attes
Lavenia Lowe, City'Secretary
Appr ved: Ap oved:
Rr
% U/ ,✓
Wil o . Watson, -City Engineer Fred 0. Senter, Jr., Cit Att rney