HomeMy WebLinkAboutResolution - 4667 - Contract - TDOHCA - Comprehensive Energy Assistance Program - 11_17_1994Resolution No. 4667
November 17, 1994
Item #23
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to
execute for and on behalf of the City of Lubbock a Contract and all related documents during the
effective dates of the Contract, by and between the City of Lubbock and the Texas Department of
Housing and Community Affairs for the Comprehensive Energy Assistance Program. Said
Contract and all related documents are attached hereto and incorporated in this Resolution as if
fully set forth herein and shall be included in the minutes of the Council.
Passed by the City Council this
APPROVED AS TO CONTENT:
ti
Doug g Director of H th,
Community velopment & Neighborhood
Initiatives
APPROVED AS TO FORM:
Linda L. Chamales, Assistant City Attorney
i 1 C-JaCOMPENER M
oodoc"ova nbw 8, 1994
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS
Ann W. Richards
�i,�
BOARD MEMBERS
GOVERNOR
Paul R. Rodriguez
�10
It
Chairman
Henry Flores
^� c
D(C
Harvey Clemons Jr.
EXECUTIVE DIRECTOR
b
Elizabeth Flores
a
Richard C. Hile
so
Joseph Kemp
44
Walter Martinez
Judith McDonald
Mary Sanger
Susan Sharlot
MEMORANDUM
TO: Sylvia A. Martinez -Flores, Executive Director
CITY OF LUBBOCK, COMMUNITY DEVELOPMENT &
NEIGHBORHOOD INITIATIVES
FROM: J. Al Almaguer, Program Manager
Energy Assistance
DATE: December 8, 1994
SUBJECT: Comprehensive Energy Asssitance Program
Contract No. 595048
Enclosed is your signed copy of the above document. If you have any questions, please
contact your assigned program officer.
Enclosure
SIGNEDLE
811 BARTON SPRINGS ROAD - SUITE 100 • P. O. BOX 13941 • AUSTIN, TEXAS 78711-3941 • (512) 475-3800
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS
CONTRACT NO. 595048 FOR THE
FY 1995 COMPREHENSIVE ENERGY ASSISTANCE PROGRAM
SECTION 1. PARTIES TO THE CONTRACT
This contract is made by and between the Texas Department of Housing and Community Affairs, an agency of the
State of Texas (the "Department") and Lubbock, City of, Community Services Department (the "Contractor").
SECTION 2. CONTRACT PERIOD
Ibis contract shall commence on September 30, 1994, and unless terminated earlier, shall end on September 30,
1995 (the "Contract Period").
SECTION 3. CONTRACTOR PERFORMANCE
Pursuant to the Low -Income Home Energy Assistance Act of 1981, as amended, 42 U.S.C. Sec. 8621 et sea. (the
"LIREAP Act") Contractor shall operate, on an equitable basis throughout Contractor's service area, a Comprehensive
Energy Assistance Program, (the "CEAP"), in accordance with the terms of this contract and all applicable state and
federal regulations. Services shall include Case Management, Energy Crisis, Co -Payment, Elderly and Disabled
Assistance, and Heating/Cooling Systems as further specified in the Performance Statement (Exhibit "A" ), the Budget
(Exhibit "B"), and the Allowable Activities Document (Exhibit "C"). Contractor's service area consists of the following
Texas counties: Lu k .
SECTION 4. DEPARTMENT OBLIGATIONS
A. In consideration of Contractor's satisfactory performance of this contract, Department shall reimburse
Contractor for the actual allowable costs incurred in the amount of.
i
Funds for FY '95 CEAP Currently Available: Thirty Five Thousand and no/100 Dollars ($35,000.00).
Travel Funds for FFY 195 CEAP Training: Nine Hundred Twenty Six and no/100 Dollars ($926.00).
B. By written notice to Contractor, Department may obligate additional funds under Section 4(A). For planning
purposes only, Contractor may assume that the total award to Contractor during the Contract Period will be:
Anticipated FY '95 Funds: Three Hundred Twelve Thousand Twelve and no/100 Dollars
($312,012.00).
PAGE 1 OF 10
C. Any decision to obligate additional funds or deobligate funds shall be made by Department based upon factors,
including but not limited to, the status of funding under grants to Department, the rate of Contracts
utilization of funds under this or previous contracts, the existence of questioned or disallowed costs under this
or other contracts between the parties, and Contractor's overall compliance with the terms of this contract.
D. Department's obligations under this Section are contingent upon the actual receipt of funds from the U.S.
Department of Health and Human Services and the State of Texas. Department acknowledges that it has
received obligations from those sources, which, if paid, will be sufficient to pay the allowable costs incurred by
Contractor under this contract.
E. Department is not liable for any cost incurred by Contractor which:
(1) is subject to reimbursement by a source other than Department;
(2) is for performance of services or activities not authorized by the LMAP Act, or which is not in
accordance with the terms of this contract;
(3) is not reported to Department on a Monthly Funding/Financial/Performance Report within sixty (60)
days following the termination of this contract; or,
(4) is not incurred during the Contract Period.
SECTION 5. METHOD OF PAYMENT/CASH BALANCES
A. For each month of the Contract Period, Contractor may request an advance payment by submitting to
Department at its offices in Austin, Travis County, Texas, no later than the twentieth (20th) day of the month
prior to the month for which advance payment is sought, a properly completed Monthly
Funding/Financial/Performance Report and a State of Texas Purchase Voucher for an amount not to exceed
Contractor's actual cash needs for the month for which such advance is sought.
B. Contractor's requests for advances shall be limited to the minimum amount needed for the effective
performance of this contract, and shall be timed as closely as possible to coincide with Contractor's actual
immediate cash requirements. Contractor shall establish procedures to minimize the time elapsing between the
transfer of funds from Department to Contractor and the disbursal of such funds by Contractor.
C. Department reserves the right to utilize a cost reimbursement method of payment if (1) Contractor maintains
excessive cash balances or requests advance payments in excess of thirty (30) days' need; (2) Department
identifies any deficiency in the internal controls or financial management system used by Contractor, (3)
Contractor violates any of the terns of this contract; or (4) Department's funding sources require the use of a
cost reimbursement method of payment.
D. Contractor shall refund, within fifteen (15) days of Department's request, any sum of money paid to Contractor
by Department which Department determines (1) has resulted in an overpayment to Contractor or (2) has not
been spent strictly in accordance with terms of this contract. Department may offset or withhold any amounts
otherwise owed to Contractor under this contract against any amount owed by Contractor to Department
arising under this contract.
PAGE 2 OF 10
E. All funds paid to Contractor under this contract are paid in trust for the exclusive benefit of the eligible
recipients of the Comprehensive Energy Assistance Program and for allowable administrative and case
management expenditures.
SECTION 6. COST PRINCIPLES AND ADMINISTRATIVE REQUIREMENTS
Except as specifically modified by law or the terms of this contract, Contractor shall comply with the cost principles
and uniform administrative requirements set forth in the Uniform Grant and Contract Management Standards for State
Agencies, 1 T.A.C. §§ 5.141 et seq. (the "Uniform Grant Management Standards") provided that all references therein
to "local government" shall be construed to mean Contractor.
SECTION 7. ALLOWABLE ADMINISTRATIVE/CASE MANAGEMENT EXPENDITURES
Administrative costs incurred by Contractor in carrying out this contract shall be allowable up to a maximum of 7.22%
of the total allowable contract expenditures excluding travel costs for training within the Contract Period. Case
Management costs incurred by Contractor in carrying out this contract shall be allowable up to a maximum of 6.19%
of the total allowable contract expenditures excluding travel costs for training within this contract period.
SECTIONS. TERMINATION AND SUSPENSION
A. Department may terminate this contract, in whole or in part, at any time Department determines that there is
cause for termination. Cause for termination includes but is not limited to Contractor's failure to comply with
any term of this contract. Department shall notify Contractor in writing at least thirty (30) days before the date
of termination.
B. Department may deobligate all or part of the funds provided under this contract if Contractor has not expended
at least 40% of such funds within six months after the commencement date specified in Section 2 or if
Contractor has not expended at least 60% of the funds within nine months after the commencement date.
Contractor's failure to expend the funds provided under this contract in a timely manner may also result in
either the termination of this contract or Contractor's ineligibility to receive additional funding under the
Comprehensive Energy Assistance Program Act, or both.
C. Nothing in this Section shall be construed to limit Department's authority to withhold payment and irmnediately
suspend Contractor's performance of this contract if Department identifies possible instances of fraud, abuse,
waste, fiscal mismanagement, or other deficiencies in Contractor's performance. Suspension shall be a
temporary measure pending either corrective action by Contractor or a decision by Department to terminate
this contract..
D. Notwithstanding any exercise by Department of its right of termination or suspension, Contractor shall not be
relieved of any liability to Department for damages by virtue of any breach of this contract by Contractor.
Department may withhold any payment due to Contractor until such time as the exact amount of damages due
to Department is agreed upon or is otherwise determined.
E. Department shall not be liable for any costs incurred by Contractor after termination or during suspension of
this contract..
PAGE 3 OF 10
SECTION 9. CHANGES AND AMENDMENTS
Any change in the terms of this contract required by a change in federal or state law or regulation is automatically
incorporated herein effective on the date designated by such law or regulation. Except as otherwise specifically
provided herein any other change in the terms of this contract shall be by amendment in writing and signed by both
parties.
SECTION 10. DEPARTMENT ISSUANCES
Department may issue regulations or policy directives which serve to establish Contractor eligibility or interpret and
clarify the terms of this contract. Such regulations or policy directives shall be in the form of Issuances. Issuances
shall not alter the terms of this contract so as to relieve Department of any obligation to reimburse an allowable cost
incurred by Contractor prior to the effective date of the Issuance or five days after such Issuance is mailed or delivered
to Contractor, whichever is later. All Issuances promulgated by Department, whether before or after the execution of
this contract, shall govern the performance of this contract until specifically rescinded by Department.
SECTION 11. MONITORING
Department or its designee may conduct on and off -site monitoring and evaluation of Contractor's compliance with the
terms of this contract. Department's monitoring may include a review of the efficiency, economy, and effectiveness of
Contractor's performance. Department will notify Contractor in writing of any deficiencies noted during such
monitoring. Department may provide training and technical assistance to Contractor in correcting the deficiencies
noted. Department may require or suggest corrective action to remedy deficiencies noted in Contractor's accounting,
personnel, procurement, and management procedures and systems. Department may conduct follow-up visits to
review the previously noted deficiencies and to assess the efforts made to correct them Department may terminate or
suspend this contract or invoke other remedies Department determines to be appropriate in the event monitoring
uncovers material deficiencies in Contractor's performanceor if Contractor fails to correct any deficiency within a
reasonable period of time. Department or its designee may conduct an ongoing program evaluation throughout the
contract year.
SECTION 12. RETENTION AND ACCESSIBILITY OF RECORDS
A. Contractor shall maintain fiscal records and supporting documentation for all expenditures made under this
contract in accordance with the retention and custodial requirements for records set forth in the Uniform Grant
Management Standards, Common Rule § .42.
B. Contractor shall maintain a client file system to document direct services rendered. Each client file shall
contain the following:
1. Client application containing all Department requirements;
2. Documentation/Verification of Client Income;
3. Declaration of Income Eligibility (when required);
4. Copy of Client's Utility Bill(s);
PAGE 4 OF 10
5. Documentation of Payment. (Documentation of payment may be maintained in a separate file, but
must be accessible at the site where client files are maintained);
6. Benefits Determination Form; and,
7. Notice of Denial Form.
C. Contractor shall give the U.S. Department of Health and Human Services, the U.S. General Accounting Office,
and Department, or any of their duly authorized representatives, access to and the right to examine and copy,
on or off the premises of Contractor, all records pertaining to this contract. Such right to access shall continue
as long as the records are retained by Contractor. Contractor agrees to maintain such records for three years in
an accessible location and to cooperate with any examination conducted pursuant to this Subsection.
Contractor shall include the substance of the Subsection in all subcontracts.
SECTION 13. REPORTING REQUIREMENTS
A. Contractor shall submit, for receipt by Department no later than twenty (20) days after the end of each month
of the Contract Period a Monthly Funding/Financial Performance Report of all expenditure of funds under this
contract during the previous month.
B. Contractor shall submit to Department no later than sixty (60) days after the end of the Contract Period an
inventory of all equipment acquired in whole or in part with funds received under this contract. Upon the
termination of this Contract, Department may transfer title to any non expendable personal property so
acquired to itself or to any other entity receiving funds under the LIHEAP Act.
C. Contractor shall submit to Department no later than sixty (60) days after the termination of this contract, a final
Monthly Funding/Financial/Performance Report of all expenditures of funds under this contract. The failure of
Contractor to provide a full accounting of funds expended under this contract may result in the termination of
this contract and holding contractor ineligible to receive additional funds.
D. If Contractor fails to submit, in a timely and satisfactory manner, any report or response required by this
contract, Department may withhold any or all payments otherwise due or requested by Contractor hereunder.
Payments may be withheld until such time as the delinquent report or response is received by Deparunent. N
the delinquent report or response is not received within forty-five (45) days of its due date, Department may
suspend or terminate this contract. If Contractor receives funds from Department over two or more contract
periods, funds may be withheld or this contract suspended or terminated for Contractor's failure to submit a
report or response (including a report of audit) past due from a prior contract.
SECTION 14. INDEPENDENT CONTRACTOR
It is agreed that Department is contracting with Contractor as an independent contractor. Contractor agrees to
indemnify Department against all disallowed costs or other claims which may be asserted by any third party in
connection with Contractor's performance of this contract.
PAGE 5 OF 10
SECTION 15. SUBCONTRACTS
A. Contractor may not subcontract the performance of this contract unless it receives Department's prior written
approval. Contractor shall submit to Department a signed copy of each such subcontract. Department is in no
way liable to Contractor's subcontractor(s).
B. Subcontractors shall comply with the terms of this contract to the same extent as if the performance rendered
by the subcontractor were being rendered by Contractor. Subcontractors will be subject to monitoring and
investigation by Department.
SECTION 16. CONFLICT OF INTEREST/NEPOTISM
A. Contractor covenants that neither it nor any member of its governing body presently has or shall acquire any
interest, direct or indirect, which would conflict in any manner with the performance of this contract. No
person having such interest shall be employed by Contractor or appointed as a member of Contractor's
governing body.
B. Contractor agrees that it will comply with TEX. GOWT CODE ANN. ch. 573 by ensuring that no officer,
employee, or member of the governing body of Contractor shall vote or confirm the employment of any person
related within the second degree by affinity or third degree by consanguinity to any member of the government
body or to any other officer or employee authorized to employ or supervise such person.
C. Contractor shall ensure that no employee, officer, or agent of Contractor shall participate in the selection, or in
the award or administration of a subcontract supported by funds provided hereunder if a conflict of interest,
real or apparent, would be involved. Such a conflict of interest would arise when: 1) the employee, officer, or
agent 2) any member of his or her immediate family 3) his or her partner or 4) any organization which employs
or is about to employ, any of the above, has a financial or other interest in the firm or person selected to
perform the subcontract.
D. Contractor's employees, officers, and/or agents shall neither solicit nor accept gratuities, favors, or anything of
monetary value from subcontractors, or potential subcontractors.
SECTION 17. NON-DISCRIMINATION AND EQUAL OPPORTUNITY
No person shall on the grounds of race, color, religion, sex, national origin, age, handicap, political affiliation or belief
be excluded from participation in, be denied the benefits of, be subjected to discrimination under, or be denied
employment in the administration of or in connection with any program or activity funded in whole or in part with
funds made available under this contract.
SECTION 18. LEGAL AUTHORITY
A. Contractor represents that it possesses the legal authority to enter into this contract and to perform the services
Contractor has obligated itself to perform hereunder.
PAGE 6 OF 10
B. The person signing this contract on behalf of Contractor hereby warrants that he/she was been duly authorized
by Contractor to execute this contract on behalf of Contractor and to bind Contractor to the terns herein set
forth.
C. Department shall have the right to suspend or terminate this contract if there is a dispute as to the legal
authority of either Contractor or the person signing this contract to enter into this contract or to render
performances hereunder. Contractor is liable to Department for any money it has received from Department
for performance of the provisions of this contract, if Department has suspended or terminated this contract for
reasons enumerated in this Section 18.
SECTION 19. DEPARTMENT/CEAP TRAINING TRAVEL
A. In consideration of Contractor's staff attending in -state training events sponsored by Department, Contractor
may be reimbursed for the actual costs of travel associated with attending the training event not to exceed the
amount shown in section 4(Ax2). Travel expenses shall be computed as follows:
Personal Car Mileage
S
.28 per
mile
Meals actual cost not to exceed
S
*25.00 per
diem
Lodging actual cost not to exceed
S
55.00 per
diem
Other Travel Expenses actual cost not to exceed
$
50.00 per
diem
Airfare
1 $
Qbwestpossible)
* Reimbursement for meals is allowed as follows: Breakfast up to $7.00, Lunch up to S&W, Dinner up to
$10.00.
B. Upon completion of the travel, Contractor shall submit to Department a Request for Payment in an amount not
of exceed Departmental liabilities accrued pursuant to Subsection 4(Ax2). The Request for Payment shall be
on a form specified by Department, and shall be accompained by receipts for hotel accommodations and
transportation. Receipts for meals are not needed.
SECTION 19. APPEALS PROCESS
In compliance with the Lff1EAP Act, Contractor must provide an opportunity for a fair administrative hearing to
individuals whose application for assistance is denied, or not acted upon in a timely manner by:
1) Providing written notification to applicant of denial of assistance within ten (10) days of the adverse
determination which shall include written instructions of the appeals process. Applicants wishing to appeal a
decision must provide written notice to Contractor within 10 days of receipt of the denial notice.
2) Requiring each CEAP Contractor to establish a written appeals procedure which shall, at a minimum, include
the following provisions:
a. Establish an appeals committee composed of at least three (3) persons.
b. Appeals must be heard by the committee within 10 days of Contractor's receipt of the appeal.
PAGE 7 OF 10
C. Tape record all appeal hearings.
d. Require a majority vote to sustain the appeal and approve assistance for the applicant.
e. Require a majority vote to deny the appeal and provide written notification to applicant the results of
the appeal by close of business the following business day. The notification must include the
applicant's right to appeal an adverse determination to the Department.
f. To appeal to the Texas Department of Housing & Community Affairs, an applicant must provide an
appeal request to Department in writing within 10 days of an adverse determination by Contractor.
Department will review the tape recording of the hearing, the committee's decision and any other
relevant information the Department requests. No oral testimony will be allowed. Department will
notify all parties in writing of its decision within 30 days of the receipt of the appeal.
SECTION 20. AUDIT
A. Contractor shall arrange for the annual performance of a financial and compliance audit of the funds received
under this contract. The audit shall be made in accordance with the Single Audit Act of 1984, 31 U.S.C. sec
7501 et seq. (herein the "Audit Act"), and OMB Circular No. A-128, "Audits of State and Local
Governments", 45 CFR Part 74, Appendix J or OMB Circular No. A-133, "Audits of Instructions of Higher
Education and other nonprofit Institutions", 45 C.F.R. Part 74, Appendix L Where a contract is awarded for
audit services, the contract shall include a reference to the Audit Act and OMB Circular A-128 or A-133.
Contractor shall take such action to facilitate the performance of the audit(s) conducted pursuant to this Section
as Department may require. Audits are to be conducted in accordance with GAGAS (generally accepted
government auditing standards).
B. Contractor shall submit three (3) copies of the report of such audit to Department within the time limit required
by the "Audit Act". Audits performed under this Section are subject to review and resolution by Department
or its authorized representative after the end of the audit period.
C. Contractor shall take immediate appropriate corrective action after issuance of the audit report in instances of
material noncompliance with laws, regulations or this contract. Contractor shall be liable to Department for
any costs disallowed pursuant to financial and compliance audits(s) of funds received under this contract.
Reimbursement to Department of disallowed costs shall be paid by Contractor from funds which were not
made available to Contractor under any contract with Department.
SECTION 21. POLITICAL AND SECTARIAN ACTIVITY PROHIBITED
A. No funds received by Contractor hereunder may be used for any political activity including, but not limited to,
any attempt to influence the outcome of any election or the passage or defeat of any legislation or appropriation.
B. No funds received by Contractor under this contract may be used, either directly or indirectly, to support any
religious or anti -religious activity.
PAGE 8 OF 10
C. If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing
or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee
of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loam, or
cooperative agreement, Contractor shall complete and submit a Certification Regarding Lobbying form in
accordance with its instructions and 45 CFR Part 93.
SECTION 22. PREVENTION OF WASTE, FRAUD, AND ABUSE
A. Contractor shall establish, maintain, and utilize systems and procedures to prevent, detect and correct waste,
fraud and abuse in activities funded under this contract. The systems and procedures are to address possible
waste, fraud and abuse by Contractor, its employees, recipients, vendors and administering agencies.
Contractor's internal control systems and all transactions and other significant events are to be clearly
documented, and the documentation is to be readily available for monitoring by Department.
B. Contractor shall give Department complete access to all of its records, employees, and agents for the purposes
of any investigation of the Comprehensive Energy Assistance Program. Contractor shall immediately notify
Department of any discovery of waste, fraud or abuse. Contractor shall fully cooperate with Department's
efforts to detect, investigate, and prevent waste, fraud and abuse in the Comprehensive Energy Assistance
Program.
C. Contractor may not discriminate against any employee or other person who reports a violation of the terms of
this contract or of any law or regulation to Department or to any appropriate law enforcement authority, if the
report is made in good faith.
SECTION 23. MAINTENANCE OF EFFORT
Funds provided to Contractor under this contract may not be substituted for funds or resources from any other source
nor in any way serve to reduce the funds or resources which would have been available to or provided through
Contractor had this contract never been executed.
SECTION 24. NO WAIVER
Any right or remedy given to Department by this contract shall not preclude the existence of any other right or remedy,
nor shall any action taken in the exercise of any right or remedy by deemed a waiver of any other right or remedy. The
failure of Department to exercise any right or remedy on any occasion shall not constitute a waiver of Department's
right to exercise that or any other right or remedy at a later time.
SECTION 25. SEVERABILITY
If any portion of this contract is held to be invalid by a court or administrative tribunal of competent jurisdiction, the
remainder shall remain valid and binding.
PAGE 9 OF 10
SECTION 26. ORAL AND WRITTEN AGREEMENTS
All oral and written agreements between the parties relating to the subject matter of this contract
have been reduced to writing and are contained in this document and the exhibits attached heret
SECTION 27. DEBARRED AND SUSPENDED PARTIES
Contractor must not make any award (subgrant or contract) to any party which is debarred or
suspended or is otherwise excluded from or ineligible for participation in Federal assistance
programs under Executive Order 12549.
SECTION 28. EXHIBITS
The exhibits identified below are hereby made a part of this contract:
(1) Exhibit A, Performance Statement
(2) Exhibit B, Budget
(3) Exhibit C, Allowable Activities Document
Signed this
17th
APPROVED AS TO CONTENT:
day of November , 1994.
!Sylvia A. Martinez -Flores
Manager, Community Development & Neighborhood Initiatives
Linda Chamales,
Assistant City Attorney
CITY OF LUBBOCK
COMMUNITY DEVELOPMENT &
NE BORHOOD-INITAATIVES
David R.
TEXAS DEPARTMENT OF
HOUSING AND COMMUNITY
AFFAIRS
BY: Henry J
ExOceive Director
This contract is not effective unless signed by the Executive Director of the Department or his
authorized designee.
PAGE 10 OF 10
EXHIBIT A - PERFORMANCE STATEMENT
COMPREHENSIVE ENERGY ASSISTANCE PROGRAM
CONTRACT NO. $95048
WITH
CITY OF LUBBOCK, COMMUNITY SERVICES DEPARTMENT
PAGE 1 OF 1
595048
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS
EXHIBIT B - BUDGET
COMPREHENSIVE ENERGY ASSISTANCE PROGRAM
CONTRACT NO.595048 WITH
CITY OF LUBBOCK, COMMUNITY SERVICES DEPARTMENT
BUDGET CATEGORY
FUNDS
Administration
$
2,527.00
Case Management
$
2,167.00
Direct Services
$
30,306.00
TOTAL
$
35,000.00
Training Travel Allowance $ 926.00
DIRECT SERVICES FUNDS
Energy Crisis
$12,122.40
40%
Co -Payment
$9,091.80
30%
Elderly Assistance
$2,121.42
7%
Heating/CoolingHeating/Cooling Systems
$6,970.38
23%
Total Direct Services
$30,306.00
100%
Administrative costs, salaries, fringe benefits. non -training travel, equipment, supplies, audit and office space are
limited to 7,22% of the contract expenditures.
Case Management costs are limited to 6,19% of the contract expenditures excluding Training Travel costs.
•• Contractor may adjust dollar amounts within the following components at levels not to exceed 10 % of said
components: Energy Crisis (may not exceed 40% of Direct Service Dollars emended), Co -Payment, Elderly,
and Heating/Cooling Systems.
May allocate up to 40% of the Direct Services allowance.
Department's prior written approval for purchase or lease of equipment with acquisition cost of $5,000 and over
is required. Approval of this budget does not constitute prior approval.
Availability of budget funds is controlled by SECTION 4(A), DEPARTMENT OBLIGATIONS, of this
contract.
Funds may not be used for the purchase or improvement of land, or the purchase, construction, or permanent
improvement of any building or facility.
PAGE 1 OF 1
EXHIBIT C
ALLOWABLE ACTIVITIES DOCUMENT
COMPREHENSIVE ENERGY ASSISTANCE PROGRAM
I. PROGRAM GUIDELINES
A. DEFINITIONS
The primary intent of this program is to make funds available to enable Contractor to respond to energy
needs affecting low-income households. Under this program, a household is not entitled to a preset amount
of assistance. The term "household" means any individual or group of individuals who live together as one
economic unit and customarily purchase residential energy in common or who make undesignated
payments for energy in the form of rent. In order for a household to receive assistance through the
Comprehensive Energy Assistance Program, the household must meet the following criteria:
Have a gross annual income that does not exceed 125% of the current Poverty Income Guidelines.
Contractor shall provide all potential clients the opportunity to make an application for the Comprehensive
Energy Assistance Program.
B. PRIORITY
Contractor should give priority to eligible households containing one or more persons age 60 or above, a
disabled individual, and families with young children six years of age and under. Contractor demonstrates
adherence to these priorities by documenting special outreach efforts directed at these populations.
Department will monitor Contractor on these efforts.
Priority shall be given to households with the lowest incomes that pay a high proportion of their incomes
for the energy.
The term disabled may include individuals who are unable to engage in any substantial employment by
reasons of any medically determinable physical or mental condition which can be expected to last for a
continuous period of not less than twelve (12) months.
C. SERVING RENTERS
The provisions set by this plan for non -renters also apply to those renters who have a separate meter or who
pay their utility and/or fuel bills separately from the rent.
For those renters who pay heating and utility bills as part of their rent, Contractor shall make special efforts
to determine the portion of the rent that constitutes the fuel and/or utility payment. Contractor shall
exercise care when negotiating with the landlords so the cost of utilities quoted is in line with the
consumption for similar residents of the community. If Contractor pays the landlord, then the landlord
must furnish evidence that he/she has paid the bill.
A. INCOME ELIGIBILITY GUIDELINES
Contractor should only distribute available funds under the Comprehensive Energy Assistance Program to
households needing energy related assistance and having an income that does not exceed 125% of the
current Poverty Income Guidelines as issued by the Secretary of Planning and Evaluation, U.S. Department
of Health and Human Services.
PAGE 1 OF 9
When the Poverty Income Guidelines are updated, this program will follow the most current published
guidelines. Income refers to total annual cash receipts before taxes from all sources. Income is more fully
described in the current Poverty Income Guidelines. Contractor shall annualize income data for a part of a
year in order to determine eligibility. Each Contractor shoulddetermine the method of annualizing most
appropriate to that locality and abide by that method only for all recipients equally through the end of the
contract period. During a contract period, a Contractor may not utilize a combination of income calculation
methods.
All households at or below 125% of the Federal Poverty Level will be afforded access to the program.
This applies to all components. There are no categorically eligibility options. All applicant households will
be determined eligible according to the income guidelines and program procedures. Benefits
determinations includes the household's income, the household size, the energy consumption and/or the
vulnerablility of the household and the availability of finds.
B. DETERMINATION OF INCOME
Applicants must submit proof of income. Proof may consist of checks, check stubs, award letters,
employee statements, etc., showing the gross monthly income, if any. In the exceptional case when proof
of income is unavailable, an applicant must sign a declaration of income statement. In such cases,
Contractor will verify income eligibility, through some source other than the applicant's statement.
Another member of the applicant's household may not provide this verification. Verification efforts shall
be completed by the end of the next working day from when the declaration of income eligibility statement
was provided.
C. INCOME DISREGARD
Payments made under this program are not considered income for the purpose of determining eligibility or
benefits under any income maintenance program, including, but not limited to, food stamps, gifts, loans,
sale of property, tax refunds, lump -sum inheritances, one-time insurance payments, or compensation for
injuries. Governmental restitution payments are not considered income for the purpose of determining
eligiib q or benefits under this program.
III. PROGRAM ASSISTANCE
A. ASSISTANCE
Contractor may only provide the following types of assistance with funds from the Comprehensive Energy
Assistance Program contract..
1. Payment to vendors and suppliers of fuel/utilities, goods, and other services for past due or current
bills related to the procurement of energy for heating and cooling needs of the residence.
2. Assist households in developing goals for self-sufficiency through case management. This may
involve coordination of resources, referrals to other programs, and client involvement in developing
an energy co -payment plan. Priority must be given to co -pay clients. Others may receive case
management services if funds are available after serving co -pay clients.
PAGE 2 OF 9
3. Provide utility assistance to low-income elderly and disabled most vulnerable to the high cost of
energy for heating and cooling needs of the residence.
4. Replacing/retrofitting/repair of household heating and cooling systems if needed. All replacement
units must comply with minimum standard for energy efficiency
5. Provide assistance for an energy related crisis.
6. Contractor may pay water bills only when such cost include expenses from operating an evaporative
water cooler unit or when the water bill is an inseparable part of a utility bill. As a part of the intake
process, outreach and coordination, contractor shall confirm that a client owns a properly connected
and operational cooler and has used it within sixty (60) days prior to cool the dwelling. Whenever
possible, contractor shall negotiate with the utility providers to pay only the energy portion of the bill.
7. Purchase, lease, or repair of butane or propane tanks as well as the residential lines associated with
the tanks or natural gas lines of the dwelling not to exceed the household's maximum allowable
assistance and if such service ensures the flow of energy to the household.
8. Contractor may only pay reconnection fee in line with the registered tariff filed with the Public
Utility Commission and/or Texas Railroad Commission. Payment cannot exceed that stated tariff
cost. Contractor must negotiate to reduce the costs to cover the actual labor and material and to
assure that the utility does not assess a penalty for delinquency in payments.
9. Contractor may not pay a security deposit except when state law requires such a payment, or if the
Public Utility Commission or Texas Railroad Commission has listed such a payment as an approved
cost, and where required by law, tariff or regulation or a deferred payment agreement includes such a
payment. Contractor cannot pay any such security deposit the energy provider will eventually return
to the client.
10. While utility/fuel rates and repair charges may vary from vendor to vendor, Contractor will negotiate
for the lowest possible payment. Contractor must have a signed vendor agreement on file from the
energy vendor receiving direct LUIEAP payments from the contractor.
11. Contractor may make payment to landlords on behalf of eligible renters who pay their utility and/or
fuel bills indirectly. Contractor shall notify each participating household of the amount of assistance
paid on its behalf. Contractor must document this notification. Contractor shall maintain proof of
utility or fuel bill payment.
12. Contractor may not establish lower focal limits of assistance.
13. This is not an entitlement program; payments are made subject to the availability of federal funds.
IV. OUTREACH AND COORDINATION
Contractor shall document and provide outreach activities designed to assure that eligible households,
especially households with elderly and/or disabled, are made aware of the Comprehensive Energy
Assistance Program. Outreach activities shall include the activities listed below or other activities that
serve the purpose of advertising the availability of the Comprehensive Energy Assistance Program.
PAGE 3 OF 9
Provide information through home visits, site visits, group meetings or by telephone for the
physically infirmed (Le. elderly or disabled);
Distribute posters/flyers and other information materials in local and county social services
agencies, offices of aging, social security offices, etc.
Provide information on the program and eligibility criteria in articles in local newspapers or
broadcast media announcements, utilizing Spanish (or Vietnamese) media where appropriate;
Coordinate with other low-income services to provide LIHEAP information in conjunction with
other programs.
Provide information on one-to-one basis for applicants in need of translation or interpretation
assistance;
Provide applications, forms, and energy education materials in Spanish and English;
Work with energy providers in identifying potential applicants;
Assist applicants to gather needed documentation; and
Mail information and application
In order to achieve compliance with the LIHEAP Act, Contractor must coordinate with other energy related
programs. Specifically, Contractor must make documented referrals to the local Weatherization Assistance
Program contractor.
Contractor shall accept applications for CEAP benefits at sites that are geographically accessible to all
households in the service area. Contractor shall provide physically infinned individuals the means to
submit applications for CEAP benefits without leaving their residence or by securing transportation for
them to the sites that accept such applications.
V. APPEALS PROCESS
In compliance with the Low -Income Home Energy Assistance Act, Contractor shall provide an appeals
process as specified in Section 19 of this contract.
VI. BENEFITS
Contractor may not establish lower local limits of assistance for any component.
ENERGY CRISIS COMPONENT
A bona fide energy crisis exists when extraordinary events or situations have depleted or will deplete
household financial resources and/or have created problems in meeting basic household expenses,
particularly bills for energy so as to constitute a threat to the health or well-being of the household,
particularly the elderly, the disabled, or very young children.
PAGE 4OF9
NOTE: A utility termination notice alone does not constitute an energy crisis.
In no event shall the sum of all energy crisis assistance provided for the contract year made to or on behalf
of any household exceed the actual amount needed to ameliorate the household's energy -related crisis or
$600.00, whichever is less, under this Energy Crisis Component.
Where necessary to prevent undue hardships or extreme health dangers from an energy crisis, Contractor
may directly issue a voucher to provide:
Temporary shelter not to exceed $350.00 per household for the duration of the contract period in the
limited instances that inoperable heating/cooling appliances or supply of power to the dwelling is disrupted
causing temporary evacuation of household members. Payments shall not be made for rent or mortgages
and;
Emergency deliveries of fuel not to exceed $150.00 per delivery per household.
Purchase of pgrtable heating/cooling units(portable electric heaters are only allowable as a last resort) not
to exceed $500.00 per household for the duration of the contract period Portable AC and heating units
may only be purchased in cases of life threatening situations to the client. Documentation of the situation
such as doctor statements, must be maintained in the client file.
Emergency funds, whether for emergency fuel deliveries with a limit of $150.00, purchase of portable
heating/cooling units with a limit of $350.00 or temporary shelter with a limit of $500.00, shall be
considered part of the total maximum household allowable assistance. Funds for this program shall not
be used to weatherize dwelling units, for medicine, food, transportation assistance, or to pay for
penalties or fines assessed to clients.
Time Limits for Assistance
Contractor shall ensure that it will:
Provide within forty-eight (48) hours after a household completes the application process for energy crisis
benefits, some form of assistance to resolve the energy crisis if such household is eligible to receive such
benefits;
Provide within 18 hours after a household completes the application process for crisis benefits, some form
of assistance to resolve the energy crisis if such household is eligible to receive such benefits and faces a
life -threatening situation.
For clients who have already lost service or are in immediate danger of losing service, the 48-hour time limit
(18 hours in life -threatening situations) commences upon completion of the application process. The
application process is considered to be complete when an agency representative accepts an application and
completes the intake process.
PAGE 5 OF 9
Conwactor must maintain written documentation in the client file that it resolved the crisis within the
appropriate time deadline.
HOUSEHOLDS WITH
INCOMES OF:
0 to 50% of Poverty
50 + to 80% of Poverty
80 + to amount not to exceed
125 % Poverty
IF THE HOUSEHOD HAS AN ENERGY CRISIS AND
MEETS INCOME ELIGIBILITY, THEN THE PAYMENT
IS BASED ON THE FOLLOWING:
Households would receive amount needed to
solve crisis up to $600.
Households would receive the amount needed
to solve crisis up to$580.
Households would receive the amount needed
to resolve crisis up to $560.
PAGE 6 OF 9
CO -PAYMENT COMPONENT
• Contractor shall obtain the clients' consumption and billing history for the preceding 12 months.
• Clients with an energy burden higher than that of the average household in the vendor's service area may receive
priority service.
• As a planning tool, contractor may base future utility assistance payments and co -payments on the previous years
billing to aid the client to budget the household expenses and to allow contractor to maintain a running fund balance
of available monies.
• Contractor shall provide budget counseling, energy conservation education and coordinate with or refer households to
other services which will address the underlying contributing causes of energy induced hardship.
MAXIMUM BENEFIT LEVELS FOR CO -PAYMENT COMPONENT
Contractor shall enroll CEAP co -payment clients in the program for a minimum period of six months. Clients may be
terminated at any time between six and twelve months, if the goal of self-sufficiency has been achieved Utility payments
on behalf of clients to utility vendors will be made on a sliding scale co -payment system designed by the subgrantee. The
program must target clients with the least income and the greatest energy costs. Clients may receive up to 100% of the
bill and arrears for the first months bill and the agreed co -payment plan as long as it does not exceed the set maximum
amounts established for their income levels for the program year.
In order to ensure that the highest level of assistance will be furnished to those households which have the lowest incomes
and highest energy costs or needs in relation to household income:
IF THE HOUSEHOLD MEETS THE ELIGIBILITY
HOUSEHOLDS WITH CRITERIA, THEN PAYMENT IS BASED ON THE
INCOMES OF: FOLLOWING:
0 to 50% of Poverty Household would receive an
amount not to exceed $1,000.
50 + to 80% of Poverty Household would receive an
amount not to exceed $900.
80 + to amount not to exceed Household would receive an
125% of Poverty amount not to exceed $800.
PAGE7OF9
ELDERLY AND DISABLED ASSISTANCE COMPONENT
• The elderly and disabled shall be a priority of the program.
• Payments on behalf of the elderly will be made based on the previous 12 months billing history. Excess amounts
over the actual bill will be treated as a credit with the utility company for the client.
• Elderly households are defined as households with at least one member who is age 60 or above. Disabled
households are defined as households with at least one member who is disabled. A disabled individual is defined as
an individual who is unable to engage in any substantial employment by reasons of an medically determinable
physical or mental condition which can be expected to last for a continous period of not less than twelve months.
• Contractor may provide energy conservation education, budget counseling and referrals if case management funds
are available.
BENEFIT LEVELS UNDER THE ELDERLY AND DISABLED COMPONENT
Elderly clients may receive up to 100% of their bills within the contract year, including arrears, as long as the cost does
not exceed the maximum allowable benefit and no more than four payments per program year are made. Payments should
be limited to the highest consumption months during which time the elderly are most vulnerable to energy related stress.
This period may be determined by the local subgrantee based on 12 month billing history.
In order to ensure that the highest level of assistance will be furnished to those households which have the lowest incomes
and highest energy costs or needs in relation to household income:
IF THE HOUSEHOLD MEETS THE ELIGIBILITY
HOUSEHOLD WITH CRITERIA, THEN PAYMENT IS BASED ON THE
INCOMES OF: FOLLOWING:
0 to 50% of Poverty Household would receive an
amount not to exceed $1,000.
50 + to 80% of Poverty Household would receive an
amount not to exceed $900.
80 + to amount not to exceed Household would receive an
125% of Poverty amount not to exceed $800.
PAGE 8 OF 9
REPLACEMENT AND RETROFIT OF DATING/COOLING SYSTEMS
CEAP clients are eligible for replacement repair and/or retrofit of heating and cooling systems. The replacement, repair
and/or retrofit must be based on need, i.e., an energy assesment of heating/cooling appliances has determined that the
retrofit repair and/or/ replacement of a heating/cooling appliance will be cost effective and will result in a reduction of
energy consumption. Energy assesment of heating/cooling appliances must be conducted by qualified professionals, from
either within the agency, such as the weatherization program, or outside the agency. In contracting out for the service, the
subgrantee must follow the WAP/ECP Policy Issuance 88-10.1 for procuring goods and services.
The services may include the cleaning, tuning and evaluation of systems, repair and upgrade of existing components, and
replacement of unsafe or inoperable systems. Cooling systems, such as central air conditioners, window air conditioners
units and evaporative coolers will be covered under the CEAP program. Heating systems, such as central heating systems
and space heaters, wall heaters, wood burning stoves will be covered under the CEAP program. Replacement appliance
must meet minimum energy efficiency standards.
Real benefits to the households are based on the energy efficiency needs of the unit, as determined by an appliance energy
assesment. The maximum allowable costs are as follows:
Heating and Cooling $1000.00 per household
PAGE 9 OF 9
Community Development & Neighborhood Initiatives
1993 Funding (Direct Services)
■ CSBG ($226,065)-
® CEAP ($483,551)-
(2 0% o Homeless ($13,550)
(2.3%) 0 Elder Care ($800)
0.1 %)
( .R
o Project Help ($17,699)
o Project Help ($15,095)
*CSBG AND CEAP
600
500
400
04i1i1
100
W
TOTAL DIRECT SERVICES FUNDS
Comprehensive Energy Assistance Program
1992 1993 1994 1995
Years
— ,J-
GRANT PROPOSAL EVALUATION FORM
Page 1
1.
Is this grant:
New
Continuing X
Number of Years 10
2.
Is a match required?
Yes
No X
If yes:
Percentage
Amount
Is it:
In —kind
OR Cash
Source
3.
Is indirect cost allowed?
Yes
No X
If yes:
Percentage
E
4.
Are audit costs reimbursed?
Yes
i
No X
If yes:
Percentage
S. What are the audit requirements for this grant? Annual basis. This is funded through the primary
grant, Carmmity Services Block Gant (CSBG).
i
F
6. Can this grant be renewed? Yes X No
If yes, how many times?
What are the terms of renewal? Federal funding availability
7. Does the grant require the City to gradually assume the cost of the program?
Yes
If yes, what is the timetable?
No X
8. Please address whether other agencies are currently administering similar programs and whether any other
agencies are available to administer this program. No agency administers similar program; however, there j
are agencies whifh provide similar services with distinct guidelines and requirements: Catholic Family
Services, Salvation Army, and St. John's United NYthodist Church.
GRANT PROPOSAL EVALUATION FORM
Page 2
9. For the "Current Year", please identify how expenditures are to be made in the following categories
and how the program will be funded. If the grant is for an on -going program, please project revenue
and expenditures for future years. If the grant is for one year, show any on -going costs to the
city, such as the cost of maintenance on equipment purchased by the grant.
EXPENDITURES
Personnel (13.41%)
Supplies
Maintenance (86.5976)
Other(Direct Service)
Capital
TOTAL EXPENDITURES
REVENUE
Federal Grant
State Grant
Local Match
Other
TOTAL REVENUE
CURRENT FUTURE YEARS
YEAR
19 95 19 96 1917 1998 1922
41,841
270,171
312,012
10. Please list any new positions to be added:
11. Please list any capital items to be purchased:
41,841
270,171
IVA
N/A
12. Please discuss how this program will impact current employee allocation and utilization and whether
it will have a long-term financial or manpower impact. Attach additional pages if needed.
The Comprehensive Energy Assistance (CEAP) grant is funded through the State agency, Texas Department of
Housing and Community Affairs, and funding is based on annual federal funding availability. Currently, four
employees are funded from this grant (one full-time and three part-time) . Since this funding fluctuates
annually, manpower is impacted by the funding availability.
* Anticipated Amount
M�
GRANT PROPOSAL EVALUATION FORM
Page 3
13. In narrative form, please provide a brief description of the program, including the need which will be
addressed, the goals and objectives of the program, the target population to be served, and any other
significant aspects of the application. Attach additional pages if needed.
The Comprehensive Energy Assistance Program (C.E.A.P.) provides for the energy assistance for individuals
experiencing an energy crisis who qualify for the program in Lubbock County. Although the City has received
this grant for the last ten years, within the past two years the funding was substantially increased to
provide comprehensive case managerent. This program has a three -prong approach for providing energy services:
a) Emergency energy assistance for individuals in need of immediate assistance with maximum assistance of
$1,000 per household.
b) Co -payment will provide energy assistance to individuals for a three-month period and requires compre-
hensive service management, mandatory trainings (energy efficiency, nutritional, budgeting, etc.) and a
maximum assistance of $1,000 per household.
c) Elderly assistance, which will provide energy assistance to the elderly with a maximum assistance of
$1,000 per household.
The funding provides for the following:
Administrative (7.21657.), includes funding for coordinator's salary and other operating costs
Case management (6.19%), includes outreach workers' salaries
Direct services (92.7835%)--All energy assistance is funded from this category
Within the past year, this grant has assisted over 426 households. This funding is further maximized by the
agreement between the City and Project HELP, Inc. Project HELP receives community contributions and other
state funding for energy assistance, and the City provides the staff to administer those funds.
The funding for these three grants is based on Congressional approval and also on the state's funding
formula (poverty, employment, etc.). Therefore, finding varies from -year-to-year. There is no general fund
money utilized for direct services provided by these grants.
In reference to CEAP, the last fan years of funding have varied:
1992 -- 43,852
1993 -- 24,208
1994 -- 483,551 _
1995 -- 312,012 (Anticipated)
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS
CONTRACT NO.595048 FOR THE
FY 1995 COMPREHENSIVE ENERGY ASSISTANCE PROGRAM
SECTION 1. PARTIES TO THE CONTRACT
This contract is made by and between the Texas Department of Housing and Community Affairs, an agency of the
State of Texas (the "Department") and Lubbock. City of, Community Services Department (the "Contractor").
SECTION 2. CONTRACT PERIOD
This contract shall commence on September 30, 1994, and unless terminated earlier, shall end on September 30,
1995 (the "Contract Period").
SECTION 3. CONTRACTOR PERFORMANCE
Pursuant to the Low -Income Home Energy Assistance Act of 1981, as amended, 42 U.S.C. Sec. 8621 et sea. (the
"LIHEAP Act") Contractor shall operate, on an equitable basis throughout Contractor's service area, a Comprehensive
Energy Assistance Program, (the "CEAP"), in accordance with the terms of this contract and all applicable state and
federal regulations. Services shall include Case Management, Energy Crisis, Co -Payment, Elderly and Disabled
Assistance, and Heating/Cooling Systems as further specified in the Performance Statement (Exhibit "A" ), the Budget
(Exhibit "B"), and the Allowable Activities Document (Exhibit "C"). Contractor's service area consists of the following
Texas counties: Lubbock.
SECTION 4. DEPARTMENT OBLIGATIONS
A. In consideration of Contractor's satisfactory performance of this contract, Department shall reimburse
Contractor for the actual allowable costs incurred in the amount of:
i
Funds for FY '95 CEAP Currently Available: Thirty Five Thousand and no/100 Dollars ($35.000.00).
Travel Funds for FFY 195 CEAP Training: Nine Hundred Twenty Six and no/100 Dollars ($926.00).
B. By written notice to Contractor, Department may obligate additional funds under Section 4(A). For planning
purposes only, Contractor may assume that the total award to Contractor during the Contract Period will be:
Anticipated FY '95 Funds: Three Hundred Twelve Thousand Twelve and no/100 Dollars
($312.012.00).
PAGE 1 OF 10
C. Any decision to obligate additional funds or deobligate funds shall be made by Department based upon factors,
including but not limited to, the status of funding under grants to Department, the rate of Contractor's
utilization of funds under this or previous contracts, the existence of questioned or disallowed costs under this
or other contracts between the parties, and Contractor's overall compliance with the terms of this contract.
D. Department's obligations under this Section are contingent upon the actual receipt of funds from the U.S.
Department of Health and Human Services and the State of Texas. Department acknowledges that it has
received obligations from those sources, which, if paid, will be sufficient to pay the allowable costs incurred by
Contractor under this contract.
E. Department is not liable for any cost incurred by Contractor which:
(1) is subject to reimbursement by a source other than Department;
(2) is for performance of services or activities not authorized by the LIHEAP Act, or which is not in
accordance with the terms of this contract;
(3) is not reported to Department on a Monthly Funding/Financial/Performance Report within sixty (60)
days following the termination of this contract; or,
(4) is not incurred during the Contract Period.
SECTION 5. METHOD OF PAYMENT/CASH BALANCES
A. For each month of the Contract Period, Contractor may request an advance payment by submitting to
Department at its offices in Austin, Travis County, Texas, no later than the twentieth (20th) day of the month
prior to the month for which advance payment is sought, a properly completed Monthly
Funding/Financial/Performance Report and a State of Texas Purchase Voucher for an amount not to exceed
Contractor's actual cash needs for the month for which such advance is sought.
B. Contractor's requests for advances shall be limited to the minimum amount needed for the effective
performance of this contract, and shall be timed as closely as possible to coincide with Contractor's actual
immediate cash requirements. Contractor shall establish procedures to miriimize the time elapsing between the
transfer of funds from Department to Contractor and the disbursal of such funds by Contractor.
C. Department reserves the right to utilize a cost reimbursement method of payment if (1) Contractor maintains
excessive cash balances or requests advance payments in excess of thirty (30) days' need; (2) Department
identifies any deficiency in the internal controls or financial management system used by Contractor, (3)
Contractor violates any of the terms of this contract; or (4) Department's funding sources require the use of a
cost reimbursement method of payment.
D. Contractor shall refund, within fifteen (15) days of Department's request, any sum of money paid to Contractor
by Department which Department determines (1) has resulted in an overpayment to Contractor or (2) has not
been spent strictly in accordance with terms of this contract. Department may offset or withhold any amounts
otherwise owed to Contractor under this contract against any amount owed by Contractor to Department
arising under this contract.
PAGE 2 OF 10
F
E. All funds paid to Contractor under this contract are paid in trust for the exclusive benefit of the eligible
recipients of the Comprehensive Energy Assistance Program and for allowable administrative and, case
management expenditures.
SECTION 6. COST PRINCIPLES AND ADMINISTRATIVE REQUIREMENTS
Except as specifically modified by law or the terms of this contract, Contractor shall comply with the cost principles
and uniform administrative requirements set forth in the Uniform Grant and Contract Management Standards for State
Agencies, 1 T.A.C. §§ 5.141 et seq. (the "Uniform Grant Management Standards") provided that all references therein
to "local government" shall be construed to mean Contractor.
SECTION 7. ALLOWABLE ADMINISTRATIVE/CASE MANAGEMENT EXPENDITURES
Administrative costs incurred by Contractor in carrying out this contract shall be allowable up to a maximum of 7.22%
of the total allowable contract expenditures excluding travel costs for training within the Contract Period. Case
Management costs incurred by Contractor in carrying out this contract shall be allowable up to a maximum of 6.19%
of the total allowable contract expenditures excluding travel costs for training within this contract period.
SECTION 8. TERMINATION AND SUSPENSION
A. Department may terminate this contract, in whole or in part, at any time Department determines that there is
cause for termination. Cause for termination includes but is not limited to Contractor's failure to comply with
any term of this contract. Department shall notify Contractor in writing at least thirty (30) days before the date
of termination. .
B. Department may deobligate all or part of the funds provided under this contract if Contractor has not expended
at least 40% of such funds within six months after the commencement date specified in Section 2 or if
Contractor has not expended at least 60% of the funds within nine months after the commencement date.
Contractor's failure to expend the funds provided under this contract in a timely manner may also result in
either the termination of this contract or Contractor's ineligibility to receive additional funding under the
Comprehensive Energy Assistance Program Act, or both.
C. Nothing in this Section shall be construed to limit Department's authority to withhold payment and immediately
suspend Contractor's performance of this contract if Department identifies possible instances of fraud, abuse,
waste, fiscal mismanagement, or other deficiencies in Contractors performance. Suspension shall be a
temporary measure pending either corrective action by Contractor or a decision by Department to terminate
this contract.
D. Notwithstanding any exercise by Department of its right of termination or suspension, Contractor shall not be
relieved of any liability to Department for damages by virtue of any breach of this contract by Contractor.
Department may withhold any payment due to Contractor until such time as the exact amount of damages due
to Department is agreed upon or is otherwise determined.
E. Department shall not be liable for any costs incurred by Contractor after termination or during suspension of
this contract.
PAGE 3 OF 10
SECTION 9. CHANGES AND AMENDMENTS
Any change in the terms of this contract required by a change in federal or state law or regulation is automatically
incorporated herein effective on the date designated by such law or regulation. Except as otherwise specifically
provided herein any other change in the terms of this contract shall be by amendment in writing and signed by both
parties.
SECTION 10. DEPARTMENT ISSUANCES
Department may issue regulations or policy directives which serve to establish Contractor eligibility or interpret and
clarify the terms of this contract. Such regulations or policy directives shall be in the form of Issuances. Issuances
shall not alter the terms of this contract so as to relieve Department of any obligation to reimburse an allowable cost
incurred by Contractor prior to the effective date of the Issuance or five days after such Issuance is mailed or delivered
to Contractor, whichever is later. All Issuances promulgated by Department, whether before or after the execution of
this contract, shall govern the performance of this contract until specifically rescinded by Department.
SECTION 11. MONITORING
Department or its designee may conduct on and off -site monitoring and evaluation of Contractor's compliance with the
terms of this contract. Department's monitoring may include a review of the efficiency, economy, and effectiveness of
Contractor's performance. Department will notify Contractor in writing of any deficiencies noted during such
monitoring. Department may provide training and technical assistance to Contractor in correcting the deficiencies
noted. Department may require or suggest corrective action to remedy deficiencies noted in Contractor's accounting,
personnel, procurement, and management procedures and systems. Department may conduct follow-up visits to
review the previously noted deficiencies and to assess the efforts made to correct them. Department may terminate or
suspend this contract or invoke other remedies Department determines to be appropriate in the event monitoring
uncovers material deficiencies in Contractor's performance or if Contractor fails to correct any deficiency within a
reasonable period of time. Department or its designee may conduct an ongoing program evaluation throughout the
contract year.
SECTION 12. RETENTION AND ACCESSIBILITY OF RECORDS
A. Contractor shall maintain fiscal records and supporting documentation for all expenditures made under this
contract in accordance with the retention and custodial requirements for records set forth in the Uniform Grant
Management Standards, Common Rule § .42.
B. Contractor shall maintain a client file system to document direct services rendered. Each client file shall
contain the following:
1. Client application containing all Department requirements;
2. Documentation/Verification of Client Income;
3. Declaration of Income Eligibility (when required);
4. Copy of Client's Utility Bill(s);
PAGE 4 OF 10
_/p —
5. Documentation of Payment. (Documentation of payment may be maintained in a separate file, but
must be accessible at the site where client files are maintained.);
6. Benefits Determination Form; and,
7. Notice of Denial Form.
C. Contractor shall give the U.S. Department of Health and Human Services, the U.S. General Accounting Office,
and Department, or any of their duly authorized representatives, access to and the right to examine and copy,
on or off the premises of Contractor, all records pertaining to this contract. Such right to access shall continue
as long as the records are retained by Contractor. Contractor agrees to maintain such records for three years in
an accessible location and to cooperate with any examination conducted pursuant to this Subsection.
Contractor shall include the substance of the Subsection in all subcontracts.
SECTION 13. REPORTING REQUIREMENTS
A. Contractor shall submit, for receipt by Department no later than twenty (20) days after the end of each month
of the Contract Period a Monthly Funding/Financial Performance Report of all expenditure of funds under this
contract during the previous month.
B. Contractor shall submit to Department no later than sixty (60) days after the end of the Contract Period an
inventory of all equipment acquired in whole or in part with funds received under this contract. Upon the
termination of this Contract, Department may transfer title to any non expendable personal property so
acquired to itself or to any other entity receiving funds under the LUMAP Act.
C. Contractor shall submit to Department no later than sixty (60) days after the termination of this contract, a final
Monthly Funding/Financial/Performance Report of all expenditures of funds under this contract. The failure of
Contractor to provide a full accounting of funds expended under this contract may result in the termination of
this contract and holding contractor ineligible to receive additional funds.
D. If Contractor fails to submit, in a timely and satisfactory manner, any report or response required by this
contract, Department may withhold any or all payments otherwise due or requested by Contractor hereunder.
Payments may be withheld until such time as the delinquent report or response is received by Department. if
the delinquent report or response is not received within forty-five (45) days of its due date, Department may
suspend or terminate this contract. If Contractor receives funds from Department over two or more contract
periods, funds may be withheld or this contract suspended or terminated for Contractor's failure to submit a
report or response (including a report of audit) past due from a prior contract.
SECTION 14. INDEPENDENT CONTRACTOR
It is agreed that Department is contracting with Contractor as an independent contractor. Contractor agrees to
indemnify Department against all disallowed costs or other claims which may be asserted by any third party in
connection with Contractor's performance of this contract.
PAGE 5 OF 10
SECTION 15. SUBCONTRACTS
A. Contractor may not subcontract the performance of this contract unless it receives Department's prior written
approval. Contractor shall submit to Department a signed copy of each such subcontract. Department is in no
way liable to Contractor's subcontractor(s).
B. Subcontractors shall comply with the terms of this contract to the same extent as if the performance rendered
by the subcontractor were being rendered by Contractor. Subcontractors will be subject to monitoring and
investigation by Department.
SECTION 16. CONFLICT OF INTEREST/NEPOTISM
A. Contractor covenants that neither it nor any member of its governing body presently has or shall acquire any
interest, direct or indirect, which would conflict in any manner with the performance of this contract. No
person having such interest shall be employed by Contractor or appointed as a member of Contractor's
governing body.
B. Contractor agrees that it will comply with TEX. GOWT CODE ANN. ch. 573 by ensuring that no officer,
employee, or member of the governing body of Contractor shall vote or confirm the employment of any person
related within the second degree by affinity or third degree by consanguinity to any member of the government
body or to any other officer or employee authorized to employ or supervise such person.
C. Contractor shall ensure that no employee, officer, or agent of Contractor shall participate in the selection, or in
the award or administration of a subcontract supported by funds provided hereunder if a conflict of interest,
real or apparent, would be involved. Such a conflict of interest would arise when: 1) the employee, officer, or
agent 2) any member of his or her immediate family 3) his or her partner or 4) any organization which employs
or is about to employ, any of the above, has a financial or other interest in the firm or person selected to
perform the subcontract..
D. Contractor's employees, officers, and/or agents shall neither solicit nor accept gratuities, favors, or anything of
monetary value from subcontractors, or potential subcontractors.
SECTION 17. NON-DISCRIMINATION AND EQUAL OPPORTUNITY
No person shall on the grounds of race, color, religion, sex, national origin, age, handicap, political affiliation or belief
be excluded from participation in, be denied the benefits of, be subjected to discrimination under, or be denied
employment in the administration of or in connection with any program or activity funded in whole or in part with
funds made available under this contract.
SECTION 18. LEGAL AUTHORITY
A. Contractor represents that it possesses the legal authority to enter into this contract and to perform the services
Contractor has obligated itself to perform hereunder.
PAGE 6 OF 10
.—./z, —
B. The person signing this contract on behalf of Contractor hereby warrants that he/she was been duly authorized
by Contractor to execute this contract on behalf of Contractor and to bind Contractor to the terms herein sex
forth.
C. Department shall have the right to suspend or terminate this contract if there is a dispute as to the legal
authority of either Contractor or the person signing this contract to enter into this contract or to render
performances hereunder. Contractor is liable to Department for any money it has received from Department
for performance of the provisions of this contract, if Department has suspended or terminated this contract for
reasons enumerated in this Section 18.
SECTION 19. DEPARTMENT/CEAP TRAINING TRAVEL
A. In consideration of Contractor's staff attending in -state training events sponsored by Department, Contractor
may be reimbursed for the actual costs of travel associated with attending the training event not to exceed the
amount shown in section 4(Ax2). Travel expenses shall be computed as follows:
Personal Car Mileage
$
.28 per
mile
Meals actual cost not to exceed
$
*25.00 per
diem
Lodging actual cost not to exceed
$
55.00 per
diem
Other Travel Expenses actual cost not to exceed
$
50.00 per
diem
Airfare
1 $(lowestpossible)
* Reimbursement for meals is allowed as follows: Breakfast up to $7.00, Lunch up to $8.00, Dinner up to
$10.00.
B. Upon completion of the travel, Contractor shall submit to Department a Request for Payment in an amount not
of exceed Departmental liabilities accrued pursuant to Subsection 4(Ax2). The Request for Payment shall be
on a form specified by Department, and shall be accompained by receipts for hotel accommodations and
transportation. Receipts for meals are not needed.
SECTION 19. APPEALS PROCESS
In compliance with the LMEAP Act, Contractor must provide an opportunity for a fair administrative hearing to
individuals whose application for assistance is denied, or not acted upon in a timely manner by:
1) Providing written notification to applicant of denial of assistance within ten (10) days of the adverse
determination which shall include written instructions of the appeals process. Applicants wishing to appeal a
decision must provide written notice to Contractor within 10 days of receipt of the denial notice.
2) Requiring each CEAP Contractor to establish a written appeals procedure which shall, at a minimum, include
the following provisions:
a. Establish an appeals committee composed of at least three (3) persons.
b. Appeals must be heard by the committee within 10 days of Contractor's receipt of the appeal.
PAGE 7 OF 10
-13-
C. Tape record all appeal hearings.
d. Require a majority vote to sustain the appeal and approve assistance for the applicant.
e. Require a majority vote to deny the appeal and provide written notification to applicant the results of
the appeal by close of business the following business day. The notification must include the
applicant's right to appeal an adverse determination to the Department.
f. To appeal to the Texas Department of Housing & Community Affairs, an applicant must provide an
appeal request to Department in writing within 10 days of an adverse determination by Contractor.
Department will review the tape recording of the hearing, the committee's decision and any other
relevant information the Department requests. No oral testimony will be allowed. Department will
notify all parties in writing of its decision within 30 days of the receipt of the appeal.
SECTION 20. AUDIT
A. Contractor shall arrange for the annual performance of a financial and compliance audit of the funds received
under this contract. The audit shall be made in accordance with the Single Audit Act of 1984, 31 U.S.C. sec
7501 et seq. (herein the "Audit Act"), and OMB Circular No. A-128, "Audits of State and Local
Governments", 45 CFR Part 74, Appendix J or OMB Circular No. A-133, "Audits of Instructions of Higher
Education and other nonprofit Institutions", 45 C.F.R. Part 74, Appendix L Where a contract is awarded for
audit services, the contract shall include a reference to the Audit Act and OMB Circular A-128 or A-133.
Contractor shall take such action to facilitate the performance of the audit(s) conducted pursuant to this Section
as Department may require. Audits are to be conducted in accordance with GAGAS (generally accepted
government auditing standards).
B. Contractor shall submit three (3) copies of the report of such audit to Department within the time limit required
by the "Audit Act". Audits performed under this Section are subject to review and resolution by Department
or its authorized representative after the end of the audit period.
C. Contractor shall take immediate appropriate corrective action after issuance of the audit report in instances of
material noncompliance with laws, regulations or this contract. Contractor shall be liable to Department for
any costs disallowed pursuant to financial and compliance audits(s) of funds received under this contract.
Reimbursement to Department of disallowed costs shall be paid by Contractor from funds which were not
made available to Contractor under any contract with Department.
SECTION 21. POLITICAL AND SECTARIAN ACTIVITY PROHIBITED
A. No funds received by Contractor hereunder may be used for any political activity including, but not limited to,
any attempt to influence the outcome of any election or the passage or defeat of any legislation or appropriation.
B. No funds received by Contractor under this contract may be used, either directly or indirectly, to support any
religious or anti -religious activity.
PAGE 8 OF 10
-/44-
C. If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing
or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee
of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loan, or
cooperative agreement, Contractor shall complete and submit a Certification Regarding Lobbying form in
accordance with its instructions and 45 CFR Part 93.
SECTION 22. PREVENTION OF WASTE, FRAUD, AND ABUSE
A. Contractor shall establish, maintain, and utilize systems and procedures to prevent, detect and correct waste,
fraud and abuse in activities funded under this contract. The systems and procedures are to address possible
waste, fraud and abuse by Contractor, its employees, recipients, vendors and administering agencies.
Contractor's internal control systems and all transactions and other significant events are to be clearly
documented, and the documentation is to be readily available for monitoring by Department.
B. Contractor shall give Department complete access to all of its records, employees, and agents for the purposes
of any investigation of the Comprehensive Energy Assistance Program. Contractor shall immediately notify
Department of any discovery of waste, fraud or abuse. Contractor shall fully cooperate with Department's
efforts to detect, investigate, and prevent waste, fraud and abuse in the Comprehensive Energy Assistance
Program.
C. Contractor may not discriminate against any employee or other person who reports a violation of the terms of
this contract or of any law or regulation to Department or to any appropriate law enforcement authority, if the
report is made in good faith.
SECTION 23. MAINTENANCE OF EFFORT
Funds provided to Contractor under this contract may not be substituted for funds or resources from any other source
nor in any way serve to reduce the funds or resources which would have been available to or provided through
Contractor had this contract never been executed.
SECTION 24. NO WAIVER
Any right or remedy given to Department by this contract shall not preclude the existence of any other right or remedy,
nor shall any action taken in the exercise of any right or remedy by deemed a waiver of any other right or remedy. The
failure of Department to exercise any right or remedy on any occasion shall not constitute a waiver of Department's
right to exercise that or any other right or remedy at a later time.
SECTION 25. SEVERABILITY
If any portion of this contract is held to be invalid by a court or administrative tribunal of competent jurisdiction, the
remainder shall remain valid and binding.
PAGE 9 OF 10
SECTION 26. ORAL AND WRITTEN AGREEMENTS
All oral and written agreements between the parties relating to the subject matter of this contract
have been reduced to writing and are contained in this document and the exhibits attached heret
SECTION 27. DEBARRED AND SUSPENDED PARTIES
Contractor must not make any award (subgrant or contract) to any party which is debarred or
suspended or is otherwise excluded from or ineligible for participation in Federal assistance
programs under Executive Order 12549.
SECTION 28. EXHIBITS
The exhibits identified below are hereby made a part of this contract:
(1) Exhibit A, Performance Statement
(2) Exhibit B, Budget
(3) Exhibit C, Allowable Activities Document
Signed this
APPROVED AS TO CONTENT:
day of , 1994.
'Sylvia A. Martinez -Flores
Manager, Community Development & Neighborhood Initiatives
Linda Chamales,
Assistant City Attorney
CITY OF LUBBOCK
COMMUNITY DEVELOPMENT &
NEIGHBORHOOD INITIATIVES
By: David R. Langston, Mayor
TEXAS DEPARTMENT OF
HOUSING AND COMMUNITY
AFFAIRS
BY: Henry Flores
Executive Director
This contract is not effective unless signed by the Executive Director of the Department or his
authorized designee.
PAGE 10OF10
/p/ r
EXHIBIT A - PERFORMANCE STATEMENT
COMPREHENSIVE ENERGY ASSISTANCE PROGRAM
CONTRACT NO.595048
WITH
CITY OF LUBBOCK, COMMUNITY SERVICES DEPARTMENT
NUMBER NUMBER
ACTIVITIES DESCRIPTION OF OF
HOUSEHOLDS PERSONS
SERVED I SERVED
Contractor shall develop a Comprehensive Energy
Assistance Program which will provide assistance to
the minimum number of households and persons
identified in this table for low-income residents of
the geographic area referred to in Section 3 of this
contract.
Entries are estimated figures and may vary between
F. .f •%_lf;',f/;`';:Fi �:"'�l?' F�F
�f+::{� j���•fi'�'41f::' ..:1 f.::;.u,tr':'•�',,�:{; ;y,�':y:�:i �:'�:?:,i v...:
f.�components, 1 1 G,✓r+'':' /..' f' r' /r)t' < ;.F;.f ram. /rj $ r;m:;r ::+: ' �'•'' F:: r';.,. .fir r...
limitations established .1 i of this contract.
• • 1 1
ELDERLY • i ASSISTANCE
BEATING/COOLING SYSTEMS
PAGE 1 OF 1
595048
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS
EXHIBIT B - BUDGET
COMPREHENSIVE ENERGY ASSISTANCE PROGRAM
CONTRACT NO.595048 WITH
CITY OF LUBBOCK, COMMUNITY SERVICES DEPARTMENT
BUDGET CATEGORY
FUNDS
Administration
$
2,527.00
Case Management
$
2,167.00
Direct Services
$
30,306.00
TOTAL
$
35,000.00
Training Travel Allowance 1 $ 926.00
DIRECT SERVICES FUNDS
Energy Crisis
$12,122.40
40%
Co -Payment
$9,091.80
30%
Elderly Assistance
$2,121.42
7%
Heating/CoolingHeating/Cooling Systems
$6,970.38
23%
Total Direct Services
$30,306.00
100%
Administrative costs, salaries, fringe benefits, non -training travel, equipment, supplies, audit and office space are
limited to 7,22% of the contract expenditures.
Case Management costs are limited to 6,19% of the contract expenditures excluding Training Travel costs.
" Contractor may adjust dollar amounts within the following components at levels not to exceed 10 % of said
components: Energy Crisis (may not exceed 40% of Direct Service Dollars expended), Co -Payment, Elderly,
and Heating/Cooling Systems.
May allocate up to 40% of the Direct Services allowance.
Department's prior written approval for purchase or lease of equipment with acquisition cost of $5,000 and over
is required. Approval of this budget does not constitute prior approval.
Availability of budget funds is controlled by SECTION 4(A), DEPARTMENT OBLIGATIONS, of this
contract.
Funds may not be used for the purchase or improvement of land, or the purchase, construction, or permanent
improvement of any building or facility.
PAGE 1 OF 1
- le-
EXHIBIT C
ALLOWABLE ACTIVITIES DOCUMENT
COMPREHENSIVE ENERGY ASSISTANCE PROGRAM
I. PROGRAM GUIDELINES
A. DEFINITIONS
The primary intent of this program is to make funds available to enable Contractor to respond to energy
needs affecting low-income households. Under this program, a household is not entitled to a preset amount
of assistance. The term "household" means any individual or group of individuals who live together as one
economic unit and customarily purchase residential energy in common or who make undesignated
payments for energy in the form of rent. In order for a household to receive assistance through the
Comprehensive Energy Assistance Program, the household must meet the following criteria:
Have a gross annual income that does not exceed 125% of the current Poverty Income Guidelines.
Contractor shall provide all potential clients the opportunity to make an application for the Comprehensive
Energy Assistance Program.
B. PRIORITY
Contractor should give priority to eligible households containing one or more persons age 60 or above, a
disabled individual, and families with young children six years of age and under. Contractor demonstrates
adherence to these priorities by documenting special outreach efforts directed at these populations.
Department will monitor Contractor on these efforts.
Priority shall be given to households with the lowest incomes that pay a high proportion of their incomes
for the energy.
The term disabled may include individuals who are unable to engage in any substantial employment by
reasons of any medically determinable physical or mental condition which can be expected to last for a
continuous period of not less than twelve (12) months.
C. SERVING RENTERS
The provisions set by this plan for non -renters also apply to those renters who have a separate meter or who
pay their utility and/or fuel bills separately from the rent.
For those renters who pay heating and utility bills as part of their rent, Contractor shall make special efforts
to determine the portion of the rent that constitutes the fuel and/or utility payment. Contractor shall
exercise care when negotiating with the landlords so the cost of utilities quoted is in line with the
consumption for similar residents of the community. If Contractor pays the landlord, then the landlord
must furnish evidence that he/she has paid the bill.
A. INCOME ELIGIBILITY GUIDELINES
Contractor should only distribute available funds under the Comprehensive Energy Assistance Program to
households needing energy related assistance and having an income that does not exceed 125% of the
current Poverty Income Guidelines as issued by the Secretary of Planning and Evaluation, U.S. Department
of Health and Human Services.
PAGE 1 OF 9
When the Poverty Income Guidelines are updated, this program will follow the most current published
guidelines. Income refers to total annual cash receipts before taxes from all sources. Income is more fully
described in the current Poverty Income Guidelines. Contractor shall annualize income data for a part of a
year in order to determine eligibility. Each Contractor shoulddetemune the method of annualizing most
appropriate to that locality and abide by that method only for all recipients equally through the end of the
contract period. During a contract period, a Contractor may not utilize a combination of income calculation
methods.
All households at or below 125% of the Federal Poverty Level will be afforded access to the program.
This applies to all components. There are no categorically eligibility options. All applicant households will
be determined eligible according to the income guidelines and program procedures. Benefits
determinations includes the household's income, the household size, the energy consumption and/or the
vulnerablility of the household and the availability of funds.
B. DETERMINATION OF INCOME
Applicants must submit proof of income. Proof may consist of checks, check stubs, award letters,
employee statements, etc., showing the gross monthly income, if any. In the exceptional case when proof
of income is unavailable, an applicant must sign a declaration of income statement. In such cases,
Contractor will verify income eligibility, through some source other than the applicant's statement.
Another member of the applicant's household may not provide this verification. Verification efforts shall
be completed by the end of the next working day from when the declaration of income eligibility statement
was provided.
C. INCOME DISREGARD
Payments made under this program are not considered income for the purpose of determining eligibility or
benefits under any income maintenance program, including, but not limited to, food stamps, gifts, loans,
sale of property, tax refunds, lump -sum inheritances, one-time insurance payments, or compensation for
injuries. Governmental restitution payments are not considered income for the purpose of determining
eligibility or benefits under this program.
III. PROGRAM ASSISTANCE
A. ASSISTANCE
Contractor may only provide the following types of assistance with funds from the Comprehensive Energy
Assistance Program contract..
1. Payment to vendors and suppliers of fuel/utilities, goods, and other services for past due or current
bills related to the procurement of energy for heating and cooling needs of the residence.
2. Assist households in developing goals for self-sufficiency through case management. This may
involve coordination of resources, referrals to other programs, and client involvement in developing
an energy co -payment plan. Priority must be given to co -pay clients. Others may receive case
management services if funds are available after serving co -pay clients.
PAGE 2 OF 9
3,. Provide utility assistance to low-income elderly and disabled most vulnerable to the high cost of
energy for heating and cooling needs of the residence.
4. Replacing/retrofitting/repair of household heating and cooling systems if needed. All replacement
units must comply with minimum standard for energy efficiency
5. Provide assistance for an energy related crisis.
6. Contractor may pay water bills only when such cost include expenses from operating an evaporative
water cooler unit or when the water bill is an inseparable part of a utility bill. As a part of the intake
process, outreach and coordination, contractor shall confirm that a client owns a properly connected
and operational cooler and has used it within sixty (60) days prior to cool the dwelling. Whenever
possible, contractor shall negotiate with the utility providers to pay only the energy portion of the bill.
7. Purchase, lease, or repair of butane or propane tanks as well as the residential lines associated with
the tanks or natural gas lines of the dwelling not to exceed the household's maximum allowable
assistance and if such service ensures the flow of energy to the household.
8. Contractor may only pay reconnection fee in line with the registered tariff filed with the Public
Utility Commission and/or Texas Railroad Commission. Payment cannot exceed that stated tariff
cost. Contractor must negotiate to reduce the costs to cover the actual labor and material and to
assure that the utility does not assess a penalty for delinquency in payments.
9. Contractor may not pay a security deposit except when state law requires such a payment, or if the
Public Utility Commission or Texas Railroad Commission has listed such a payment as an approved
cost, and where required by law, tariff or regulation or a deferred payment agreement includes such a
payment. Contractor cannot pay any such security deposit the energy provider will eventually return
to the client.
10. While utility/fuel rates and repair charges may vary from vendor to vendor, Contractor will negotiate
for the lowest possible payment. Contractor must have a signed vendor agreement on file from the
energy vendor receiving direct LMAP payments from the contractor.
11. Contractor may make payment to landlords on behalf of eligible renters who pay their utility and/or
fuel bills indirectly. Contractor shall notify each participating household of the amount of assistance
paid on its behalf. Contractor must document this notification. Contractor shall maintain proof of
utility or fuel bill payment.
12. Contractor may not establish lower local limits of assistance.
13. This is not an entitlement program; payments are made subject to the availability of federal funds.
IV. OUTREACH AND COORDINATION
Contractor shall document and provide outreach activities designed to assure that eligible households,
especially households with elderly and/or disabled, are made aware of the Comprehensive Energy
Assistance Program. Outreach activities shall include the activities listed below or other activities that
serve the purpose of advertising the availability of the Comprehensive Energy Assistance Program.
PAGE 3OF9
Provide information through home visits, site visits, group meetings or by telephone for the
physically infirmed (Le. elderly or disabled);
Distribute posters/flyers and other information materials in local and county social services
agencies, offices of aging, social security offices, etc.
Provide information on the program and eligibility criteria in articles in local newspapers or
broadcast media announcements, utilizing Spanish (or Vietnamese) media where appropriate;
Coordinate with other low-income services to provide LIHEAP information in conjunction with
other programs.
Provide information on one-to-one basis for applicants in need of translation or interpretation
assistance;
Provide applications, forms, and energy education materials in Spanish and English;
Work with energy providers in identifying potential applicants;
Assist applicants to gather needed documentation; and
Mail information and application
In order to achieve compliance with the LIHEAP Act, Contractor must coordinate with other energy related
programs. Specifically, Contractor must make documented referrals to the local Weatherization Assistance
Program contractor.
Contractor shall accept applications for CEAP benefits at sites that are geographically accessible to all
households in the service area. Contractor shall provide physically infirmed individuals the means to
submit applications for CEAP benefits without leaving their residence or by securing transportation for
them to the sites that accept such applications.
V. APPEALS PROCESS
In compliance with the Low -Income Home Energy Assistance Act, Contractor shall provide an appeals
process as specified in Section 19 of this contract.
VI. BENEFITS
Contractor may not establish lower local limits of assistance for any component.
ENERGY CRISIS COMPONENT
A bona fide energy crisis exists when extraordinary events or situations have depleted or will deplete
household financial resources and/or have created problems in meeting basic household expenses,
particularly bills for energy so as to constitute a threat to the health or well-being of the household,
particularly the elderly, the disabled, or very young children.
PAGE 4 OF 9
—"� 3 —
NOTE: A utility termination notice alone does not constitute an energy crisis.
In no event shall the sum of all energy crisis assistance provided for the contract year made to or on behalf
of any household exceed the actual amount needed to ameliorate the household's energy -related crisis or
$600.00, whichever is less, under this Energy Crisis Component.
Where necessary to prevent undue hardships or extreme health dangers from an energy crisis, Contractor
may directly issue a voucher to provide:
Temporary shelter not to exceed $350.00 per household for the duration of the contract period in the
limited instances that inoperable heating/cooling appliances or supply of power.to the dwelling is disrupted
causing temporary evacuation of household members. Payments shall not be made for rent or mortgages
and;
Emergency deliveries of fuel not to exceed $150.00 per delivery per household.
Purchase of fable heating/cooling units(portable electric heaters are only allowable as a last resort) not
to exceed $500.00 per household for the duration of the contract period. Portable AC and heating units
may only be purchased in cases of life threatening situations to the client. Documentation of the situation
such as doctor statements, must be maintained in the client file.
Emergency funds, whether for emergency fuel deliveries with a limit of $150.00, purchase of portable
heating/cooling units with a limit of $350.00 or temporary shelter with a limit of $500.00, shall be
considered part of the total maximum household allowable assistance. Funds for this program shall not
be used to weatherize dwelling units, for medicine, food, transportation assistance, or to pay for
penalties or fines assessed to clients.
Time Limits for Assistance
Contractor shall ensure that it will:
Provide within forty-eight (48) hours after a household completes the application process for energy crisis
benefits, some form of assistance to resolve the energy crisis if such household is eligible to receive such
benefits;
Provide within 18 hours after a household completes the application process for crisis benefits, some form
of assistance to resolve the energy crisis if such household is eligible to receive such benefits and faces a
life -threatening situation.
For clients who have already lost service or are in immediate danger of losing service, the 48-hour time limit
(18 hours in life -threatening situations) commences upon completion of the application process. The
application process is considered to be complete when an agency representative accepts an application and
completes the intake process.
PAGE 5 OF 9
Contractor must maintain written documentation in the client file that it resolved the crisis within the
appropriate time deadline.
IF THE HOUSEHOD HAS AN ENERGY CRISIS AND
HOUSEHOLDS WITH MEETS INCOME ELIGIBELI `Y, THEN THE PAYMENT
INCOMES OF: IS BASED ON THE FOLLOWING:
0 to 50% of Poverty Households would receive amount needed to
solve crisis up to $600.
50 + to 80% of Poverty Households would receive the amount needed
to solve crisis up to$580.
80 + to amount not to exceed Households would receive the amount needed
125% Poverty to resolve crisis up to $560.
PAGE 6 OF 9
CO -PAYMENT COMPONENT
• Contractor shall obtain the clients' consumption and billing history for the preceding 12 months.
• Clients with an energy burden higher than that of the average household in the vendor's service area may receive
priority service.
• As a planning tool, contractor may base future utility assistance payments and co -payments on the previous years
billing to aid the client to budget the household expenses and to allow contractor to maintain a running fund balance
of available monies.
• Contractor shall provide budget counseling, energy conservation education and coordinate with or refer households to
other services which will address the underlying contributing causes of energy induced hardship.
MAXIMUM BENEFIT LEVELS FOR CO -PAYMENT COMPONENT
Contractor shall enroll CEAP co -payment clients in the program for a minimum period of six months. Clients may be
terminated at any time between six and twelve months, if the goal of self-sufficiency has been achieved Utility payments
on behalf of clients to utility vendors will be made on a sliding scale co -payment system designed by the subgrantee. The
program must target clients with the least income and the greatest energy costs. Clients may receive up to 100% of the
bill and arrears for the first month's bill and the agreed co -payment plan as long as it does not exceed the set maximum
amounts established for their income levels for the program year.
In order to ensure that the highest level of assistance will be furnished to those households which have the lowest incomes
and highest energy costs or needs in relation to household income:
IF THE HOUSEHOLD MEETS THE ELIGIBILITY
HOUSEHOLDS WITH CRITERIA, THEN PAYMENT LS BASED ON THE
INCOMES OF: FOLLOWING:
0 to 50% of Poverty Household would receive an
amount not to exceed $1,000.
50 + to 80% of Poverty Household would receive an
amount not to exceed $900.
80 + to amount not to exceed Household would receive an
125% of Poverty -- = amount not to exceed $800.
PAGE 7 OF 9
ELDERLY AND DISABLED ASSISTANCE COMPONENT
• The elderly and disabled shall be a priority of the program.
• Payments on behalf of the elderly will be made based on the previous 12 months billing history. Excess amounts
over the actual bill will be treated as a credit with the utility company for the client.
• Elderly households are defined as households with at least one member who is age 60 or above. Disabled
households are defined as households with at least one member who is disabled. A disabled individual is defined as
an individual who is unable to engage in any substantial employment by reasons of an medically determinable
physical or mental condition which can be expected to last for a continous period of not less than twelve months.
• Contractor may provide energy conservation education, budget counseling and referrals if case management funds
are available.
BENEFIT LEVELS UNDER THE ELDERLY AND DISABLED COMPONENT
Elderly clients may receive up to 100% of their bills within the contract year, including arrears, as long as the cost does
not exceed the maximum allowable benefit and no more than four payments per program year are made. Payments should
be limited to the highest consumption months during which time the elderly are most vulnerable to energy related stress.
This period may be determined by the local subgrantee based on 12 month billing history.
In order to ensure that the highest level of assistance will be furnished to those households which have the lowest incomes
and highest energy costs or needs in relation to household income:
IF THE HOUSEHOLD MEETS THE ELIGIBILITY
HOUSEHOLD WITH CRITERIA, THEN PAYMENT IS BASED ON THE
INCOMES OF: FOLLOWING:
0 to 50% of Poverty Household would receive an
amount not to exceed $1,000.
50 + to 80% of Poverty Household would receive an
amount not to exceed $900.
80 + to amount not to exceed Household would receive an
125 % of Poverty amount not to exceed $800.
PAGE 8 OF 9
— o;2 �7—
REPLACEMENT AND RETROFIT OF HEATING/COOLING SYSTEMS
CEAP clients are eligible for replacement repair and/or retrofit of heating and cooling systems. The replacement, repair
and/or retrofit must be based on need, i.e., an energy assesment of heating/cooling appliances has determined that the
retrofit repair and/or/ replacement of a heating/cooling appliance will be cost effective and will result in a reduction of
energy consumption. Energy assesment of heating/cooling appliances must be conducted by qualified professionals, from
either within the agency, such as the weatherization program, or outside the agency. In contracting out for the service, the
subgrantee must follow the WAP/ECP Policy Issuance 88-10.1 for procuring goods and services.
The services may include the cleaning, tuning and evaluation of systems, repair and upgrade of existing components, and
replacement of unsafe or inoperable systems. Cooling systems, such as central air conditioners, window air conditioners
units and evaporative coolers will be covered under the CEAP program. Heating systems, such as central heating systems
and space heaters, wall heaters, wood burning stoves will be covered under the CEAP program. Replacement appliance
must meet minimum energy efficiency standards.
Real benefits to the households are based on the energy efficiency needs of the unit, as determined by an appliance energy
assesment. The maximum allowable costs are as follows:
Heating and Cooling $1000.00 per household
PAGE 9 OF 9