RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdividered of Live Oak Addition, Lots 198, 198 A,
B and C, made arrangements with Kerr Construction Company for the construction
of paving improvements on a certain street dedicated in said subdivision under
the provisions of said Ordinance prior to the recording of the subdivision pla
cif Live Oak Addition including the following street:
The South one-half (1/2) of 70th Street from its intersection with the East
Lip Line of Indiana Avenue to its intersection with the centerline of Hartford
Avenue, known and designated as new Sub -division Unit Number 1936.
AND WHEREAS, the construction of the above improvements on the above -
mentioned street was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to hav
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.`
I.
That the improvements on said portions of the abovementioned street
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to
release escrow money.
passage.
II.
This resolution shall take effect and be in force from and after its
PASSED AND APPROVED THIS 24th DAY OF MAY, 1973.
ATTEST:
r
r avenia Lowe,,City Secretary
APPRQIMD:
Morris W. Turner, Mayor
YAW Nw
en er, r., ty ttorn
CONSOLIDATED FINAL ESTIMATE
Live Oak Addition
Lots 198, 198A, B & C
Accepted May 24, 1973
h
S.Y.
S.Y.
S.Y.
L.F.
L.F.
Unit &
Paving
L.F. Extra
Valley
Re-sur
C & G
Sub -Unit Location
6" Base
C & G Base 6"
Gutter
facing
Removal
NS 1936 The South one-half (1/2) of ?Oth
1,258.87
463.00 65.69
31.66
53.20
43.00
Street from the ELL of Indiana
Avenue to the centerline of
Hartford Avenue.
COST ESTIMATE
1,258.87
S.Y.
Paving
6" Base
@
2.08
$2,618.45
463.00
L.F.
Curb &
Gutter
@
2.09
$ 967.67
31.66
S.Y.
Valley
Gutter
@
8.40
$ 265.94
65.69
S.Y.
Extra Base 6"
@
1.25
$ 82.11
53.20
L.F.
Re -surface
@
1.00
$ 53.20
43.00
L.F.
Curb &
Gutter Removal
@
1.00
$ 43.00
CONTRACT COST
$4,030.37
COST DISTRIBUTION
Pre -Paid Paving
Uilit & Contract Property to be paid to
Sub -Unit Cost Owner Ccs t J.D. Badle
1936 $4,030.37 $4,030.37 $3,651.62