RESOLUTION
RESOLUTION ACCEPTING CONCRETE IMPROVEMENTS ON A PORTION OF AN ALLEY AS
LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Glenridge Addition, Lots 262-264, made arran -
ments with Ronald F. Betenbough and Burl J. Jones for the construction of
paving improvements on certain alley dedicated in said subdivision under the
provisions of said Ordinance prior to the recording of the subdivision plat of
Glenridge Addition, Lots 262-264, including the following alley:
The East-West alley between 54th Street and 53rd Street from the West lip line
of Kenosha Avenue to the West Property Line of the North -South alley West of
Kenosha Avenue.
AND WHEREAS, the construction of the above improvements on the abovemen-
tioned alley was performed under the supervision of the City Engineer, and sai
improvements have been completed and have been inspected and found to have bee
constructed in accordance with City specifications and in accordance with the
provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned alley be and
the same are hereby accepted and the City Engineer be and he is hereby author-
ized to direct.the payment of the City`s portion of the cost and to release
escrow money.
II.
This resolution shall flake Affect and be in force from and after its
passage.
PASSED AND APPROVED THIS 26TH DAY OF OCTOBER, 1972.
Morris W. Turner, Mayor
AT T: ----�
Lavbnia Lowe, Citty Secretary
A PPR 19 VED: AP VED:
.. - ��, r /
Wilfo D. Watson, City Engineer red 0. Senter, Jr., City Attorney
CONSOLIDATED FINAL
ESTIMATE
GLENRIDGE ADDITION
Lots 262-264
Accepted October
26, 1972
QUANTITIES
L.F.
L.F.
S.Y.
Unit &
Paving
C & G L.F.
Alley
Sub -Unit
Location
Repair
Removal C & G
Return
A-417
East-West alley between 53rd
Street and 54th Street from the
WLL of Kenosha Avenue to the
WPL of the North -South alley'
West of Kenosha Avenue.
45.28
45.00 31.42
80.89
COST ESTIMATE
31.42
L.F.
Curb & Gutter
80.89
S.Y.
Alley Return
45.28
L.F.
Paving Repairs
45.00
L.F.
Curb & Gutter Removal
@
$2.45
$ 76.98
@
$8.40
679.48
@
$1.00
45.28
@
$1.00
45.00
CONTRACT COST $846-74
COST DISTRIBUTION
Unit & Contract Escrow to
-Sub-Unit Cost Be Released
A-417 846.74 $846.74