HomeMy WebLinkAboutResolution - 081072H - Pavement Improvements - Kerr Construction Co - Live Oak Addition - 08_10_1972P
r}S/07Z ti
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW
WHEREAS, in conformance with the paving requirement provisions of City
rdinance 1331, the subdivider of Live Oak Addition, Lots 224-229, made arrange
ents with Kerr Construction Company for the construction of paving improvement
n certain street dedicated in said subdivision under the provisions of said
rdinance prior to the recording of the subdivision plat of Live Oak Addition,
ots 224-229, including the following street:
remont Avenue from its intersection with a line 17.0 feet South of the North
roperty Line of Loop 289 to its intersection with the cul-de-sac North of
oop 289 known and designated as New Subdivision Unit Number 2014-12.
he East-West alley just North of Loop 289 fron its intersectiony,with the North
outh alley East of Gary Avenue to its intersection with the North -South alley
ast of Fremont Avenue known and designated as New Subdivision Unit Number A-41 .
AND WHEREAS, the construction of the above improvements on the abovemen-
tioned street was Performed under the supervision of the City Engineer, and sai
improvements have been completed and have been inspected and found to have been
constructed in accordance with the City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street be and
the same are hereby accepted and the City Engineer be and he is hereby authoriz
to direct the payment of the City's portion:;of the cost.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS LOTH DAY OF AUGUST, 1972.
lATTEST: ,
Lavenia Lowe, City ecretary
APPROVED:
Wilford D. Watson, City Engineer
A
i
Morris W. Turner, Mayor
Fred 1,0. Senter, Jr., q� Attorney
Unit 41,
Sub -Unit
Location
2014-12
Fremont Avenue from 17.0
feet
South of NPL of Loop
289
to cul-de-sac North of
Loop
289.
A-418
East-West alley North of
Loop
289 from alley East
of Gary Avenue to alley
East
of Fremont Avenue.
TOTALS
COST ESTIMATE
1,456.06
S.Y.
Paving 6" Base
868.05
L.F.
Curb &Gutter
35.00
L.F.
12" Curb & Gutter
18.55
S.Y.
Valley Gutter
489.46
S.Y.
Drainage Channel
116.3
L.F.
Resurface
116.3
L.F.
Curb & Gutter Removal
Unit &
Sub -Unit
A-418
NS 2014-12
t
Z�
i
Contract
Cost
4,368.66
5,009.68
TOTAL $9,378.34
CONSOLIDATED FINAL ESTIMATE
LIVE OAK ADDITION Lots 224-229
Accepted August 10, 1972
L.F. S.Y. S.Y. S.Y. L.F. L.F.
12" Paving L.F. Alley Valley Re -sure C & G
C & G 6" Base C & G Return Gutter facing Removal
1,456.06 759.05 18.55 90.3 90.3
35.00
109.00
489.46
26.0
26.0
35.0
1,456.06 868.05
489.46
18.55 116.3
116.3
@ $2.12
$3,086.85
@ $2.09
1,814.22
@ $2.85
99.75
@ $8.40
155.82
@ $8.15
3,989.10
@ $1.00
116.3
@ $1.00
116.3
CONTRACT COST $9,378.34
Property Owner
Cost
$9,378.34