RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES
S LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Melonie Park South, Lots 261-327, made
arrangements with Kerr Construction Company for the construction of paving impr ve-
ments on certain streets dedicated in said subdivision under the provisions of aid
Ordinance prior to the recording of the subdivision plat of Melonie Park South,
Lots 261-327 including the following streets:
Knoxville Drive from its intersection with the East Lip Line of Kenosha Drive
to its intersection with a line 3.00 feet East of the alley Southeast of Knoxville
Avenue known and designated as New Subdivision Unit Number 2014-63.
Knoxville Avenue from its intersection with the South Lip Line of Knoxville Dri e
to its intersection with a line 8.00 feet North of the centerline of 82nd Stree
known and designated as New Subdivision Unit Number 2014-64.
Kenosha Avenue from its intersection with a line 18.00 feet South of the South
Property Line of 78th Street to its intersection with the cul-de-sac South of
81st Street known and designated as New Subdivision Unit Number 2014-65.
81st Street from its intersection with the East Lip Line of Kenosha Avenue to i Is
intersection with the West Lip Line of Knoxville Avenue known and designated
as New Subdivision Unit Number 2014-66.
Part of the North 1/2 of 82nd Street from its intersection with a line 3.00
feet East of the alley East of Louisville Avenue to its intersection with a
line 3.00 feet East of the alley East of Knoxville Avenue known and designated
as New Subdivision Unit Number 2014-67.
AND WHEREAS, the construction of the above improvements on the abovemen-
tioned streets was performed under the supervision of the City Engineer, and sa
improvements have been completed and have been inspected and found to have been
constructed in accordance with City specifications and in accordance with the
provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the aboveme_tioned streets be
and the same are hereby accepted and the City Engineer,be;,:and.:hd_is hereby
authorized to direct the payment of the City's portion of the cost and to re-
lease escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 27th DAY OF JULY, 1972.
Morris M. Turner, Mayor
ATTEST:
Lav is Lowe, Ci Secretary
APPROVED:
Ac;dlttg:�
WiTfordy. Watson, City Engineer
APPROVED:
/Xr � V
Fred 0. Senter, Jr., CityZAttorney
CONSOLIDATED FINAL ESTIMATE
MELONIE PARK SOUTH - Lots 261-327
Acdepted July 27, 1972
S.Y.
S.Y.
S.Y.
L.F.
L.F.
Unit &
Paving
L.F.
Alley
Malley
Paving
C & G
Sub -Unit
Location
6" Base
C & G
Return
Gutter
Repair
Removal
NS 2014-63
Knoxville Drive from the ELL
2,378.67
1,331.17
40.00
52.54
112.00
112.00
of Kenosha Drive to 3.0 feet
East of the alley Southeast
of Knoxville Avenue.
NS 2014-64
Knoxville Avenue from the SLL
4,258.97
2,114.59
of Knoxville Drive to 8.0 feet
North of the centerline of
82nd Street.
NS 2014-65
Kenosha Avenue from 18.0 feet
4,400.70
2,172.62
22.78
South of the SPL of 78th Street
to the cul-de-sac South of 81st
Street.
NS 2014-66
81st Street from the ELL of
1,029.53
609.08
26.67
Kenosha Avenue to the WLL
of Knoxville Avenue.
Part of
NS 2014-67
The North 1/2 Of 82nd Street
546.00
31.11
from 3.0 feet East of the alley
East of Louisville Avenue to
3.0 feet East of the alley East
of Knoxville Avenue (Concrete Only)
TOTAL
12,067.87
6,773.46
120.56
52.54
112.00
112.00
COST ESTIMATE
12,067.87
S.Y.
Paving
6" Base
@
$2.02
6,773.46
L.F.
Curb &
Gutter
@
$2.05
120.56
S.Y.
Alley Return
@
$7.90
52.54
S.Y.
Valley
Gutter
@'$7.90
112.00
L.F.
Paving
Repair
@
$1.00
112.00
L.F.
Curb &
Gutter Removal
@
$1.00
$24,377.10
13,885.59
952.42
415.06
112.00
112_nn
CONTRACT COST $39,854.17
COST DISTRIBUTION
Property
Unit & Contract Owner
Sub -Unit Cost Cost
NS
2014-63
$8,488.88
$8,488.88
NS
2014-64
$12,938.03
$12,938.03
NS
2014-65
$13,523.24
$13,523.24
NS
2014-66
$3,538.95
$3,538.95
NS
2014-67
$1,365.07
$1,365.07
TOTAL
$39,854.17
$39,854.17