HomeMy WebLinkAboutResolution - 062272C - Street Improvements - Zahn Pavers Inc - Multiple Locations - 06_22_1972RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF ALLEYS, STREETS, AND/OR AVENUES AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE ASSESSMENTS LEVIED. WHEREAS, the City of Lubbock heretofore passed various street improvement ordinances and resolutions and entered into contract with Zahn Pavers, Inc., G. .0. 10733-A, for the making and construction of street and/or alley improvets men portions of numerous alleys, streets and/or avenues in said City including amon others the following: 62nd Street from its intersection with a line 13.00 feet West of the West Prope ty Line of Toledo Avenue to its intersection with the West Lot Line of Lot 110, Crestview Addition known and designated as Sub -Unit Number 12 of Unit Number 2220. 63rd Street from its intersection with a line 13.00 feet West of the West Prope ty Line of Toledo Avenue to its intersection with the West Lot Line of Lot 29, Qua 1 Ridge Addition known and designated as Sub -Unit Number 14, of Unit Number 2220. 63rd Street from its intersection with a line 16.00 feet West of the West Prope ty Line of Utica Avenue to its intersection with a line 13.00 feet West of the Wes Property Line of Toledo Avenue known and designated as Sub�Unit Number 15 of Unit Number 2220. 64th Street from its:iintersection with a line 13.00 feet West of the West Prope ty Line of Toledo Avenue to its intersection with the West Lot Line of Lot 63, Quail Ridge Addition known and designated as Sub -Unit Number 16 of Unit Number 2220. 64th Street from its intersection with a line 16.00 feet West of the West Prope ty Line of Utica Avenue to its intersection *ith a line 13.00 feet West of the Wes Property Line of Toledo Avenue known and designated as Sub -Unit Number 17 of Unit Number 2220. Toledo Avenue from its intersection with a line 18.00 feet South of the South Property Line of 61st Street to its intersection with a line 18.00 feet North of the North Property Line of 62nd Street known and designated as Sub -Unit Number 18 of Unit Number 2220. Toledo Avenue from its intersection with a line 18.00 feet South of the South Property Line of 62nd Street to its intersection with a line 18.00 feet North of the North Property Line of 63rd Street known and designated as Sub -Unit Number 19 of Unit Number 2220. Toledo Avenue from its intersection with a line 18.00 feet South of the South Property Line of 63rd Street to its intersection with a line 18.00 feet North the North Property Line -of 64th Street known and designated as Sub -Unit Number 20 of Unit Number 2220. The South 1/2 of 24th Street from its intersection with a line 8.00 feet East ., -- „_ _ ..,'r;,o f Alhanv Avenue to its intersection with a line 40.80 feet East of the East Property Line of Albany Avenue known and designate s Sub -Unit Number 23 of Unit Number 2220. AND WHEREAS, the improvements upon the said portions of the abovementioned lleys, streets and/or avenues, have been inspected and found to have been con- tructed in accordance with terms of said contract G.W.O. 10,733-A. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned alleys, strees, /or avenues be and the same are hereby accepted, and the City Engineer be an he hereby authorized to direct payment of the City's portion of the cost. Ii. That the Mayor and City Secretary be, and they are hereby instructed to xecute and deliver certificates in evidence of the assessments levied against arcels of property abutting upon the'said portions of the alleys, streets and/ venues listed above and against the owners of such property in accordance with aw and in the manner provided in said contract, and the proceedings with refer o said improvements and assessments where such assessments were levied. III. This resolution shall take effect and be in force from and after its Re. PASSED AND APPROVED THIS 22ND DAY OF JUKE, 1972. A'4'� Morris W. Turner, Mayor TTEST: venia Lowe, City Secretary P OVED: WilVo Yd. Watson, City Engineer PPRO— Fled 0. Senter; Jr., City At5pfnty CONSOLIDATED FINAL ESTIMATE G.W.O. 10,733 Accepted June 22, 1972 QUANTITIES S.Y. S .Y. Unit & Paving L.F. Alley Sub -Unit Location 6" Base C & G Return 2220-12 62nd Street from 13.0 feet West of 2,767.48 1,396.10 the WPL of Toledo Avenue to 631.80 feet East of EPL of Toledo Avenue. 2220-14 63rd Street from 13.0 feet West of 2,767.48 1,396.90 WPL of Toledo Avenue to 631.8 feet East of EPL of Toledo Avenue. 2220-15 63rd Street from 13.0 feet West of 2,697.08 1,320.10 the WPL of Toledo Avenue to 16.0 feet West of WPL of Utica Avenue. 2220-16 64th Street from 13.0 feet West of 2,767.48 1,395.80 the WPL of Toledo Avenue to 631.8 feet East of EPL of Toledo Avenue. 2220-17 64th Street from 13.0 feet West of 2,739.30 1,339.50 WPL of Toledo Avenue to 16.0 feet West of WPL of Utica Avenue. 2220-18 Toledo Avenue from 18.0 feet South 867.56 520.40 24.86 of SPL of 61st Street to 18.0 feet North of NPL of 62nd Street. - 2220-19 Toledo Avenue from 18.0 feet South 849.78 511.10 25.06 of SPL of 62nd Street to 18.0 feet North of NPL of 63rd Street. 2220-20 Toledo Avenue from 18.0 feet South 849.78 510.80 24.89 of SPL of 63rd Street to 18.0 feet North of NPL of 64th Street. 2220-23 24th Street from 8.0 feet East of 1,894.40 536.30 9.54 EPL of Albany Avenue to 540.8 feet East of EPL of Albany Avenue. TOTALS 18,200.34 8,926.50 84.35 COST ESTIMATE 18,200.34 S.Y. Paving 6" Base 8,926.50 L.F. Curb & Gutter 84.35 S.Y. Alley Return @ $1.67 $30,394.56 @ $2.00 17,853.00 @ $7.00 590.45 CONTRACT COST $48,838.01 COST DISTRIBUTION Property Release Owner City to of *Previoi Unit & Contract Cost Contractor Prepaid Monthl; Sub -Unit Cost Due City NOW Paving Payment 2220-12 $ 7,413.89 $ 6,888.00 $ 525.89 $ 2,420.42 2220-14 7,415.49 6,720.00 695.49 2,420.42 2220-15 7,144.32 6,720.00 424.32 2,284.34 2220-16 7,412.29 6,720.00 692.29 2,420.42 2220-17 7,253.63 6,720.00 533.63 2,320.34 2220-18 2,663.65 2,347.92 315.73 1,002.81 2220-19 2,616.75 2,303.60 313.15 984.81 2220-20 2,614.96 2,303.60 311.36 984.81 2220-23 4,303.03 2,899.68 -1,143.65 $2,547.00 939.24 $48,838.01 $43,622.80 $ 2,668.21 $2,547.00 $15,777.61 Total Contract Cost $48,838.01 Less Previous Payments $15,777.61 City to Contractor Now $33,060.40 *On monthly payments, 10% is retained; and this column reflects only the amount received by the Contractor. FINAL PAVING ASSESSMENT 62ND STREET City of Lubbock Width 36 Feet From 13.0 feet West of the WPL of Toledo Avenue to the West Lot Line of Lot 110, Crestview Addition Acceptance Date June 22, 1972 G.W.O. 10,733-A Sheet No. 1 of 2 Sub -Unit No. 12 of Unit No. 2220 Owner Blk. Lots No. Addition Paving $3.50 Rate/L.F. No. Ft. Cost Curb & Gutter $2.10 Rate/L.F. Cost Total Cost NORTH SIDE A. J. Bell 11 4 Slidell 60.00 210.00 126.00 336.00 Joe L. Wagoner 12 4 Slidell 60.00 210.00 126.00 336.00 Lora Ellis 13 4 Slidell 60.00 210.00 126.00 336.00 Terry C. Redford 14 4 Slidell 60.00 210.00 126.00 336.00 Loyd Evans 15 4 Slidell 60.00 210.00 126.00 336.00 Loyd Evans 16 4 Slidell 60.00 210.00 126.00 336.00 R. W. Webb 17 4 Slidell 60.00 210.00 126.00 336.00 C. C. Turquette, Jr. 18 4 Slidell 60.00 210.00 126.00 336.00 Floy Roberts 19 4 Slidell 60.00 210.00 126.00 336.00 Dewie Rothwell 20 (Rel. 6-15-72) 4 Slidell 60.00 210.00 126.00 336.00 Harold A. Young & Gloria F. Merideth Beginning at a point, said point being (Rel. 6-16-72) 30.00 105.00 63.00 168.00 the Southeast corner of Lot 20, Block 4, Slidell Addition to the City of Lubbock; Thence North along the East Property Line of Lot 20, Block 4, Slidell Addition a distance of 132.50 feet to a point, said point being the Northeast corner of Lot 20, Block 4; Thence Easterly 30.00 feet more or less, to a point, said point being the Northwest corner of Lot 110, Crestview Addition; Thence South a dis- tance of 127.00 feet to a point, said point being the Southwest corner of Lot 110, Crest- view Addition to theCity of Lubbock; Thence 30.161Z Acceptance Date June 22, 1972 G.W.O. 10,733-A FINAL PAVING ASSESSMENT 62ND STREET Sheet No. 2 of 2 City of Lubbock Sub -Unit No. 12 of Width 36 Feet From 13.0 feet West of the WPL of Toledo Avenue to the West Lot Line of Lot 110, Crestview Unit No. 2220 Addition Owner Lots Blk. No. Addition $3.50 No. Ft. Paving Rate/L.F. Cost Curb & Gutter $2.10 Rate/L.F. Total Cost Cost NORTH SIDE (Cont.) westerly a distance of 30.00 feet more or less, to the point of beginning. SOUTH SIDE Mrs. F. M. Shawver 1 5 Slidell 60.00 210.00 126.00 336.00 Mrs. F. M. Shawver 2 5 Slidell 60.00 210.00 126.00 336.00 H. P. Ainsworth 3 5 Slidell 60.00 210.00 126.00 336.00 Mrs. Oleta Houston 4 5 Slidell 60.00 210.00 126.00 336.00 Troy Randolph 5 5 Slidell 60.00 210.00 126.00 336.00 Troy Randolph 6 5 Slidell 60.00 210.00 126.00 336.00 Ernest Barker 7 5 Slidell 60.00 210.00 126.00 336.00 I. Silverman 8 5 Slidell 60.00 210.00 126.00 336.00 Scoggin Dickey Buick 9 5 Slidell 60.00 210.00 126.00 336.00 Carrie B. Primm 10 5 Slidell 60.00 210.00 126.00 336.00 TOTAL PROPERTY OWNER COST $6,888.00 CITY'S SHARE 896.58 TOTAL FINAL SUB UNIT COST $7,784.58 Acceptance Date �vJune J22, 1972 G.W.O. 10,733-A FINAL PAVING ASSESSMENT 63RD STREET Sheet No. 1 of 2 City of Lubbock Sub Unit No. 14 of Width 36 Feet From 13.0 feet West of the WPL of Toledo Avenue to the West Lot Line of Lot 29, Quail Ridge Unit No. 2220 Addition Owner Lots Blk. No. Addition $3.50 No. Ft. Paving Rate/L.F. Cost Curb & Gutter $2.10 Rate/L.F. Cost Total Cost NORTH SIDE Robert L. Short 11 5 Slidell 60.00 210.00 126.00 336.00 M. B. Colbert 12 5 Slidell 60.00 210.00 126.00 336.00 Garnett W. Jones 13 5 Slidell 60.00 210.00 126.00 336.00 Garnett W. Jones 14 5 Slidell 60.00 210.00 126.00 336.00 Florence E. Maris 15 5 Slidell 60.00 210.00 126.00 336.00 Florence E. Maris 16 5 Slidell 60.00 210.00 126.00 336.00 Charles Nelson 17 5 Slidell 60.00 210.00 126.00 336.00 Florence E. Maris 18 5 Slidell 60.00 210.00 126.00 336.00 Doyle H. Brooks 19 5 Slidell 60.00 210.00 126.00 336.00 A. L. Melton 20 5 Slidell 60.00 210.00 126.00 336.00 SOUTH SIDE C. D. Howard 1 6 Slidell 60.00 210.00 126.00 336.00 C. D. Howard 2 6 Slidell 60.00 210.00 126.00 336.00 C. D. Howard 3 6 Slidell 60.00 210.00 126.00 336.00 Logan McCabe 4 6 Slidell 60.00 210.00 126.00 336.00 Mrs-. Katy McMillan 5 6 Slidell 60.00 210.00 126.00 336.00 Bert Shanks 6 6 Slidell 60.00 210.00 126.00 336.00 30.1619 Acceptance Date June 22, 1972 G.W.O. 10,733-A FINAL PAVING ASSESSMENT 63RD STREET Sheet No. 2 of 2 City of Lubbock Sub Unit No. 14 of Width 36 Feet From 13.0 feet West of the WPL of Toledo Avenue to the West Lot Line of Lot 29, Quail Ridge Unit No. 2220 Addition Owner Lots SOUTH SIDE (Cont. Bert Shanks Bert Shanks Randall J. Abernathy Wayne Adams Paving Curb & Gutter Blk. $3.50 Rate/L.F. $2.10 Rate/L.F. Total 7 6 Slidell 8 6 Slidell 9 6 Slidell 10 6 Slidell 60.00 210.00 126.00 336.00 60.00 210.00 126.00 336.00 60.00 210.00 126.00 336.00 60.00 210.00 126.00 336.00 TOTAL PROPERTY OWNER COST $6,720.00 CITY'S SHARE 1,066.26 TOTAL FINAL SUB UNIT COST $7,786.26 .JV.LV7V Acceptance Date June 22, 1972 G.W.O. 10,733-A FINAL PAVING ASSESSMENT 63RD STREET Sheet No. 1 of 2 City of Lubbock Sub Unit No. 15 of Width 36 Feet From 16.0 feetWest of the WPL of Utica Avenue to 13.0 feet West of the WPL of Toledo Avenue Unit No. 2220 Paying Curb & Gutter Blk. $3.50 Rate/L.F. $2.10 Rate/L.F.. Total Owner Lots No. Addition No. Ft. Cost Cost Cost NORTH SIDE Jack Vallance 11 5 Slidell Addition Annex 60.00 210.00 126.00 336.00 Mrs. Mary Ann Sires 12 5 Slidell Addition Annex 60.00 210.00 126.00 336.00 Mrs. Mary Ann Sires 13 5 Slidell Addition Annex 60.00 210.00 126.00 336.00 Mae Price 14 5 Slidell Addition Annex 60.00 210.00 126.00 336.00 D. B. Blanton 15 5 Slidell Addition Annex 60.00 210.00 126.00 336.00 S. A. Barbee, Jr. 16 5 Slidell Addition Annex 60.00 210.00 126.00 336.00 Charles Nelson 17 5 Slidell Addition Annex 60.00 210.00 126.00 336.00 Mrs. John W. Gideon 18 5 Slidell Addition Annex 60.00 210.00 126.00 336.00 Charles C. Nelson 19 5 Slidell Addition Annex 60.00 210.00 126.00 336.00 Charles C. Nelson 20 5 Slidell Addition Annex 60.00 210.00 126.00 336.00 SOUTH SIDE Richard Tivis 1 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 Charles Nelson 2 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 Charles Nelson 3 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 James W. Kelly 4 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 James Kelly 5 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 30.1690 Acceptance Date June 22, 1972 G.W.O. 10,733-A FINAL PAVING ASSESSMENT 63RD STREET Sheet No. 2 of 2 City of Lubbock Sub Unit No. 15 of Width 36 Feet From 16.0 feet West of the WPL of Utica Avenue to the 13.0 feet West of the WPL of Toledo Avenue Unit No. 2220 Paving Curb & Gutter Blk. $3.50 Rate/L.F. $2.10 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Cost Cost SOUTH SIDE (Cont.) Plains Helicopter, Inc. Roger Evans Wade Smith Wade Smith Earnest A. Peloguin Earnest A. Peloguin 6 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 7 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 8 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 9 6 'Slidell Addition Annex 60.00 210.00 126.00 336.00 10 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 TOTAL PROPERTY OWNER COST $6,720.00 CITY'S SHARE 781.54 TOTAL FINAL SUB UNIT COST $7,501.54 .su.ioiy Acceptance Date June 22, 1972 G.W.O. 10,733-A FINAL PAVING ASSESSMENT 64TH STREET Sheet No. 1 of 2 City of Lubbock Sub Unit No. 16 of Width 36 Feet From 13.0 feet West of the WPL of Toledo Avenue to the West Lot Line of Lot 63, Quail Ridge Unit No. 2220 Addition Owner NORTH SIDE Thad Smith A. G. Irwin Carrie B. Primm Arthur W. Boyd Arthur W. Boyd J. E. Whitehead J. E. Whitehead Norvin Smith, Jr. Norvin Smith, Jr. S. 0. Howard SOUTH SIDE A. D. Mayne C. G. Lovell C. G. Lovell Dewie Rothwell Dewie Rothwell Paving Curb & Gutter Blk. $3.50 Rate/L.F. $2.10 Rate/L.F. Total Lots No. Addition No. Ft. Cost Cost Cost 11 6 Slidell 60.00 210.00 126.00 336.00 12 6 Slidell 60.00 210.00 126.00 336.00 13 6 Slidell 60.00 210.00 126.00 336.00 14 6 Slidell 60.00 210.00 126.00 336.00 15 6 Slidell 60.00 210.00 126.00 336.00 16 6 Slidell 60.00 210.00 126.00 336.00 17 6 Slidell 60.00 210.00 126.00 336.00 18 6 Slidell 60.00 210.00 126.00 336.00 19 6 Slidell 60.00 210.00 126.00 336.00 20 6 Slidell 60.00 210.00 126.00 336.00 1 7 Slidell 60.00 210.00 126.00 336.00 2 7 Slidell 60.00 210.00 126.00 336.00 3 7 Slidell 60.00 210.00 126.00 336.00 4 7 Slidell 60.00 210.00 126.00 336.00 5 7 Slidell 60.00 210.00 126.00 336.00 Acceptance Date June 22, 1972 G,W.O. 10,733-A FINAL PAVING ASSESSMENT 64TH STREET Sheet No. 2 of 2 City of Lubbock Sub Unit No. 16 of Width 36 Feet From 13.0 feet West of the WPL of Toledo Avenue to the West Lot Line of Lot 63, Quail Ridge Addition Unit No. 2220 Paving Cuirb & Gutter Blk. $3.50 Rate/L.F. $2.10 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Cost Cost SOUTH SIDE (Cont.) Wanda King 6 7 Slidell 60.00 210.00 126.00 336.00 Clara F. Cagle Mauney 7 7 Slidell 60.00 210.00 126.00 336.00 Ray Vaught 8 7 Slidell 60.00 210.00 126.00 336.00 Leroy Holladay 9 7 Slidell 60.00 210.00 126.00 336.00 Leroy Holladay 10 7 Slidell 60.00 210.00 126.00 336.00 TOTAL PROPERTY OWNER COST $6,720.00 CITY'S SHARE 1,062.90 TOTAL FINAL SUB UNIT COST $7,782.90 FINAL PAVING ASSESSMENT City of Lubbock Width 36 Feet From 16.0 feet West of the WPL 64TH STREET of Utica Avenue to 13.0 feet West of the WPL of Toledo w. LU71 Acceptance Date June 22, 1972 G.W.O. 10,733-A Sheet No. 1 of 2 Sub Unit No. 17 of Avenue Unit No. 2220 Paving Cafb & Gutter Blk. $3.50 Rate/L.F. $2.10 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Ccs t Cost NORTH SIDE Charles C. Nelson 11 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 N. B. Nicholas 12 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 R. W. Barton 13 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 J. C. Leake 14 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 Kenneth A. Sutton 15 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 W. J. Patton 16 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 W. J. Patton 17 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 W. J. Patton 18 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 Mrs. Myrtice Bulsterbaum 19 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 H. E. Raines 20 6 Slidell Addition Annex 60.00 210.00 126.00 336.00 SOUTH SIDE R. E. Turner 1 7 Slidell Addition Annex 60.00 210.00 126.00 336.00 S. R. Sedgwick 2 7 Slidell Addition Annex 60.00 210.00 126.00 336.00 Wayland Burk 3 7 Slidell Addition Annex 60.00 210.00 126.00 336.00 Wayland Burk 4 7 Slidell Addition Annex 60.00 210.00 126.00 336.00 Charles Nelson 5 7 Slidell Addition Annex 60.00 210.00 126.00 336.00 Ju.IovI Acceptance Date June 22, 1972 G.W.O. 10,733-A FINAL PAVING ASSESSMENT 64TH STREET Sheet No. 2 of 2 City of Lubbock Sub Unit No. 17 of Width 36 Feet From 16.0 feet West of the WPL of Utica Avenue to 13.0 feet West of the WPL of Toledo Avenue Unit No. 2220 Owner Lots Blk. No. Addition Paving $3.50 Rate/L.F. No. Ft. Cost Curb & Gutter $2.10 Rate/L.F. Cost Total Cost SOUTH SIDE (Cont.) Virginia N. Buzan 6 7 Slidell Addition Annex 60.00 210.00 126.00 336.00 Virginia N. Buzan 7 7 Slidell Addition Annex 60.00 210.00 126.00 336.00 Virginia N. Buzan 8 7 Slidell Addition Annex 60.00 210.00 126.00 336.00 Malcolm G. Kennedy 9 7 Slidell Addition Annex 60.00 210.00 126.00 336.00 Malcolm G. Kennedy 10 7 Slidell Addition Annex 60.00 210.00 126.00 336.00 TOTAL PROPERTY OWNER COST $6,720.00 CITY'S SHARE 896.31 TOTAL FINAL SUB UNIT COST $7,616.31 Ju.loyu Acceptance Date June 22, 1972 G.W.O. 10,733-A FINAL PAVING ASSESSMENT TOLEDO AVENUE Sheet No. 1 of 1 City of Lubbock Sub Unit No. 18 of Width 36 Feet From 18.0 feet South of the SPL of 61st Street to 18.0 feet North of the NFL of 62nd Street Unit No. 2220 Owner Lots Blk. No. Addition Paving Curb & Gutter $2.33 Rate/L.F. $2.10 Rate/L.F. No. Ft. Cost Cost Total Cost EAST SIDE Joe Manning, Jr. 10 4 Slidell 132.50 308.73 278.25 586.98 A. J. Bell 11 4 Slidell 132.50 308.73 278.25 586.98 WEST SIDE Preston Vest 1 4 Slidell Addition Annex 132.50 308.73 278.25 586.98 R. W. Webb 20 4 Slidell Addition Annex 132.50 308.73 278.25 586.98 TOTAL PID PERTY OWNER COST $2,347.92 CITY'S SHARE 448.91 TOTAL FINAL SUB UNIT COST $2,796.83 FINAL PAVING ASSESSMENT City of Lubbock Width 36 Feet From 18.0 feet South of the TOLEDO AVENUE SPL of 62nd Street to 18.0 feet North 30.1690 Acceptance Date June 22, 1972 G.W.O. 10,733-A Sheet No. 1 of 1 Sub Unit No. 19 of of the NPL of 63rd Street Unit No. 2220 Paving Curb & Gutter Blk. $2.33 Rate/L.F. $2.10 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Cost Cost EAST SIDE Carrie B. Primm 10 5 Slidell 130.00 302.90 273.00 575.90 Robert L. Short 11 5 Slidell 130.00 302.90 273.00 575.90 WEST SIDE Hershel A. Martin 1 5 Slidell Addition Annex 130.00 302.90 273.00 575.90 Charles C. Nelson 20 5 Slidell Addition Annex 130.00 302.90 273.00 575.90 TOTAL PROPERTY OWNER COST $2,303.60 CITY'S SHARE 443.99 TOTAL FINAL SUB UNIT COST $2,747.59 .lV.1V7V Acceptance Date June 22, 1972 GWO 10,733-A FINAL PAVING ASSESSMENT TOLEDO AVENUE Sheet No. 1 of 1 City of Lubbock Sub Unit No. 20 of Width 36 Feet From 18.0 feet South of the SPL of 63rd Street to 18.0 feet North of the NPL of 64th Street Unit No. 2220. Owner Lots Blk. No. Addition Paving Curb & Gutter $2.33 Rate/L.F. $2.10 Rate/L.F. No. Ft. Cost Cost Total Cost EAST SIDE Wayne Adams 10 6 Slidell 130.00 302.90 273.00 575.90 Thad Smith 11 6 Slidell 130.00 302.90 273.00 575.90 WEST SIDE Richard Tivis 1 6 Slidell Addition Annex 130.00 302.90 273.00 575.90 H. E. Raines 20 6 Slidell Addition Annex 130.00 302.90 273.00 575.90 TOTAL PROPERTY OWNER COST $2,303.60 CITY'S SHARE 442.11 TOTAL FINAL SUB UNIT COST $2,745.71 .l V. L. LL Acceptance Date June 22, 1972 G.W.O. 10,733-A FINAL PAVING ASSESSMENT South 1/2 of 24th Street Sheet No. 1 of 1 City of Lubbock Sub Unit No. 23 of Width 36 Feet From 8.0 feet East of the EPL of Albany Avenue to 540.80 feet East of the EPL of Albany Avenue Unit No. 2220 Owner Lots Blk. No. Addition Paving $3.50 Rate/L.F. No. Ft. Cost Curb & Gutter $2.10 Rate/L.F. Cost Total Cost SOUTH SIDE David & Joy Hartley 7 Clyde G. Tatum 159.00 556.50 333.90 890.40 David & Joy Hartley 6 Clyde G. Tatum 92.00 322.00 193.20 515.20 David & Joy Hartley 5 Clyde G. Tatum 92.00 322.00 193.20 515.20 Weldon R. Steele 4 Clyde G. Tatum 87.40 305.90 183.54 489.44 Weldon R. Steele 3 Clyde G. Tatum 87.40 305.90 183.54 489.44 TOTAL PROPERTY OWNER COST $2,899.68 CITY'S SHARE 1,618.50 TOTAL FINAL SUB UNIT COST $4,518.18