HomeMy WebLinkAboutResolution - 052572D - Water_Sewer Improvements - Holloway Contracting Co - La Fiesta Estates Addition - 05_25_197205�72
RESOLUTION
5, 1 Resolution accepting water and sewer system pimprovements for Lots 5-21,
Lots 62-65, Lots 144-147, Lots 165=179, Lots 184-197 and Lots 202-209, La
Fiesta.Estates.
WHEREAS, the developer of Lots 5-21, 62-65, 144-147, 165-179, 184-197 and
202-209, La Fiesta Es Ates- have complied with the provisions of the City of
Lubbock Code, Chapter 34, Article 2, by providing the water and sewer improve-
ments for said addition in accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $23,177.66 with the
improvements constructed by Holloway Contracting Company having a value of
$21,967.65 as determined by the unit prices established by said Chapter 34, an
$1,210.01 cash (engineering, wet tie-ins, paving repair, difference in Pro Rat
and actual cost) paid to the City, with Executive Parks International, the
developer, to receive a refund of $4,881.25 in accordancu,-with Chapter 34 of
the Code of the City of Lubbock, and,
WHEREAS, the construction of the said water and sewer improvements was
performed under the supervision of the,t ity Engineer and said improvements hav
been completed in accordance with the 6ity of Lubbock's plans and specificatio s,
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
1. That the improvements be and the same are hereby accepted as an
integral part of the water and sewage system of the City of Lubbock.
2. That refund of the refundable cost in the amount of $4,881.25 be
made in accordance with said Chapter 34.
t
3. This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 25th DAY OF MAY, 1972.
22Z�`��
Morris W. Turner, Mayor
ATTES ,
Laveni'a Lowe, City ecretary
Al?P)OMAQ
Wilfor . Watson,Cfty Engineer
A RAYED
Fred 0. Senter, Jr. ,,,.1,-1ty Attorney