Loading...
HomeMy WebLinkAboutResolution - 051172B - Street Improvements - Zahn Pavers - GWO Multiple Locations - 05_11_197265117243 N RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR AVENUES LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESS- MENTS LEVIED. WHEREAS, the City of Lubbock heretofore passed various street improvement ordinances and resolutions and entered into contract with Zahn Pavers, Inc., G.W.O. 10,733 for;:the making and construction of street and/or alley improve- ments on portions of numerous alleys, streets and/or avenues in said City in- cluding among others the following: 44th Street from its intersection with a line 8.00 feet East of the East Prope. Line of Dover Avenue to its intersection with a line 6.00 feet West of the West Property Line of Chicago Avenue known and designated as Sub -Unit Number 1 of Unit Number 2220. Elkhart Avenue from its intersection with a line 18.00 feet South of the South Property Line of 45th Street to its intersection with a line 13.00 feet North of the North Property Line of 46th Street known and designated as Sub -Unit Number 9 of Unit Number 2220. 58th Street from its intersection with a line 13.00 feet East of the East Property Line of Slide Road to its intersection with a line 18.00 feet West of the West Property Line of Wayne Avenue known and designated as Sub -Unit Number 2 of Unit Number 2222. AND WHEREAS, the improvements upon the said portions of the abovementione streets and/or avenues, have been inspected and found to have been constructed in accordance with terms of said contract G.W.O. 10,733. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned streets, a or avenues be and the same are hereby accepted, and the City Engineer be and is hereby authorized to direct payment of the City's portion of the cost and release escrow. II. That the Mayor and City Secretary be and they are hereby instructed to execute and deliver certificates in evidence of the assessments levied against the parcels of property abutting upon the said portions of the streets and/or avenues listed above and against the owners of such property in accordance wit law and in the manner provided in said contract, and the proceedings with reference to said improvements and assessments where such assessments were levied. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 11 DAY OF MAY, 1972. Morris W. Turner, Mayor ATTEST: Elm LaVenia Lowe;„Ci'ty Secretary A OVED: I, IY i o D. Watson, City Engineer APPROVED: 0. Senter, Jr.;/,City Attorney CONSOLIDATED FINAL ESTIMATE G.W.1% 10,733 Accepted May 11, 1972 UANTITIES S.Y. S.Y. S.Y. Unit & Paving L.F., Alley Valley Sub -Unit Location 6" Base C & G Return Gutter 2220-1 44th Street from 8 feet 1,568.00 894.00 16.00 East of EPL of Dover Ave- nue to 6 feet West of WPL of Chicago Avenue. 2220-9 Elkhart Avenue from 18 feetcl 876.44 371.80 16.00 South of SPL of 45th Street to 13 feet North of NPL of 46th Street. 2222-2 58th Street from 13 feet East of EPL of Slide Road to 18 feet West of WPL of Wayne Avenue. TOTALS COST ESTIMATE 8,007.55 S.Y. Paving 6" Base 3,731.30 L.F. Curb & Gutter 32.00 S.Y.'Alley Return 110.87 S.Y. Valley Gutter 5,563.11 2,465.50 110.87 8,007.55 3,731.30 32.00 110.87 @ $1.67 $13,372.60 @ $2.00 7,462.60 @ $7.00 224.00 @ $7.00 776.09 CONTRACT COST $21,835.29 COST DISTRIBUTION Property Owner Release of Unit & Contract Cost City to Prepaid Sub -Unit Cost Due City Contractor Paving 2220-1 $ 4,518.56 $ 4,200.00 $ 318.56 2220-9 2,319.25 1,527.25 157.03 $ 634.97 2222-2 14,997.48 13,031.20 -3,170.81 5,137.09 TOTAL $21,835.29 $18,758.45-2,695.22 $5,772.06 + 847.52* $22,682.81 - 82173.31** $14,509.50 + 817.33*** $15,326.83 Now Due Contractor *Plus retainage not paid on Units 2220-1 and 6 Accepted April 27, 1972 **Less Payment on estimates No. 1 & 3 ***Plus retainage on estimates No. 1 & 3 JV.1011 Acceptance Date May 11, 1972 G.W.O. 10,733 FINAL PAVING ASSESSMENT 44th STREET Sheet No. 1 of 1 City of Lubbock Sub -Unit No. 1 of Width 36 Feet From 8.00 feet East of the EPL of Dover Avenue to 6.00 feet West of the WPL of Chicago Avenue Unit No. 2220 Paving Curb & Gutter Blk. $ Rate/L.F. $2.10 Rate/L.F. Total Owner Lot No. Addition No. Ft. iff. Rate Cost Cost Cost NORTH SIDE Earle L. Heinsen 9 3 Westmoreland: 75.00 3.50 262.50 157.50 420.00 Frankie Youngblood 10 3 Westmoreland 75.00 3.50 262.50 157.50 420.00 Robert S. Handren 11 3 Westmoreland 75.00 3.50 262.50 157.50 420.00 Elbert N. Haddock 12 3 Westmoreland 75.00 3.50 262.50 157.50 420.00 Charles A. Rowell 4 3 Westmoreland 140.00 2.33 *420.00 SOUTH SIDE J. N. Henson 8 4 Westmoreland 75.00 3.50 262.50 157.50 420.00 Dwayne Key 7 4 Westmoreland 75.00 3.50 262.50 157.50 420.00 I. B. Johnston 6 4 Westmoreland 75.00 3.50 262.50 157.50 420.00 M. L. Williams 5 4 Westmoreland 75.00 3.50 262.50 157.50 420.00 Edward Haug 1 4 Westmoreland 140.00 2.33 *420.00 TOTAL PROPERTY OWNER COST b CITY'S SHARE 544.49 *The City Council on May 27, 1971 reduced the total cost on Lot 4, Block 3 and TOTAL FINAL SUB UNIT COST 4,744.49 Lot 1, Block 4 from side rate to the cost of a 75.00 foot front rate lot. .ju. 16 /tf Acceptance Date May 11, 1972 G.W.O. 10,733 FINAL PAVING ASSESSMENT ELKHART AVENUE Sheet No. 1 of 1 City of Lubbock Sub -Unit No. 9 of Width 36 Feet From 18.00 feet South of the SPL of 45th Street to 13.00 feet North of the NPL of 46th Street Unit No. 2220 Paving Curb & Gutter Blk. $2.33 Rate/L.F. $2.10 Rate/L.F. Total Owner Lot No. Addition No. Ft. Cost Cost Cost EAST SIDE Don Streety 6 9 Westmoreland 113.25 263.87 237.83 501.70 Southern Capital & Invest. Coi 7 9 Westmoreland 118.25 275.52 248.33 523.85 WEST SIDE C. W. Hargrove 1 11 Westmoreland 113.25 263.87 237.83 501.70 No Assessment 14 11 Westmoreland EXISTING N 0 A S S E S S M E N T TOTAL PROPERTY OWNER COST 1,527.25 CITY'S SHARE 907.96 TOTAL FINAL SUB UNIT COST 2,435.21 30.1688 Acceptance Date May 11, 1972 G.W.O. 10,733 FINAL PAVING ASSESSMENT 58th STREET Sheet No. 1 of 3 City of Lubbock Sub -Unit No. 2 of Width 44 Feet From 13.00 feet East of the EPL of Slide Road to 18.00 feet West of the WPL of Wayne Avenue Unit No. 2222 (S. Leg) Paving Curb & Gutter $3.50 Rate/L.F. $2.10 Rate/L.F. Total Owner Lots Addition No. Ft. Cost Cost Cost NORTH SIDE Kathryn G. Bacon 136 Western Meadows 58.00 203.00 121.80 324.80 Kathryn G. Bacon 137 Western Meadows 65.00 227.50 136.50 364.00 Charlie Moore 138 Western Meadows 65.00 227.50 136.50 364.00 F. E. Carter 139 Western Meadows 65.00 227.50 136.50 364.00 F. E. Carter 140 Western Meadows 65.00 227.50 136.50 364.00 Mrs. Edith B. Burns 141 Western Meadows 65.00 227.50 136.50 364.00 Mrs. Edith B. Burns 142 Western Meadows 65.00 227.50 136.50 364.00 A. J. Roberts - 143 Western Meadows 65.00 227.50 136.50 364.00 A. J. Roberts 144 Western Meadows 71.00 248.50 149.10 397.60 Kathryn G. Bacon 100 Western Meadows 66.00 231.00 138.60 369.60 Billy Ray Carter 101 Western Meadows 65.00 227.50 136.50 364.00 Murry Wright Lumber Co. 102 (Rel. 4-13-72) Western Meadows 65.00 227.50 136.50 364.00 Murry Wright Lumber Co. 103 (Rel. 4-13-72) Western Meadows 65.00 227.50 136.50 364.00 Robert E. L. Pattillo, Jr. 104 Western Meadows 65.00 227.50 136.50 364.00 d 30.1688 Acceptance Date May 11, 1972 G.W.O. 10,733 FINAL PAVING ASSESSMENT 584h STREET Sheet No. 2 of 3 City of Lubbock Sub -Unit No. 2 of Width 44 Feet From 13.00 feet East of the EFL of Slide Road to 18.00 feet West of the WPL of Wayne Avenue Unit No. 2222 (S. Leg) Paving Curb & Gutter Blk. $3.50 Rate/L.F. $2.10 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Cost Cost NORTH SIDE (cont.) Wm. F. Morris 105 Western Meadows 65.00 227.50 136.50 364.00 Kathryn G. Bacon 106 Western Meadows 65.00 227.50 136.50 364.00 Coy McDougald 107 Western Meadows 65.00 227.50 136.50 364.00 Coy McDougald 108 Western Meadows 53.00 185.50 111.30 296.80 SOUTH SIDE V. A. Ervin 1 1 Piedmont 47.00 164.50 98.70 263.20 Edwin De Lavan 2 1 Piedmont 60.00 210.00 126.00 336.00 Edwin De Lavan 3 1 Piedmont 60.00 210.00 126.00 336.00 D. B. Cravens 4 1 Piedmont 60.00 210.00 126.00 336.00 Floyd 0. Guinn 5 1 Piedmont 60.00 210.00 126.00 336.00 Floyd 0. Guinn 6 1 Piedmont 60.00 210.00 126.00 336.00 A. M. Dodgin 7 1 Piedmont 60.00 210.00 126.00 336.00 A. M. Dodgin 8 1 Piedmont 60.00 210.00 126.00 336.00 Carrie E. Reid 9 1 Piedmont 60.00 210.00 126.00 336.00 Carrie E. Reid 10 1 Piedmont 60.00 210.00 126.00 336.00 30.1688 r Acceptance Date May 11, 1972 G.W.O. 10,733 FINAL PAVING ASSESSMENT 58th STREET Sheet No. 3 of 3 City of Lubbock Sub -Unit No. 2 of Width 44 Feet From 13.00 feet East of the EPL of Slide Road to 18.00 feet West of the WPL of Wayne Avenue Unit No. 2222 (S.' Leg) Paving Curb & Gutter Blk. $3.50 Rate/L.F. $2.10 Rate/L.F. Total Owner Lots No. Additionc_ No. Ft. Cost Cost Cost SOUTH SIDE (cont.) Billy Hamilton 1 2 Piedmont 60.00 210.00 126.00 336.00 Jack Ballow 2 2 Piedmont 60.00 210.00 126.00 336.00 M. Richardson, Jr. 3 2 Piedmont 60.00 210.00 126.00 336.00 L. R. Aldridge 4 2 Piedmont 60.00 210.00 126.00 336.00 Jack R. Longgear 5 2 Piedmont 60.00 210.00 126.00 336.00 J. L. Harden 6 (Rel. 12-20-71) 2 Piedmont 60.00 210.00 126.00 336.00 Jane H. Rainer 7 2 Piedmont 60.00 210.00 126.00 336.00 James H. Rainer 8 2 Piedmont 60.00 210.00 126.00 336.00 Ishmall Hill 9 2 Piedmont 60.00 210.00 126.00 336.00 Ishmall Hill 10 2 Piedmont 42.00 147.00 .88-20. 235.20 TOTAL PROPERTY OWNER COST 13,031.20 CITY'S SHARE 2,715.16 TOTAL FINAL SUB UNIT COST 15,747.35 11