RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR AVENUES
LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESS-
MENTS LEVIED.
WHEREAS, the City of Lubbock heretofore passed various street improvement
ordinances and resolutions and entered into contract with Zahn Pavers, Inc.,
G.W.O. 10,733 for;:the making and construction of street and/or alley improve-
ments on portions of numerous alleys, streets and/or avenues in said City in-
cluding among others the following:
44th Street from its intersection with a line 8.00 feet East of the East Prope.
Line of Dover Avenue to its intersection with a line 6.00 feet West of the
West Property Line of Chicago Avenue known and designated as Sub -Unit Number 1
of Unit Number 2220.
Elkhart Avenue from its intersection with a line 18.00 feet South of the South
Property Line of 45th Street to its intersection with a line 13.00 feet North
of the North Property Line of 46th Street known and designated as Sub -Unit
Number 9 of Unit Number 2220.
58th Street from its intersection with a line 13.00 feet East of the East
Property Line of Slide Road to its intersection with a line 18.00 feet West of
the West Property Line of Wayne Avenue known and designated as Sub -Unit Number
2 of Unit Number 2222.
AND WHEREAS, the improvements upon the said portions of the abovementione
streets and/or avenues, have been inspected and found to have been constructed
in accordance with terms of said contract G.W.O. 10,733.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned streets, a
or avenues be and the same are hereby accepted, and the City Engineer be and
is hereby authorized to direct payment of the City's portion of the cost and
release escrow.
II.
That the Mayor and City Secretary be and they are hereby instructed to
execute and deliver certificates in evidence of the assessments levied against the
parcels of property abutting upon the said portions of the streets and/or
avenues listed above and against the owners of such property in accordance wit
law and in the manner provided in said contract, and the proceedings with
reference to said improvements and assessments where such assessments were levied.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 11 DAY OF MAY, 1972.
Morris W. Turner, Mayor
ATTEST:
Elm
LaVenia Lowe;„Ci'ty Secretary
A OVED:
I,
IY
i o D. Watson, City Engineer
APPROVED:
0. Senter, Jr.;/,City Attorney
CONSOLIDATED FINAL ESTIMATE
G.W.1% 10,733
Accepted May 11, 1972
UANTITIES
S.Y.
S.Y. S.Y.
Unit &
Paving
L.F.,
Alley Valley
Sub -Unit
Location
6" Base
C & G
Return Gutter
2220-1
44th Street from 8 feet
1,568.00
894.00
16.00
East of EPL of Dover Ave-
nue to 6 feet West of WPL
of Chicago Avenue.
2220-9
Elkhart Avenue from 18 feetcl
876.44
371.80
16.00
South of SPL of 45th Street
to 13 feet North of NPL of
46th Street.
2222-2 58th Street from 13 feet
East of EPL of Slide Road
to 18 feet West of WPL of
Wayne Avenue.
TOTALS
COST ESTIMATE
8,007.55 S.Y. Paving 6" Base
3,731.30 L.F. Curb & Gutter
32.00 S.Y.'Alley Return
110.87 S.Y. Valley Gutter
5,563.11 2,465.50 110.87
8,007.55 3,731.30 32.00 110.87
@ $1.67
$13,372.60
@ $2.00
7,462.60
@ $7.00
224.00
@ $7.00
776.09
CONTRACT COST $21,835.29
COST DISTRIBUTION
Property
Owner
Release of
Unit &
Contract
Cost
City to
Prepaid
Sub -Unit
Cost
Due City
Contractor
Paving
2220-1
$ 4,518.56
$ 4,200.00
$ 318.56
2220-9
2,319.25
1,527.25
157.03
$ 634.97
2222-2
14,997.48
13,031.20
-3,170.81
5,137.09
TOTAL $21,835.29 $18,758.45-2,695.22 $5,772.06
+ 847.52*
$22,682.81
- 82173.31**
$14,509.50
+ 817.33***
$15,326.83 Now Due Contractor
*Plus retainage not paid on Units 2220-1 and 6 Accepted April 27, 1972
**Less Payment on estimates No. 1 & 3
***Plus retainage on estimates No. 1 & 3
JV.1011
Acceptance Date May 11, 1972
G.W.O. 10,733
FINAL PAVING ASSESSMENT 44th STREET Sheet No. 1 of 1
City of Lubbock Sub -Unit No. 1 of
Width 36 Feet From 8.00 feet East of the EPL of Dover Avenue to 6.00 feet West of the WPL of Chicago Avenue Unit No. 2220
Paving
Curb & Gutter
Blk.
$
Rate/L.F.
$2.10 Rate/L.F.
Total
Owner
Lot
No.
Addition
No. Ft.
iff. Rate
Cost
Cost
Cost
NORTH SIDE
Earle L. Heinsen
9
3
Westmoreland:
75.00
3.50
262.50
157.50
420.00
Frankie Youngblood
10
3
Westmoreland
75.00
3.50
262.50
157.50
420.00
Robert S. Handren
11
3
Westmoreland
75.00
3.50
262.50
157.50
420.00
Elbert N. Haddock
12
3
Westmoreland
75.00
3.50
262.50
157.50
420.00
Charles A. Rowell
4
3
Westmoreland
140.00
2.33
*420.00
SOUTH SIDE
J. N. Henson
8
4
Westmoreland
75.00
3.50
262.50
157.50
420.00
Dwayne Key
7
4
Westmoreland
75.00
3.50
262.50
157.50
420.00
I. B. Johnston
6
4
Westmoreland
75.00
3.50
262.50
157.50
420.00
M. L. Williams
5
4
Westmoreland
75.00
3.50
262.50
157.50
420.00
Edward Haug
1
4
Westmoreland
140.00
2.33
*420.00
TOTAL PROPERTY OWNER COST
b
CITY'S
SHARE
544.49
*The City Council on May
27, 1971 reduced the
total cost
on Lot 4, Block
3 and
TOTAL FINAL SUB UNIT COST
4,744.49
Lot 1, Block 4 from side
rate to the cost of
a 75.00 foot front rate lot.
.ju. 16 /tf
Acceptance Date May 11, 1972
G.W.O. 10,733
FINAL PAVING ASSESSMENT ELKHART AVENUE Sheet No. 1 of 1
City of Lubbock Sub -Unit No. 9 of
Width 36 Feet From 18.00 feet South of the SPL of 45th Street to 13.00 feet North of the NPL of 46th Street Unit No. 2220
Paving
Curb & Gutter
Blk.
$2.33
Rate/L.F.
$2.10 Rate/L.F.
Total
Owner
Lot
No.
Addition
No. Ft.
Cost
Cost
Cost
EAST SIDE
Don Streety
6
9
Westmoreland
113.25
263.87
237.83
501.70
Southern Capital &
Invest. Coi
7
9
Westmoreland
118.25
275.52
248.33
523.85
WEST SIDE
C. W. Hargrove
1
11
Westmoreland
113.25
263.87
237.83
501.70
No Assessment
14
11
Westmoreland
EXISTING N 0 A S
S E S S M E N T
TOTAL PROPERTY OWNER COST 1,527.25
CITY'S SHARE 907.96
TOTAL FINAL SUB UNIT COST 2,435.21
30.1688
Acceptance Date May 11, 1972
G.W.O. 10,733
FINAL PAVING ASSESSMENT 58th STREET Sheet No. 1 of 3
City of Lubbock Sub -Unit No. 2 of
Width 44 Feet From 13.00 feet East of the EPL of Slide Road to 18.00 feet West of the WPL of Wayne Avenue Unit No. 2222
(S. Leg)
Paving
Curb & Gutter
$3.50
Rate/L.F.
$2.10 Rate/L.F.
Total
Owner
Lots
Addition
No. Ft.
Cost
Cost
Cost
NORTH SIDE
Kathryn G. Bacon
136
Western Meadows
58.00
203.00
121.80
324.80
Kathryn G. Bacon
137
Western Meadows
65.00
227.50
136.50
364.00
Charlie Moore
138
Western Meadows
65.00
227.50
136.50
364.00
F. E. Carter
139
Western Meadows
65.00
227.50
136.50
364.00
F. E. Carter
140
Western Meadows
65.00
227.50
136.50
364.00
Mrs. Edith B. Burns
141
Western Meadows
65.00
227.50
136.50
364.00
Mrs. Edith B. Burns
142
Western Meadows
65.00
227.50
136.50
364.00
A. J. Roberts
- 143
Western Meadows
65.00
227.50
136.50
364.00
A. J. Roberts
144
Western Meadows
71.00
248.50
149.10
397.60
Kathryn G. Bacon
100
Western Meadows
66.00
231.00
138.60
369.60
Billy Ray Carter
101
Western Meadows
65.00
227.50
136.50
364.00
Murry Wright Lumber Co.
102 (Rel. 4-13-72)
Western Meadows
65.00
227.50
136.50
364.00
Murry Wright Lumber Co.
103 (Rel. 4-13-72)
Western Meadows
65.00
227.50
136.50
364.00
Robert E. L. Pattillo, Jr.
104
Western Meadows
65.00
227.50
136.50
364.00
d
30.1688
Acceptance Date May 11, 1972
G.W.O. 10,733
FINAL PAVING ASSESSMENT 584h STREET Sheet No. 2 of 3
City of Lubbock Sub -Unit No. 2 of
Width 44 Feet From 13.00 feet East of the EFL of Slide Road to 18.00 feet West of the WPL of Wayne Avenue Unit No. 2222
(S. Leg)
Paving Curb & Gutter
Blk. $3.50 Rate/L.F. $2.10 Rate/L.F. Total
Owner Lots No. Addition No. Ft. Cost Cost Cost
NORTH SIDE (cont.)
Wm. F. Morris
105
Western Meadows
65.00
227.50
136.50
364.00
Kathryn G. Bacon
106
Western Meadows
65.00
227.50
136.50
364.00
Coy McDougald
107
Western Meadows
65.00
227.50
136.50
364.00
Coy McDougald
108
Western Meadows
53.00
185.50
111.30
296.80
SOUTH SIDE
V. A. Ervin
1
1
Piedmont
47.00
164.50
98.70
263.20
Edwin De Lavan
2
1
Piedmont
60.00
210.00
126.00
336.00
Edwin De Lavan
3
1
Piedmont
60.00
210.00
126.00
336.00
D. B. Cravens
4
1
Piedmont
60.00
210.00
126.00
336.00
Floyd 0. Guinn
5
1
Piedmont
60.00
210.00
126.00
336.00
Floyd 0. Guinn
6
1
Piedmont
60.00
210.00
126.00
336.00
A. M. Dodgin
7
1
Piedmont
60.00
210.00
126.00
336.00
A. M. Dodgin
8
1
Piedmont
60.00
210.00
126.00
336.00
Carrie E. Reid
9
1
Piedmont
60.00
210.00
126.00
336.00
Carrie E. Reid
10
1
Piedmont
60.00
210.00
126.00
336.00
30.1688
r Acceptance Date May 11, 1972
G.W.O. 10,733
FINAL PAVING ASSESSMENT 58th STREET Sheet No. 3 of 3
City of Lubbock Sub -Unit No. 2 of
Width 44 Feet From 13.00 feet East of the EPL of Slide Road to 18.00 feet West of the WPL of Wayne Avenue Unit No. 2222
(S.' Leg)
Paving
Curb & Gutter
Blk.
$3.50
Rate/L.F.
$2.10 Rate/L.F.
Total
Owner
Lots
No.
Additionc_
No. Ft.
Cost
Cost
Cost
SOUTH SIDE (cont.)
Billy Hamilton
1
2
Piedmont
60.00
210.00
126.00
336.00
Jack Ballow
2
2
Piedmont
60.00
210.00
126.00
336.00
M. Richardson, Jr.
3
2
Piedmont
60.00
210.00
126.00
336.00
L. R. Aldridge
4
2
Piedmont
60.00
210.00
126.00
336.00
Jack R. Longgear
5
2
Piedmont
60.00
210.00
126.00
336.00
J. L. Harden
6 (Rel.
12-20-71) 2
Piedmont
60.00
210.00
126.00
336.00
Jane H. Rainer
7
2
Piedmont
60.00
210.00
126.00
336.00
James H. Rainer
8
2
Piedmont
60.00
210.00
126.00
336.00
Ishmall Hill
9
2
Piedmont
60.00
210.00
126.00
336.00
Ishmall Hill
10
2
Piedmont
42.00
147.00
.88-20.
235.20
TOTAL PROPERTY OWNER COST
13,031.20
CITY'S SHARE
2,715.16
TOTAL FINAL
SUB UNIT COST
15,747.35