HomeMy WebLinkAboutResolution - 042772L - Street Improvements - Zahn Pavers Inc - Multiple Locations - 04_27_1972CIA
41)4e929 L
RESOLUTION
RESOLUTION ACCEPTION IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR AVENUES
AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF
ASSESSMENTS LEVIED.
WHEREAS, the City of Lubbock heretofore passed various street improvement
ordinances and resolutions and entered into contract with Zahn Pavers, Inc.
G.W.O. 10,733 for the making and construction of street and/or alley improve-
ments on portions of numerous alleys, streets and/or avenues in said City in-
cluding among others the following:
Avenue N from its intersection with a line 3.00 feet South of the South Proper
Line of 52nd Street (West Leg) to its intersection with a line 9.00 feet South
of the North Property Line of 53rd Street (West Leg) known and designated as
Sub -Unit Number 6 of Unit Number 2220.
53rd Street from its intersection with a line 16.00 feet East of the East
Property Line of Avenue P to its intersection with a line 8.00 feet West of
West Property Line of Avenue L known and designated as Sub -Unit Number 7 of
Unit Number 22g0.
AND WHEREAS, the improvements upon the said portions of the abovemention
streets and/or avenues, have been inspected and found to have 'Nbeen construct
in accordance with terms of said contract G.W.O. 10,733.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned streets
and/or avenues be and the same are hereby accepted, and the City Engineer be
and he is hereby authorized to direct payment of the City's portion of the
cost and release escrow.
II.
That the Mayor and City Secretary be, and they are hereby instructed to
execute and deliver certificates in evidence of the assessments levied against
the parcels of property abutting upon the said portions of the streets and/or
avenues listed above and against the owners of such property in accordance wit
law and in the manner provided in said contract, and the proceedings with
reference to said improvements and Assessments where such assessments were
levied.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 27th DAY OF APRIL, 19
ames H. Granberry,
ATT T: 1�
La enia Lowe, City Secretary
AP OVER•.. -'
i�� '0
Wilford D. Watson, City Engineer
APPROVED:
red 0. Senter, City At ney -
CONSOLIDATED FINAL ESTIMATE
G.W.O. 10,733
Accepted April 27, 1972
UANTITIES
S.Y.
S.Y.
S.Y.
Unit &
Paving
L.F. Alley
Valley
Sub -Unit Location
6" Base
C & G Return
Gutter
2220-6 Avenue N from the SPL
999.11
612.54 21.33
52.54
of 52nd Street (W. Leg)
to the North Lip Line of
53rd Street.
2220-7 53rd Street from 16 feet
East of the EPL of Avenue
P to 8 feet West of the
WPL of Avenue L.
TOTAL
COST ESTIMATE
5,581.16 S.Y. Paving 6" Base
1,828.94 L.F. Curb & Gutter
21.33 S.Y. Alley Return
52.54 S.Y. Valley Gutter
COST DISTRIBUTION
4,582.05 1,216.40
5,581.16 1,828.94
21.33 52.54
@ $1.67
$ 9,320.53
@ $2.00
3,657.88
@ $7.00
149.31
@ $7.00
367.78
CONTRACT COST
$13,495.50
Unit &
Sub -Unit
Contract
Cost
Property
Owner
Cost Due
City
Release
of
Prepaid
Paving
2220-6
$ 3,410.68
$1,173.96
$ 466.40
2220-7
$10,084.82
$5,341.75
$4,553.93
TOTAL
$13,495.50
$6,515.71
$5,020.33
- 8,475.17*
$ 5,020.33
Now due Contractor
*Less payment on Estimate No. 1
30.1663
Acceptance Date April 27, 1972
G.W.O. 10,733
FINAL PAVING ASSESSMENT 53rd STREET Sheet No. 4 of 6
City of Lubbock Sub -Unit No. 7 of
Width 36 Feet From 16.00 feet East of the EPL of Avenue P to 8.00 feet West of the WPL of Avenue L Unit No. 2220
Paving Curb & Gutter
Blk. $3.50 Rate/L.F. $2.10 Rate/L.F. Total
Owner _ Lots No. Addition No. Ft. Cost Cost Cost
NORTH SIDE (Cont.
line of 53rd Street a distance
of 190.00 feet to a point, said
point being the intersection of
the North right-of-way line of
53rd Street and the West right-
of-way line of Avenue L; Thence
North along the West right-of-way
line of Avenue L a distance of
65.00 feet to a point; Thence
West parallel to the North right-
of-way line of 53rd Street a
distance of 150.00 feet to a
point; Thence North parallel to
the West right-of-way of Avenue
L a distance of 57.50 feet to a
point; Thence West parallel to the
North right-of-way line of 53rd
Street a distance of 40.00 feet to
a point; Thence South a distance
of 122.50 feet to the point of
beginning. (Part of Lot 1, Block
3, C. N. Hodges Subdivision)
SOUTH SIDE
No Assessment Tract G C. N. Hodges N 0 A S S E S S M E N T
No Assessment 1 2 Pattillo Subd. N 0 A S S E S S M E N T
No Assessment 2 2 Pattillo Subd N 0 A S S E S S M E N T
Acceptance Date- April 27, 1972
G.W.O. 10,733
FINAL PAVING ASSESSMENT 53rd STREET Sheet No. 5 of 6
City of Lubbock Sub -Unit No. 7 of
Width 36 Feet From 16.00 feet East of the EPL of Avenue P to 8.00feet West of the WPL of Avenue L Unit No. 2220
Paving Curb & Gutter
Blk. $3.50 Rate/L.F. b V .10 Rate/L.F. Total
Owner Lots No. Addition No. Ft. Cost Cost Cost
SOUTH SIDE (Cont.)
Elmer Pattillo Beginning at a point, 3 C. N. Hodges Subd. 50.00 175.00 Existing 175.00
said point being the
Northeast corner of
Lot 2, Block 2; Pattillo
Subdivision; Thence South
a distance of 132.50 feet
to a point; Thence East
parallel to the South right-
of-way line of 53rd Street
a distance of 50.00 feet to
a point; Thence North a dis-
tance of 132.50 feet to a
point said point being in the
South right-of-way line of
53rd Street; Thence West along
the South right-of-way line of
53rd Street a distance of 50.00
feet to the point of beginning.
(Part of Lot 4)
Calvin McCrum Beginning at a point, 3 C. N. Hodges Subd. 50.00 175.00 Existing 175.00
said point being 50.00 feet
East of the Northeast corner
of Lot 2, Block 2, Pattillo
Subdivision and being in the
South right-of-way line of
53rd Street; Thence South a
distance of 132.50 feet to a
point; Thence East a distance of
50.00 feet to a point, said point
being in the West right-of-way
line of Avenue L;Thence North
along the West right-of-way line
of Avenue L a distance of 132.50
feet to a point; said point being -
30.1663
Acceptance Date April 27, 1972
G.W.O. 10,733
FINAL PAVING ASSESSMENT 53rd STREET Sheet No. 6 of 6
City of Lubbock Sub -Unit No. 7 of
Width 36 Feet From 16.00 feet East of the EPL of Avenue P to 8.00 feet West of the WPL of Avenue L Unit No. 2220
Paving Curb & Gutter
Blk. $3.50 Rate/L.F. $2.10 Rate/L.F. Total
Owner Lots No. Addition No. Ft. Cost Cost Cost
&f§14y11
t.
the intersection of the West
right-of-way line of Avenue
L and the South property line of
53rd Street; Thence West along the
South right-of-way line of 53rd
Street a distance of 50.00 feet
to the point of beginning.
(Part of Lot 4, Block 3, C. N.
Hodges Subdivision)
TOTAL PROPERTY OWNER COST $5,341.75
CITY'S SHARE $5,247.31
TOTAL FINAL SUB UNIT COST $10,589.06
Acceptance Date April 27, 1972
G.W.O. 10,733
FINAL PAVING ASSESSMENT 53rd STREET Sheet No. 3 of 6
City of Lubbock Sub -Unit 7 of
Width 36 Feet From 16.00 feet East of the EPL of Avenue P to 8.00 feet West of the WPL of Avenue L Unit No. 2220
Paving Curb & Gutter I
Blk. $ Diff.Rate/L.F. $2.10 Rate/L.F. Total
Owner Lot No. Addition No. Ft. Rate Cost Cost Cost
NORTH SIDE (Cont.
a distance of 2.50 feet to a
point; said point being in the
East property line of Lot 13,
Kirk Subdivision; Thence South
along the East property line
of Lot 13, Kirk Subdivision a
distance of 127.00 feet to the
point of beginning.
Richard L. Williams &
J. D. Badley Beginning at a point, 3 C. N. Hodges Subd. 50.00 3.50 175.00 ' 105.00 280.00
said point being 75.00
feet East and 3.00 feet
South of the Southeast
corner of Lot 13, Kirk Sub-
division to the City of Lubbock,
Texas; Thence East along the
North right-of-way line of 53rd
Street a distance of 50.00 feet;
Thence North a distance of 122.50
feet to a point; Thence West parallel
to the North right-of-way line of 53rd
Street a distance of 50.00 feet to a
point; Thence South a distance of
122.50 feet to the point of beginning.
(Part of Lot 1, Block 3, C. N. Hodges
Subdivision)
Pentecostal Calvary United
Church Beginning at a point, said 3 C. N. Hodges Subd. 190.00 2.33 442.70 399.00 841.70
point being 125.00 feet
East and 3.00 feet South
of the Southeast corner of
Lot 13, Kirk Subdivision to the
City of Lubbock, Texas; Thence
East along the North right-of-way
FINAL PAVING ASSESSMENT 53rd STREET
City of Lubbock
Width 36 Feet From 16.00 feet East of the EPL of Avenue P to 8.00
30.1663
Acceptance Date April 27, 1972
G.W.O. 10,733
Sheet No. 1 of 6
Sub -Unit No. 7 of
feet West of the WPL of Avenue L Unit No. 2220
Paving Curb & Gutter
Blk.
$3.50 Diff. Rate/L.F. $2.10 Rate/L.F.
Total
Owner
Lots No. Addition
No. Ft. Rate Cost Cost.
Cost
NORTH SIDE
Assembley of God Church
Crestview
Beginning at a point in the East
11.08 38.78 23.27
62.05
line of Avenue P, said point being
848.16 feet South and 30.00 feet
East of the Northwest corner of
Section 2, Block E, Lubbock County,
Texas; Thence South a distance of
116.84 feet to a point in the North
line of 53rd Street; Thence North-
westerly on a curve to the right
having a radius of 20.00 feet a
distance of 11.08 feet to a point;
Thence North 580 15' West a distance
of 1.10 feet to a point of curve;
Thence on a curve to the right having
a radius of 15.00 feet a distance of
22.50 feet to a point; Thence North-
westerly on a curve to the left
having a radius of 242.44 feet a
distance of 97.20 feet to the point
of beginning.
Assembly of God Church
Crestview
5
Nancy
52.50
183.75
110.25
294.00
Assembly of God Church
Crestview
6
Nancy
52.50
183.75
110.25
294.00
Assembly of God Church
Crestview
7
Nancy
52.50
183.75
110.25
294.00
'J. A. Hodges Ent. Inc.
8
Nancy
52.50
183.75
110.25
294.00
30.1663
Acceptance Date April 27, 1972
G.W.O. 10,733
FINAL PAVING ASSESSMENT 53rd STREET Sheet No. 2 of 6
City of Lubbock Sub- Unit No. 7 of
Width 36 Feet From 16.00 feet East of the EPL of Avenue P to 8.00 feet West of the WPL of Avenue L Unit No. 2220
Paving
Curb &
Gutter
Blk.
$3.50
Rate/L.F.
$2.10
RatetL.F.
Total
Owner
Lots No.
Addition
No. Ft.
Cost
Cost
Cost
NORTH SIDE (Cont.)
J. A. Hodges Ent. Inc
9
Nancy
52.50
183.75
110.25
294.00
J. A. Hodges Ent. Inc.
10
Nancy
52.50
183.75
110.25
294.00
Cosma McCullough Rel. 4-18-72 6
Ada E. Hood
58.00
203.00
121.80
324.80
Mrs. Ada Hood Rel. 4-18-72 7
Ada E. Hood
58.00
203.00
121.80
324.80
Alva Lee Green Rel. 4-18-72 8
Ada E. Hood
58.00
203.00
121.80
324.80
L. L. Hendrix
9
Ada E. Hood
58.00
203.00
121.80
324.80
L. L. Hendrix
10
Ada E. Hood
58.00
203.00
121.80
324.80
No Assessment (Prepaid
Paving) 16
Kirk Subdivision
N 0
A S S E
S S M E N T
No Assessment (Prepaid
Paving) 12
Kirk Subdivision
N 0
A S S E
S S M E N T
No Assessment (Prepaid
Paving) 13
Kirk Subdivision
N 0
A S S E
S S M E N T
Richard L. Williams
Beginning at a point, said
C. N. Hodges Subd.
75.00
262.50
157.50
420.00
point being the Southeast
corner of Lot 13, Kirk Sub-
division to the City of
Lubbock, Texas; Thence South a
distance of 3.00 feet to a point;
Thence East a distance of 75.00
feet to a point; Thence North
122.50 feet to a point; Thence
West a distance of 65.00 feet
to a point; Thence North 450
'
West a distance of 10.60 feet
more or less, to a point; Thence
West
FINAL PAVING ASSESSMENT AVENUE N
City of Lubbock
Width 36 Feet From 3.00 feet South of the SPL of 52nd Street (W. Leg) to 9 feet South of the NPL of
53rd Street (W. Leg)
30.1672
Acceptance Date April 27, 1972
G.W.O. 10,733
Sheet No. 1 of 1
Sub -Unit No. 6 of
Unit No. 2220
Paving Curb & Gutter
Blk. $2.33 Rate/ L.F. $2.10 Rate/L.F. TotAl