RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Burlington Industrial Addition, made
arrangements with Welch Brothers, paving contractor for the construction of
paving improvements on certain streets dedicated in said subdivision under
the provisions of said Ordinance prior to the recording of the subdivision
plat of Burlington industrial Addition including the following street:
East 44th Street from the East Property Line of Globe Avenue to the
East Property Line of Lot 2, Block 9, Burlington Industrial Addition.
(Curb & Gutter only)
AND WHEREAS, the construction of the above improvements on the above -
mentioned street was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in accor-
dance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS,
That the improvements on said portions of the abovementioned street
be and the same are hereby accepted and the City Engineer be and he is
hereby authorized to direct the payment of the City's portion of the cost
and to release escrow money.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 26th
A TTES
Lave is Lowe, Cit -Secretary
APPR VED ;
G
Wil'far Watson, Ci y Engineer
APPROVED,
Fred 0. Senter, Jr. City torney
Ik
CONSOLIDATED FINAL ESTIMATE
BURLINGTON INDUSTRIAL ADDITION
Lot 2, Block 9
Lots 3 & 4, Block 10
Accepted August 26, 1971
UANTI TI ES
Uni t & L.F.
Sub -Unit Location C & G
E. 44th S t. f rom G 1 obe. Ave.
to the E.P.L. of Lot 2, Blk 9,
Burlington Industrial Addn.
NS -1913 (Lot 4, Blk 10) 50.00
N s-713[ (Lot 3, Blk 10) 49.4o
(Lot 2, Blk 9) 281.00
TOTALS 380.40
COST ESTIMATE
380.40 L.F. Curb & Gutter $2.45 = $931.98
COST DISTRIBUTION
Property Escrow
Unit & Contract Owner to. be.
Sub -Unit Cost Cost Released
NS 1913
Lot 4, Blk 10 122.50 122.50
Lot 3, Blk 10 121.03 89.18 31.85
Lot 2, Blk 9 688.45 688.45
TOTALS 931.98 89.18 842.80