HomeMy WebLinkAboutResolution - 081271H - Pavement Improvements - Kerr Construction Co - Hodges Addition - 08_12_1971RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREET AND/OR AVENUES
AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of C.N. Hodges Addition, Tract H, made arrange-
ments with Kerr Construction Co. for the construction of paving improvements
on certain streets dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of C.N Hodges Addi-
tion, Tract H, including the following streets:
West 2 of Avenue J (concrete only) from its intersection with a line
5.00 feet South of the South Property Line of 56th Street to its intersection
with a line 11.00 feet South of the North Property Line of 58th Street known
and designated as New Subdivision Unit Number 1889.
Avenue L (drainage channel and pavement repair) from its intersection
with the South Lip Line of 56th Street to its intersection with a line 273.00
feet South of the South Lip Line of 56th Street known and designated as New
Subdivision Unit Number 1891.
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in accor-
dance with the provisions of City Ordinance 1331. ,,,
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK$ TEXAS.
I.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted.
This resolution shall take effect and be in force from and after
,.- .,
APPROVED:
W
,,,City Engineer
APPROVED:
2-
Fred 0. Senter, Jr., City Attorhey
CONSOLIDATED FINAL ESTIMATE
C.N. Hodges Addition
Tract H
Accepted August 12, 1971
UANTITIES
C S.G S.Y. S.Y.
Unit & Removal Paving L.F. Alley L.F.
Sub -Unit Location L.F. 6" Base C & G Return Patching
NS 1889 West '—z of Ave. J from 593.40
5.00 feet S. of the SPL
of 56th St. to 11.991S.
of the SPL of 58th St.
(concrete only)
NS 1891 Ave. L at the inter- 147.30 68.29
section with 56th St.
and drainage channel
TOTALS 147.30
COST ESTIMATE
68.29 S.Y. Paving 6" Base
806.40 L.F. Curb & Gutter
216.67 S.Y. Alley Return
52.00 L.F. Patching
147.30 L.F. C & G Removal
COST DISTRIBUTION
88.29
213.00 216.67 52.00
806.40 216.67 52.00
$2.45
= $167.31
@ $2.15
= $1,733.76
$8.40
= $1 ,820.03
@ $1.00
= $52.00
$1.00 = $147.30
CONTRACT COST $3,920.40
Sub -Unit Contract Property
Unit & Cost Owner
Cost
NS 1889 $1,275.81 $1,275.81
NS 1891 $2,644.59 $2,644.59
TOTALS $3,920.40 $3,920.40