RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock be and is hereby authorized
and directed to execute for and on behalf of the City of Lubbock a Contract
for Pipe Line under Railroad Right -of -Way in favor of Ft. Worth - Denver
Railroad Company, attached herewith which shall be spread upon the minutes
of the Council and as spread upon the minutes of this Council shall constitute
and be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this 23th da ofj , 1971.
ATTEST:
L:tavenia Lowe, City Secretary -Treasurer
APPROVED -AS TO FORM:
Fred O. Senter, Jr., Ci ttorney,
fern 310.
i
CONTRACT FOR PIPE LINE
ACROSS OR ALONG RIGHT OF WAY
J
sh..t 1 of 2
THIS AGREEMENT, Made and entered into as of ................. April 1 71
between FORT WORTH AND DENVER RAILWAY COMPANY, hereinafter called the "Railway," and...._
CITY OF LUBBOCKfµa municipal corporation
ofTexas 79408 _
hereinafter called the "Licensee."
WITNESSEl'H:
Aarrcla 1: In consideration of._...One ri$1.00� dollar .initial and _only to be paid by Licensee
to Railway immediately upon the execution of this agreement, .................................... and upon the terms
and conditions hereinafter set forth, Railway hereby Frants unto Licensee license to enter upon the ppremises of Railway at eFeeer... LubbOCk1
Lubbock County, Texas, ,said pipe line crosses under Railway's tail track in an easterly
westerly__ dizection_between 29th and _30th S.t.reet ................. and construct and thereafter maintain across or
along said premises at the sole expense of Licensee, a .._ ..thY ee ..(.........3.......) inch pipe line to be used for conveying
.... ........... ............... ...._....Water............ _.................... ...._...............only, the location of said pipe line being shown in red on the Railway's print
S.P.
No.22-994t-3O9.-.7_... hereto attached, ._._.._.._..._r_. ._... _.._..__...._...._..__ _._ ._ _.. and made a part hereof.
ARTICLE 2: The top of said pipe line shall be placed at a depth of not lees than five (5) feet six (6) inches below the base of the rails of the track
or tracks of Railway where it passes under the same and not less than three (3) feet below the surface of the ground at any point on Railway's property.
If the said pipe line shall be of a diameter four inches or larger the portion of same directly under the said track or tracks, and under the roadbed
thereof, shall be of cast iron or other material of approved strength.
ARTICLE 3: The said pipe line shall be constructed and maintained in such manner and at such time or times and of such materials as shall meet
with the approval of the Superintendent of Railway, and as shall not hinder, delay or endanger the operation of engines, trains, cars or business of
Railway over its track or tracks now laid or hereafter laid on said premises, or in any manner interfere with the present or future use of the said premises.
The Licensee shall not enter upon said premises for the purpose of constructing, maintaining or removing said pipe line except upon forty-eight hours'
notice to Superintendent of Railway, and then a designated representative of Railway may oversee or inspect all of said work as it progresses, at the
expense of Licensee, and performance of such work shall be subject to his approval. If deemed necessary by Railway so to do, Licensee shall, at the
expense of Licensee, support the said track or tracks, as directed by Railway, while the work of constructing, maintaining or removing said pipe line
is being done.
In the event the pipe line shall be used to carry any liquid or other substance under pressure, and shall be located under any track or within
forty—five (45) feet of any track, bridge or structure of the Railway, the pipe line shall be constructed and maintained strictly In accordance with
Railway's Plan No.,}'mm copy of which shall be attached to, and thereby become a part of, this agreement.
In case Railway shall, after said pipe line has been constructed, build upon Its premises any additional track or tracks, or structures, or make any
changes in existing tracks or structures over snid pipe line, the Liconw shall, at once, at its own expotiso, make such ehnnges in its said pipe line as
may he nesx:eruuy to make the same conform In its rolation to suldd now tracks or structures, or changes In existing tracks or structures, In all respects
to the conditions herein required for said presont tracks or structures, or as may be required by the Railway.
Form 310 Sheet 2 of 2
. ARTICLE 4: In the event any cathodic electrolysis or other electrical grounding system is installed in connection with said pipe line which in the
opinion of Railway in any way interferes with any train signals, telephone or telegraph lines, or other facilities of Railway, the Licensee immediately
shall discontinue operation of and remove said grounding system, or take such steps as may be necessary to avoid all such interference. Licensee further
agrees to indemnify and save harmless Railway from and against any damages, claims, losses, suits or expenses in any manner arising from or
growing out of interference with the signals, telephone or telegraph lines of Railway by the operation, use or existence of any such grounding system.
ARTICLE 5: The Licensee further covenants and agrees at all times during the existence of said pipe line upon the premises of Railway to keep and
maintain the soil over the same thoroughly compacted, and the grade even with the adjacent surface of the ground, and that Licensee will at all times
release, protect, indemnify and save harmless Railway from all claims, demands, judgments, loss, costa and expenses, for injury to or death of any person,
or loss or damage to the property of any person or persons whomsoever (including both parties hereto and their employes), in any manner arising from
or growing out of in whole or in part, the construction, reconstruction, maintenance, operation, repair, change, existence, use or removal of said pipe
line or the subsidence of soil over the same whether caused by the negligence of the Railway, its servants or employes, or otherwise.
ARTICLE 6: If Licensee shall well and faithfully comply with all the terms, covenants, and conditions herein act forth on the part of Licensee to be
observed and complied with, the license herein granted by Railway shall continue in force to the full expiration of the period of one (1) year from the
date hereof, and thereafter until terminated, upon not less than sixty (60) days' written notice by either party hereto to the other; but if Licensee shall
fail to perform any of the covenants herein contained, Railway shall have the right to terminate this license forthwith and without notice. Any notice
herein provided for shall be sufficiently given and delivered if mailed in an envelope properly stamped and addressed to Licensee. Upon the termination
of this license in any of the modes herein provided for, Licensee shall, at its own expense, upon being notified so to do by Railway, remove said pipe
line from said premises, and restore the ground to a safe and level condition, and in rase of its failure so to do, the Railway may at its option, either
remove the said pipe line from said premises at the sole expense of Licensee, or disconnect the same at points where it enters and leaves the said premises.
ARTICLE 7: The Licensee shall not transfer or assign this license without the written consent of Railway. The said license shall be binding upon the
heirs, personal representatives, successor and assigns of the parties hereto.
IN WrrNzss Weaazor, the parties hereto have caused this agreement to be executed on the day and year first herein written.
ATTEST:
_._ . FORT WORTH AND DENVER RAILWAY COMPANY.
Secretary.
Ry....................... ..................._.._.._.._...._.._.._
ATTEST' , prr Its President
01 CITY C
J BOCK
Licensee.
APPROVED AS TO FORM
.__.----._.... ._..._......... .. _..-- •----•--... .....-.._.._._.......
Attorney.
Recommendedy
Divisio ear
Chief Engineer
Sapt. � mmutr�ication 8i�5igriaTs
No Text
FORM 3203
Installation
Pipelines crossing under any track shall be installed in accordance with Figure Four
and shall not be placed within a culvert or under a railway bridge.
Pipelines crossing under tracks shall be installed by boring crjocking,if practicable,
otherwise with use of folsework. However, upon receipt of special written permission
from the Division Superintendent permitting removal of trocks,pipelinet crossing
under tracks may be installed by the open trench method,ond pipes carrying only
non-flammable substances not under pressure may then be installed without
casing pipes,in any manner set forth in the nest succeeding porogroph,provided that
a concrete Collar at least 9inches thick and I foot on each sldeof the joint shall
be cost around the joints whenever tongue and groove concrete pipe is used.
Any Pipeline not crossing under any track shall be installed as (ollows:
L If Within 45 feet of any moek,bridge or structure the carrier pipe shall
be installed and encosed in accordance with the standards shown In
figure 5, if carrying non-flammoble substances.
2. If mare than 45 feet from any track,bridge or sfucture the pipe shall
consist of steel, cost Iron or wrought Iran plpe meeting the specALearlms
for such carrier pipes here -in -otter set forth:
3. If such pile shall carry only a non-flommoble substance not under
pressure, it may consist of concrete pipe meeting A.S.T.M. Specification
C-76-57,Toble N,ond no encasement is necessary.
All pipes shot) be installed at a depth of not less than 3feer below the
surface of the ground of all points. Signs are required of all points where
the pipeline enters and leaves the right of way,ond at appropriate periodic
intervals where the pipeline parallels the right of way.
when laws or orders at competent public authority prescribe a higher degree of
Protection than specified herein, then the higher degree of protection so prescribed
shall be deemed o port of the specHkatiortt set forth In this exhibit.
Carrier Pipe
Carrier line pipe and joints inside of casing under railway lacks and right-of-way
shall be of approved construct -con satisfactory to the railway company. Joints for carrier
fine pipe operating hinder pressure shall be of mechanical or welded type. Pipe shall be
laid with slack (no tension) In the fine, or with expanslon joint our the point of railway
crossing.
Casing Pipe
Casing pipe and joints shall be of kakproof construction, capable of withstanding
railway loading.
WALL TN1ctimEss FOR STEEL* CASINO Pipe FOR E 72 LOADING (INCLUDINC IMPACT)
M AIrRan Thickness Dionelrr of Pipe
.................................e, B•, f0', It, Wend le
E............................. .22' and 24'
)76 ...................... .....26• and 28"
J'................................W.32'and aW
c 96. . . . . . . . . . . . . . . . . . ..... ....3e and 38'
y............................. , .....W and 42'
• Thick.ew -s la s1-1 pipe having • milam m y4tl strength of 55,000 psi. Adlun this►nets asMr, for esker mad. of pipe, -mt that Ilikkaess of pipe shell sot b. In. Ilia- Hi in.
Class ISO ash iron pile may be used for 12 in and under and Class 23D shall be
used for over 12 in, provided the method of installation is by open trench and prior
approval has been secured from the chief engineer of the railway company.
The inside diameter of the casing pipe shall be at Least 2 in greater than the largest
outside diameter of the carrier pipe, joints or couplings, for carrier pipe less than 6 in
in diameter; and at least 4 in greater for carrier pipe 6 in and over In diameter. It shall,
in all cases, be great enuugh to allow the carrier pipe to be removed subsequently without
disturbing the cuing pipe or roadbed.
Casing pipe shall be so constructed u to prevent Leakage of any matter from the
casing or conduit throughout its length under track and railway fight -of -way, except
at ends of casing or conduit where ends are Left open. Cuing shall be so installed as to
prevent the formation of ■ waterway under the railway end with an even bearing
throughout its length, and shall slope to one end.
Protection Against Corrosion
Pipes, when of steel material, shall receive extemally the time protective
coating which is applied to the carrier pipe adjacent to the crossing, except that in no
use shall the protective coating be Im thin a coil -tar primer coat, followed by a single
application of hot coal -tar enamel � in thick ± by in, Plus a bonded 15-lb Asbestos
felt wrap, or in lieu of the above, the coating shall be an approved substitute equal
to this combination protective coaling.
Before installation, electrical detection methods shall be LIMA to locate flaws or
breaks in the coating. AB damaged or broken coatings shall be repaired or replaced.
Installation shall be made in such manner that the protective coating of the arrier pipe
is undamaged.
Where adjacent carrier pipe is uthodically protected, this protection shall be extended
to the casing pip, in addition to the protective coatings. Where such protection Is pro-
vided, the railway company shall be notified and suitable test made to insure that other
railway structures and facilities arc adequately protected from the cathodic current In
accordance with the recommendations of Report of Correlating Committee on Cathodic
Protection, published In July 1951 by the National Association of Corrosion Engineers.
Fig.4 Pipe Line For Non -Flammable Substances
See f/ds S--i i�---6•a nth• S
I I
S Ihao allh Sc 1 (a ,fie
11511 GIn(Miq
Sea We 2 4 srt Pie A See Mai. 1
-Cis" Pipe AJ
SM I.BO III
NOTE�� I. fads of msing,when Delos yrourd, Waatl be suMobly pTrrt¢ied agmnsf rnfraRa d
foreign moieriol.
L Ends ofenswl. when above Smand surface and •nave hlyh yr a lavel,moy Be
Leff open where &,sine ge b windable.
i Cowl pipe chill extend a miniRam data" a1 lift plus 5 fi plus L5 D measured of rW
prl91ea Rem LTzrler fine or •utaWe fifro�ck(where D •gmis 41e deoh erboliamo(adfl.y
beltsw M.Dgrede),arfo rwllWay right-or-rcly.whrchever Is yholer
ASPHALT COATED CARRIER PIPE TO BE SMOOTH STEEL
ASBESTOS BONDED SPACE BETWEEN CAR-
SMDOM STEEL OR OR WROUGHT RIER PIPE AND CAS-
CORRUGATEDr/LST in% PIPE. IRON OR COR- ING PIPE TO BE BACK
METAL, OR W.I. CARRIER PIPE RUGATED FILLED WITH SAND
PIPE�N CENTERED WYK JACKING OR LEAN CONCRETE
SNOOT
SAND OR OTHER PIPE' IF CORRUGATED PIPE
STEEL PPE, SUITABLE MATERIAL. IS USED.
PROTECTED
AGAINST
CORROSION.
SECTION A -A SCHEME I SECTION A -A SCHEME 2
CARRIER PIPE WITH SUB- CARRIER PIPE WITH SUBSTANCES NOT
STANCES UNDER PRESSURE. UNDER PRESSURE. CASING PIPE
CASING PIPE IN BORED HOLE. JACKED THROUGH ROAD BED.
MANHOLE REEOIIRED AS SHOWN IN FIG 4
UNLESS OTHERWISE SPECIFIED IN CONTRACT, ASPHALT COATED,
EXCEPT THAT MANHOLES AND SAND ASBESTOS BONDED
CENTERING MAY IL OMITTED IN INSTALLA- CORRUGATED METAL
T04S USED ONLY INTERMITTENTLY WHERE OR SMOOTH STEEL
BOTH ENDS OF CASING PIPE ARE ABOVE PIPE. PROTECTED
GROUND AND OPEN FOR INSPECTION. AGAINST rroorvv.M
Pipe lines carrying ran-flarmable
substances under a pressure of Ion
than 100 paL may be encosed In
reinforced txxarete culvert pipe
made In accordance With 0.TSM.
Spec. 06-57 Table IV
RR Strength..
Corrugated Metal Pipes
Under hock
Dialler
Riveted
I Multi.
Tears.
pipe
plafr
Liter
e" to IY
A-
IB" a 21"
12
-
-
24
t0
-
-
30• b 42•
8
-
-
41r
8•
DGo
Bd
e •
7•
W to Ir
5co.
5-
84" b 10e•
3 •
3
QO• b 144•
-
1 •
3
SECTION A -A SCHEME 3
TO BE USED IN INSTALLATIONS USED ONLY INTER-
MITTENTLY WHERE BOTH ENDS OF THE CASING
PIPE ARE ABOVE GROUNO,A80VE THE MGM
WATER LEVEL AND OPEN FOR INSPECTION
DRAINAGE MUST BE PROVIDED IN A MANNER
SO THAT LEAKAGE WILL BE CONDUCTED AWAY
FROM THE ROAD BED AND STRUCTURES.
NOR :
ASBESTOS BONDING MAY BE
OMITTED FOR MULTI -PLATE
AND TUNNEL LMER.
Fig. 5 Pipe Line Alorg Right of Way
r. :WE--E. GRMNc seas sTAMCEs SIDS
jJI PM[aMT CEH et I— OF r WRMPI y,
b RAT cur ¢ a TraCK OR
r wvTHIM As rrxT cur eases '
CIT ' I
OR aTAUCTII.E
wHtTS n Ia •FWKTKApLt To coso Lv
OPAaD car"' WFM TM. PLAN ¢wAT.H MUST at
AARoeED rr "a" _.Et.
STANDARD SIZES OF PIPES WROUGHT IRON OR STEEL
LINE
I I
I
2
3 4 5 6 7
8 9 1
CASING
2
3
3
4
4
14
LINE I I I
12 as o. as
CASING as
ao. ao. ao. ME
STANDARD SIZES OF CAST IRON PIPES
LINE 1 4 6 8 10 1 14 16 18 2
A I G 10 I 14 16 18 20 24
O.D. SIZRE BASE ES ARE ON:
1*TO 16'PIPE INCLr#TN1CK.17•T024'PrPE fNCL- THRCR,SC7042'PIPE INCH-: fTKICN
ONLY WHEN PIPE IS NOT UNDER TRACK.
Burlington Lines
Pipe Lines
For Non -Flammable Substances
Across . or Along Right of Way