Loading...
HomeMy WebLinkAboutResolution - 052771B - Street Improvements - V. & N. Construction Co - Hodges Addition - 05_27_1971RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Tract "G", C. N. Hodges Addition, made arrang ements with V. & N. Construction Company for the construction of paving im- provements on certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Tract "G", C. N. Hodges Addition, including the following street: The North half of 54th Street adjacent to Tract "G" (street stub re- moval and construction of curb and gutter and alley return only) AND WHEREAS, the construction of the above improvements on the above - mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovemehtioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost. II. This resolution shall take effect and in force from and after its sage. PASSED AND APPROVED THIS 27th May , 19 71 J. Granberry, Mayor ve is Lowe, City_ -Secretary PRICED: ilfo d Watson, City Engineer PPROVED:: red 0. Senter, City At &ney CONSOLIDATED FINAL ESTIMATE Tract G, C.N. Hodges Addition Accepted May 27., 1971 QUANTITIES S. Y. L. F. S. Y. S. Y. L. F. Alley L. F. Unit & Paving Pavmt. L. F. Alley C & G Return Reinf. Sub -Unit Location Repair Removal C & G Return Removal Removal Gutter NS 1855 The North k of 54th 123.60 175.10 97.20 St. adjacent to Tract G,C.N.Hodges Addn. (Street slab removal & concrete only) COST ESTIMATE 123.60 L.F. Paving Repair @1.00 $123.60 175.10 S.Y. Pavement Removal @2.69 $471.02 97.20 L.F. Curb & Gutter @2.45 $238.14 49.00 L.E. Reinforced Curb & Gutter @2.90 $142.10 20.33 S.Y. Alley Return @8.40 $170.77 137.00 L.F. Curb & Gutter Removal @2.45 $335.65 12.13 S.Y. Alley Return Removal @8.40 $101.89 CONTRACT COST $1,583.17 COST DISTRIBUTION Property Unit & Contract Owner -iab-Unit Cost Cost 20.33 137.00 12.13 49.00 NS 1855 $1,583.17 $1,583.17