HomeMy WebLinkAboutResolution - 111369E - Pavement Improvements - Kerr Construction Co - Time's Square Addition - 11_13_1969RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES
AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Time's Square Addition Lots 10-68, made arrange-
ments with Kerr Construction Company for the construction of paving improvements
on certain streets dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of Time's Square Addition
Lots 10-68 including the following streets:
74th Place from its intersection with the center line of Akron Avenue to its
intersection with a line 15.00 feet West of the West Property Line of Canton
Avenue, known and designated as Part of New Subdivision Unit Number 1806.
74th Place from its intersection with the center line of Akron Avenue to its
intersection with the West Paving Line of University Avenue, known and designated
as Part of New Subdivision Unit Number 1806.
75th Street from its intersection with the East Lip Line of Canton Avenue to its
intersection with the West Lip Line of Akron Avenue, known and designated as New
Subdivision Unit Number 1807.
The East 1/2 of Akron Avenue from its intersection with the South Lip Line of 74th
Place to its intersection with a line 438 feet South of the South Lip Line of
74th Place, known and designated as Part of New Subdivision Unit Number 1808.
The West 1/2 of Akron Avenue from its intersection with the South Lip Line of 74th
Place to its intersection with a line 438 feet South of the South Lip Line of 74th
Place, known and designated as Part of New Subdivision Unit Number 1808.
Canton Avenue from its intersection with the South Lip Line of 74th Place to its
intersection with a line 33.00 feet South of the South Property Line of the alley
South of 75th Street (East Leg), known and designated as New Subdivision Unit
Number 1809.
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to release
escrow money.
passage.
H.
This resolution shall take effect and be in force from and after its
PASSED AND APPROVED THIS 13TH DAY OF NOVEMBER, 1969.
ATTE
1
Lavenia Lowe, Ctq.Secretary
APPROVED:
Wilfor Wats,n, ,City Engineer
APPROVED:
Fred 0. Senter, Jr., City Attorney
PORTER 2-6411
BOX 2000
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
LUBBOCK, TEXAS 79406
November 13, 1969
I have examined the paving improvements constructed by Kerr
Construction Company, paving,contractor, under their contract with the
subdividers of Time's Square Addition Lots 10-68 and find the improve-
ments on 74th Place from University Avenue to Canton Avenue, 75th Street
from Akron Avenue to Canton Avenue, Akron Avenue from 74th Place to
alley South of 75th Street, Canton Avenue from 74th Place to alley South
of 75th Street (E. Leg) as listed on the final estimate sheet to have
been completed in accordance with the plans and specifications and
recommend that1you accept the improvements on said streets and/or avenues,
authorizing payment to the contractor the amount shown on the attached
consolidated final estimate sheet as due them by the City of Lubbock.
You very uly,
W r D. Watson
City gineer
CONSOLIDATED FINAL ESTIMATE
TIME'S SQUARE ADDITION
LOTS 10-68
Accepted November 13, 1969
UANTITIES
S.Y. S.Y. S.Y. S.Y. C.Y.
Unit & Paving Paving L.F. Alley Valley Extra
Sub -Unit Location 9" Base 6" Base C & G Return Gutter Calichc
Part of
NS 1806 74th Place from the center- 4,085.33 2,169.00
line of Akron Avenue to 15'
W. of the WPL of Canton
Avenue
Part of
NS 1806 74th Place from the center-
line of Akron Avenue to the
West Paving Line of Univer-
sity Avenue
NS 1807 75th Street from the E.Lip
Line of Canton Avenue to the
W.Lip Line of Akron Avenue
Part of
NS 1808 The East 1/2 of Akron Avenue
from the S.Lip Line of 74th
Place to 438' South of S.
Lip Line of 74th Place
Part of
NS 1808 The West 1/2 of Akron Avenue
from the S.Lip Line of 74th
Place to 438' S. of the S.
Lip Line of 74th Place
NS 1809 Canton Avenue from the S.
Lip Line of 74th Place to
33' South of the SPL of the
alley S. of 75th Street
(E. Leg)
TOTAL
COST ESTIMATE
427.94 S.Y. Paving 9" Base
12,754.46 S.Y. Paving 6" Base
6,915.82 L.F. Curb & Gutter
53.34 S.Y. Alley Return
157.62 S.Y. Valley Gutter
60.87, S.Y. Extra Base 9"
427.94 1,336.89 742.40
4,000.84 2,289.99
769.78 450.27
769.78 384.27 26.67
1,791.84 879.89 26.67
427.94 12,754.46 6,915.82
@ $ 2.15
@ $ 1.79
@ $ 1.68
@ $ 6.75
@ $ 6.95
@ $ 2.50
52.54 60.87
52.54
26.27
26.27
53.34 157.62 60.87
$ 920.07
22,830.48
11,618.58
360.04
1,095.46
152.17
CONTRACT COST $ 36,976.80
COST DISTRIBUTION
Property
City
Unit &
Contract
Owner
to
Sub -Unit
Cost
Cost
Contractor
Part of
NS 1806
$ 5,077.66
$ 4,586.49
$ 491.17
Part of
NS 1806
10,956.66
10,956.66
NS 1807
11,373.83
11,373.83
Part of
NS 1808
2,316.94
2,316.94
Part of
NS 1808
2,386.08
2,386.08
NS 1809
4,865.63
4,865.63_ _
TOTAL $ 36,976.80 $ 36,485.63 $ 491.17