RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, the City of Lubbock passed a resolution on September 11, 1969
authorizing the construction of street improvements by Kerr Construction Company
on a portion of the following street:
54th Street from its intersection with a line 13.00 feet East of the East Property
Line of Raleigh Avenue to its intersection with a line 16.00 feet West of the West
Property Line of Quaker Avenue, known and designated as Sub -Unit Number 29 of
Unit Number 2180.
AND WHEREAS, the improvements upon the said portion of the abovementioned
street have been inspected and found to have been constructed according to the
approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS
I.
That the improvements on said portion of the abovementioned street be,
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's share.
This resolution shall take effect and
PASSED AND APPROVED THIS 13TH DAY OF
AT `T ' y
La nia Lowe, Cit.-Secretar�y
:PPAPPRO ED:
Wilford Watson, City Engineer
AP VED :
_. {S/
red 0. Senter, Jr., City A t6o y
force after its passage.
969.
ON
a
POrter 2-6411
P. O, Box 2000
L U B SOCK, TEXAS 7 9 4 0 6
November 13, 1969
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Kerr
Construction Company, paving contractor, as authorized by a resolution
passed on September 11, 1969 and find the improvements on 54th Street
from Quaker Avenue to Raleigh Avenue as listed on the final estimate
sheet to have been completed in accordance with the plans and specifica-
tions and recommend that you accept the improvements on said street,
authorizing payment to the contractor .the amount shown on the attached
consolidated final estimate sheet as due them by the City of Lubbock.
You ver t ly,
Wilfo D. Watson
City E gineer
CONSOLIDATED FINAL ESTIMATE
G.W.O. 2991
Accepted November 13, 1969
UANTITIES
S.Y.
Unit & Paving L.F.
Sub -Unit Location 6" Base C & G
2180-29 54th Street from 16' West of the 1,977.00 1,112.00
WPL of Quaker Avenue to 13' E. of
the EPL of Raleigh Avenue
COST ESTIMATE
1,977.00 S.Y. Paving 6" Base
1,112.00 L.F. Curb & Gutter
COST DISTRIBUTION
@ $ 2.15 $ 4,250.55
@ $ 1.95 2,168.40
CONTRACT COST $ 6,418.95
Property City
Unit & Contract Owner to
Sub -Unit Cost Cost Contractor
2180-29 $ 6,418.95 $ 6,293.59 $ 125.36