May 10, 1990
Item #11
JWF:dw
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Overton Addition, Tracts "A" and "B" made
arrangements with Wardroup & Associates, Inc., for the construction of
paving improvements on a certain street dedicated in said subdivision under
the provisions of said Ordinance prior to the recording of the subdivision
plat of the above mentioned addition including the following street:
Construction necessary to close 13th Street between Vernon
Avenue and Avenue "V" known as Unit No. 2033-69; and
WHEREAS, the construction of the above improvements on the above
mentioned street was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331; NOW THEREFORE:
SECTION 1. THAT the improvements on said portions of the above
mentioned street be and the same are hereby accepted and the City Engineer
be and he is hereby authorized to notify the owner of acceptance by the
Lubbock City Council.
SECTION 2. THAT this Resolution shall take effect and be in force
from and after its passage.
Passed by the City Council this loth day of
Mayy�, 1990.
'"B. C. McMINN, MAYOR
e uoya, city wcgetary
APPROY5D AS /TO CONTENT:
Larry D. erte ,ty Engineer
APPRO D AS TO FORM:
17
J.,//jorth Fullingim, Assista ity
t orney
e s-A-33�4
CONSOLIDATED FINAL QUANTITIES
OVERTON ADDITION
Tracts "A" & "B"
Accepted May 10, 1990
Unit & Sub -Unit
2033-69 Close 13th. Street between Avenue "V" and Vernon Avenue.
41.11 S.Y. Pavement Patching
80.26 L. F. Curb and Gutter
42.10 S.Y. Drive Approaches
32.00 S.Y 6" thick concrete on existing asphalt
89.12 S.Y. Paving Removal
TOTAL CONSTRUCTION COST
LUMP SUM CONTRACT FOR $ 7,260.00
COST DISTRIBUTION
Contract Cost Developer Cost
$ 7,260.00 $ 7,260.00