Loading...
HomeMy WebLinkAboutResolution - 061269F - Accept Paving Improvements- W.D. Turner Co.- Lot 7, Lubbock Industrial Addition - 06_12_1969RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Lubbock Industrial Park Addition, Lot 7, made arrangements with W. D. Turner Construction Company for the construction of paving improvements on a certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Lubbock Indus- trial Park Addition, Lot 7, including the following street: North Elder Avenue from its intersection with the North Lip Line of Loop 289 (Nor to its intersection with a line 927.65 feet North of the North Property Line of Loop 289 (North), known and designated as New Subdivision Unit Number 1771. AND WHEREAS, the construction of the above improvements on the above - mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost and to release escrow money passage. II. This resolution shall take effect and be in force from and after its PASSED AND APPROVED THIS 12TH DAY i AT T: . L enia Lowe, Ci Secretary Wilf6r4 /15. Watson, City Engineer APPROVED Fred 0. Senter, Jr., City t o ey PORTER 2,6411 BOX 2000 Honorable Mayor and City Council Lubbock, Texas Gentlemen: LUBBOCK. TEXAS 79406 June 12, 1969 I have examined the paving improvements constructed by W. D. Turner Construction Company, paving contractor, under their contract with the subdividers of Lubbock Industrial Park Addition, Lot 7, and find the improve- ments on North Elder Avenue from Loop 289 (North) to 927.65 feet North of the NPL of Loop 289 (North) as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said street, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due him by the City of Lubbock. Yo rs very u�, Wi d D. Watson City Engineer CONSOLIDATED FINAL ESTIMATE LUBBOCK INDUSTRIAL PARK ADDITION, LOT 7 Accepted June 12, 1969 QUANTITIES S.Y. L.F. S.X. Gals. Drainage Unit & Paving L.F. Reinf. Valley Extra Channel Sub -Unit Location 6" Base C & G C & G Gutter Asphalt Cut C.Y. NS 1771 North Elder Avenue from 5,198.36 1,817.20 151.20 41.67 the North Lip Line of Loop 289 (North) to 927.65 feet N. of the NPL of Loop 289 (North) COST ESTIMATE 5,198.36 S.Y. Paving 61' Base @ $ 1.78 $ 9,253.08 1,817.20 L.F. Curb & Gutter @ $ 1.65 22998.38 151.20 L.F. Reinforced Curb & Gutter @ $ 2.50 378.00 41.67 S.Y. Valley Gutter @ $ 6.90 287.57 2,720.00 C.Y. Drainage Channel Cut @ $ 0.30 816.00 461.00 Gals. Extra Asphalt @ $ 0.20 92.20 CONTRACT COST $13,825.23 COST DISTRIBUTION Property City Unit & Contract Owner to Sub -Unit Cost Cost Contractor NS 1771 $ 13,825.23 $ 13,733.03 $ 92.20 461.00 2,720.00