HomeMy WebLinkAboutResolution - 3241 - Accept Paving Improvements - Rhode Construction - 34Th & Quaker Intersection - 11_09_1989Resolution #3241 November 9, 1989 Item #10 JWF:js GF¢nl IITinK1 A RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR AVENUES AS LISTED BELOW: WHEREAS, the City",gfAubbock heretofore entered into Contract with Rhode Construction -Company for the making of street improvements on portions of streets and/or avenues in said City including among others the following: 34th Street and Quaker Avenue Concrete Intersection Construction WHEREAS, the construction of the above improvements on the above - mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with terms of said Contract, Project No. 9402; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements on said portion of 34th Street and Quaker Avenue BE and the same are hereby accepted and the City Engineer BE and he is hereby authorized to direct the final payment to the contractor in the amount of $16,015.12. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 9th day of November , 1989 46. B. C. McMINN, MAYOR --Ranettee.$oyd, City Secretai4y APPROV D AS TO CONTENT: arry Hert 1, City Eng neer AP PR D AS TO FORM: 1 1 7 . Worth Fullingim, Assista City Wrney MONTHLY ESTIMATE CITY OF LUBBOCK Project: 34th. & Quaker Concrete Intersection Project No. 9402 Contractor: _ Rhode Construction Company Estimate No. 4 & FINAL Address: P. 0. Box 53370 Contract $, 316,767.18 Lubbock, Texas 79453 Estimate Period From October 20, r 19 89 to November 9, r 19 89 On First estimate and final estimate use actual work dates ITEM UNIT OF PROJECT WORK DONE CONTRACT MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT 7. 1-1/2" compacted THD Tvpe "C" Sly. 312 387.73 8 in 74 9 11 A.C. paving, 9' asphalt stabilized gravel base, prime tack coat 1:2 diluted emul— sion at rate of 0.10 gallon per square yard, and removal and hauling to desijznated a e of existine Davine and base. 8. Hot Mix Resurfacing includine S.Y.502.15 removal and disposal of exist- ing asphalt surface and re— paving with 1-1/2" of Type "5rr hot mix on an oiled base. 9. Sawing of contraction and I L.F. I 8,300 1 8,574 ) $ 2.5 �$ 21,949.44 longitudinal ioints. sealing the Mead APPROVED: Engineer Engineer 7&",4 De t. Hea j Director . ti S9 (�.1 �f r11afrf1115 t�V: s� oats '7 QheCked hy• Date Date Total Amount of Work Done ....... $ 316, 679.19 Less 5 `% Retained ............. $ 0 Diffeience ............... .. , S 316,679.19 Less Special Deduction ........... S 0 Less Liryuidated D;tmage ......... S 0 Less Previous Payments . ......... S 300, 664.07 Amount Due this Estimate......... $ 16,015.12 MONTHLY ESTIMATE CITY OF" LUBBOCK 34th. & Quaker Concrete Intersection Project Project No. 9402 Contractor: Rhode Construction Company Estimate No. 4 & FINAL Address: P.D. Box 53370 Contract $ 316,767.18 Lubbock, Texas 79453 Estimate Period From October 20, , 1989 to November 9, , 19 89 on First estimate and final estimate use actual work dates ITEM UNIT OF PROJECT WORK DONE CONTRACT MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT 1. 8"thick reinforced concrete S.Y. 6,160 6,179.58 38.03 paving with 5% entrained air, Class "C" 3600 psi concrete. 2. 6" concrete curb & gutter L.F. 1,400 1.431.58 7.98 or 30" wide separate gutter, including removal and dis- posal of existing C & G. 3. Six Foot storm sewer inlet Lump 1 Completed 3,175.00 9 3.175.00 box including removal and Sum disposal of existing box. 4. Alley Returns: Reinforced S.Y. 75 80.80 30.32 2.428.03 concrete(3 000 si/7da s 5" thick Incl. removal and disposal of existing returns 5. Driveway Returns: Reinforced S.Y. 577 438.67 25.56 11,212 concrete(3 000psi/7 day) 5" thick driveway returns including removal and dis- posal of existing driveways. 6. Sidewalk: Concrete slab and S.Y. 610 446.03 23.33 10 405.88 sidewalk adjustment with 4" thick, air entrained (5%) concrete(3,000 psi/7 day) including removal and dis- osal of existing slabs. APPROVED: Fn, F^ ''' hr' e Total Amount of Work Done ...... c � Less 5 'O Retained ............. S Difference ............... ........ ...5 Less Special Deduction . ......... S Less Liquidated Ddmage ......... 5 Less Previous Pavnients . ......... S Amount Due this Estimate......... $ <:r t'uratinns hV: Engineer Date Checked t, : Devt. Head Date L Director Date