HomeMy WebLinkAboutResolution - 3223 - Contract - Knox Gailey & Meador Inc - Operations Facilities, Municipal Hill - 10_12_1989HW: js RESOLUTION Resolution # 3223 BID #10293 October 12, 1989 Item #22 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Contract by and between the City of Lubbock and Knox, Gailey and Meador, Inc. for Munic- ipal Hill operations facilities, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Coun- cil shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 12th day of October , 1989. 0�- (1 -'010 e B. C. cMIN , MAYOR ATTEST: Rane to Boyd, City Secretary APPROVE AS TO CONTENT: "Gene Eads, Purchasing Manager APPROVED AS TO FORM: Vv m old Willard, Assistant City Attorney CONTRACT STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this 12th day of October. 1989, by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through B.C. McMinn, Mayor, thereunto authorized to do so, hereinafter referred to as OWNER, and Knox Galley 8 Meadors Inc. of the City of LUBBOCK, County of LUBBOCK and the State of TEXAS, hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CON- TRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as fol- lows: BID # 10293 - MUNICIPAL HILL OPERATIONS FACILITIES FOR THE AMOUNT OF $2,035,119.00 and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or I their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to Somplete the said construction in accordance with the contract documents as defined in the General Condition of Agreement. 7 The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CONTRACTOR in current finds for the performance of the contract in accordance with the proposal submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbocii, Lubbock County, Texas in the year and day first above written. CITY OF LUBBOCK, TEXAS (OWNER) By/ v r MAYOR APPROVED AS TOFORM: ATTEST: Secretary P.O. Box 5736 ,1109 North Ave T. Lubbock. Texas 79417 .22- CHANGE ORDER NO. 1 TO BID NO. 10293 MUNICIPAL HILL OPERATIONS FACILITIES TO: Knox, Gailey & Meadors, Inc. P.O. Box 5736 1109 North Ave T. Lubbock, -Texas 79417 Gentlemen: WHEREAS, it is desirable to make changes with the contract for this project, being namely the following: Owner's Represenative to be changed from William J. Payne, Director of Building Services to Jerry Smith, Director of Building Services. WHEREAS, the Contractor herein agrees to the following change: THIS AGREEMENT WITNESSETH: The Owner and the Contractor agree to the change shown herein. The Contractor agrees to proceed with expedited fabrication of the structures in accordance with the plans and specifications. Furthermore, the parties agree that the original contract between the Owner and the Contractor shall be modified to the extent herein indicated. IN WITNESS WHEREOF, the Owner and the gContractor have hereto set their hands this 30th day of October h KNOX, GAILEY & MEADORS, INC. (Contractor) By: 6- Title: Kn x, Gailey & Meadors, Inc. CITY OF LUBBOCK (Ow t ) By: ���5 Attest: Bob Cass, Deputy City Manager Ranet a Boyd, City Se ary RECOMMENDED FOR APPROVAL: APPROVED AS TO FORM: �S I BobCass, Deputy City Manager Don d G. Vandiver, Firs Assistant City Attorney CHANGE ORDER NUMBER NINETEEN: BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5336 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 84,110.70 Net Amount this Change Order 3,950.00 Amended Amount of Contract $ 2,123,179.70 Percentage Change of Contract Price is 4.3% Additional Time of Completion is 10 Days The Date of Substantial Completion as of this Change Order is April 9, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material to add electrical wiring for kitchen equipment installation. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 28 day of May, 1991. CONTRACTOR: Kno BY: TIT APPROVED ASJO FORM: -7 <)AA&. Ac� C y Attorney OWNER: City of Lubbock BY: ,lnRCASS Deputy City Manager AP P OVED AS TO CONTENT: e or of Building Services CHANGE ORDER NUMBER TWENTY BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5336 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 88,060.70 Net Amount this Change Order 3,205.00 Amended Amount of Contract $ 2,126,384.70 Percentage Change of Contract Price is 4.5% Additional Time of Completion is 10 Days The Date of Substantial- Completion as of this Change Order is April 19, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material to add plumbing installation of kitchen equipment, repair floor and clean kitchen. IN WITNESS WHEREOF, the Owner and the Contractor have hereto s t their hands this the 28 day of May, 1991. CONTRACTOR: Kno BY: TIT OWNER: CityofLubbock BY: �aPS Deputy City Manager APPROVED AS TO FORM: APPROVED AS TO CONTENT: 14 /\%ft., C7i W Attorney Jr7ecr of Building Services `.4 CHANGE ORDER NUMBER TWENTY-ONE BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5336 Lubbock, Texas 79417 Original Amount of Contract Amount Previous Change Orders Net Amount this Change Order Amended Amount of Contract Percentage Change of Contract Price is 4.7% Additional Time of Completion is 10 Days The Date of Substantial Completion as of this Change Order is April 29, 1991 $ 2,035,119.00 91,265.70 4,335.00 $ 2,130,719.70 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material to make changes as per attached Exhibit A dated May 22, 1991. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 28 day of May, 1991. CONTRACTOR: Kna BY: TI1 APPROVED AS O FORM: A6�+, Ci Attorney OWNER: City of Lubbock BY: & CAZ-0 Deputy City Manager ;APROVED AS TO CONTENT: e or of Building Services ATTACHMENT A CHANGE ORDER #17 MUNICIPAL HILL OPERATIONS CENTER BID #10293 ITEM 1: Tech-E1ec One (1).Bogen CPT-1A AM/FM Cassette ,'$ 400.00 ITEM 2: Tech -Flee - Add power booster'on Police Academy 800.00 ITEM 3: Lubbock Sound -:Furnish & install securitron magnet for front door -one magnalock 24 VDC, 880.00 one magnalock key operated switch & regd. - wiremold, wise and labor. ITEM 4: Security fencing at Building "A" A. Labor to remove existing,& install temp- 715.00 orary fencing B. Rental on approximately 600.LF temporary - :650.00 fencing . ITEM 5: Install plywood deck at Air Compressor Room at 130.00 Building "B". TOTAL CHANGE ORDER #17: $ 3,575.00 sdh 3/26/91 EXHIBIT A CHANGE ORDER #21 MUNICIPAL HILL OPERATIONS CENTER BID #10293 1. Paint new flashings on three (3) buildings + $395.00 2. Provide c.f. mirrors in washroom and aluminum + 155.00 threshold at Building "D" 3. .' Provide 41 3/4" x 97 5/8" mirror at Police Academy + 150.00 4 Omit sand trap at Building "A" - 650.00 5 Furnish and install thresholds and weatherstripping + 180.00 at three (3) doors 6 Remove and reinstall chain link fence for paving + 270.00 contractor 7. Re -work serving line counter + 95.00 8. Cut and re -work pass window counter top + 145.00 9 Labor, miscellaneous metals, scaffold and equipment + 975.00 to install signs and letters on various buildings 10. Provide and install 4' x 5' galvanized steel box at + 865.00 east exterior wall of Building "B" 11. Remove north overhead door of Building "B", remove + 1,755.00 masonry and steel lintel, raise opening approximately 4" and reinstall overhead door TOTAL $ 4,335.00 'i 5/28/91 mhzlatt CHANGE ORDER NUMBER TWO BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract Amount Previous Change Orders Net Amount this Change Order Amended Amount of Contract Percentage Change of Contract Price is 0% Additional Time of Completion is 140 Days The Date of Substantial Completion'as of this Change Order is March 4, 1991 $ 2,035,119.00 32,619.00 .00 $ 2,067,738.00 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to add 140 days additional construc- tion time for weather delays and additional work. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: Knox BY: TITL OWNER: City of Lubbock BY: lc�z Deputy'City Manager AP OVED AS TO CONTENT: s ctor of Building Services APPROVED AS TO FORM: TIQ;� 9A_' AAAARfl o ld G. ndiver, First Assistant City Attorney CHANGE ORDER NUMBER THREE BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 32,619.00 Net Amount this Change Order 4,485.80 Amended Amount of Contract $ 2,072,223.80 Percentage Change of Contract Price is 1.8% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material to make changes for electrical work to Building A as per Attachment "A", dated -- February 14, 1991. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: Knox, Gaile Me Inc. -BY: TITLE tz-, 7 OWNER: City of Lubbock BY: ;Cee Deputy City Manager AP P OVED AS TO CONTENT: ect of Building Services APPROVED AS TO FORM: 9�. 7Q.A,,. ld G. andive First Assistant City Attorney ATTACHMENT A CHANGE ORDER #3 MUNICIPAL HILL OPERATIONS CENTER BID #10293 ELECTRICAL FOR BUILDING "A° ITEM #1: Add seven (7), one light, 4' fixtures in corridors $ 368.00 (118, 132, 106, 149, 112 and lobby #151) Building "A". ITEM #2: Lower outlets in Rooms 109, 110, 11.1, 105, 107 & 325.00 108 from 42" as per plans to 36". ITEM #3: Wire three (3) hot water heater circulating pumps 177.00 not shown on plans ITEM #4: Add six (6) undercounter lights in Reception Area #102 444.00 ITEM 05: Add three (3) 2' x 2' fixtures in Cafeteria #107 183.00 ITEM #6: Add two (2) 30a 30 receptacles & cord caps in Calibration 457.00 Room #135. Install receptacles only in Glove Room 0137, wire contract ITEM #7: Add two (2) recess eye -ball fixtures in Office #152 213.00 ITEM #8: Add two (2) fixtures in LP&L Dispatch Room #123 (map 190.00 sign needed more than one fixture) ITEM #9: Add one intercom unit outside by Maintenance Room #140, 425.00 master unit in LP&L Dispatch ITEM #10: Add three (3) spot lights in Reception Area #156 296.00 ITEM #11: Add bath fixture in Storage #148 38.00 ITEM #12: Water Meter Dept., tie-in existing service not shown on plans 426.00 ITEM #13: Building "A" - modify cabinet & AED AM/FM cassette unit 536.00 ELECTRICAL SUB -TOTAL $ 4,078.00 GEN. CONTR. & O.H. 407.80 TOTAL CHANGE ORDER #3 $ 4,485.80 sdh 2/14/91 . CHANGE ORDER NUMBER FOUR BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 37,104.80 Net Amount this Change Order 2,579.50 Amended Amount of Contract $ 2,074,803.30 Percentage Change of Contract Price is 1.9% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material to make changes for mechanical work as per Attachment "A", dated February 14, 1991. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: Knox, Gail ey ado r C. BY:✓� TITLE OWNER: City of Lubbock BY: Deputy City Manager APPROVED AS TO CONTENT: Ire or -of Building Services APPROVED AS TO FORM: 9�.? - AAA,14�)� nald G. V nd0er, First Assistant City Attorney ATTACHMENT A CHANGE ORDER #4 MUNICIPAL HILL OPERATIONS CENTER BID #10293 I MECHANICAL . ITEM #1: Add hot water line to eye wash in Building "D" ITEM #2: Repair 3" gas line {20LF section} ITEM #3: Add 1 1/2" gas line from Building "A" to Building irCu ITEM #4: Move floor drain in Kitchen ITEM #5: Run water to evaporative cooler in Building "A" ITEM #6: Cap water line below floor in Building "A" ITEM #7: Move condensing unit & reinstall for roofing contractor on separate control MECHANICAL SUB -TOTAL GEN. CONTR. & O.H. TOTAL CHANGE ORDER #4 sdh 2/14/91 500.00 475.00 680.00 200.00 95.00 95.00 300.00 $ 2,345.00 234.50 $ 2,579.50 CHANGE ORDER NUMBER FIVE BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract Amount Previous Change Orders Net Amount this Change Order Amended Amount of Contract Percentage Change of Contract Price is 2.0% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 $ 2,035,119.00 39,684.30 687.50 $ 2,075,490.80 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material for additional masonry work as per Attachment "A", dated February 14, 1991. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: Knox BY: TITL OWNER: City ((oo�f,�, Lubbock BY: JC40� Deputy City Manager APP VED AS TO CONTENT: rec�,6r o Building Services APPROVED AS TO FORM: ald G. andive , First Assistant City Attorney MASONRY ITEM #1: sdh 2/14/91 ATTACHMENT A CHANGE ORDER #5 MUNICIPAL HILL OPERATIONS CENTER BID #10293 Fill in door with masonry & tooth in two (2) doors MASONRY SUB -TOTAL GEN. CONTR. & O.H. TOTAL CHANGE ORDER #5 $ 625.00 625.00 62.50 $ 687.50 CHANGE ORDER NUMBER SIX BID NUMBER 102t3 j' TO: Knox, Gailey & Meador, 'Irrc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract Amount Previous Change'Orders Net Amount this Change Order Amended Amount of Contract Percentage Change of Contract Price is 1.9% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 $ 2,035,119.00 40,371.80 1,976.70 $ 2,077,467.50 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material for additional painting as per Attachment "A", dated February 14, 1991. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: Knox, Gailey ad r Inc. 011 BY: TITLE ' __ OWNER: City of "Lubbock BY: ((�.iSK WS Deputy City Manager APP OVED AS TO CONTENT: ire or of Building Services APPROVED AS TO FORM: r ald G7. Vandiver, Firs Assistant City Attorney PAINTING ITEM #1: ITEM #2: ITEM #3: ITEM #4: ITEM #5: ITEM #6: ITEM #7: ITEM #8: ITEM #9: ITEM #10: sdh 2/14/91 ATTACHMENT A CHANGE ORDER #6 MUNICIPAL HILL OPERATIONS CENTER BID #10293 Add door & opening @ Room #140 Finish wood for meters @ Room #140 Add offices in Calibration Room Vinyl entry @ Cafeteria (not on finish schedule) Move plugs in walls in Rooms 121, 105, 109, 110, 111 Move door in Room #108 Refinish wall that was moved Room #108 Drywall tape & bed for extra gyp board in existing Add vinyl in Cafeteria over roll -up door Drywall work in office @ Building "B" PAINTING SUB -TOTAL GEN. CONTR. & O.H. TOTAL CHANGE ORDER #6 $ 100.00 100.00 210.00 300.00 250.00 75.00 100.00 500.00 50.00 112.00 $ 1,797.00 179.70 $ 1,976.70 CHANGE ORDER NUMBER SEVEN BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 42,348.50 Net Amount this Change Order 2,816.00 Amended Amount of Contract $ 2,080,283.50 Percentage Change of Contract Price is 2.2% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material for additional drywall per Attachment "A", dated February 14, 1991. _ IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: Knox, Gaile M d r, Inc. BY: z. TITLE -- OWNER: City of Lubbock B Y k,4 Go9<,- DeputyC-ity Manager APPROVED AS TO CONTENT: firecty of -Building Services APPROVED AS TO FO 1 D ald andiver, First Assistant City Attorney ATTACHMENT A CHANGE ORDER #7 MUNICIPAL HILL OPERATIONS CENTER BID #10293 DRYWALL ITEM #1: (08/04/90) - Install insulation on gyp board $ 191.00 ceiling - Labor only ITEM #2: (08/28/90) - Add 1/4" gyp board on walls of 185.00 existing Room 144, 145, 146 ITEM #3: (09/11/90) - Patch holes in Rooms 105, 108, 109, 334.00 110, 111, 123 ` . Extend furrdown in Room #139 above joist Install 1/4" board on walls of Office & Storage #106 (Building "C") with drywall adhesive & roofing ITEM #4: (09/19/90) - Install 1/4" gyp board on walls of 429.00 existing building Lobby #151, 162, Corridor #149, Rooms 143, 152, 153, 156 ITEM #5: (09/19/90) - Move walls at Corridor & Rooms 107 455.00 & 108 ITEM #6: (10/18/90) - Move door at Room #108 966.00 New door in Hall Framed & rocked in room between #135 & #140 Built new walls in Room #138 Reworked overhead Door #40 DRYWALL SUB -TOTAL $ 2,560.00 GEN. CONTR. & O.H. 256.00 TOTAL CHANGE ORDER #7 $ 2,816.00 sdh 2/14/91 CHANGE ORDER NUMBER EIGHT BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 45,164.50 Net Amount this Change Order 3,972.10 Amended Amount of Contract $ 2,084,255.60 Percentage Change of Contract Price is 2.2% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material for additional ceiling work as per Attachment "A", dated February 14, 1991. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: Knox BY: TITL __OWNER: City of Lubbock BY: Deputy City Manager APP VED AS TO CONTENT: rectqe of Building Services APPROVED AS TO FORM: ld andiver, First Assistant City Attorney ATTACHMENT A CHANGE ORDER 98 MUNICIPAL HILL OPERATIONS CENTER BID #10293 ACOUSTICAL CEILINGS ITEM #1: Rework ceiling & grid after revise floor plan, $ 265.00 move walls, door opening etc. (Office #144 Storage #138 & Room #108 ITEM #2: Repair wall angles 123, patch ceiling panels 285.00 #145, 146, 147, 148, 161; install ceiling not scheduled #162, 105 ITEM #3: Add insulation (R-30) above acoustical panels 627.00 @ Building "B" ITEM #4: Add insulation (R-30) above acoustical panels 757.00 @ Building "C" ITEM #5: Change prismatic lens to paracube 1,415.00 ITEM #6: Change floor plan at Secretary #178 262.00 ACOUSTICAL CEILINGS SUB -TOTAL $ 3,611.00 GEN. CONTR. & O.H. 361.10 TOTAL CHANGE ORDER #8 $ 3,972.10 sdh. 2/14/91 CHANGE ORDER NUMBER.NINE BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 49,136.60 Net Amount this Change Order 3,201.00 Amended Amount of Contract $ 2,087,456.60 Percentage Change of Contract Price is 2.4% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material as per letter dated December 2, 1990. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: __OWNER: 41 Knox, Gailey 7eado nc. City of Lubbock BY: BY: Deputy City Manager TITLE Az� — APPR VED AS TO CONTENT: recur a ui1 ing Services APPROVED AS TO FORM: 9A_ &"o� o Id G. andieer, First Assistant City Attorney ATTACHMENT A CHANGE ORDER #9 MUNICIPAL HILL OPERATIONS CENTER BID #10293 PER LETTER DATED 12/2/90 ITEM #1: Delete VCT behind serving line in Serving #114 & $ 2,250.00 Kitchen & install quarry tile ITEM #2: At west side of Building "A", Entry #151 & 140.00 adjacent to Corridor #160, omit VCT & install carpet ITEM #3: Furnish & install new door & hardware in existing 520.00 frame (1 @ 520) SUB -TOTAL $ 2,910.00 GEN. CONTR. & O.H. 291.00 TOTAL CHANGE ORDER #9 $ 3,201.00 sdh 2/14/91 CHANGE ORDER NUMBER TEN BID NUMBER 10203 TO: Knox, Gailey & Meador, Int. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 52,337.60 Net Amount this Change Order 2,860.00 Amended Amount of Contract $ 2,090,316.60 Percentage Change of Contract Price is 2.6% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material for additional carpentry work as per Attachment "A", dated February 14, 1991. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: Knox, Gailey ead ', Inc. BY: TITLE kh� __ OWNER: City of Lubbock BY: ASS Deputy City Manager 4APPE-ID) AS TO CONTENT: r of Building Services APPROVED AS TO FO r Ale 'T1 D ald G. Vandiver, First Assistant City Attorney ATTACHMENT A CHANGE ORDER #10 MUNICIPAL HILL OPERATIONS CENTER BID #10293 CARPENTRY WORK ITEM#1: Add locus @ storage cabinets @ Rooms 102, 123, 156 ITEM #2: Add 3" x 3" x 1/4" angle iron supports @ counter tops ITEM 03: Furnish & install plywood on walls for telephone equipment ITEM #4: Furnish & install plywood in planters @ Cafeteria #117 ITEM #5: Add shelving and shelf stiffness in #108 & #152 ITEM #6: Add 4' x 5' x 18 GA steel box at wall of Building "B" ITEM #7: Furnish & install plywood @ screw strips on N. & W. wall of meter check-out room (Main #140) ITEM #8: Aluminum brake metal to cover lights at Door #68 & column at G12 CARPENTRY WORK SUB -TOTAL GEN. CONTR. & O.H. TOTAL CHANGE ORDER #10 sdh 2/14/91 160.00 155.00 200.00 125.00 210.00 800.00 600.00 350.00 $ 2,600.00 260.00 $ 2,860.00 CHANGE ORDER NUMBER FIFTEEN BID NUMBER 10293 i . TO: Knox, Gail;ey & Meador, Inc: P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract Amount Previous Change Orders Net Amount this Change Order,. Amended Amount of Contract Percentage Change of Contract Price is 3.7% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 $ 2,035,119.00 72,416.40 3,724.30 $ 2,111,259.70 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material for additional painting and finishing at Building "B" as per Schauer Associ- ates, Inc. drawings dated December 7, 1990. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: OWNER: Knox, Gai Me Inc. City of Lubbock BY: BY:�� Deputy City Manager TITLE APP OUED AS TO CONTENT: irec of Building Services APPROVED AS TO FORM: Donald G. Vandiver, First Assistant City Attorney CHANGE ORDER NUMBER FOURTEEN BID NUMBER 102�3 TO: Knox, Gailey & Meador, 'Ind. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 67,843.70 Net Amount this Change Order 4,572.70 Amended Amount of Contract $ 2,107,535.40 Percentage Change of Contract Price is 3.5% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material for additional hollow metal doors work at Building "B" as per Schauer Associ- ates, Inc. drawings dated December 7, 1990. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: OWNER: Knox, GaiM Me7 Inc. City of Lubbock BY: BY: awcaP; 'Deputy City Manager TITLE APP OVED AS TO CONTENT: 1 ect o uilding Services i APPROVED AS TO FORM: Donald G. Vand, First iver Assistant City Attorney CHANGE ORDER NUMBER THIRTEEN BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 63,306.20 Net Amount this Change Order 4,537.50 Amended Amount of Contract $ 2,102,962.70 Percentage Change of Contract Price is 3.3% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material for additional millwork and carpentry at Building "B" as per Schauer Associ- ates, Inc. drawings dated December 7, 1990. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: Knox BY: TITL OWNER: City of Lubbock BY: �J Deputy City Manager AP VED AS TO CONTENT: 're r of Building Services APPROVED AS TO FORM: Do ald G. Vandiver, First Assistant City Attorney CHANGE ORDER NUMBER.ELEVEN BID NUMBER 10293 TO: Knox, Gailey & Meador, Inc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 55,197.00 Net Amount this Change Order 4,657.40 Amended Amount of Contract $ 2,094,973.40 Percentage Change of Contract Price is 2.9% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material for additional electrical and mechanical work at Building "B" as per Schauer Assocociates, Inc. drawings dated December 7, 1990. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: OWNER: Knox, Gail e Me , Inc. City of Lubbock BY: BY: l� Deputy City Manager TITLE. APPROVED AS TO CONTENT: rec r of -Building Services APPROVED AS TO FORM: r D 'ald G. Vandiver, First Assistant City Attorney CHANGE ORDER NUMBER TWELVE BID NUMBER 10293 TO: Knox, Gaiiey & Meador, Inc. P.O. Box 5736 Lubbock, Texas 79417 Original Amount of Contract $ 2,035,119.00 Amount Previous Change Orders 59,854.40 Net Amount this Change Order 3,451.80 Amended Amount of Contract $ 2,098,425.20 Percentage Change of Contract Price is 3.1% Additional Time of Completion is 0 Days The Date of Substantial Completion as of this Change Order is March 4, 1991 WHEREAS, it is desirable to make changes in the plans and specifications for this project. THIS AGREEMENT WITNESSED: The Contractor to furnish all labor and material for additional overhead door work at Building "B" as per Schauer Associates, Inc. drawings dated December 7, 1990. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 14th day of February, 1991. CONTRACTOR: Knox, Gail & M or, Inc. BY: TITLE OWNER: City of Lubbock BY: Deputy City Manager APPROVED AS TO CONTENT: ect r of -Building Services APPROVED AS TO FORM: D ald G. Vandiver, First Assistant City Attorney