Loading...
HomeMy WebLinkAboutResolution - 3168 - CO#1 To Contract - ABB Electric - TTU Congeneration Substation - 07_27_1989Resolution # 3168 July 27, 1989 Item #31 DGV:da RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1 to Bid No. 9999, Texas Tech Cogeneration Substation, by and between the City of Lubbock and ABB Electric, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 27th day of July , 1989. C B.C. McM N , MAYOR ATTEST: APPROVED -AS TO CONTENT: Carroll McDonald, Assistant City Manager of Utilities APPROVED AS TO FORM: Donald G. Vandiver, First Ass City Attorney CHANGE ORDER NO.1 TO BID N0.9999 TEXAS TECH COGENERATION SUBSTATION TO: ABB Electric 400 South Prairie Ave. Waukesha, Wisconsin 53186-5937 Gentlemen: WHEREAS, it is desirable to make changes in the contract for this project, being namely the following: Provide controls, metering and protective relays for all maintenance position circuit breaker cubicles. WHEREAS, the Contractor herein agrees to the following change: Add one circuit breaker control switch (52CS) to each switchgear building to control the maintenance position breakers in each building. Add one three phase and ground overcurrent relay per switchgear building for overcurrent protection of all maintenance position circuit breakers. Add one digital ammeter and ammeter switch to each switchgear building to monitor all maintenance position circuit breakers. Delete the recording ammeter and ammeter switch for the 15KV tie breaker. Add one set of 1200:5 MR, C400 current transformers to each of the two 69KV line breakers. Add a single phase digital ammeter on the 12KV side of each of the two transformers. Add a single phase current transformer in the test position of each of the two 12KV main breakers for metering. Add an AVR relay in each active breaker position and one AVR relay and one amber light for all test positions in each switchgear building. Delete the phase distance fault detectors from the two 69KV line breaker relay schemes. Bid No.9999 Change No-1 Page 2 Delete the separate lockout relays for the 69KV breaker failure scheme (86BF) and 69KV overvoltage scheme (86-59). The contract amount will be increased $8690.00 resulting in a new contract amount of $2,364,690.00 THIS AGREEMENT WITNESSETH: The Owner and the Contractor agree to the change shown herein. The Contractor agrees to proceed with the addition of the required controls, metering and protective relays. Furthermore, the parties agree that the original contract between the Owner and the Contractor shall be modified to the extent herein indicated. IN WITNESS WHEREOF, the Owner and the ont actor have hereto set the hands this _1 �day of _ 1989. ABB ELECTRIC (Contractor) C�—� ABB Electric CITY OF LUBBOCK (Owner) Attest'--ne r Rd c i� Mayo at M MBoy City Secret ry RECOMMENDED FOR APPROVAL: APPROVED AS TO FORM: Carroll McDo ald, Assistant Do ald G. Vandiver, First City Manager of Utilities Assistant City Attorney