HomeMy WebLinkAboutResolution - 3025 - Agreement - TDHPT - Traffic Signals, W Brownfield Rd At W Loop 289 - 01_26_1989Resolution #3025
January 26, 1989
JWF:dw
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an agreement to
be entered into by and between the City of Lubbock and the Texas State
Department of Highways and Public Transportation concerning the installation
and maintenance of three highway traffic signals at the West Brownfield
Highway intersection with Loop 289, the Loop 289 intersection with 34th
Street, and the Loop 289 intersection with North Quaker Avenue, attached
herewith, which shall be spread upon the minutes of the Council and as
spread upon the minutes of this Council shall constitute and be a part of
this Resolution as if fully copied herein in detail.
Passed by the City Council this 26th day of January , 1989.
c '
C. McM N , MAYOR
Randtte Boyd, City Secreta
APPROVED AS TO CONTENT:
David E. Woosley, Traffic
Engineer
APPR VED AS TO FORM:
Jorth Fullingim, Assistant
.
C Attorney
THE STATE OF TEXAS
THE COUNTY OF TRAVIS
AGREEMENT FOR THE
INSTALLATION, OPERATION AND MAINTENANCE OF
TRAFFIC SIGNALS WITHIN MUNICIPALITY
This AGREEMENT, made by and through the State of Texas, acting
by and through the State Department of Highways and Public
Transportation, hereinafter called the "State", and the City of
LUBBOCK , hereinafter called the "City", acting by and
through its duly authorized officers as evidenced by an Ordinance/
Resolution No. 3025 , passed the 26thday of Jan. 19 89
hereinafter incorporated by reference.
W I T N E S S E T H
WHEREAS, by virtue of a Municipal Maintenance Agreement entered
into by the City and the State, the City has authorized the State to
maintain certain highways within the City; and
WHEREAS, from time to time the City requests the State to install
highway traffic signals on such highways; and
WHEREAS, on the 27th day of May, 1987, the State Highway and
Public Transportation Commission passed Commission Minute Order No.
85777 adopting rules codified under Title 43, Texas Administrator
Code (TAC) Section 25.5 authorizing the State to install, operate
and maintain highway traffic signals on: (a) highway routes not
designated as full control of access inside the corporate limits of
cities, having a population less than 50,000 (latest Federal Census);
and (b) highways designated as full control of access in all cities;
and
WSBREAS, the City has a population of overt 4MMWe 50,000
population according to the latest Federal Census; and
WHEREAS, the City requests and agrees to be responsible for all
expenses incurred for furnishing power to, and maintaining and
operating highway traffic signals within the City.
A G R E E M E N T
NOW, THEREFORE, in consideration of the premises and of the mutual
covenants and agreements of the parties hereto to be by them
respectively kept and performed, as hereinafter set forth, it is
agreed as follows:
Agreement (Traffic Signal Type-M) (City Maintenance)
Page 1 of 4 06/88
1. This Agreement shall apply to all existing highway traffic
signal systems shown on EXHIBIT I.
2. This Agreement shall also apply to all highway traffic signal
installations and/or modernizations approved by both the State and
the City, the City's approval being indicated by signature of the
Mayor on the plan title sheet.
3. The State will furnish the necessary funds for the actual
construction, prepare.plans and specifications, install and/or-
modernize said highway traffic signal(s) and supervise construction.
4. The City hereby consents to the construction of the highway
traffic signal(s) by the approval of the location and manner of
construction as shown on plans and described in specifications.
5. The City will operate and maintain the highway traffic
signal(s) at their expense upon completion of the installation(s)
by the State.
6. The City will pay all power costs for operating the highway
traffic signal(s), including all power necessary for installation
and testing of the highway traffic signals prior to completion of
the installation by the State.
7. The City will obtain approval of the State Department of
Highways and Public Transportation before making any changes in the
design of operation and timing of the highway traffic signal(s) or
before removing any part of the installation(s).
8. The City will return any and all parts of said.state highway
traffic signal installation(s) to the State should it (they) be
removed by the City for any reason other than for installation on
a State or Federal Numbered highway route at a location approved by
the State.
9. The City will be responsible for the police enforcement
required for securing obedience to the highway traffic signal(s).
10. In the event the highway traffic signal(s) installed in
accordance with this Agreement become unnecessary or are removed
for any reason, this Agreement on those signals shall terminate.
11. To the extent permitted by law, the City shall indemnify
and save harmless the State, its agents, officers or employees, from
all suits, actions or claims and from all liability and damages for
any and all injuries or damages sustained by any person or property
in consequence of any neglect in the performance, or failure of
performance of the City, its agents, officers and employees under
this Agreement.
12. The State will not incur any financial obligation to the City
as a result of this Agreement.
Agreement (Traffic Signal Type-M) (City Maintenance)
Page 2 of 4 06/68
13. A.
This agreement may be terminated by any of the
following conditions:
(1)
By mutual agreement and consent of both parties.
(2)
By the State upon thirty (30) days written notice to
the City for failure of the City to provide adequate
maintenance and operation services for those highway
"
-traffic signal installations which the City has agreed
to maintain and operate.
(3)
By the City upon one hundred and twenty (120) days
written notice to the State.
B.
in the event this agreement is terminated by any of
the above conditions, the power, and maintenance.and
operation of the highway traffic signal systems shall
become the responsibility of the State. Any state owned
equipment being held by the City shall be promptly
returned to the State upon termination of this
agreement.
Agreement (Traffic Signal Type-M) (City Maintenance)
Page 3 of 4 06/88
IN WITNESS WHEREOF, the State and the City have signed duplicate
counterparts of the agreement.
THE CITY OF LUBBOCK
BY: ../,// An ec '
B. C. McMinn
Typed Name
Mayor
Title
January 26, 1989
Date
T:
ity Secrgtary
Appr ved as to con ent.
David E. Woosley, Trafficngineer
Apprq4d 'prh to form: '
J. th Yullingim, Asst. CitflAttorney
THE STATE OF TEXAS
Executed for the State Engineer
Director and approved for the
State Highway and Public Trans-
portation Commission under the
authority of Minute Order 82513
and Administrative Order 32-87,
for the purpose and effect of
activating and/or carrying out
the orders, establishing
policies or work programs here-
tofore approved and authorized
by the State Highway and Public
Transportation Commission.
BY:
ignature
Gary K. Trietsch; P,.E. -.
Traffic Operatio_ns,. Engineer
D t 5 b
Agreement (Traffic Signal Type-M) (City Maintenance)
Page 4 of 4 06/88
"EXHIBIT I
LOCATIONS
PROJECT NO. MC 0380-01-039 - U.S. 62-82, WEST BROWNFIELD HIGHWAY INTERSECTION..
WITH LOOP 289.
PROJECT NO.
MC 0783-02-048
- LOOP
289
INTERSECTION WITH 34TH STREET
PROTECT NO.
MC 0783-02-049
- LOOP
289
INTERSECTION WITH N. QUAKER AVENUE
09
s f
Jew
Resms-n!
46r
i4rm
t
s't
to 6rM ST
My" S'
Para
rH
+ 1;17 —1,."
62
-
RIMst
:oT.
st
PAS
is
St
1ST ST
2
St
sr
mr
n-vp
sr
221yo
ST
sr
4
P
72ND
It
PN T
23RD
24TH
25 rm
S T
S T
~
24T#4
—
2
1
lb
1
�4
LOOP 289 EAST AND
WEST
621*
2?1
FRONTAGE ROADS WITH
82
r"
sr
T
34TH STREET
ST
Park
LUBBOCK, LUBBOCK
COUNTY
TH
I
I
Itl t
1\\� MS�'(�Q JS /N 09�
Rk' � w1k trm!,Efw
I!Mflf ST
U.S. 62-82 (BROWNFIELD HWY.)
% WITH EAST AND WEST FRONTAGE ROADS
82 OF LOOP 289
2 LUBBOCK, LUBBOCK COUNTY
60#'
1-6 Ilk
FAP
0.
Ar
s
vr,.r
z
a
I I I _TsT
rA rf 31
.15
ST
m
INTERSECTION OF LOOP 289
28 EAST AND WEST FRONTAGE ROADS
WITH NORTH QUAKER AVENUE
LUBBOCK, LUBBOCK COUNTY
ro s r
ew
S7
VrCh
fp
62
j 6r I
rAl.
L14 116 A 26
7.1
Its—