HomeMy WebLinkAboutResolution - 2003-R0012 - Contract For The Center Pivot Systems - Mesa Irrigation Company - 01_09_2003RESOLUTION
Resolution No. 2003-R0012
January 9, 2003
Item No. 29
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Contract for the center
pivot systems at the land application site, by and between the City of Lubbock and Mesa
Irrigation Company of Wilson, Texas and related documents. Said Contract is attached
hereto and incorporated in this resolution as if fully set forth herein and shall be included
in the minutes of the City Council.
ATTEST:
APPROVED AS TO CONTENT:
APPROVED AS TO FORM:
ml:/ccdocs/Contract-mesa irrigation.res
Dec. 26, 2002
-; ~\
j
CITY OF LUBBOCK
SPECIFICATIONS FOR
CENTER PIVOT SYSTEMS AT THE LAND APPLICATION SITE
ITB #232-02/RS
"A City Of Planned Progress"
CITY OF LUBBOCK
Lubbock, Texas
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
City of Lubbock
PURCHASING DEPARTMENT
ROOM L04, MUNICIPAL BUILDING
1625 13 TH STREET
LUBBOCK, TEXAS 79401
PH: (806) 775-2167 FAX: (806) 775-2164
http://purchasing.ci.lubbock.tx.us
MAILED TO VENDOR:
CLOSE DATE:
ITB #232-02JRS, Addendum #7
ADDENDUM #7
ITB # 232-02/RS
Center Pivot System at the Land
Application Site
December 17, 2002
December 23, 2002@ 2:00 P.M.
The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any
item called for in the ITB documents is supplemented here, the original requirements, not affected by this
addendum, shall remain in effect.
1 . On Page 1 of 5 of the Minimum Specifications, change Item 4 to read:
No. Item
4. Towers
Minimum Requirements
FOUR LEGS CONSTRUCTED O.F 3"X 3" X W' ANGLE
IRON BOLTED TO 6-5/8" X 12 GAUGE NON-TOWABLE
MOBILE BASE. MAXIMUM SPAN LENGTH 160 FEET.
FIRST SPAN MAY BE UP TO 180 FEET.
All requests for additional information or clarification must be submitted in writing and directed to:
Questions may be faxed to :
or Email to:
232-02Add7 .doc
Ron Shuffield, Senior Buyer
City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
(806)775-2164
rshuffield@mail.ci.lubbock. tx. us
THANK YOU,
CITY OF LUBBOCK
1Wn SliuffieU
Ron Shuffield
Senior Buyer
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
City of Lubbock
PURCHASING DEPARTMENT
ROOM L04, MUNICIPAL BUILDING
1625 1 3 TH STREET
LUBBOCK, TEXAS 79401
ITS #232-02/RS, Addendum #6
ADDENDUM #6
ITB # 232-02/RS
PH: (806) 775-2167 FAX: (806) 775-2164
Center Pivot System at the Land
Application Site
http:/ /purchasing.ci.lubbock.tx.us
MAILED TO VENDOR: December 17, 2002
CLOSE DATE: December 23, 2002 @ 2:00 P.M.
The following items take precedence over specifications for the above named Invitation to Bid {ITB). Where any
item called for in the ITB documents is supplemented here, the original requirements, not affected by this
addendum, shall remain in effect.
1. Center Pivot Specifications is changed to read:
SPECIFICATIONS FOR THE REPLACEMENT OF FIVE CENTER PIVOT SYSTEMS ARE AS FOLLOWS:
OVERALL LENGTH -LENGTH FROM CENTER OF PAD TO THE CENTER OF THE LAST WHEEL TRACK.
HLAS Plot 4 Total Length 1289 feet minimum · 1300 feet maximum
HLAS Plot 11 Total Length 1285 feet minimum · 1295 feet maximum
HLAS Plot 19 Total Length 1457 feet minimum· 1470 feet maximum
HLAS Plot 21 Total Length 1090 feet minimum · 1110 feet maximum
LLAS Plot 35 Total Length 1540 feet minimum · 1550 feet maximum
2. On Page 1 of 5 of the Minimum Specifications, change the following items as follows:
No.
1.
2 ..
4.
5.
Item
Main Pipe
Pivot Assembly
Towers
All Towers
Minimum Requirements
Replace "0.115 IN. WALL THICKNESS" with "12
GAUGE WALL THICKNESS".
After 4"x4"x 3/8" Angle Iron Legs, add, "or reinforced
4"x 4"rolled form angle." Add sentence,
"Manufacturers standard heavy duty skid will be
included to evenly distribute forces to all four legs."
Change to read: "Four Legs Constructed of 3"x 3" x
W' angle iron bolted to 6-518" x 12 gauge non-
towable mobile ba.se. Maximum Span Length 180
feet, vendors are to use as many 160 foot spans per
pivot as possible."
Change to read: "Connections must be of pin and
hinge type or ball and socket design with flexible
rubber boot with clamps or acceptable approved·
equivalent."
· 3. On Page 3 of 5 of the Minimum Specifications, change the following items as follows:
232-02Add6.doc
No. Item Minimum Requirements
3. Programmable Main ADD: "HLAS plots 4, 11, 19 and LLAS plot 35 will use
existing control panels and communication
equipment. HLAS plot 21 is the only new center
pivot that requires a new control panel and
-,.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ITB #232-02/RS, Addendum #0
communication equipment. The communication
equipment must communicate and be fully
compatible with the City's Aims telemetry system."
4. On Page 4 of 5 of the Minimum Specifications, change the following items as follows:
No. Item Minimum Requirements
4.
5.
6.
7.
Electric Motor
On Gear Drives
Center Drive Gearbox
Wheel Gearbox
All Wheels
Replace "ALL MOTORS SHALL BE% HP. 460-480 VAC."
With "ALL MOTORS SHALL BE 0.6 HP. 460-480 VAC".
Delete: "FULL LOAD TORQUE SHALL BE 36 OZ. FT. (MIN)
AND LOCKED ROTOR TORQUE 220 OZ.FT.(MIN)."
Change to read: "Drive Gearbox designed
specifically for use on Center Pivot System. The
Gear Drive must be capable of delivering a minimum
of 90,000 inch/pounds of instantaneous torque and
30,000 inch/pounds of continuous torque."
Delete "WHEEL GEARBOX ASSEMBLIES SHALL BE RA TED
AT () 60,000 IN-LBS. CONTINUOUS OUTPUT TORQUE
AND CAPABLE OF WITHSTANDING 120,000 IN-LBS.
INSTANTANEOUS OUTPUT TORQUE WITH OUT FAILURE."
ADD "Heavy Duty Durst or equivalent with a 2 ~
inch output shaft."
Change to read: "All wheels shall have 11.2x38 tires
mounted on 10" reinforced rims."
All requests for additional information or clarification. must be submitted in writing and directed to:
Questions may be faxed to :
or Email to:
232-02Add6.doc
Ron Shuffield, Senior Buyer
City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
(806)775-2164
rshuffield@maiLci. lubbock. tx. us
THANK YOU,
CITY OF LUBBOCK
<J?.pn S liuffieU
Ron Shuffield
Senior Buyer
-
-
-
-
-
-
-
-
-
-
-
-
-
-
·-
-
-
City of Lubbock
PURCHASING DEPARTMENT
ROOM L04, MUNICIPAL BUILDING
1625 13 TH STREET
LUBBOCK, TEXAS 79401
PH: (806) 775-2167 FAX: (806) 775-2164
http:/ /purchasing.ci.lubbock.tx.us
MAILED TO VENDOR:
OLD CLOSE DATE:
NEW CLOSE DATE:
f ITB #232-02/RS, Addendum #5
ADDENDUM #5
ITB # 232-02/RS
Center Pivot System at the Land
Application Site
December 5, 2002
December 12, 2002@ 2:00 P.M.
December 23, 2002@ 2:00 P.M.
The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any
item called for in the ITB documents is supplemented here, the original requirements, not affected by this
addendum, shall remain in effect.
1. Please note the following change:
The dose date is changed:
FROM: December 12, 2002@ 2:00 P.M.
TO: . December 23,2002 @ 2:00 P.M.
All requests for additional information or.clarirication mu.st be subm_itte_d.in~r]tirlg arid dfrectedto:
Questions may be faxed to :
or Email to:
232-02Add5.doc
Ron Shuffield, Senior Buyer
City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
(806)775-2164
rshuffield@mail.ci. lubbock. tx. us
THANK YOU,
CITY OF LUBBOCK
CJ?.pn Snuffiet:d
Ron Shuffield
Senior Buy.er.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
City of Lubbock
PURCHASING DEPARTMENT
ROOM L04, MUNICIPAL BUILDING
1625 13 TH STREET
LUBBOCK, TEXAS 79401
PH: (806) 775-2167 FAX: (806) 775-2164
http:/ /purchasing.ci.lubbock. tx.us
MAILED TO VENDOR:
CLOSE DATE:
ITB #232-02/RS, Addendum #4
ADDENDUM #4
ITB # 232-02/RS
Center Pivot System at the Land
Application Site
December 5, 2002
December 12, 2002@ 2:00 P.M.
The following items take precedence ayer specifications for the above named Invitation to Bid (ITB). Where any
item called for in the ITB documents is supplemented here, the original requirements, not affected by this
addendum, shall remain in effect.
1. Please note the following change:
Under GENERAL INSTRUCTIONS TO BIDDERS, Item #30, QUALIFICATIONS OF BIDDERS, the paragraph is changed
as CAPITALIZED and balded:
The bidder may be required before the award of any contract to show to the complete satisfaction
of the City of Lubbock that it has the necessary facilities, ability, and financial resources to provide
the service specified therein in a satisfactory manner. The bidder may also be required to give a
past history and references in order to satisfy the City of Lubbock about the bidder's qualifications.
The City of Lubbock may make reasonable investigations deemed necessary and proper to
determine· the ability of the bidder to perform the work, and the bidder shall furnish to the City of
Lubbock all information for this purpose thafmay be requested. THE BIDDER'S BID MAY BE
DEEMED NOT TO MEET SPECIFICATIONS ORT.HE BID MAY BE REJECTED IF THE
EVIDENCE SUBMITTED ·av, OR INVESTIGATION OF, THE BIDDER FAILS TO SATISFY THE
CITY OF LUBBOCK THAT THE BIDDER IS PROPERLY QUALIFIED TO CARRY OUT THE
OBLIGATIONS OF THE CONTRACT AND TO COMPLETE THE WORK DESCRIBED
THEREIN. Evaluation of the bidder's qualifications shall include:
(a) The ability, capacity, skill, and financial resources to perform the work or provide the service
required.
{b) The ability of the bidder to perform the work or provide the service promptly or within the time
specified, without delay or interference.
(c) The character, integrity, reputation, judgment, experience, and efficiency of the bidder.
(d) The quality of performance of previous contracts or services.
Alf'requests for additfohai illforrnafion .or Clariflca,1io~ fl1t!s(~~ ~Ll6rnii:i:ed iij '-YVn£iqg and directed· fo:
Q,uestions may be faxed to :
or Email to:
232-02Add4.doc
Ron Shuffield, Senior Buyer
City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
(806)ns-2164
rshuffield@mail.ci. lubbock. tx. us
THANK YOU,
CITY OF LUBBOCK
. ~n SliuffieU
Ron Shuffield
Senior Buyer
-
-
-
-
-
-
-
-
-
--
-
-
-
City of Lubbock
PURCHASING DEPARTMENT
ROOM L04, MUNICIPAL BUILDING
1625 13TH STREET
LUBBOCK, TEXAS 79401
PH; (806) 775-2167 FAX: (806) 775-2164
http://purchasing.ci.lubbock.tx.us
MAILED TO VENDOR:
CLOSE DATE:
ITB #232-02/RS, Addendum #3
ADDENDUM #3
ITB # 232-02/RS
Center Pivot System at the Land
· Application Site
December 4, 2002
December 12, 2002@ 2:00 P.M.
The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any
item called for in the ITB documents is supplemented here, the original requirements, not affected by this
addendum, shall remain in effect.
1. Please note the following changes:
A. In SPECIFICATIONS, page 2, change total lengths as follows:
PLOT 4 TOTAL LENGTH 1299 FEET
PLOT 11 TOTAL LENGTH 1295 FEET
PLOT 19 TOTAL LENGTH 1467 FEET
PLOT 35 TOT AL LENGTH 1549 FEET
B. In SPECIFICATIONS, page 3, item 4, add the following: "First span may be 179 feet."
C. In SPECIFICATIONS, page 4, item 8, change minimum requirements to read, "NO END BOOMS MAY BE
USED."
Under HYDRAULICS, in the second sentence after "RUBBER HOSE DROPS 3' ABOVE GROUND," add "18-
inch, 1. 5 pound, slip poly-weight per drop,".
D. In SPECIFICATIONS, page 5, item 3, EXCEPTIONS change to read, "PIVOTS WILL USE EXISTING PANEL
BOXES AND COMMUNICATION BOXES."
E. In SPECIFICATIONS, page 7, OTHER: paragraph three, after "CENTER PIVOT LOCATED ON PLOT HLAS 11"
add, "and PLOT 35"
f; In SPECIFICATIONS, page 7, OTHER: last paragraph change to read, "DISMANTLE EXISTING SYSTEMS BY
SPAN."
All requests for additional information or clarification must be submitted in writing and directed to:
Questions may be faxed to :
or Email to:
232-02Add3.doc
Ron Shuffield, Senior Buyer
City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
(806 )775-2164
rshuffield@mail.ci.Lubbock. tx. us
THANK YOU,
. CITY OF LUBBOCK ;;7/)rf· y)' /J d , . ~f_,-/ ~~ /A/ 4'/~7/
Ron Shuffield /J.
Senior Buyer
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
City of Lubbock
PURCHASING DEPARTMENT
ROOM L04, MUNICIPAL BUILDING
1625 13 rn STREET
LUBBOCK, TEXAS 79401
PH: (8061775-2167 FAX: (806)775-2164
http://purchasing.ci. I u bbock. tx. us
MAILED TO VENDOR:
CLOSE DATE:
ITB #232-02/RS, Addendum #2
ADDENDUM#2
ITB #232-02/RS
Center Pivot System at the Land Application Site
November 26, 2002
December 12, 2002 @ 2:00 p.m.
The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where
any item called for in the ITB documents is supplemented here, the original requirements, not affected by this
addendum, shall remain in effect.
1. Please find enclosed the new Wage Rate Determinations adopted by City Council on November 14,
2002.
All requests for additional information or clarification must be submitted in writing and directed to:
Questions may be faxed to :
or Email to:
232-02Add2.doc
Ron Shuffield, Senior Buyer
. City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
(806)775-2164
rshuffield@mail.ci.lubbock.tx.us
THANK YOU,
CITY OF LUBBOCK
Senior Buyer
-
-
-
-
-
-
-
-
-
-
-
-
EXHIBIT A
City of Lubbock
Building Construction Trades
Prevailing Rates
Acoustical Ceiling Installer
Air Conditioner Installer
Air Conditioner Installer-Helper
Asbestos Worker
Asbestos Supervisor
Bricklayer
Bricklayer-Helper
Carpenter
Carpenter-Helper
Cement Finisher
Drywall Hanger
Electrician
Electrician-Helper
Equipment Operator-Heavy ·
Equipment Operator-Light
Fire Sprinkler Fitter-Journey
Fire Sprinkler Fitter-Apprentice
Floor Installer
Glazier
Insulator-Piping/Boiler
Insulator-Helper
Iron Worker
Laborer-General
Mortar Mixer
Painter
Pl Limber
Plumber-Helper
Roofer
Roofer-Helper
Sheet Metal Worker
Sheet Metal Worker-Helper
Welder-Certified
232-02Add2.doc
ITB #232-02/RS, Addendum #2
Hourly
Rate
11.50
12.00
7.50
9.00
12.50
12.50
7.00
11.00
7.00
9.00
11.00
15.00
8.00
10.00
. 9.00
18.00
10.00
. 9.50
10.50
10.50
7.00
11.00
6.00
6.00
9.50
12.50
7.00
9.00
7.00
10.00
7.00
11.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
EXHIBIT B
Paving and Highway Construction
Prevailing Wage Rates
Asphalt Heaterman
Asphalt Shoveler
Concrete Finisher
Concrete Finisher-Helper
Electrical Repairer-Equipment
Flagger
Form Setter
Form Setter-Helper
Laborer-General
Laborer-Utility
Mechanic
Mechanic-Helper
Power Equipment Operators
Asphalt Paving Machine
Bulldozer
Concrete Paving Machine
Front End Loader
Heavy Equipment Operator
Light Equipment Operator
Motor Grader Operator
Roller
Scraper
Tractor-Trailer
Truck Driver-Heavy
Truck Driver-.Light
232-02Add2.doc
ITB #232-02/RS, Addendum #2
Hourly
Rate
9.00
7.50
9.00
7.50
12.50
6.50
8.00
6.50
6.00
6.75
9.00
7.00
9.00
9.00
9.00
9.00
9.00
8.00
10.25
7.00
7.50
8.50
8.00
7.00
-.
-
-
-
-
-
-
-
-
-
-
• I , ...
EXHIBIT C
Prevailing Wage Rates
Overtime Rate
ITB #232-02/RS, Addendum #2
The rate for overtime (in excess of forty hours per week) shall be as required by the Fair
Labor Standards Act.
EXHIBIT D
Prevailing Wage Rates
Legal Holiday Rate
The rate for legal holidays shall be as required by the Fair Labor Standards Act.
232-02Add2.doc
-
-
-
-
-
-
-
-
-
City of Lubbock
PURCHASING DEPARTMENT
ROOM L04, MUNICIPAL BUILDING
1625 13TH STREET
LUBBOCK, TEXAS 79401
PH: (806)775-2167 FAX: (806)775-2164
http://purchasing.ci. I ubbock.tx. us
MAILED TO VENDOR:
CLOSE DATE:
ITB #232-02/RS, Addendum #1
ADDENDUM#1
ITB #232-02/RS
Center Pivot System at the Land Application Site
November 25, 2002
December 12, 2002 @ 2:00 p.m.
The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where
any item called for in the ITB documents is supplemented here, the original requirements, not affected by this
addendum, shall remain in effect.
1. The Bid Form must be completed in blue or black ink or by typewriter.
All requests for additional information or clarification must be submitted in writing and directed to:
Questions may be faxed to :
or Email to:
232-02Add1 .doc
Ron Shuffield, Senior Buyer
City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
(806)775-2164
rshuffield@mail.ci.lubbock.tx.us
THANK YOU,
CITY OF LUBBOCK
Senior Buyer
-
-
-
-
-
-
-
-
-
CITY OF LUBBOCK
INVITATION TO BID
FOR
TITLE: CENTER PIVOT SYSTEMS AT THE LAND APPLICATION SITE
ADDRESS: LUBBOCK, TEXAS
ITB NUMBER: 232-02/RS
PROJECT NUMBER: 6415.8107
CONTRACT PREPARED BY: PURCHASING DEPARTMENT
-
-
-
-
,,,,,,,,.
INDEX
l""I
'
1. NOTICE TO BIDDERS
~
2. GENERAL INSTRUCTIONS TO BIDDERS
-3. BID SUBMITTAL -BID FOR LUMP SUM CONTRACTS
f: ;
4. PAYMENT BOND
,.-,. 5. PERFORMANCE BOND
6. CERTIFICATE OF INSURANCE
""" 7. CONTRACT
8. GENERAL CONDITIONS OF THE AGREEMENT ,...,
9. CURRENT WAGE DETERMINATIONS
-10. SPECIFICATIONS
-
-
-
-
-
-
-' . '
-
-
......
-
NOTICE TO BIDDERS
-1
-
-
-
-
-
-
-
-
NOTICE TO BIDDERS
ITB #232-02/RS
Sealed bids addressed to Victor Kilman, Purchasing Manager, City of Lubbock, Texas, will be received in the
office of the Purchasing Manager, Municipal Building, 1625 13th Street, Room L-04, Lubbock, Texas, 79401, until 2:00
o'clock p.m. on the 12th day of December. 2002, or as changed by the issuance of formal addenda to all planholders, to
furnish all labor and materials and perform all work for the construction of the following described project:
"CENTER PIVOT SYSTEMS AT THE LAND APPLICATION SITE"
After the expiration of the time and date above first written, said sealed bids will be opened in the office of the
Purchasing Manager and publicly read aloud. It is the sole responsibility of the bidder to ensure that his bid is actually in
the office of the Purchasing Manager for the City of Lubbock, before the expiration of the date above first written.
Bids are due at 2:00 o'clock p.m. on the 12th day of December. 2002, and the City of Lubbock City Council will
consider the bids on the 9th day of January. 2003, at the Municipal Building, 1625 13th Street, Lubbock, Texas, or as
soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities.
The successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, Government
Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the
successful bidder will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the
amount of 100% of the total contract price in the event that said contract price exceeds $25,000. Said statutory bonds
should be issued by a company carrying a current Best Rating of~ or superior.
Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's or certified
check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without
recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the bid submitted as a
guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within fifteen ( 15) days after
notice of award of the contract to him.
It shall be each bidders sole responsibility to inspect the site of the work and to inform himself regarding all local
conditions under which the work is to be done. It shall be understood and agreed that all such factors have been
thoroughly investigated and considered in the preparation of the bid submitted. There will be a non-mandatory pre-bid
conference on 4th day of December. 2002at10:00 o'clock a.m., in the Planning Conference Room 107, Lubbock,
Texas.
Bidders may view the plans and specifications without charge at Lubbock City Hall, 1625 13th Street, Lubbock,
Texas, Purchasing Department, Room L-04. Plans and specifications may be obtained from City of Lubbock, 1625
13th Street, Lubbock, TX 79457, Phone: (806) 775-2167. Plans and specifications will be shipped at the bidder's
expense. If bidder requires overnight or second day expedited method parcel shipment, the bidder will incur shipping
charges and must furnish the name of the service to be used and the bidder's account number.
Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included
in the contract documents on file in the office of the Purchasing Manager of the City of Lubbock, which document is
specifically referred to in this notice to bidders. Each bidder's attention is further directed to provision of Article 5159a,
Vernon's Ann. Civil St., and the requirements contained therein concerning the above wage scale and payment by the
contractor of the prevailing rates of wages as heretofore established by owner in said wage scale.
The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this
advertisement, minority and women business enterprises will be afforded equal opportunities to submit bids in response to
this invitation and will not be discriminated against on the grounds of race, color, sex, disability, or national origin in
consideration for an award.
The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre-bid meetings and
bid openings are available to all persons regardless of disability. If you would like bid information made available in a more
accessible format or if you require assistance, please contact the City of Lubbock ADA Coordinator at (806) 775-2018 at
least 48 hours in advance of the meeting.
CITY OF LUBBOCK
VICTOR KILMAN
PURCHASING MANAGER
-
-
-
-
-
-. ; GENERAL INSTRUCTIONS TO BIDDERS
-
-
-.
-
.....
-
-
-
-1
-
-
-
-
2
r 3
-
-
-
-
GENERAL INSTRUCTIONS TO BIDDERS
BID DELIVERY. TIME & DATE
1.1 The City of Lubbock is seeking written and sealed competitive bids to furnish CENTER PIVOT SYSTEMS
AT THE LAND APPLICATION SITE per the attached specifications and contract documents. Sealed bids
will be received no later than 2:00 p.m. CST, the 12th day of December, 2002 at the office listed below.
Any bid received after the date and hour specified will be rejected and returned unopened to the bidder.
J , Each bid and supporting documentation must be in a sealed envelope or container plainly labeled in the
1: lower left-hand corner: "ITB #232-02/RS, CENTER PIVOT SYSTEMS AT THE LAND APPLICATION
SITE" and the bid opening date and time. Bidders must also include their company name and address on
the outside of the envelope or container. Bids must be addressed to:
1.2
1.3
1.4
Victor Kilman, Purchasing Manager
City of Lubbock
1625 13th Street, Room L-04
Lubbock, Texas 79401
Bidders are responsible for making certain bids are delivered to the Purchasing Department. Mailing of a
bid does not ensure that the bid will be delivered on time or delivered at all. If bidder does not hand deliver
bid, we suggest that he/she use some sort of delivery service that provides a receipt.
Bids will be accepted in person, by United States Mail, by United Parcel Service, or by private courielr
service. No bids will be accepted by oral communication, telephone, electronic mail, telegraphic /
transmission, or telefacsimile transmission. THE CITY WILL NOT ACCEPT FAX BIDS.
The City of Lubbock reserves the right to postpone the date and time for opening bids through an
addendum.
PRE-BID MEETING
2.1 For the purpose of familiarizing bidders with the requirements, answering questions, and issuing addenda
as needed for the clarification of the Invitation to Bid (ITB) documents, a non-mandatory pre-bid meeting
will be held at 10:00 a.m .. December 4th. 2002 in Planning Conference Room 107. Lubbock. Texas. All
persons attending the meeting will be asked to identify themselves and the prospective bidder they
represent.
2.2 It is the bidder's responsibility to attend the pre-bid meeting though the meeting is not mandatory. The
City will not be responsible for providing information discussed at the pre-bid meeting to bidders who do
not attend the pre-bid meeting.
ADDENDA & MODIFICATIONS
3.1 Any changes, additions, or clarifications to the ITB are made by written bid addenda.
3.2
3.3
3.4
Any bidder in doubt as to the true meaning of any part of the specifications or other documents may
request an interpretation thereof from the Purchasing Department. At the request of the bidder, or in the
event the Purchasing Department deems the interpretation to be substantive, the interpretation will be
made by written addendum issued by the Purchasing Department. Such addendum issued by the
Purchasing Department will be sent to all bidders receiving the original Invitation to Bid (ITB) and will
become part of the bid package having the same binding effect as provisions of the original bid. NO
VERBAL EXPLANATIONS OR INTERPRETATIONS WILL BE BINDING. In order to have a request for
interpretation considered, the request must be submitted in writing and must be received by the City of
Lubbock Purchasing Department no later than five (5) days before the bid closing date.
All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of Lubbock
shall not be legally bound by any amendment or interpretation that is not in writing. Only information
supplied by the City of Lubbock Purchasing Department in writing or in this ITB should be used in
preparing bid responses. All contacts that a bidder may have had before or after receipt of this ITB with
any individuals, employees, or representatives of the City and any information that may have been read in
any news media or seen or heard in any communication facility regarding this bid should be disregarded in
preparing responses.
The City does not assume responsibility for the receipt of any addendum sent to bidders.
1
4 EXAMINATION OF DOCUMENTS AND REQUIREMENTS
4.1 Each bidder shall carefully examine all ITB documents and thoroughly familiarize itself with all
requirements before submitting a bid to ensure that their bid meets the intent of these specifications.
4.2 Before submitting a bid, each bidder shall be responsible for making all investigations and examinations
that are necessary to ascertain conditions and requirements affecting the requirements of this Invitation to
Bid. Failure to make such investigations and examinations shall not relieve the bidder from obligation to
comply, in every detail, with all provisions and requirements of the Invitation to Bid.
4.3 Notices of any discrepancies or omissions in these plans, specifications, or contract documents,
shall be given to the Purchasing Manager and a clarification obtained before the bids are received,
and if no such notice is received by the Purchasing Manager prior to the opening of bids, then it
shall be deemed that the bidder fully understands the work to be included and has provided
sufficient sums in its bid to complete the work in accordance with these plans and specifications.
If bidder does not notify Purchasing Manager before bidding of any discrepancies or omissions,
then it shall be deemed for all purposes that the plans and specifications are sufficient and
adequate for completion of the project. It is further agreed that any request for clarification must
be submitted no later than five {5} calendar days prior to the opening of bids.
5 BID PREPARATION COSTS
5.1 Issuance of this ITB does not commit the City of Lubbock, in any way, to pay any costs incurred in the
preparation and submission of a bid.
5.2 The issuance of this ITB does not obligate the City of Lubbock to enter into contract for any services or
equipment.
5.3 All costs related to the preparation and submission of a bid shall be paid by the bidder.
6 TRADE SECRETS. CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC INFORMATION ACT
6.1 If you consider any portion of your bid to be privileged or confidential by statute or judicial decision,
including trade secrets and commercial or financial information, clearly identify those portions.
6.2
6.3
The City of Lubbock will honor your notations of trade secrets and confidential information and decline to
release such information initially, but please note that the final determination of whether a particular
portion of your bid is in fact a trade secret or commercial or financial information that may be withheld from
public inspection will be made by the Texas Attorney General or a court of competent jurisdiction. In the
event a public information request is received for a portion of your bid that you have marked as being
confidential information, you will be notified of such request and you will be required to justify your legal
position in writing to the Texas Attorney General pursuant to Section 552.305 of the Government Code. In
the event that it is determined by opinion or order of the Texas Attorney General or a court of competent
jurisdiction that such information is in fact not privileged and confidential under Section 552.11 O of the
Government Code and Section 252.049 of the Local Government Code, then such information will be
made available to the requester.
Marking your entire bid CONFIDENTIAL/PROPRIETARY is not in conformance with the Texas Open
Records Act.
7 LICENSES. PERMITS. TAXES
The price or prices for the work shall include full compensation for all taxes, permits, etc. that the bidder is or may
be required to pay.
8 UTILIZATION OF LOCAL BUSINESS RESOURCES
Prospective bidders are strongly encouraged to explore and implement methods for the utilization of local
resources, and to outline in their bid submittal how they would utilize local resources.
9 CONFLICT OF INTEREST
9.1 The bidder shall not offer or accept gifts or anything of value nor enter into any business arrangement with any
employee, official or agent of the City of Lubbock.
2
-
-
-
,....,
• '
"""" ~
-'
-;
-~ '
~
-' '
-
-
-
-
-
-
10
11
12
13
14
15
9.2 By signing and executing this bid, the bidder certifies and represents to the City the bidder has not offered,
conferred or agreed to confer any pecuniary benefit or other thing of value for the receipt of special treatment,
advantage, information, recipient's decision, opinion, recommendation, vote or any other exercise of discretion
concerning this bid.
CONTRACT DOCUMENTS
10.1 All work covered by the contract shall be done in accordance with contract documents described in the
General Conditions.
10.2 All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for
the construction of this project and shall be responsible for the satisfactory completion of all work
contemplated by said contract documents.
PLANS FOR USE BY BIDDERS
It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by
the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without
charge or forfeiture of deposit. The contract documents, may be examined without charge as noted in the Notice
to Bidders.
BIDDER INQUIRIES AND CLARIFICATION OF REQUIREMENTS
12.1 It is the intent and purpose of the City of Lubbock that this request permit competitive bids. It shall be the
bidder's responsibility to advise the Purchasing Manager if any language. requirements. etc .. or any
combinations thereof, inadvertently restricts or limits the requirements stated in this ITB to a single source.
Such notification must be submitted in writing and must be received by the City of Lubbock Purchasing
Office no later than five (5) calendar days before the bid closing date. A review of such notifications will be
made.
12.2 ~ig~~;~g~:~1JtJliiYffi~1f!~1 1~8~~.~~~:~Z·¥~~8i~~~fAitB~: .. ~~i~~1wir~~t~~~TiONAL
SUBMlltEPIN WijlTINGt\IQ LATl:R"fflAN FlVE (5) ·cALEN[)AFf DAY$ P~IOt{TO Tfll: BlD . CLOSINGDAiE.ANOADDRESSED·to:··<··· .··.······· .. ···.···•·•·· <· /:' ••
RON SHUFFIELD, SENIOR BUYER
City of Lubbock
1625 13th Street
Lubbock, Texas 79401
Fax: (806) 775-2164
Email: RShuffield@mail.ci.lubbock.tx.us
TIME AND ORDER FOR COMPLETION
~ 13.1
13.2
The construction covered by the contract documents shall be fully completed within FORTY-FIVE (45)
CONSECUTIVE CALENDAR DAYS from the date specified in the Notice to Proceed issued by the City of
Lubbock to the successful bidder.
The Contractor will be permitted to prosecute the work in the order of his own choosing, provided,
however, the City reserves the right to require the Contractor to submit a progress schedule of the work
contemplated by the contract documents. In the event the City requires a progress schedule to be
submitted, and it is determined by the City that the progress of the work is not in accordance with the
progress schedule so submitted, the City may direct the Contractor to take such action as the City deems
necessary to ensure completion of the project within the time specified.
PAYMENT
All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the
contract documents.
AFFIDAVITS OF BILLS PAID
The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute
an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements
3
contemplated by the contract documents have been paid in full and that there are no claims pending, of which the
Contractor has been notified.
16 MATERIALS AND WORKMANSHIP
The intent of these contract documents is that only materials and workmanship of the best quality and grade will
be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve
the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until
incorporated into the project. The presence or absence of a representative of the City on the site will not relieve
the Contractor of full responsibility of complying with this provision. The specifications for materials and methods
set forth in the contract documents provide minimum standards of quality, which the Owner believes necessary to
procure a satisfactory project.
17 GUARANTEES
17 .1 All equipment and materials incorporated in the project and all construction shall be guaranteed against
defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner,
a written general guarantee which shall provide that the Contractor shall remedy any defects in the work,
and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects
appear within ONE year from date of final acceptance of the work as a result of defective materials or
workmanship, at no cost to the Owner (City of Lubbock).
17.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor represents and
warrants fault-free performance and fault-free result in the processing date and date-related data
(including, but not limited to calculating, comparing and sequencing) of all hardware, software and
firmware products delivered and services provided under this Contract, individually or in combination, as
the case may be from the effective date of this Contract. Also, the Contractor warrants calculations will be
recognized and accommodated and will not, in any way, result in hardware, software or firmware failure.
The City of Lubbock, at its sole option, may require the Contractor, at any time, to demonstrate the
procedures it intends to follow in order to comply with all the obligations contained herein.
17 .3 The obligations contained herein apply to products and services provided by the Contractor, its sub-
contractor or any third party involved in the creation or development of the products and services to be
delivered to the City of Lubbock under this Contract. Failure to comply with any of the obligations
contained herein, may result in the City of Lubbock availing itself of any of its rights under the law and
under this Contract including, but not limited to, its right pertaining to termination or default.
17.4 The warranties contained herein are separate and discrete from any other warranties specified in this
Contract, and are not subject to any disclaimer of warranty, implied or expressed, or limitation to the
Contractor's liability which may be specified in this Contract, its appendices, its schedules, its annexes or
any document incorporated in this Contract by reference.
18 PLANS FOR THE CONTRACTOR
The contractor will be furnished one set of plans and specifications, and related contract documents for his use
during construction. Plans and specifications for use during construction will only be furnished directly to the
Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or
others, as required for proper prosecution of the work contemplated by the Contractor.
19 PROTECTION OF THE WORK
The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials,
supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any
and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the
date the City issues its certificate of completion to Contractor. The City reserves the right, after the bids have
been opened and before the contract has been awarded, to require of a bidder the following information:
(a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by
the intended contract and all work in progress with bond amounts and percentage completed.
(b) A sworn statement of the current financial condition of the bidder.
(c) Equipment schedule.
4
-
,...
. '
-
,,...
!""""
-'
!"""
'
-
-
19 TEXAS STATE SALES TAX
19.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions
of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act.
19.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the
materials to be incorporated into the work without paying the tax at the time of purchase.
20 PROTECTION OF SUBSURFACE LINES AND STRUCTURES
21
22
23
24
It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a
way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or
other underground structures which might or could be damaged by Contractor during the construction of the
project contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the
location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve
the Contractor of his responsibilities aforementioned. All such underground lines or structures cut or damaged by
Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by
Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense.
BARRICADES AND SAFETY MEASURES
The contractor shall~ at his own expense, furnish arid erect such barricades, fences, lights and danger signals, and
shall take such other precautionary measures for the protection of persons, property and the work as may be
necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs,
and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and
replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of
barricades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of
acceptance of the project.
EXPLOSIVES
22.1 The use of explosives will not be permitted unless written permission to do so is obtained by the
Contractor from the City. In all cases where written permission is obtained for the use of explosives, the
Contractor shall assume full responsibility for all damage, which may occur as a direct or indirect result of
the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall use
utmost care so as not to endanger life or property and the Contractor shall further use only such methods
as are currently utilized by persons, firms, or corporations engaged in similar type of construction activity.
22.2 Explosive materials shall not be stored or kept at the construction site by the Contractor.
22.3 In all cases where explosives are to be used during the construction of the project contemplated by this
contract, it shall be the duty of the Contractor to notify each utility company having structures (above or
below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and such
notice shall be given sufficiently in advance to enable the companies to take such steps as they may
deem necessary to protect their property from injury. Such notice, however, shall not relieve the
Contractor of responsibility for any damage resulting from his blasting operations.
CONTRACTOR'S REPRESENTATIVE
The successful bidder shall be required to have a responsible local representative available at all times while the
work is in progress under this contract. The successful bidder shall be required to furnish the name, address and
telephone number where such local representative may be reached during the time that the work contemplated by
this contract is in progress.
INSURANCE
24.1 The Contractor shall not commence work under this contract until he has obtained all insurance as
required in the General Conditions of the contract documents, from an underwriter authorized to do
business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City
and written notice of cancellation or any material change will be provided ten (10) days in advance of
cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right
to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this
contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also
shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact
business in the State of Texas and shall cover all operations in connection with this contract, whether
5
performed by the Contractor or a subcontractor, or separate policies shall be provided covering the
operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be
submitted before contract execution.
24.2 PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A
CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE
CITY OF LUBBOCK AS AN ADDITIONAL INSURED AND PROVIDE A WAIVER OF SUBROGATION IN
FAVOR OF THE CITY OF LUBBOCK AS REQUIRED BELOW, OR IN THE ALTERNATIVE, SHALL BE
ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT NO WORK
ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE
INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH
SUBCONTRACTOR.
25 LABOR AND WORKING HOURS
25.1 Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages
included in these contract documents. The wage rate that must be paid on this project shall not be less
than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The
bidders' attention is further directed to the requirements of Article 5159a, Vernon's Annotated Civil
Statutes providing for the payment of the wage schedules above mentioned and the bidder's obligations
thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in these contract
documents does not release the Contractor from compliance with any wage law that may be applicable.
Construction work under this contract requiring an inspector will not be performed on weekends or
holidays unless the following conditions exist:
25.1.1 The project being constructed is essential to the City of Lubbock's ability to provide the necessary
service to its citizens.
25.1.2 Delays in construction are due to factors outside the control of the Contractor. The Contractor is
approaching the penalty provisions of the contract and Contractor can show he has made a
diligent effort to complete the contract within the allotted time.
25.2 Before construction work requiring an inspector is to be performed on weekends or holidays, the
Contractor must notify the Owner's Representative not less than three full working days prior to the
weekend or holiday he desires to do work and obtain written permission from the Owner's Representative
to do such work. The final decision on whether to allow construction work requiring an inspector on
weekends or holidays will be made by the Owner's Representative.
25.3 In any event, if a condition should occur or arise at the site of this project or from the work being done
under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately
commence work, regardless of the day of the week or the time of day, to correct or alleviate such
condition so that it is no longer dangerous to property or life.
26 PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS
The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project
under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount,
not less often than once each week. The Contractor and each of his subcontractors engaged at the site of the
work shall not later than the seventh day following the payment of wages, file with the Owner's Representative, or
Engineer, a certified, sworn, legible copy of such payroll. This shall contain the name of each employee, his
classification, the number of hours worked on each day, rate of pay, and net pay. The affidavit shall state that the
copy is a true and correct copy of such payroll, that no rebates or deductions (except as shown) have been made,
or will in the future be made from the wages paid as shown thereon. The Contractor must classify employees
according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which
schedule is included in the contract documents. The Contractor shall forfeit as a penalty to the City of Lubbock on
whose behalf this contract is made, ten dollars for each laborer, workman, or mechanic employed for each
calendar day, or portion thereof, such laborer, workman or mechanic is paid less than the wages assigned to his
particular classification as set forth in the schedule of general prevailing rate of per diem wages included in these
contract documents.
6
-
-
-
-
,,....!
-
-
-
-
-
27 PROVISIONS CONCERNING ESCALATION CLAUSES
Bids submitted containing any conditions which provide for changes in the stated bid price due to increases or
decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the
bidder without being considered.
28 PREPARATION FOR BID
29
28.1 The bidder shall submit his bid on forms furnished by the City. All blank spaces in the form shall be
correctly filled in and the bidder shall state the price both in words and numerals, for which he intends to
do the work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly
and legibly, or typewritten. In case of discrepancy between the price written in words and the price written
in figures, the price written in words shall govern.
28.2 If the bid is submitted by an individual, his name must be signed by him or his duly authorized agent. If a
bid is submitted by a firm, association, or partnership, the name and address of each member must be
given and the bid signed by a member of the firm, association or partnership, or person duly authorized. If
the bid is submitted by a company or corporation, the company or corporate name and business address
must be given, and the bid signed by an official or duly authorized agent. Powers of attorney authorizing
agents or others to sign bids must be properly certified and must be in writing and submitted with the bid.
28.3
28.4
28.5
The bid shall be executed in ink.
Each bid shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and
endorsed on the outside of the envelope in the following manner:
28.3.1 Bidder's name
28.3.2 Bid for (description of the project).
Bid submittals may be withdrawn and resubmitted at any time before the time set for opening of the bids,
but no bid may be withdrawn or altered thereafter.
Pursuant to Texas Local Government Code 252.043(a}, a competitive sealed bid that has been
opened may not be changed for the purpose of correcting an error in the bid price. THEREFORE,
ANY CORRECTIONS TO THE BID PRICE MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR
TO BID OPENING.
BOUND COPY OF CONTRACT DOCUMENTS
Bidder understands and agrees that the contract to be executed by bidder shall be bound and include the
following:
(a) Notice to Bidders.
(b) General Instructions to Bidders.
(c) Bidder's Submittal.
(d) Statutory Bond (if required).
( e) Contract Agreement.
(f) General Conditions.
(g) Special Conditions (if any).
(h) Specifications.
(i) Insurance Certificates.
0) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders.
If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered
incorporated by reference into the aforementioned contract documents.
30 QUALIFICATIONS OF BIDDERS
The bidder may be required before the award of any contract to show to the complete satisfaction of the City of
Lubbock that it has the necessary facilities, ability, and financial resources to provide the service specified therein
in a satisfactory manner. The bidder may also be required to give a past history and references in order to satisfy
the City of Lubbock about the bidder's qualifications. The City of Lubbock may make reasonable investigations
7
deemed necessary and proper to determine the ability of the bidder to perform the work, and the bidder shall
furnish to the City of Lubbock all information for this purpose that may be requested. The City of Lubbock
reserves the right to reject any bid if the evidence submitted by, or investigation of, the bidder fails to satisfy the
City of Lubbock that the bidder is properly qualified to carry out the obligations of the contract and to complete the
work described therein. Evaluation of the bidder's qualifications shall include:
(a) The ability, capacity, skill, and financial resources to perform the work or provide the service required.
{b) The ability of the bidder to perform the work or provide the service promptly or within the time specified,
without delay or interference.
(c) The character, integrity, reputation, judgment, experience, and efficiency of the bidder.
(d) The quality of performance of previous contracts or services.
31 BID AWARD
31.1 The City of Lubbock reserves the right to reject any or all bids, reject any particular item on a bid, and to
waive immaterial formalities and to accept the offer most advantageous to the City of Lubbock in its sole
discretion. Unless otherwise specified herein, the City shall award the bid based on the total bid.
31.2 All bids are evaluated for compliance with specifications before the bid price is considered. Response to
specifications is primary in determining the best low bid. Failure to comply with the specifications may
result in disqualification of the bid.
31.3 In case of tie bids, preference will be given to local bidders. Consistent and continued tie bidding may be
cause for rejection of bids by the City of Lubbock and/or investigation by the Attorney General to
determine possible Anti-Trust violations.
31.4 Before the City may award a bid to a nonresident bidder, the nonresident bidder's bid must be lower than
lowest bid submitted by a responsible Texas bidder by the same margin or amount that a Texas bidder
would be required to underbid the nonresident bidder in the nonresident bidders' home state.
31.5 Any contract made, or purchase order issued, as a result of this Invitation to Bid, shall be entered into the
State of Texas and under the laws of the State of Texas. In connection with the performance of work, the
Bidder agrees to comply with the Fair Labor Standard Act, Equal Opportunity Employment Act, and all
other applicable Federal, State, and Local laws, regulations, and executive orders to the extent that the
same may be applicable.
31.6 NO INDIVIDUAL OF ANY USING DEPARTMENT HAS THE AUTHORITY TO LEGALLY AND/OR
FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR PURCHASE ORDER FOR
GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED BY THE REQUIREMENTS OF THIS
INVITATION TO BID.
8
-
-
-
-BID SUBMITTAL
-
-
-
-
-
-
-
-
-
-
-
-'
-
DATE: 12-23-2002
/
BID SUBMITTAL
LUMP SUM BID CONTRACT
PROJECT NUMBER: #232-02/RS -CENTER PIVOT SYSTEMS AT THE LAND APPLICATION SITE
To the Honorable Mayor and City Council City of Lubbock, Texas {hereinafter called Owner)
Gentlemen:
The Bidder, in compliance with your Invitation to Bid for the construction of a CENTER PIVOT SYSTEMS AT THE LAND
APPLICATION SITE having carefully examined the plans, specifications, instructions to bidders, notice to bidders and all
other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding
the construction of the intended project including the availability of materials and labor, hereby intends to furnish all labor,
materials, and supplies; and to construct the project in accordance with the plans, specifications and contract documents,
within the time set forth therein and at the price stated below. The price to cover all expenses incurred in performing the
work required under the contract documents.
MATERIALS: One Hundred Sixty One Thousand Nine Hundred 'thirty_ ($ 161,930.00
SERVICES: Thirteen -Thousand :Eiqht Hnnarea "I>ollars · _ Dollars
($ 13,800.00
~ TOTAL BID: One Hundred Seventy-1';ive Thousand Seven Hundred Thirty($ 175,730.00
-
-
-
-
(Amount shall be shown in both words and numerals. In case of discrepancy, th~JriJS-a~t shown in words shall govern.)
Bidder hereby agrees to commence the work on the above project on or before a date to be specified in a written
"Notice to Proceed" of the Owner and to fully complete the project within 45 (FORTY-FIVE) consecutive calendar days
thereafter as stipulated in the specifications and other contract documents. Bidder hereby further agrees to pay to Owner
as liquidated damages the sum of $200 (TWO HUNDRED) for each consecutive calendar day in excess of the time set
forth herein above for completion of this project, all as more fully set forth in the general conditions of the contract
documents.
Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with
instruction number 28 of the General Instructions to Bidders.
Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the
bidding. ·
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days
after the scheduled closing time for receiving bids.
The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the
plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to
commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on
which he has bid; as provided in the contract documents.
1
-
-
-
-
-
-. ,
-I
-
-
-
-
-
Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or
certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable
without recourse to the order of the City of Lubbock in an amount not less than five percent (5%) of the total amount of the
bid submitted as a guarantee that bidder will enter into a contract, obtain all required insurance policies, and execute all
necessary bonds (if required) within fifteen (15) days after notice of award of the contract to him.
Enclosed with this bid is a Cashier's Check or Certified Check for Nj ne Thousand IX>llars
Dollars ($ 9, ooo on ) or a Bid Bond in the sum of Dollars
($ · , which it is agreed shall be collected and retained by the Owner as liquidated damages in the
event the bid is accepted by the Owner and the undersigned fails to execute the necessary contract documents,
insurance certificates, and the required bond (if any) with the Owner within fifteen (15) days after the date of
receipt of written notification of acceptance of said bid; otherwise, said check or bond shall be returned to the
undersigned upon demand.
Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract
documents made available to him for his inspection in accordance with the Notice to Bidders.
Pursuant to Texas Local Government Code 252.043(a), a
competitive sealed bid that has been opened may not be
changed for the purpose of correcting an error in the bid
price. THEREFORE, ANY CORRECTIONS TO THE BID
PRICE MUST BE MADE ON THE BID SUBMITTAL FORM
PRIOR TO BID OPENING.
(Seal if Bidder is a Corporation)
YE~T ~)Q~~
Secretary ===
Bidder acknowledges receipt of the following addenda:
Addenda No. -~' _ Date II -J...fo-D 1-.
Addenda No. .l. Date 11 -~ 7-o ;i..
Addenda No. 3 Date I;)..~ 5 -o ;l...
Addenda No. If-Date I & -It> -o ;z.
:J-I A. -I J... -0 A.
6 I l, -I Cf -o Z.
7 /]...-/Cf-lJl....
M/WBE Firm: Woman Black American
Danny Martin
(Printed or Typed Name)
Company
Rt 1 B:•x 10
Address
Wils~ 'l!exas 79.JBC-1------
City, aunty
State
Telephone:
Fax: 806-
79381
Zip Code
806 -924-7257
. -924-7260
His anic American Asian Pacific American
2
-
-
-.. LIST OF SUBCONTRACTORS
!"""'
-Minority Owned
Yes No
1. D D
!"""
2. D D
-3. D D
4. D D
5. D D
6. D D -
7. D D -8. D D
9. D D -10. D D
-
-
-
-
-
3
-
-
-
-
-i
-
-
-
-
-
-
CITY OF LUBBOCK
INSURANCE REQUIREMENT AFFIDAVIT
To Be Completed by Bidder
And Attached to Bid Submittal
I, the undersigned Bidder, certify that the insurance requirements contained in this bid document have been
reviewed by me with the below identified Insurance Agent/Broker. If I am awarded this contract by the City of
Lubbock, I will be able to, within fifteen (15) days after being notified of such award by the City of Lubbock,
furnish a valid insurance certificate to the City meeting all of the requirements defined in this bid/proposal.
CONTRACTOR'S FIRM NAME:
l2A fl) A) 'ti ?<.) I /llfl ,,1-/L TI~
Contractor (Print)
/11£ S/f I£t11-174 /rtJ~v>.1 -tU 1 /sotA.J /&-r1-s
(Print or Type )
CONTRACTOR'S FIRM ADDRESS:_~t~r_/_~b~_o_X~/_D _______ _
7
Name of Agent/Broker: JAc./<. blle7 tJdy
Address of Agent/Broker: /50 2' J. t< 6 b o Jc_
,.-._
lsxA-5
Sts fe brll.YI'\. TNsv.,e-4/f/c..L
/fwv
(
City/State/Zip: __ _,_/----"-'A._...M-'-'--"'Z.."'"""s'-'-A-=-----LT£ ___ ~X.L..:.../'/.L.;;5=------'7_1.L->o<..3_._3"'--/.__ ___ _
Agent/Broker Telephone Number: ( 36CD ) £ 7 ~ -</ 5 31
Date: / 'A -I f -0 ~
NOTE TO CONTRACTOR
-If the time requirement specified above is not met, the City has the right to reject this bid/proposal and
award the contract to another contractor. If you have any questions concerning these requirements,
please contact the Purchasing Manager for the City of Lubbock at (806) 775-2165.
BID #232-02/RS -CENTER PIVOT SYSTEMS AT THE LAND APPLICATION SITE
4
u
u
y
u
u
u
PAYMENT BOND
***** OLD REPUBLIC
*
.* * Old Republic Surety Company Bond # LCN-1136962
* * Old Republic Insurance Company
* * * Bituminous Casualty Corporation
TEXAS STATUTORY PAYMENT BOND
(PUBLIC WORKS)
KNOW ALL MEN BY THESE PRESENTS: That NEW HOME-WILSON MESA IRRIGATION
COMPANY, 620 US HWY 87, WILSON, TX 79381
(hereinafter called the Principal), as Principal and OLD REPUBLIC SURETY COMPANY
, a corporation organized and existing under the laws of the
State of WISCONSIN , licensed to do business in the State of Texas and
admitted to write bonds, as surety (hereinafter called the Surety), are held and
firmly bound unto CITY OF LUBBOCK, 1625 13TH STREET, LUBBOCK, TX 79401
(hereinafter called the Obligee), in the amount of ONE HUNRED SEVENTY FIVE
THOUSAND SEVEN HUNDRED THIRTY DOLLARS AND N0/100-- Dollars ($$175,730.00*
for the payment whereof, the said Principal and Surety bind themselves and their
heirs, administrators, executors, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain contract with the
Obligee, dated the 9TH day of JANUARY ,2003 ,for
CENTER PIVOT SYSTEMS AT THE LAND APPLICATION SITE PURSUANT TO BID #232-02/RS
which contract is hereby referred to and made a part hereof as fully and to the
same extent as if copied at length herein:
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, That if the said
Principal shall pay all claimants supplying labor and material to him or a
subcontractor in the prosecution of the work provided for in said contract, then
this obligation shall be null and void; otherwise to remain in full force and
effect;
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of
Chapter 2253 of the Texas Government Code and all liabilities on this bond shall
be determined in accordance with provisions, conditions and limitations of
said Chapter to the same extent as if they were copied at length herein.
IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed
this instrument the27TH day of JANUARY 2003
NEW HOME-WILSON MESA IRRIGATION
ATTEST: PRINCI L: COMPANY
By: By U.
(Seal)
APPROVED AS TO FORM:
By:
CITY OF LUBBOCK
Obligee
OLD REPUBLIC SURETY COMPANY ( Surety)
By_J
-oar
TONIE PETRANEK
Attorney -in -Fact
TEXAS ADDRESS OF SURETY:
7610 STEMMONS, SUITE 400
DALLAS, TX 75247
IMPORTANT NOTICE
TO OBTAIN INFORMATION OR MAKE A COMPLAINT:
You may call Old Republic Surety Company, Old Republic Insurance Company, Bituminous
Casualty Corporation, and/or International Business & Mercantile REassurance Company's
toll -free telephone number for information or to make a complaint at:
800-217-1792 or 262-797-2640
_ You may also write to Old Republic Surety Company, Old Republic Insurance Company,
Bituminous Casualty Corporation, and/or International Business & Mercantile REassurance
Company at:
Attn: Claims Department
P.O. Box 1635
Milwaukee, WI 53201
- or street address -
Attn: Claims Department
445 S. Moorland Road, Suite 301
Brookfield, WI 53005
You may contact the Texas Department of Insurance to obtain information on companies,
coverages, rights or complaints at:
You may write the Texas Department of Insurance at:
P.O. Box 149104
Austin, TX 78714-9104
ATTACH THIS NOTICE TO YOUR BOND. This notice is for information only and does not
become a part or a condition of the attached document and is given to comply with
Section 2253.048, Government Code, and Section 53.202, Property Code, effective
September 1, 2001.
ORSC 22823
IIII **
I*I* OLD REPUBLIC
111t,***7 Surety Company POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That OLD REPUBLIC SURETY COMPANY, a Wisconsin stock insurance corporation,
— does make, constitute and appoint:
ANNIE TUTT, SHARLON ROGERS, BRIAN P. KINDER, BRENDA LANGLEY, TERESA SEGOVIA,
LESIA SLUCK, DONNA NELSON, PAM LANDRETH, MARY SHACKELFORD, TONIE PETRANEK,
— PAULA MIDDLETON, JEROLD'L. TOPLIFF, OF DALLAS,,TX
its true and lawful Attorney(s)-in-Fact, with full power and authority for and on behalf of the company as surety, to execute and deliver and alfix the seal of the
company thereto (if,a seal is required), bonds, undertakings, recognizances or other written obligations in the nature thereof, (other than bail bonds, bankdepository
bonds, mortgage deficiency bonds, mortgage guaranty bonds, guarantees of installment paper and note guaranty bonds, self-insurance workers compensation
—' bonds guaranteeing payment of benefits, asbestos abatement contract bonds, waste management bonds, hazardous waste remediation bonds or black lung bonds),
as follows:
ALL WRITTEN INSTRUMENTS IN AN AMOUNT NOT TO EXCEED AN AGGREGATE OF
TWO HUNDRED FIFTY THOUSAND DOLLARS($250,000)------------- FOR ANY SINGLE
OBLIGATION, REGARDLESS OF THE NUMBER OF INSTRUMENTS ISSUED FOR THE OBLIGATION.
— and to bind OLD REPUBLIC SURETY COMPANY thereby, and all of the acts of said Attorneys -in -Fact, pursuant to these presents, are
ratified and confirmed. This document is not valid unless printed oncolored background and is multi -colored. This appointment is made
under and by authority of the board of directors at a special meeting held on February 18, 1982. This Power of Attorney is signed and sealed
by facsimile under and by the authority of the following resolutions adopted by the board of directors of the OLD REPUBLIC SURETY
COMPANY on February 18, 1982.
— RESOLVED that, the president, any vice-president, or assistant vice president in conjunction with the secretary or any assistant
secretary, may appoint attorneys -in -fact or agents with authority as defined or limited in the instrument evidencing the appointment
in each case, for and on behalf of the company to execute and deliver and affix the seal of the company to bonds, undertakings, recog-
nizances, and suretyship obligations of all kinds; and said officers may remove any such attorney -in -fact or agent and revoke any
—' Power of Attorney previously granted to such person.
RESOLVED FURTHER,that any bond, undertaking, recognizance, or suretyship obligation shall bevalid and binding upon the Company
(i) when signed by the president, any vice president or assistant vice president, and attested and sealed (if a seal be required) by any secretary or assistant
secretary; or
(i i) when signed by president, any vice president or assistant vice president, secretary 'or assistant secretary, and countersigned and sealed (if a seal
be required) by a duly authorized attorney -in -fact or agent; or
(iii) when duly executed and sealed (if a seal be required) by one or more attorneys -In -fact or agents pursuant to and within the limits of the authority
evidenced by the Power of Attorney issued by company to such person or persons:
RESOLVEDFURTHER,thatthe signature of any authorized officer and the seal of the company may be affixed by facsimile to any Power of Attorney or
certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the company; and such
signature and seal when so used shall have the same force and effect as though manually affixed.
IN WITNESS WHEREOF, OLD REPUBLIC SURETY COMPANY has caused these presents to be signed by its proper officer, and its
corporate seal to be affixed this 6TH day of JANUARY 2003
OLD REPUBLIC SURETY COMPANY
JO �G SURETY
r c O
9 SEAL
Assistant Secre ry President
STATE OF WISCONSIN, COUNTY OF WAUKESHA - SS
On this 6TH day of JANUARY 2003 personally came before me, JAMES E. LEE
and DAVID G. MENZEL to me known to be the individuals and officers of the OLD REPUBLIC SURETY COMPANY who executed the above
— instrument, and they each acknowledged the execution of the same, and being by me duly sworn, did severally depose and say;
that they are said officers of the corporation aforesaid, and that the seal affixed to the above instrument is the seal of the corporation,
and that said corporate seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority of
the board of directors of said corporation.
%AOTARy 9
Notary Public
N9�PUB",,_= 02/13/2005
FOF W.s°° ' #vly commission expires:
CERTIFICATE
I, the undersigned, assistant secretary of the OLD REPUBLIC SURETY COMPANY, a Wisconsin corporation, CERTIFY that the
foregoing and attached Power of Attorney remains in:fullforce and has not been revoked; and furthermore, that the Resolutions of the board of
directors set forth in the Power of Attorney, are now in force.
89-0030
` RFT
�0 ' Signed and sealed at the City of Brookfield, WI this 271h day of January 2003
coA Mid
- o SEAL
OLD REPUBLf ,'SFF' Y COMPANY Assistant cr0tary
ORSC 22262 (1/97)
PERFORMANCE BOND
**** OLD REPUBLIC
**
Old Republic Surety Company
* * Old Republic Insurance Company
* * Bituminous Casualty Corporation
Bond # LCN-1136962
TEXAS STATUTORY PERFORMANCE BOND
(PUBLIC WORKS)
KNOW ALL MEN BY THESE PRESENTS, That
NEW HOME-WILSON MESA
IRRIGATION, 620 US HWY 87, WILSON, TX 79381 (hereinafter called the
Principal), as Principal, and OLD REPUBLIC SURETY COMPANY , a corporation
organized and existing under the laws of the State of WISCONSIN
licensed to do business in the State of Texas and admitted to write bonds, as
surety (hereinafter called the Surety), are held and firmly bound unto
CITY OF LUBBOCK, 1625 13TH STREET, LUBBOCK, TX 79401
(hereinafter called the Obligee), in the amount
of ONE HUNRED SEVENTY FIVE THOUSAND SEVEN HUNDRED THIRTY DOLLARS AND N0/100--
(Dollars) ($ 175,730.00** ) for the payment whereof, the said
Principal and Surety bind themselves and their heirs, administrators, executors,
successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the
Obligee, dated the 9TH day of JANUARY r 2003 , for
CENTER PIVOT SYSTEMS AT THE LAND APPLICATION SITE PURSUANT TO BID #232-02/RS
which
contract is hereby referred to and made a part hereof as fully and to the same
extent as if copied at length herein:
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, That if the said
Principal shall faithfully perform the work in accordance with the plans,
specifications and contract documents, then this obligation shall be null and
void; otherwise to remain in full force and effect;
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of
Chapter 2253 of the Texas Government Code and all liabilities on this bond shall
be determined in accordance with provisions, conditions and limitations of
said Chapter to the same extent as if they were copied at length herein.
IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed
this instrument this27TH day of JANUARY 2003
NEW HOME _ILSON MESA IRRIGATION
ATTEST: PRINCI
By
(Seal)
APPROVED AS TO FORM:
By:
CITY OF LUBBOCK
Obligee
By.
OLD REPUBLIC,,SURETY COMPANY ( Surety)
By: Rt�_�
TONIE PETRANEK
Attorney -in -Fact
TEXAS ADDRESS OF SURETY: -
7610 STEMMONS, SUITE 400
DALLAS, TX 75247
IMPORTANT NOTICE
TO OBTAIN INFORMATION OR MAKE A COMPLAINT:
You may call Old Republic Surety Company, Old Republic Insurance Company, Bituminous
Casualty Corporation, and/or International Business & Mercantile REassurance Company's
toll -free telephone number for information or to make a complaint at:
800-217-1792 or 262-797-2640
You may also write to Old Republic Surety Company, Old Republic Insurance Company,
Bituminous Casualty Corporation, and/or International Business & Mercantile REassurance
Company at:
Attn: Claims Department
P.O. Box 1635
Milwaukee, WI 53201
- or street address -
Attn: Claims Department
445 S. Moorland Road, Suite 301
Brookfield, WI 53005
You may contact the Texas Department of Insurance to obtain information on companies,
coverages, rights or complaints at:
800-252-3439
You may write the Texas Department of Insurance at:
P.O. Box 149104
Austin, TX 78714-9104
ATTACH THIS NOTICE TO YOUR BOND. This notice is for information only and does not
become a part or a condition of the attached document and is given to comply with
Section 2253.048, Government Code, and Section 53.202, Property Code, effective
September 1, 2001.
ORSC 22823
IIIII i**1r �
�* OLD REPUBLIC
III* Surety Surety Company POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That OLD REPUBLIC SURETY COMPANY, a Wisconsin stock insurance corporation,
— does make, constitute and appoint:
ANNIE TUTT, SHARLON ROGERS, BRIAN P. KINDER, BRENDA LANGLEY, TERESA SEGOVIA,
LESIA SLUCK, DONNA NELSON, PAM LANDRETH, MARY SHACKELFORD, TONIE PETRANEK,
PAULA MIDDLETON, JEROLD L. TOPLIFF, OF DALLAS, TX
its true and lawful Attorneys) -in -Fact, with full power and authority for and on behalf of the company as surety, to execute and deliver and affix the seal of the
company thereto (if a seal is required), bonds, undertakings, recognizances or other written obligations in the nature thereof, (other than bail bonds, bankdepository
bonds, mortgage deficiency bonds, mortgage guaranty bonds, guarantees of installment paper and note guaranty bonds, self-insurance workers compensation
bonds guaranteeing payment of benefits, asbestos abatement contract bonds, waste management bonds, hazardous waste remediation bonds or black lung bonds),
as follows:
ALL WRITTEN INSTRUMENTS IN AN AMOUNT NOT TO EXCEED AN AGGREGATE OF
TWO HUNDRED FIFTY THOUSAND DOLLARS($250,000)------------- FOR ANY SINGLE
OBLIGATION, REGARDLESS OF THE NUMBER OF INSTRUMENTS ISSUED FOR THE OBLIGATION.
and to bind OLD REPUBLIC SURETY COMPANY thereby, and all of the acts of said Attorneys -in -Fact, pursuant to these presents, are
ratified and confirmed. This documentis not valid unless printed on colored background and is multi -colored. This appointment is made
under and by authority of the board of directors at a special meeting held on February 18, 1982. This Power of Attorney is signed and sealed
by facsimile under and by the authority of the following resolutions adopted by the board of directors of the OLD REPUBLIC SURETY
COMPANY on February 18, 1982.
RESOLVED that,the president, any vice-president, or assistant vice president in conjunction with the secretary or any assistant
secretary, may appoint attorneys -in -fact or agents with authority as defined or limited in the instrument evidencing the appointment
in each case, for and on behalf of the company to execute and deliver and affix the seal of the company to bonds, undertakings, recog-
nizances, and suretyship obligations of all kinds; and said officers may remove any such attorney -in -fact or agent and revoke any
Power of Attorney previously granted to such person.
RESOLVED FURTHER,that any bond, undertaking, recognizance, or suretyship obligation shall bevalid and binding upon the Company
(i) when signed by the president, any vice president or assistant vice president, and attested and sealed (if a seal be required) by any secretary or assistant
secretary; or
(ii) when signed by the president, any vice president or assistant vice president, secretary or assistant secretary, and countersigned and sealed (if a seal
be required) by a duly authorized attorney--in-fact or agent; or
(iii) when. duly executed and sealed (if a seal be required) by one or more attorneys -in -fact or agents pursuant to and within the limits of the authority
evidenced by the Power of Attorney issued by: the company to such person or persons;'
RESOLVED EURTHER,thatthe signature of any authorized officer and the seal of the company may be affixed by facsimile to any Powerof Attorney or
certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the company; and such
signature and seal when so used shall have the same force and effect as though manually affixed.
IN WITNESS WHEREOF, OLD REPUBLIC SURETY COMPANY has caused these presents to be signed by its proper officer, and its
— corporate seal to be affixed this 6 TH day of JANUARY 200 3
OLD REPUBLIC SURETY COMPANY
0 ° sueEry
> 4Qi coavoa re °O
SEAL g`
Assistant Secre ,y President
STATE OF WISCONSIN, COUNTY OF WAUKESHA - SS
On this 6TH day of JANUARY 2003 personally came before me, JAMES E. LEE
and DAVID G. MENZEL to me known to be the individuals and officers of the OLD REPUBLIC SURETY COMPANY who executed the above
instrument, and they each acknowledged the execution of the same, and being by me duly sworn, did severally depose and say;
that they are said officers of the corporation aforesaid, and that the seal affixed to the above instrument is the seal of the corporation,
and that said corporate seat and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority of
the board of directors of said corporation.
— PpN A p :i LI iY
3 N NOTARY 4
+ Notary Public
N, 2 02/13/2005
9'FOFw�s°°�y My commission expires:
CERTIFICATE
I, the undersigned, assistant secretary of the OLD REPUBLIC SURETY COMPANY, a Wisconsin corporation, CERTIFY that the
foregoing and attached Power of Attorney remains in full force and has not been revoked; and furthermore, that the Resolutions of the board of
directors set forth in the Power of Attorney, are now in force.
89-0030
�G :SURETY
�0 on �nr Signed and sealed at the City. of Brookfield, WI this 27th day of January 7003
SEAL
° 1M1
OLD REPUBLf-C,,, SURF-tY COMPANY
Assistant retary
ORSC 22262 (1/97)
-
-
CERTIFICATE OF INSURANCE
-
-
-
-
-
"Dec-OZ-OZ OZ;ZOP MESA IRR CO 8068722615
CERTIFICATE OF INSURANCE
0
0 STATE FARM FlRE ANO CASUA:...TY COMPANY, Bloom1ngton, Illinois
STATE FARM GENERAL INSURANCE COMPANY, 61oomington. Illinois
0 STATE FARM FIRE AND CASUAL TY COMPANY, Scarborough, Ontario
0 STATE FARM FlORIDA INSURANCE COMPANY, Winter Havon, Florida
181 STATE FARM LLOYDS. Dallas, Texas
P.02
insures the following policyholder for the coverages indicated below: -
-
-
-
-
-
-
-
-
-
-
Nameofpolicyh;,lder ::o:.e:nar., 'Ierry D:SA Me!:>a-Wilson !:::::::::i.g.aticr. Co.
Address of polil: ;tholder Rt l, Box 10 W~lscr., TX 79381 ---------·-------Location of ope <!tions _s.s_· t_1l1=1.,--__, __ _
Description of c1:11trations irrigation Equipr.er.t « Acce;;sorie111
-~~~~~-~----~~~~---~~~-~
The policies listed b1! low have been i$sued tJJ the poiicyholder tor tr.e policy periods shown The 1r1SLranc"* described in these policies is
subject !o all the term.; exclusions, and coMltlou .of ttwse p:>!icits. The li'11ils of liability shown may have bean reduced by any paid claims.
'
POU.CV Jt£AIQD LIMITS OF LIABILITY
POLICY NUMBEI': TYPE OF INSURANCE: Effedive .Data : Ex•tian Cate (at beginning of policy p..-iod)
Comprehensive i 1211.3102 : l:l/13/03 BODILY INJURY AND
....... .~!1.'!~~-1:-!~~-~i~)". __ ...... J ·----· .. ----· .... L .. PROPERTY DAMAGE .. ----~ -" -...... s: t8l Products • Completed Operations
JJ-GC·-S64:3-3L
r8! Contrac1ual LiabHily
O Underground Hazard Coverage Eac:tl Occ1.1rnsnca $:. 000. /JOO
0 Peraonal lfliury
0 Advertising Injury General Aggregate $ 2, 000, O'.JC·
D Explo$ion Haz:ard Co'lerage
181 Collapse Hazard Coverage Products -Completed $1,000,ooc
0 Operations Aggre98te
D -POLICY PERIOD ·---·--~~--·-----·---------
BODILY INJU.i:IY AND PROPERTY DAMAGE
EXCESS LIABILITY Effective O•t• : Expiration Cete [Coml:lined Single \..imii)
D Umbrella ' Eaeh Occurranca $
D Other ' A.ggra9ate s ·-~··· ·--: Part 1 ST ATUTOAY
' ~art 2 BODILY INJURY
' Wofl<ers' Compensation
a.id E:mployers Uabii:ty : Each Accident $
: O;seasa Each Employee $
-.--J..---~~-----
O:sease -Polley Limit $ .. _ ----·-·---~-~
-~~;v NuMae11 TYPE oF 1NsuRANCE I E~~t_~!v-t::a~~~~i=-~=~~~~~!:~~:~~---
"" '168-0P-43C :_ AccCo ciat·\li_'' t ":=_,_ 08 :n'"' : '"""' 500M.'>COM .
.. =t__________ ----------------.. THE CERTIFICATE 1; lF INSURANCE IS HOT A CONTAACT OF INSURANCE ANO NEITHER AFFIRMATIVELY NOR NEGATIVELY
AMEN OS, EXTENDS OR AL TEAS THE COVERAGE APPROVED BY ANY POLICY OESCAIBED "EREIN.
W;:;ivcr of Subro1;.lt.icn in favor :>f City of Lub:bocl<: If any of the daiscribed policies are canceied before
N~_med Addition!!!] r:-isured in favor of C}.ty of Lub::X:.ck ltsexpirationdata,StateFa1rnwllltrytomallawrl~ter
notice to the certif holder 3 c days before
oancellati f ho ev · ~o mail suc;h no · ~
Name and Address of Certificate Holder no atl e 011 State
F
Ci~y of Lubbock. TX
l~/02.102
Data
5~8·994 ~ ~> 04·19118 Prl~'f·d in US A
..
-
-
-
-
-
-
-
-
-
-
" .. ~J.L
TEXAS t--J!l!Al. Il'~ S . CO. ,,_ _______ . ·--------·---.. ---... ~__...----i
--------· .......... I tuAEO·
Mesa-Wilson :: rrigation Co.
Rt. 1 Box 10
Wilson Texas 79381
\,& s ro Cf.~TIFlf THAV""~• l'OLICVOl=INSJ~ UST~!' RelCW 1-iA~ 9Et!\ IUlitiO'Y~ ~ IN'IV1'€(')111.i.MG:i #tl&C!JE F'OA ll<IE POUCY PEHCD
OlCA'TEb. HOl'~ITMl'!"N'llP~ ~ ~v Ft£0U!P.EJ.AfN'T. l!lllM 0~ ;x,1,~'TIOlll or: iWf OONTAAC' ~ on;ff; DOCUUllN1 Wtl'>I ~!iSPECT ro -Aiil(;M TfoltS
>R1'1Ff::Al~ loAAV ae IS&LJEI :IA w.v PE~TAJN. ™ii IN$1..IV.NC€ ,.;:;.c"OEO l!Y 'll'E 111()!.iiC't' Clf&CP.iSU> HC~El .... £UB.1<. :;'f 'TO A!.l n-lt ,;P,M$,
{C1.U6lONS N«'! C-ONOIT'IOI i OF SUC>i lll~V . .-.•w I T » ......................... __ ...., __ _,,,......_.,...,,.,.__,._,,,._.,...,_.._.-.. ........ ..-"t"" ............. _._.,,,......-..... ._.,._ .... _._....,_~
~KIR1l ~TIOH »ID
olPl OVfiPri 1,,1411UfV
l'OUCV MAl!f.I< I F<.JJ.Je 'I' jill'pte. ?Ill&
--+---------1 OA'll ~~
lSF·000101•4?j 1•18·02
I .
t i
'
llOl.'C" eJCll'lllA1'! () ..
01\TE (~01'1'" --·
~AIVEJ OF SUB~)CATION ADDED TO POLICY
I~ FAVOR 0F CJ rv OF Lll880CK.
IMOUU)'""' a.IOVE DtSl'f<iilcC t'Q(..(,:'V 91'. C41'CE~U!O 'e"~)f\e rHt
i;4111Mnr;)H CATi n.lif'i;;I'. not\ iSSU!NC> COMPANf' WtLL fNOt'.AllC .. 1'0
Milili. 11J l)A'fl WMTFN ~:J11Ci 1'0 lMt; ·.:~T1t'ICAT! MO\.C!~ MllM~O TO
'1".C ~PT. IUr i;A1lVlll!< liJ M.llL llJCH fli::"·r-:;~ ~L IM.110$! ~
Olll.IGl\TION C,,it ~II.I !'I o;: ANV K~ ll~ n-ir.. t:OM?/INY. ri15 Ml EN"!'S
Ofil "l!flffll;~ATlllU
ClTY Of LUBBOCK ----·-----1 I
1625 V :h STREf::T
LU8BOC~ !EXAS 7Q40l
-•.
I
-
-
-! '
-
-
-
,....
-
~
' .
-'
-
-
-
CONTRACTOR CHECKLIST
A CONTRACTOR SHALL:
(1)
(2)
(3)
--(4)
(5)
(6)
--(7)
provide coverage for its employees providing services on a project, for the duration of the project based on
proper reporting of classification codes and payroll amounts and filling of any coverage agreements;
provide a certificate of coverage showing workers' compensation coverage to the governmental entity
prior to beginning work on the project;
provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the contractor's current certificate of
coverage ends during the duration of the project;
obtain from each person providing services on a project, and provide to the governmental entity:
(A) a certificate of coverage, prior to that person beginning work on the project, so the governmental
entity will have on file certificates of coverage showing coverage for all persons providing
services on the project; and
(B) no later than seven days after receipt by the contractor, a new certificate of coverage showing
extension of coverage, if the coverage period shown on the current certificate of coverage ends
during the duration of the project;
retain all required certificates of coverage on file for the duration of the project and for one year thereafter;
notify the governmental entity in writing by certified mail or personal delivery, within ten ( 10) days after the
contractor knew or should have known, of any change that materially affects the provision of coverage of
any person providing services on the project;
post a notice on each project site informing all persons providing services on the project that they are
required to be covered, and stating how a person may verify current coverage and report failure to provide
coverage. This notice does not satisfy other posting requirements imposed by the Act or other
commission rules. This notice must be printed in at least 19-point normal type, and shall be in both
English and Spanish and any other language common to the worker population. The text for the notices
shall be the following text provided by the commission on the sample notice, without any additional words
or changes:
PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF
INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS AN
ADDITIONAL INSURED AND PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK, OR
IN THE ALTERNATIVE, SHALL BE ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO THE EFFECT
THAT NO WORK ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE
DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR.
2
-
-
-
-
-
-
-'
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related to this construction project must (see
reverse) be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering
equipment and materials, or providing labor or transportation or other service related to the project, regardless of the
identity of their employer or status as an employee."
--(8)
"Call the Texas Workers' Compensation Commission at (512)440-3789 to receive information on the
legal requirement for coverage, to verify whether your employer has provided the required coverage, or to
report an employer's failure to provide coverage." and
contractually require each person with whom it contracts to provide services on a project, to:
(A)
(B)
(C)
(D)
(E)
(F)
provide coverage based on proper reporting of classification codes and payroll amounts and filing
of any coverage agreements for all of its employees providing services on the project, for the
duration of the project;
provide a certificate of coverage to the contractor prior to that person beginning work on the
project;
include in all contracts to provide services on the project the language in subsection (e) (3) of this
rule;
provide the contractor, prior to the end of the coverage period, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project;
obtain from each other person with whom it contracts, and provide to the contractor:
(i) a certificate of coverage, prior to the other person beginning work on the project; and
(ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the
coverage period, if the coverage period shown on the current certificate of coverage ends during
the duration of the project;
retain all required certificates of coverage on file for the duration of the project and for one year
thereafter;
(G) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10 days
after the person knew or should have known, of any change that materially affects the provision of
coverage of any person providing services on the project; and
(H) contractually require each other person with whom it contracts, to perform as required by
paragraphs (A) -(H), with the certificate of coverage to be provided to the person for whom they
are providing services. o
3
-
-
-
-
-
-
CONTRACT
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ST A TE OF TEXAS
COUNTY OF LUBBOCK
CONTRACT
THIS AGREEMENT, made and entered into this .9 1
h day of JANUARY, 2003 by and between the City of Lubbock,
County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so,
hereinafter referred to as OWNER, and MESA IRRIGATION COMPANY of the City of WILSON, County of LYNN and the
State of TEXAS hereinafter termed CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and
performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the
CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements
described as follows:
BID #232-02/RS -CENTER PIVOT SYSTEMS AT THE LAND APPLICATION SITE -$175,730.00
and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own
proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance
and other accessories and services necessary to complete the said construction in accordance with the contract
documents as defined in the General Condition of Agreement.
The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have
been given to him and to substantially complete same within the time specified in the contract documents.
The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with
the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make
payment on account thereof as provided therein.
IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County,
Texas in the year and day first above written.
ATTEST:
£~~
NT:
APPROVED AS TO FORM:
~ ~m:..
,?Aiiorney
ATTEST:
Corporate Secretary
1
PRINTED N.A: E: ferry Co le1tta. IV
TITLE: .We.A.f.
COMPLETE ADDRESS:
Mesa Irrigation Company
Route 1, Box 10
Wilson, Texas 79381
-
-
-
-
-GENERAL CONDITIONS OF THE AGREEMENT
-
1.
-
2. -
-
3.
-
4.
-
-5.
6. -
7.
8.
-
GENERAL CONDITIONS OF THE AGREEMENT
OWNER
Whenever the word Owner, or First Party, are used in this contract, it shall be understood as referring to the City of
Lubbock, Texas.
CONTRACTOR
Whenever the word Contractor, or Second Party, is used, it shall be understood to mean the person, persons, co-
partnership or corporation, to wit MESA IRRIGATION COMPANY who has agreed to perform the work embraced
in this contract, or their legal representative.
OWNER'S REPRESENTATIVE
Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as
referring to, City of Lubbock, or its representative BRAD WELCH, ASSISTANT FARM MANAGER, so designated
who will inspect constructions; or to such other representatives, supervisors, architects, engineers, or inspectors
as may be authorized by said Owner to act in any particular under this agreement. Engineers, supervisors or
inspectors will act for the Owner under the direction of Owner's Representative, but shall not directly supervise the
Contractor or persons acting on behalf of the Contractor.
CONTRACT DOCUMENTS
The contract's documents shall consist of the Notice to Bidders, General Instructions to Bidders, Bid, Signed
Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the
Agreement (if any), Specifications, Plans, Insurance Certificate, and all other documents made available to Bidder
for inspection in accordance with the Notice to Bidders. The above described materials are sometimes referred to
herein as the "contract" or "contract documents".
INTERPRETATION OF PHRASES
Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed," or
words of like import are used, it shall be understood that the direction, requirement, permission, order, designation
or prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable,"
"Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's
Representative.
SUBCONTRACTOR
The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for
performance of work on the project contemplated by these contract documents. Owner shall have no
responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated
by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments due
Subcontractor.
WRITTEN NOTICE
Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of
the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent certified mail to the last
business address known to the party who gives the notice.
CONTRACTOR'S RESPONSIBILITIES
Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery,
equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other
facilities necessary for the execution and completion of the work covered by the contract documents. Unless
1
-9. -
-10.
11.
12. -
-
-r
13. -
14.
-
-
-
otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality.
The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or
work described in words which so applied have well known, technical or trade meaning shall be held to refer such
recognized standards.
All work shall be done and all materials furnished in strict conformity with the contract documents.
SUBSTANTIALLY COMPLETED
The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents
has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still
may require minor miscellaneous work and adjustment.
LAYOUT
Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall
accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative will
check the Contractor's layout of all major structures and any other layout work done by the Contractor at
Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all
work in accordance with the Plans and Specifications.
KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE
The Contractor shall be furnished copies of all Plans and Specifications without expense to Contractor and
Contractor shall keep one copy of same consistently accessible on the job site.
RIGHT OF ENTRY
The Owner's Representative may make periodic visits to the site to observe the progress or quality of the
executed work and to determine, in general, if the work is proceeding in accordance with the contract documents.
Owner's Representative will not be required to make exhaustive or continuous onsite inspections to check the
quality or quantity of the work, nor will Owner's Representative be responsible for the construction means,
methods, techniques, sequences or procedures, or the safety precautions incident thereto. Notwithstanding the
Owner's Representative's rights of entry hereunder, the Owner's Representative will not be responsible for the
Contractor's failure to perform the work in accordance with the Contract Documents.
LINES AND GRADES
All lines and grades shall be furnished by the Owner's Representative whenever Owner's Representative deems
said lines and grades are necessary for the commencement of the work contemplated by these contract
documents or the completion of the work contemplated by these contract documents. Whenever necessary,
Contractor shall suspend its work in order to permit Owner's Representative to comply with this requirement, but
such suspension will be as brief as practical and Contractor shall be allowed no extra compensation therefore.
The Contractor shall give the Owner's Representative ample notice of the time and place where lines and grades
will be needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless
destruction or removal by Contractor, its Subcontractors, or its employees, such stakes, marks, etc., shall be
replaced by the Owner's Representative at Contractor's expense.
OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY
Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's
Representative has the authority to review all work included herein. The Owner's Representative has the authority
to stop the work whenever such stoppage may be necessary to ensure the proper execution of the contract. The
Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work
which are to be paid for under the contract documents, and shall determine all questions in relation to said work
and the construction thereof, and shall, in all cases, decide every question which may arise relative to the
execution of this contract on the part of said Contractor. The decision of the Owner's Representative shall be
conclusive in the absence of written objection to same delivered to Owner's Representative within fifteen ( 15)
2
19. CONSTRUCTION PLANT
The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution and
completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and it is
also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of
any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted.
The building of structures for the housing of men or equipment will be permitted only at such places as the
Owner's Representative shall consent or direct, and the sanitary conditions of the grounds in or about such
structure shall at all times be maintained in a manner satisfactory to the Owner's Representative.
20. SANITATION
Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public
observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be
approved by the Owner's Representative and their use shall be strictly enforced.
21. OBSERVATION AND TESTING
The Owner or Owner's Representative shall have the right at all times to observe and test the work. Contractor
shall make necessary arrangements and provide proper facilities and access fOr such observation and testing at
any location wherever such work is in preparation or progress. Contractor shall ascertain the scope of any
observation that may be contemplated by Owner or Owner's Representative and shall give ample notice as to the
time each part of the work will be ready for such observation. Owner or Owner's Representative may reject any
such work found to be defective or not in accordance with the contract documents, regardless of the stage of its
completion or the time or place of discovery of such errors and regardless of whether Owner's Representative has
previously accepted the work through oversight or otherwise. If any such work should be covered without approval
or consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination
at Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location
where it is not convenient for Owner or Owner's Representative to make observations of such work or require
testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish
Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to
perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests
will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other
applicable organization as may be required by law or the contract documents.
If any such work which is required to be inspected, tested, or approved is covered up without written approval or
consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative,
be uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and
approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the
requirements of any such tests, inspections or approvals, and any work which meets the requirements of any such
tests or approvals but does not meet the requirements of the contract documents shall be considered defective,
and shall be corrected at the Contractor's expense.
Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by
Owner, Owner's Representative, or other persons authorized under the contract documents to make such
inspections, tests, or approvals shall relieve the Contractor from its obligation to perform the work in accordance
with the requirements of the contract documents.
22. DEFECTS AND THEIR REMEDIES
It is expressly agreed that if the work or any part thereof, or any material brought on the site of the work for use in
the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not
in conformity with plans, specifications and/or contract documents, the Contractor shall, after receipt of written
notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy
such work so that it shall be in full accordance with the contract documents. It is further agreed that any remedial
action contemplated as hereinabove set forth shall be at Contractor's expense.
4
-
-~ '
-,
-
-t
-
-
-
-
' ,
-
-
-
23.
24.
CHANGES AND ALTERATIONS
The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit,
in the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either
before or after the beginning of the construction, without affecting the validity of this contract and the
accompanying bond.
If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a
claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of
work, and the increased work can fairly be classified under the specifications, such increase shall be paid
according to the quantity actually done and at the unit price established for such work under this contract;
otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make
such changes or alterations as shall make useless any work already done or material already furnished or used in
said work, then the Owner shall recompense the Contractor for any material or labor so used, and for actual
expenses incurred in preparation for the work as originally planned.
EXTRA WORK
The term "extra work" as used in this contract shall be understood to mean and include all work that may be
required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change,
alteration or addition to the work as shown on the plans and specifications or contract documents and not covered
by Contractor's bid, except as provided under Changes and Alterations herein.
It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representative
when presented with a written work order signed by the Owner's Representative; subject, however, to the right of
the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the
compensation to be paid to the Contractor for performing said extra work shall be determined by the following
methods:
Method (A)
Method (B)
Method (C)
By agreed unit prices; or
By agreed lump sum; or
If neither Method (A) or Method (B) be agreed upon before the extra work is commenced,
then the Contractor shall be paid the lesser of the following: (1) actual field cost of the
extra work, plus fifteen (15%) percent; or (2) the amount that would have been charged by
a reasonable and prudent Contractor as a reasonable and necessary cost for
performance of the extra work.
In the event said extra work be performed and paid for under Method (C)(1 ), then the provisions of this paragraph
shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen,
timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for
the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred,
together with all expenses incurred directly on account of such extra work, including Social Security, Old Age
Benefits, Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation and all other
insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by
them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be
kept and records of these accounts shall be made available to the Owner's Representative. The Owner's
Representative may also specify in writing, before the work commences, the method of doing the work and the
type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the
Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be
determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership
Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for
the use of machinery and equipment shall be incorporated in the written extra work order. The fifteen percent
(15%) of the actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit,
overhead, general superintendence and field office expense, and all other elements of cost and expense not
embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office
must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall
be included in the "actual field cost."
5
No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. In case
any orders or instructions appear to the Contractor to involve extra work for which Contractor should receive
compensation or an adjustment in the construction time, Contractor shall prior to commencement of such extra
work, make written request to the Owner's Representative for a written order authorizing such extra work. Should
a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and
the Owner's Representative insists-upon its performance, the Contractor shall proceed with the work after making
written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as
provided under Method (C)(1 ). If Contractor does not notify Owner's Representative before the commencement of
any extra work, any claim for payment due to alleged extra work shall be deemed waived.
25. DISCREPANCIES AND OMISSIONS
It is further agreed that it is the intent of the contract documents that all work described in the bid, the
specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that
such price shall include all appurtenances necessary to complete the work in accordance with the intent of these
contract documents as interpreted by Owner's Representative. Notices of any discrepancies or omissions in
these plans, specifications, or contract documents, shall be given to the Owners' Representative and a
clarification obtained before the bids are received, and if no such notice is received by the Owner's
Representative prior to the opening of bids, then it shall be deemed that the Contractor fully understands
the work to be included and has provided sufficient sums in its bid to complete the work in accordance
with these plans and specifications. If Contractor does not notify Owner's Representative before bidding
of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and
specifications are sufficient and adequate for completion of the project. It is further agreed that any
request for clarification must be submitted no later than five (5) calendar days prior to the opening of
bids.
26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT
If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of
work with the rate of progress required under this contract, the Owner or Owner's Representative may order the
Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall
comply with such order.
If, at any time, the working force of the Contractor is inadequate for securing the progress herein specified, the
Contractor shall, if so ordered in writing, increase its force or equipment, or both, to such an extent as to give
reasonable assurance of compliance with the schedule of progress.
27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL INDEMNITY
The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an
insurance company licensed to transact business in the State of Texas, which policy shall comply with the
Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable
precaution for the safety of employees and others on or near the work and shall comply with all applicable
provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment
and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in
Construction" of Associated General Contractors of America, except where incompatible with federal, state or
municipal laws or regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and hold
harmless the Owner and all of its officers, agents and employees against any all losses, costs, damages,
expenses, liabilities, claims and/or causes of action, whether known or unknown, fixed, actual, accrued or
contingent, liquidated or unliquidated, including, but not limited to, attorneys' fees and expenses, in connection
with, incident to, related to, or arising out of, the Contractor's or any subcontractor's, agent's or employee's, in any
manner whatsoever, omission, execution and/or supervision of this contract, and the project which is the subject
matter of this contract.
The safety precautions taken shall be the sole responsibility of the Contractor, in its sole discretion as an
Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given
by the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses,
6
-
.....
r
-
-
-
-
-
are intended as reminders to the Contractor of its duty and shall not be construed as any assumption of duty to
supervise safety precautions· by either the Contractor or any of its subcontractors .
28. f CONTRACTOR'S INSURANCE
The Contractor shall not commence work under this contract until he has obtained all insurance as required in the
General Conditions of the contract documents, from an underwriter authorized to do business in the State of
Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of
cancellation or any material change will be provided ten (10) calendar days in advance of cancellation or change.
All policies of insurance, required herein, including policies of insurance required to be provided by Contractor and
its subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self-insurance,
rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of
payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to the City in
conformity with the provisions hereof shall establish such waiver.
The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance
protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such
insurance shall be carried with an insurance company authorized to transact business in the State of Texas and
shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor,
or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance
specifying each and all coverages shall be submitted prior to contract execution.
PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A
CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF
LUBBOCK AS AN ADDITIONAL INSURED AND PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE
CITY OF LUBBOCK AS REQUIRED BELOW, OR IN THE ALTERNATIVE, SHALL BE ACCOMPANIED BY A
STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT NO WORK ON THIS PARTICULAR
PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS
COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR.
A.
B.
c.
General Liability Insurance (Additional Insured and Waiver of Subrogation required)
The contractor shall have Comprehensive General Liability Insurance with limits of $500,000 Combined
Single Limit in the aggregate and per occurrence to include:
Premises and Operations
Explosion & Collapse Hazard
Underground Damage Hazard
Products & Completed Operations Hazard
Contractual Liability
Independent Contractors Coverage
Personal Injury
Advertising Injury
Owner's and Contractor's Protective Liability Insurance.
For bodily injuries, including accidental death and or property damage, iQ Combined Single Limit. This
policy shall be submitted prior to contract execution.
Comprehensive Automobile Liability Insurance (Additional Insured and Waiver of Subrogation Required)
The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than;
Bodily Injury/Property Damage, $500,000 Combined Single Limit,
7
to include all owned and non-owned cars including: Employers Non-ownership Liability Hired and
Non-owned Vehicles. The City is to be named as an additional insured on this policy for this specific job
and copy of the endorsement doing so is to be attached to the Certificate of Insurance.
D. Builder's Risk Insurance/Installation Floater Insurance.
The Contractor shall obtain a Builder's Risk policy in the amount of 0% of the total contract price (100% of
potential loss) naming the City of Lubbock as insured.
E. Umbrella Liability Insurance (Additional Insured and Waiver of Subrogation required)
The Contractor shall have Umbrella Liability Insurance in the amount of ~on all contracts with coverage
to correspond with Comprehensive General Liability and Comprehensive Automobile Liability coverages.
F. Worker's Compensation and Employers Liability Insurance (Waiver of Subrogation required)
Worker's Compensation Insurance covering all employees whether employed by the Contractor or any
Subcontractor on the job with Employers Liability of at least $500,000.
1. Definitions:
Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority
to self-insure issued by the commission, or a coverage agreement {TWCC-81, TWCC-82, TWCC-
83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's
or entity's employees providing services on a project, for the duration of the project.
Duration of the project -includes the time from the beginning of the work on the project until the
Contractor's/person's work on the project has been completed and accepted by the governmental
entity.
Persons providing services on the project ("subcontractor" in Section 0406.096, Texas Labor
Code) -includes all persons or entities performing all or part of the services the Contractor has
undertaken to perform on the project, regardless of whether that person contracted directly with
the Contractor and regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-
operators, employees of any such entity, or employees of any entity which furnishes persons to
provide services on the project. "Services" include, without limitation, providing, hauling, or
delivering equipment or materials, or providing labor, transportation, or other service related to a
project. "Services" does not include activities unrelated to the project, such as food/beverage
vendors, office supply deliveries, and delivery of portable toilets.
2. The Contractor shall provide coverage, based on proper reporting of classification codes and
payroll amounts and filing of any coverage agreements, which meets the statutory requirements of
Texas Labor Code, Section 401.011 (44) for all employees of the contractor providing services on
the project, for the duration of the project.
3. The Contractor must provide a certificate of coverage to the governmental entity prior to being
awarded the contract.
4. If the coverage period shown on the Contractor's current certificate of coverage ends during the
duration of the project, the Contractor must, prior to the end of the coverage period, file a new
certificate of coverage with the governmental entity showing that coverage has been extended.
5. The Contractor shall obtain from each person providing services on the project, and provide to the
governmental entity:
8
-
-
-
~
-
-'
-
-
-
6
7.
8.
9.
10.
(a) a certificate of coverage, prior to that person beginning work on the project, so the
governmental entity will have on file certificates of coverage showing coverage for all
persons providing services on the project; and
(b) no later than seven days after receipt by the Contractor, a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of
coverage ends during the duration of the project.
The Contractor shall retain all required certificates of coverage for the duration of the project and
for one year thereafter.
The Contractor shall notify the governmental entity in writing by certified mail or personal delivery,
within 10 days after the Contractor knew or should have known, of any change that materially
affects the provision of coverage of any person providing services on the project.
The Contractor shall post on each project site a notice, in the text, form and manner prescribed by
the Texas Workers' Compensation Commission, informing all persons providing services on the
project that they are required to be covered, and stating how a person may verify coverage and
report lack of coverage.
The Contractor shall contractually require each person with whom it contracts to provide services
on the project, to:
(e)
(f)
provide coverage, based on proper reporting of classification codes and payroll amounts
and filing of any coverage agreements, which meets the statutory requirements of Texas
Labor Code, Section 401.011 (44) for all of its employees providing services on the
project, for the duration of the project;
provide to the Contractor, prior to that person beginning work on the project, a certificate
of coverage showing that coverage is being provided for all employees of the person
providing services on the project, for the duration of the project;
provide the Contractor, prior to the end of the coverage period, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the current
certificate ()f coverage ends during the duration of the project;
obtain from each other person with whom it contracts, and provide to the Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the project;
and
(2) a new certificate of coverage showing extension of coverage, prior to the end of
the coverage period, if the coverage period shown on the current certificate of
coverage ends during the duration of the project;
retain all required certificates of coverage on file for the duration of the project and for one
year thereafter;
notify the governmental entity in writing by certified mail or personal delivery, within 10
days after the person knew or should have known, of any change that materially affects
the provision of coverage of any person providing services on the project; and
(g) contractually require each person with whom it contracts to perform as required by
paragraphs (a) -(g), with the certificates of coverage to be provided to the person for
whom they are providing services.
By signing this contract or providing or causing to be provided a certificate of coverage, the
Contractor is representing to the governmental entity that all employees of the Contractor who will
9
provide services on the project will be covered by worker's compensation coverage for the
duration of the project, that the coverage will be based on proper reporting of classification codes
and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance
carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance
Regulation. Providing false or misleading information may subject the Contractor to
administrative penalties, criminal penalties, civil penalties, or other civil actions.
11. The Contractor's failure to comply with any of these provisions is a breach of contract by the
Contractor which entitles the governmental entity to declare the contract void if the Contractor
does not remedy the breach within ten days after receipt of notice of breach from the
governmental entity.
G. Proof of Coverage
Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner
for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence
of compliance with the above insurance requirements, signed by an authorized representative of the
insurance company setting forth:
(1) The name and address of the insured.
(2) The location of the operations to which the insurance applies.
(3) The name of the policy and type or types of insurance in force thereunder on the date borne by
such certificate.
(4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by
such certificate.
(5) A provision that the policy may be canceled only by mailing written notice to the named insured at
the address shown in the bid specifications.
(6) A provision that written notice shall be given to the City ten days prior to any change in or
cancellation of the policies shown on the certificate.
(7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job
specifications. No substitute of nor amendment thereto will be acceptable.
(8) If policy limits are paid, new policy must be secured for new coverage to complete project.
(9) A Contractor shall:
(a) provide coverage for its employees providing services on a project, for the duration of the
project based on proper reporting of classification codes and payroll amounts and filling of
any coverage agreements;
(b) provide a certificate of coverage showing workers' compensation coverage to the
governmental entity prior to beginning work on the project;
(c) provide the governmental entity, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
Contractor's current certificate of coverage ends during the duration of the project;
(d) obtain from each person providing services on a project, and provide to the governmental
entity:
(i) a certificate of coverage, prior to that person beginning work on the project, so
the governmental entity will have on file certificates of coverage showing
coverage for all persons providing services on the project; and
(ii) no later than seven days after receipt by the Contractor, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
10
-
-
-' '
-
-
-
-;-'
-
-
-
(e) retain all required certificates of coverage on file for the duration of the project and for one
year thereafter;
(f)
(g)
notify the governmental entity in writing by certified mail or personal delivery, within 10
days after the Contractor knew or should have known, of any change that materially
affects the provision of coverage of any person providing services on the project;
post a notice on each project site informing all persons providing services on the project
that they are required to be covered, and stating how a person may verify current
coverage and report failure to provide coverage. This notice does not satisfy other
posting requirements imposed by the Texas Worker's Compensation Act or other
commission rules. This notice must be printed with a title in at least 30 point bold type
and text in at least 19 point normal type, and shall be in both English and Spanish and any
other language common to the worker population. The text for the notices shall be the
following text provided by the commission on the sample notice, without any additional
words or changes:
REQUIRED WORKERS' COMPENSATION COVERAGE
(h)
"The law requires that each person working on this site or providing seNices
related to this construction project must be covered by workers' compensation
insurance. This includes persons providing, hauling, or delivering equipment or
materials, or providing labor or transportation or other seNice related to the
project, regardless of the identity of their employer or status as an employee.•
"Call the Texas Workers' Compensation Commission at 5121440-3789 to receive
information of the legal requirements for coverage, to verify whether your
employer has provided the required coverage, or to report an employer's failure to
provide coverage;" and
contractually require each person with whom it contracts to provide services on a project,
to:
(i) provide coverage based on proper reporting of classification codes and payroll
amounts and filing of any coverage agreements for all of its employees providing
services on the project, for the duration of the project;
(ii) provide a certificate of coverage to the Contractor prior to that person beginning
work on the project;
(iii)
(iv)
include in all contracts to provide services on the project the following language:
"By signing this contract or providing or causing to be
provided a certificate of coverage, the person signing this
contract is representing to the governmental entity that all
employees of the person signing this contract who will
provide services on the project will be covered by workers'
compensation coverage for the duration of the project, that
the coverage will be based on proper reprinting of
classification codes and payroll amounts, and that all
coverage agreements will be filed with the appropriate
insurance carrier or, in the case of a self-insured, with the
commission's Division of Self-Insurance Regulation.
Providing false or misleading information may subject the
Contractor to administrative penalties, criminal penalties,
civil penalties, or other civil actions.";
provide the Contractor, prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
11
(v) obtain from each other person with whom it contracts, and provide to the
Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the
project; and
(2) prior to the end of the coverage period, a new certificate of coverage
showing extension of the coverage period, if the coverage period shown
on the current certificate of coverage ends during the duration of the
project;
(vi) retain all required certificates of coverage on file for the duration of the project
and for one year thereafter;
(vii) notify the governmental entity in writing by certified mail or personal delivery,
within 10 days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
(viii) contractually require each other person with whom it contracts, to perform as
required by paragraphs (i)-(viii), with the certificate of coverage to be provided to
the person for whom they are providing services.
29. DISABLED EMPLOYEES
Contractors having more than fifteen (15) employees agree to comply with the Americans with Disabilities Act of
1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such
individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee
compensation, job training, and other terms, conditions, and privileges of employment.
30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS. MATERIALMEN. AND FURNISHERS
OF MACHINERY. EQUIPMENT AND SUPPLIES
Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor agrees that it will indemnify and save the Owner and all of its officers, agents and employees, harmless
against any and all claims, liabilities, losses, damages, expenses and causes of action arising out of, in any way,
manner or form, the demands of subcontractors, laborers, workmen, mechanics, materialmen and furnishers of
machinery and parts thereof, equipment, power tools, and supplies, incurred in the performance of this contract
and the project which is the subject matter of this contract. When Owner so desires, the Contractor shall furnish
satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or
waived.
31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION
The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material
or process covered by letters patent or copyright by suitable legal agreement with the Patentee or owner thereof.
Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and
save the Owner, and all of its officers, agents and employees harmless from any loss on account thereof, except
that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular
design, device, material or process or the product of a particular manufacturer or manufacturers is specified or
required in these contract documents by Owner; provided, however, if choice of alternate design, device, material
or process is allowed to the Contractor, then Contractor shall indemnify and save Owner, and all of its officers,
agents and employees harmless from any loss on account thereof. Notwithstanding anything herein to the
contrary, if the material or process specified or required by Owner and/or this contract is an infringement, the
Contractor shall be responsible for such loss unless it gives written notice of such infringement to the Owner's
Representative prior to bidding.
12
-
-
-'
-
-
-'
-
-
I"""
-
32.
33.
34.
35.
LAWS AND ORDINANCES
The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and
regulations, which in any manner affect the contract or the work, and without limiting, in any way, manner or form,
the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall indemnify and save harmless the
Owner, and all of its officers, agents, and employees against any claims arising from the violation of any such
laws, ordinances, and regulations, whether by the Contractor, its employees, or subcontractors. If the Contractor
observes that the plans and specifications are at variance therewith, he shall notify the Owner's Representative in
writing prior to bidding and any necessary changes shall be adjusted as provided in the contract for changes in the
work. In the absence of timely written notification to Owner's Representative of such variance or variances within
said time, any objection and/or assertion that the plans and specifications are at variance with any federal, state or
local laws, ordinances or regulations shall be deemed waived. If the Contractor, its employees or subcontractors
perform any work contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's
Representative, Contractor shall bear all costs arising therefrom.
The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as
the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may
enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as
though embodied herein.
SUBCONTRACTING
The Contractor agrees that it will retain personal control and will give its personal attention to the fulfillment of this
contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required
in the performance of this contract, shall not relieve the Contractor from its full obligations to the Owner, as
provided by the contract documents.
TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES
It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of
beginning and time for completion as specified in the contract documents, of work to be done hereunder are
essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in
this contract shall be commenced as provided in the contract documents.
If the Contractor should neglect, fail, or refuse to substantially complete the work within the time herein specified,
then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner
may withhold permanently from Contractor's total compensation, the sum of $200 (TWO HUNDRED) PER DAY, YJ
not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every
working day that the Contractor shall be in default after the time stipulated for substantially completing the work.
It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the substantial
completion of the work described herein is reasonable time for the completion of the same, taking into
consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality.
The amount is fixed and agreed upon by and between the Contractor and the Owner because the actual damages
the Owner would sustain in such event would be difficult and/or impossible to estimate, however, the amount
agreed upon herein is a reasonable forecast of the amount necessary to render just compensation to Owner, and
is expressly agreed to be not disproportionate to actual damages as measured at time of breach.
IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND OWNER THAT TIME IS
OF THE ESSENCE OF THIS CONTRACT.
TIME AND ORDER OF COMPLETION
It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the 'contractor shall
be allowed to prosecute its work at such time and sessions, in such order of precedence, and in such manner as
shall be most conductive to economy of construction; provided, however, that the order and time of prosecution
shall be such that the work shall be substantially completed as a whole and in part, in accordance with this
contract, the plans and specifications, and within the time of completion designated in the bid; provided, also, that
13
when the Owner is having other work done, either by contract or by its own force, the Owner's Representative may
direct the time and manner of constructing work done under this contract so that conflicts will be avoided and the
construction of the various works being done for the Owner shall be harmonized.
The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative,
schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which the
Contractor will start the several parts of the work and estimated dates of completion of the several parts.
36. TIME OF PERFORMANCE
The Contractor agrees that it has submitted its bid in full recognition of the time required for the completion of this
project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and
has considered the liquidated damage provisions of paragraph 34 hereinabove set forth and expressly agrees that
it shall not be entitled to, nor will it request, an extension of time on this contract, except when its work has been
delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or other contractors
employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God or the public
enemy, fire or flood. Any request for extension shall be in writing with the written request for same setting forth all
justifications, in detail, for the request, and submitted to Owner's Representative within twenty (20) calendar days
of the occurrence of the event causing said delay. A failure by Owner's Representative to affirmatively grant the
extension no later than twenty (20) calendar days of written submission by Contractor shall be deemed a denial,
and final. Further, in the absence of timely written notification of such delay and request for extension, as provided
herein, any request for extension by Contractor shall be deemed waived.
37. HINDRANCE AND DELAYS
In executing the contract, the Contractor agrees that in undertaking to complete the work within the time herein
fixed, Contractor has taken into consideration and made allowances for all hindrances and delays incident to such
work, whether growing out of delays due to unusual and unanticipated circumstances, difficulties or delays in
securing material or workmen, or any other cause or occurrence. No charge shall be made by the Contractor for
hindrance or delays from any cause during the progress of any part of the work embraced in this contract except
where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in
which event, such expense as in the sole judgment of the Owner's Representative that is caused by such
stoppage shall be paid by Owner to Contractor.
38. QUANTITIES AND MEASUREMENTS
No extra or customary measurements of any kind will be allowed, but the actual measured or computed length,
area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the
event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the
specifications, plans and other contract documents are intended to show clearly all work to be done and material
to be furnished hereunder. Where the estimated quantities are shown, and only when same are expressly stated
to be estimates, for the various classes of work to be done and material to be furnished under this contract, they
are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing
their bids offered for the work. In the event the amount of work to be done and materials to be furnished are
expressly stated to be estimated, and only when same are expressly stated to be estimated, it is understood and
agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ
somewhat from these estimates, and that where the basis for payment under this contract is the unit price method,
payment shall be for the actual amount of work done and materials furnished on the project.
39. PROTECTION OF ADJOINING PROPERTY
The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way
encountered, which may be injured or seriously affected by any process of construction to be undertaken under
this agreement, from any damage or injury by reason of said process of construction; and Contractor shall be
liable for any and all claims for such damage on account of his failure to fully protect all adjacent property. Without
limiting, in any way, manner and form, the indemnity provided by Contractor in paragraph 27 hereof, the
Contractor agrees to indemnify, save and hold harmless the Owner, and any of its officers, agents and employees,
14
40.
41.
-
-
42.
-
-
-
43.
-
-
against any and all claims or damages due to any injury to any adjacent or adjoining property, related to, arising
from or growing out of the performance of this contract.
PRICE FOR WORK
In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by
the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the
specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the
bid proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to
receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all
expenses incurred by Contractor and for well and truly performing the same and the whole thereof in the manner
and according to this agreement, the attached specifications, plans, contract documents and requirements of
Owner's Representative.
PAYMENTS
No payments made or certificates given shall be considered as conclusive evidence of the performance of the
contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective
work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's
Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection
with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there
are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by
Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner, Owner's
agents and employees, which have not theretofore been timely filed as provided in this contract.
PARTIAL PAYMENTS
On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application
for partial payment or, if the Contractor does not submit such application, the Owner's Representative shall
determine the amount to be partially paid. Owner's Representative shall review said application for partial
payment if submitted, and the progress of the work made by the Contractor and if found to be in order, shall
prepare a certificate for partial payment showing as completely as practical the total value of the work done by the
Contractor up to and including the last day of the preceding month. The determination of the partial payment by
the Owner's Representative shall be in accordance with Paragraph 14 hereof.
The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the
Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be
retained until final payment, and further, less all previous payments and all further sums that may be retained by
Owner under the terms of the contract documents.
Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other rights to
enforce the express terms of the contract documents, and all remedies provided therein, as to any and all work
performed, to be performed and/or materials delivered hereunder, including, but limited to, work to which said
partial payment is attributable.
SUBSTANTIAL COMPLETION
Contractor shall give Owner's Representative written notice of substantial completion. Within thirty-one (31)
working days after the Contractor has given the Owner's Representative written notice that the work has been
substantially completed, the Owner's Representative and/or the Owner shall inspect the work and within said time,
if the work be found to be substantially completed in accordance with the contract documents, the Owner's
Representative shall issue to the Owner and Contractor a certificate of substantial completion. Notwithstanding
the issuance of a certificate of substantial completion, Contractor shall proceed with diligence to finally complete
the work within the time provided in this contract.
15
44. FINAL COMPLETION AND PAYMENT
The Contractor shall give written notice to Owner's Representative of final completion. Upon written notice of final
completion, the Owner's Representative shall proceed to make final measurement to determine whether final
completion has occurred. If the Owner's Representative determines final completion has occurred, Owner's
Representative shall so certify to the Owner. Upon certification by Owner's Representative of final completion,
Owner shall pay to the Contractor on or before the 31 st working day after the date of certification of final
completion, the balance due Contractor under the terms of this agreement. Neither the certification of final
completion nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the
obligation for fulfillment of any warranty which may be required in the contract documents and/or any warranty or
warranties implied by law or otherwise.
45. CORRECTION OF WORK
Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's Representative
on account of failure to conform to the contract documents, whether actually incorporated in the work or not, and
Contractor shall at its own expense promptly replace such condemned materials with other materials conforming
to the requirements of the contract documents. Contractor shall also bear the expense of restoring all work of
other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any
such condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative,
Owner may remove and replace it at Contractor's expense.
Neither the final payment, nor certification of final completion or substantial completion, nor any provision in the
contract documents shall relieve the Contractor of responsibility for faulty materials or workmanship, and
Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which
shall appear within a period of one (1) year from the date of certification of final completion by Owner's
Representative.
46. PAYMENT WITHHELD
The Owner or Owner's Representative may, on account of subsequently discovered evidence, withhold or nullify
the whole or part of any certification to such extent as may be necessary to protect itself from loss on account of:
(a) Defective work not remedied and/or work not performed.
{b) Claims filed or reasonable evidence indicating possible filing of claims.
(c) Damage to another contractor.
When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, in the
amount withheld, payment shall be made for amounts withheld because of them.
47. CLAIM OR DISPUTE
It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor
shall be in writing and filed with the Owner's Representative within fifteen ( 15) calendar days after the Owner's
Representative has given any direction, order or instruction to which the Contractor desires to take exception.
Timely written notice of dispute as provided in this contract of any decision by Owner's Representative or Owner
shall be a condition precedent to the bringing and/or assertion of any action or claim by Contractor of any right
under this Contract. If the matters set forth in the notice of dispute are not granted or otherwise responded to by
Owner's Representative within fifteen (15) calendar days of receipt of notice of dispute by Owner's Representative,
said objections shall be deemed denied. Any decision by the Owner's Representative, or deemed denial by the
Owner's Representative, shall be final and conclusive in the absence of fraud. It is further agreed that the
acceptance by the Contractor of the final payment shall be a bar to any and all claims of the Contractor, and
constitute a waiver of the right to assert any claim against Owner, Owner's agents and employees and Owner's
Representative, by Contractor.
16
48. -
-
-
-
-
-
-
-
NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR
In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15) calendar days after
written notification from the Owner or the Owner's Representative, or (2) if the Contractor fails to comply with the
written orders of the Owner's Representative, when such orders are consistent with this contract, then the Surety
on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall be
delivered to the Contractor. In the event a bond is not required by law, or otherwise obtained by the Contractor, no
further notice of such non-compliance to Contractor shall be required.
After receiving said notice of abandonment or non-compliance , the Contractor shall not remove from the work any
machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and
equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the
Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or
credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for
under paragraph 24 of this contract); it being understood that the use of such equipment and materials will
ultimately reduce the cost to complete the work and be reflected in the final settlement.
In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance with the notice
hereinbefore provided within ten (10) calendar days after service of such notice, and/or shall fail to proceed with
diligence to complete the project as contemplated and in compliance with all terms and provisions of the contract
documents, then the Owner may exercise any and all remedies available to it pursuant to law, contract, equity or
otherwise, including, but not limited to, providing for completion of the work in either of the following elective
manners:
(a)
(b)
The Owner may employ such force of men and use of machinery, equipment, tools, materials and
supplies as said Owner may deem necessary to complete the work and charge the expense of such labor,
machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall
be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time
become due to the Contractor under and by virtue of this Agreement. In case such expense is less than
the sum which would have been payable under this contract, if the same had been completed by the
Contractor, then said Contractor shall receive the difference. In case such expense is greater than the
sum which would have been payable under this contract, if the same had been completed by said
Contractor, then the Contractor and/or its Surety shall pay the amount of such excess to the Owner; or
The Owner, under sealed bids, after notice published as required by law, at least twice in a newspaper
having a general circulation in the County of location of the work, may let the contract for the completion of
the work under substantially the same terms and conditions which are provided in this contract. In case of
any increase in cost to the Owner under the new contract as compared to what would have been the cost
under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain
bound therefore. Should the cost to complete any such new contract prove to be less than that which
would have been the cost to complete the work under this contract, the Contractor or his Surety shall be
credited therewith.
In the event the Owner's Representative elects to complete the work, as described above, when the work shall
have been finally completed, the Contractor and his Surety shall be so notified and certification of completion as
provided in paragraph 44 hereinabove set forth, shall be issued. A complete itemized statement of the contract
accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to
Contractor and his Surety, if applicable, whereon the Contractor or his Surety, or the Owner as the case may be,
shall pay the balance due as reflected by said statement within 30 days after the date of certification of completion.
In the event the statement of accounts shows that the cost to complete the work is less than that which would
have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract,
or when the Contractor and/or his Surety, if applicable, shall pay the balance shown to be due by them to the
Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over
to the Contractor and/or his Surety, if applicable. Should the cost to complete the work exceed the contract price,
and the Contractor and/or his Surety, if applicable, fail to pay the amount due the Owner within the time designated
hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work,
notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and
17
his Surety, if applicable, at the respective addresses designated in this contract; provided, however, that actual
written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such
property shall be held at the risk of the Contractor and his Surety, if applicable, subject only to the duty of the
Owner to exercise ordinary care to protect such property. After fifteen (15) calendar days from the date of said
notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived
from such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at either public
or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery,
equipment, tools, materials, or supplies that remain on the jobsite and belong to persons other than the Contractor
or his Surety, if applicable, to their proper owners.
The remedies provided to Owner by law, equity, contract, or otherwise, shall be cumulative, to the extent permitted
by law. It is expressly agreed and understood that the exercise by Owner of the remedies provided in this
paragraph shall not constitute an election of remedies on the part of Owner, and Owner, irrespective of its
exercise of remedies hereunder, shall be entitled to exercise concurrently or otherwise, any and all other remedies
available to it, by law, equity, contract or otherwise, including but not limited to, liquidated damages, as provided in
paragraph 34, hereinabove set forth.
49. LIMITATION ON CONTRACTOR'S REMEDY.
The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work actually
performed by Contractor and/or its subcontractors as set forth in the contract documents, and Owner shall not be
liable for any consequential, punitive or indirect loss or damage that Contractor may suffer in connection with the
project which is the subject matter of this contract.
50. BONDS
The Contractor is required to furnish a performance bond in accordance with Chapter 2253, Government Code, in
the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the
Contractor is required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the
amount of 100% of the total contract price in the event that said contract price exceeds $25,000. All bonds shall
be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do
business in the State of Texas. It is further agreed that this contract shall not be in effect until such bonds are so
furnished.
51. SPECIAL CONDITIONS
In the event special conditions are contained herein as part of the contract documents and said special conditions
conflict with any of the general conditions contained in this contract, then in such event the special conditions shall
control.
52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES
Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the nature of the
work to be done, or from the action of the elements, or from any unforeseen circumstance or from unusual
obstructions or difficulties, naturally occurring, man made or otherwise, which may be encountered in the
prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense.
53. INDEPENDENT CONTRACTOR
Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority to
direct, supervise, and control its own employees and to determine the method of the performance of the work
covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's
work during Contractor's performance and to carry out the other prerogatives which are expressly reserved to and
vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or
effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's
Representative or to the Contractor's own employees or to any other person, firm, or corporation.
18
-
-
-
~
> ' " .
....
-
-
-
-
-
-
-
54.
55.
CLEANING UP
The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at
the completion of the work Contractor shall remove all such debris and also its tools, scaffolding, and surplus
materials and shall leave the work room clean or its equivalent. The work shall be left in good order and condition.
In case of dispute Owner may remove the debris and charge the cost to the Contractor.
HAZARDOUS SUBSTANCES AND ASBESTOS
Hazardous Substances (herein so called), as defined in the Comprehensive Environmental Response,
Compensation, and Liability Act (42 U.S.C.S. §9601 (14)) and the regulations promulgated thereunder, as same
may be amended from time to time, hydrocarbons or other petroleum products or byproducts and/or asbestos, in
any form, shall not (i) be utilized, in any way, manner or form, in the construction of, or incorporation into, the
Project; or (ii) be brought upon, placed, or located, by any party, on the Project site, or any other property of the
City, without the written consent of the Owner's Representative. If Contractor believes that the utilization of a
Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in
the construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of the Project
or other property of the City, a Hazardous Substance, hydrocarbons or other petroleum products or byproducts
and/or asbestos, Contractor shall notify the Owner's Representative, and request consent therefrom, at least
twenty (20) days prior to such action. Owner's Representative may grant or deny the request of Contractor and
provide whatever requirements such consent, if granted, is conditioned upon, in its sole and absolute discretion. If
the request of Contractor is not granted, or otherwise not responded to, by Owner's Representative within five (5)
days of the receipt of said request, said request shall be deemed to be denied.
In the event Owner's Representative shall consent to the request of Contractor, Contractor shall be responsible for
ensuring that all personnel involved in the Project are (i) trained for the level of expertise required for proper
performance of the actions contemplated by this Contract and, in particular, in all aspects of handling, storage,
disposal and exposure of Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or
asbestos; and (ii) are provided and utilize all protective equipment, including without limitation, personal protective
gear, necessary to provide protection from exposure to Hazardous Substances, hydrocarbons or other petroleum
products or byproducts and/or asbestos.
19
-
-
-
-
CURRENT WAGE DETERMINATIONS
-
-
-
-
RE: RESOLUTION NO. 6262, ITEM NO. 39, APRIL 8, 1999
-
EXHIBIT A
l""'I City of Lubbock
Building Construction Trades
Prevailing Rates -
Craft Houri~ Rate -Acoustical Ceiling Installer 11.50
Air Conditioner Installer 12.50
Air Conditioner Installer-Helper 6.25 -Asbestos Worker 9.00
Asbestos Supervisor 12.50
Bricklayer 12.50 -Bricklayer-Helper 7.00
Carpenter 11.00
Carpenter-Helper 7.00
Cement Finisher 8.00 ,.... Drywall Hanger 11.00
Electrician 13.75
Electrician-Helper 7.00 -Equipment Operator-Heavy 9.50
Equipment Operator-Light 8.50
Floor Installer 9.50
Glazier 10.50 -Insulator-Piping/Boiler 11.50
Insulator-Helper 7.00
Iron Worker 11.00 ,., Laborer-General 6.00
Mortar Mixer 6.00
Painter 9.50
Plumber 12.50
~ Plumber-Helper 7.00
Roofer 9.00
~ ' Roofer-Helper 7.00
Sheet Metal Worker 10.00 r""'. Sheet Metal Worker-Helper 7.00
Welder-Certified 11.00
-
EXHIBIT B
Paving and Highway Construction
r. Prevailing Wage Rates
Craft Hourl:x: Rate ,....
Asphalt Heaterman 9.00
Asphalt Shoveler 6.00 -Concrete Finisher 8.00
Concrete Finisher-Helper 7.00
Electrician 12.00
Flagger 6.00 -Form Setter 7.00
Form Setter-Helper 6.25
Laborer-General 6.00
Laborer-Utility 6.75
"""" Mechanic 8.00
Mechanic-Helper 7.00 -Power Equipment Operators
Asphalt Paving Machine 7.75
Bulldozer 8.00
Concrete Paving Machine 7.75 ,...
Front End Loader 7.25
Heavy Equipment Operator 8.00
Light Equipment Operator 7.25
~ Motor Grader Operator 9.50
Roller 6.75
Scraper 7.25
Tractor 7.25 -Truck Driver-Light 6.50
Truck Driver-Heavy 7.00
-
-
2
-
-
-·
-
-
-
-
-
-
EXHIBITC
Prevailing Wage Rates
Overtime Rate
The rate for overtime (in excess of forty hours per week} shall be as required by the Fair Labor Standards Act.
EXHIBITD
Prevailing Wage Rates
Legal Holiday Rate
The rate for legal holidays shall be as required by the fair Labor Standards Act.
3
-
-
-
-
-
SPECIFICATIONS -
-
-
-
-
I .,. I . J .. J . . 1 ' I . . 1 .. l . . I I . ,. J
CENTER PIVOT SPECIFICATIONS
SPECIFICATIONS FOR THE REPLACEMENT OF FNE (5) CENTER PNOT SYSTEMS ARE AS FOLLOWS:
OVERALL LENGTH -MAXIMUM LENGTH FROM CENTER OF PAD TO THE END BOOM OR CENTER OF THE LAST WHEEL TRACK
FOR A SYSTEM W/OAN END BOOM.
HLAS PLOT4 TOTAL LENGTH 1257 FEET. f-'f 2... :: i l--'71
HLAS PLOT 11 TOTAL LENGTH 1253 FEET. + c.f-"'2-= I~ q:j
HLAS PLOT 19 TOTAL LENGTH 1425 FEET. +'f 2. = Ji.ff, 7
HLAS PLOT 21 TOTAL LENGTH 1100 FEET.
LLAS PLOT 35 TOTAL LENGTH 1507 FEET. +'f7...:; 15'17
2
) I J ]
PAGE 1 OF5
REVISED 09-23-02
NO. ITEM
l. MAIN PIPE
2. PIVOT ASSEMBLY
3. TRUSS DESIGN
4. TOWERS
5. ALL TOWERS
J ... 1 . ~. I .. J .. l ) I
CITY OF LUBBOCK
MINIMUM SPECIFICATIONS
FOR
CENTER PIVOT
SPEC
MAKE~~~~~~~~~MODEL~~~~~~~~~~-
MINIMUM REQUIREMENTS
-6 -5/8 IN O.D.
-0.115 IN. WALL THICKNESS
PIPING WILL BE FORMED FROM AISISAE 1010
COIL SHEET OR APPROVED EQUAL
8" O.D. RISER, POLYSEAL GASKET FOR HIGH
AND LOW PRESSURE. 4" X 4" X 3/8" ANGLE
IRON LEGS WITH 4 -2" X 2" X 3/16" ANGLE BRACES
ON ALL 4 SIDES. ADJUSTABLE RING LOCK ELBOW.
CONNECTION BETWEEN PIVOT ASSY. AND THE FIRST
SPAN MUST BE FLEXIBLE TO ALLOW FOR GRADE
CHANGES ON THE FIRST TOWER.
TRUSS RODS %" WITH MFG. STD. HEAVY DUTY
UNDER TRUSS BRACES.
FOUR LEGS CONSTRUCTED OF 3" X 4" X W' ANGEL
IRON BOLTED TO 6-5/8" X 11 GAUGE TUBULAR
NONTOWABLE MOBILE BASE. LEGS MUST HA VE A
MINIMUM OF 5 TIE BRACES. WHEELBASE MINIMUM
13.0 FT. MAXIMUM SPAN LENGTH 160 FEET.
CONNECTIONS MUST BE OF PIN AND HINGE TYPE
DESIGN WITH FLEXIBLE RUBBER BOOT WITH
CLAMPS OR ACCEPTABLE APPROVED EQUIVALENT.
6. ALL STEEL STRUCTURAL COMPONENTS SHALL BE HOT-DIPPED GALVANIZED
TO ASTM 123-73 SPECIFICATIONS. A MINIMUM
COAT OF 2.00 OZ/FT2 AVERAGE SHALL BE APPLIED.
7. FASTENERS ALL FASTENERS USED ON THE SYSTEM SHALL BE
GRADE 5 ZINC COATED OR BETTER.
3
I J ) I .. )
IN COMPLIANCE EXCEPTIONS
( )
( )
( )
( )
( )
( )
J '" 1
PAGE20F5
REVISED 09-23-02
CITY OF LUBBOCK
MINIMUM SPECIFICATIONS
FOR
CENTER PIVOT
SPEC
MAKE MODEL
"] ... J . J ... ] )
~~~~~~~~~ ~~~~~~~~~~-
NO.
8.
ITEM MINIMUM REQUIREMENTS
END BOOMS END BOOMS LENGTHS SHALL NOT EXCEED 40 FEET.
HYDRAULICS: OPERATING PSI 25, MAXIMUM 35 PSI ALL SYSTEMS WILL BE EQUIPPED WITH
360 DEGREE SENNINGER SPRAY NOZZLES SPACED ON 120" CENTERS WITH 30" PLUGGED
OUTLETS, W/PLASTIC PLUGS. RUBBER HOSE DROPS 3' ABOVE GROUND, STANDARD%" X 12"
GOOSENECK USE PIPE DOPE ON ALL GOOSENECKS. EACH DROP SHALL EQUIPPED WITH A
PLASTIC BALL CUT-OFF VALVE. OVERSIZED MAIN LINE DIAMETERS IN A COMBINATION
WITH THE SPECIFIED MINIMUM DIAMETER SHALL BE PROVIDED AS NECESSARY FOR EACH
SYSTEM TO OBTAIN THE DESIRED FLOW VOLUME AT THE DESIRED OPERATING PRESSURE.
MINIMUM FLOWS AT 25 PSI PER SYSTEM AT THE PIVOT POINT -ALL CALCULATION SHALL
USE A 140 C FACTOR -ARE AS FOLLOWS:
HLAS PLOT4
HLAS PLOT 11
HLAS PLOT 19
HLAS PLOT21
LLAS PLOT35
lOOOGPM
800GPM
1350 GPM
700GPM
lOOOGPM
4
IN COMPLIANCE
) '.J
EXCEPTIONS
PAGE3 OF5
REVISED 09-23-02
] . I . ,,. 1 . J ] . ··1
CITY OF LUBBOCK
MINIMUM SPECIFICATIONS
FOR
CENTER PIVOT
SPEC
'J I
MAKE _________ MODEL __________ _
NO. ITEM MINIMUM REQUIREMENTS
ELECTRICAL AND MECHANICAL:
1.
2.
ALL ELECTRICAL ALL ELECTRICAL COMPONENTS MUST COMPLYA
WITH THE FOLLOWING NATIONAL ELECTRIC CODE
SECTIONS.
1. ARTICLE 250-51 EFFECTIVE GROUNDING
2. ARTICLE 250-114 EFFECTIVE GROUNDING
3 ARTICLE 310 MINIMUM SIZE OF CONDUCTORS
4. ARTICLE 210-5 COLOR CODE FOR BRANCH OR CONTROLLED
5. ARTICLE 430 MOTORS, MOTOR CIRCUITS OR CONTROLLED
6. ARTICLE 675 ELECTRICALLY DRIVEN ON CONTROLLED
IRRIGATION MACHINES.
7. NATIONAL FIRE PROTECTION STANDARD NO. 70, NATIONAL ELECTRIC CODE.
PRIMARY POWER 3 PHASE, 480 VOLT, 60 HERTZ
SINGLE PHASE, 120 VOLT, 60 HERTZ
PRIMARY, SINGLE PHASE, 120 VOLT ENCLOSED
SURGE AND LIGHTENING PROTECTION SHALL
BE PROVIDED
1 J ]
IN COMPLIANCE EXCEPTIONS
( )
( )
3. PROGRAMMABLE MAIN SYSTEM ALLOWS FOR PROGRAMMING OF VARIOUS ( ) QTY. 1 .C::-K 1 r fr~
M.L REPLACE:l\IIQ"T
PIVO'ISFGR Hb6t8
WILL USE EXISTING
PANEL BOXES AND
COMMUNICATION
BOXES.
FUNCTIONS CONTROLLED BY DEGREES OF ROTATION.
ACCURACY SHALL BE + OR -1 DEGREE WITH NO OFFSET
TO RESET DEGREES REQUIRED. PROGRAMMABLE
FUNCTIONS TO INCLUDE -CHANGE RA TE OF SPEED.
CHANGE DIRECTION, STOP/START, CONTROL TWO
AUXILIARY PORTS FOR CONTROL OF ANCILLARY EQT.
SAFETY FEATURES TO INCLUDE: DISCONNECT RATED
AT 30 AMPS, 600 VOLTS. PANEL MUST BE COMPATIBLE
W/AIMS TELEMTRY SYSTEM.
5
I
J )
PAGE4 OF 5
REVISED 09-23-02
) , I '] I
CITY OF LUBBOCK
MINIMUM SPECIFICATIONS
FOR
CENTER PIVOT
SPEC
] I ]
MAKE _________ MODEL __________ _
NO.
4.
5.
6.
7.
ITEM
ELECTRIC MOTOR ON
GEAR DRIVES
CENTER DRIVE GEARBOX
WHEEL GEARBOX
ALL WHEELS
MINIMUM REQUIREMENTS IN COMPLIANCE
ALL MOTORS SHALL BE% HP. 460 -480 V AC., 3 PHASE ( )
WITH 1725 RPM AT 60 HZ, AND SHALL BE TOTALLY
ENCLOSED. FULL LOAD TORQUE SHALL BE 36 OZ. FT.
(MIN) AND LOCKED ROTOR TORQUE 220 OZ. FT. (MIN)
MOTORS SHALL BE RATED FOR CONTINUOS DUTY
CYCLE AND HA VE INHERENT OVERLOAD PROTECTION.
BALL BEARINGS SHALL BE DOUBLE SEALED. MOTORS
SHALL HA VE A PLASTIC SHROUD WHICH PROTECTS IT
FROM MOISTURE. MOTOR LEAD SHALL BE RUN IN%"
CONDUIT ALONG MOBIL BASE AND EXTEND UP TOWER
LEG APPROXIMATELY 3-4 FT.
SPUR GEAR DRIVE GEARBOX DESIGNED SPECIFICALLY ( )
FOR USE ON CENTER PIVOT SYSTEMS. OUTPUT RA TIO
40 TO 1. THE GEAR DRIVE MUST BE CAP ABLE OF
DELIVERING A MINIMUM OF 120,000 INCH/POUNDS OF
INSTANTANEOUS TORQUE AND 36,0000 INCH/POUNDS OF
CONTINUOUS TORQUE.
WHEEL GEARBOX ASSEMBLIES SHALL BE RATED AT ( )
60,000 IN-LBS. CONTINUOUS OUTPUT TORQUE AND
CAPABLE OF WITHSTANDING 120,000 IN-LBS.
INSTANTANEOUS OUTPUT TORQUE WITH OUT FAILURE
DURST OR EQUIVALENT 2-1/4" OUTPUT. WHEEL
GEARBOXES SHALL HA VE A BUILT IN EXPANSION
CHAMBER TO PROTECT SEALS AND PREVENT OVER FILLING
ALL WHEELS SHALL HA VE 11.2 X 38 TIRES MOUNTED
ON IO" RIMS.
6
( )
l
EXCEPTIONS
···1 ""J "'] r·J
PAGE50F5
REVISED 09-23-02
NO. ITEM
8. ALIGNMENT
OTHER:
l
CITY OF LUBBOCK
MINIMUM SPECIFICATIONS
FOR
CENTER PIVOT
SPEC
MAKE~~~~~~~~_MODEL~~~~~~~~~~
MINIMUM REQUIREMENTS
LIMIT SWITCH STANDARD -INDUSTRIAL RATED
NON-PLUG IN 680 V AC MAX. SENSITIVE DIFFERENTIAL
TRAVEL. NON CORROSIVE CAM SHAFT AND LINKAGE
COMPONENTS. HEAVY DUTY ACTUAL OR WITH
BUILT-IN HINGE.
-ALL PIVOTS SHALL HA VE A RUNNING LIGHT LOCATED
AT THE END TOWER AND CENTER OF THE MACHINE
-ALL PIVOTS SHALL BE EQUIPPED WITH A MANUALLY
OPERATED GATE VALVE LOCATED ON END OF
MAIN PIPE. MINIMUM 4" VAL VE MOUNTED NO MORE
THAN 6 FEET OFF THE GROUND.
~ 'LL .43 3:)
-CENTER PIVOT LOCATED ON PLOT HLAS 11 SHALL
HA VE AN AUTOMATIC REVERSE AND SAFETY KILL
TO PREVENT SYSTEM FROM RUNNING INTO NON-
IRRIGATED AREA.
-ONE OPERATOR'S MANUAL PER SYSTEM
8'1 Sf'AiJ
-DISMANTLE EXISTING SYSTEMS Al'ID ~
'rO-A: CONVBll.JJEWT CORNER OUTSIDE OF 'ffIE
GIRGIB ~PECIFIETI In' THE CITY OF LUBBOCK
~
i.Jo rvor !Yt oue.
7
IN COMPLIANCE
( )
( )
( )
( )
(
··1 J J
EXCEPTIONS