HomeMy WebLinkAboutResolution - 5483 - Contract - CMH&AC Inc - Lubbock Civic Center Chiller Replacement - 05_08_1997RESOLUTION NO. 5483 Item #33 May 8, 1997 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Contract, attached herewith, by and between the City of Lubbock and Comfort Masters Heating & Air Conditioning, Inc., of Lubbock, Texas, to install and furnish all materials and services as bid for the Lubbock Civic Center Chiller Replacement, and any associated documents, which Contract shall be spread upon the minutes of the Council and as spread upon the minutes of' this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 8th day of ATTEST:" Kay a Darnell, City Secretary AP ROVED AS TO CONTENT: Victor Kilmank Purchasing Manager APPROVED AS TO FORM: Dbfiald G. Vandiver, First Assistant City Attorney da/ccdocs/comfort.res April 28, 1997 5-W3 CITY OF LUBBOCK SPECIFICATIONS FOR LUBBOCK CIVIC CENTER CHILLER REPLACEMENT BID #97086 M0 CITY OF LUBBOCK Lubbock, Texas 1 m VN 0 r c 0 z z 0 Cm co w co �o V CITY OF LUBBOCK INVITATION TO BID FOR TITLE: LUBBOCK CIVIC CENTER CHILLER REPLACEMENT ADDRESS: LUBBOCK, TEXAS BID NUMBER: 97086 PROJECT NUMBER: 9325.9211 CONTRACT PREPARED BY: PURCHASING DEPARTMENT � : 1 INDEX NOTICE TO BIDDERS GENERAL INSTRUCTIONS TO BIDDERS BID SUBMITTAL - BID FOR LUMP SUM CONTRACTS PAYMENT BOND PERFORMANCE BOND CERTIFICATE OF INSURANCE CONTRACT GENERAL CONDITIONS OF THE AGREEMENT CURRENT WAGE DETERMINATIONS SPECIFICATIONS SPECIAL CONDITION a rl e NOTICE TO BIDDERS j.. r , i NOTICE TO BIDDERS BID #97086 Sealed bids addressed to Victor Kilman, Purchasing Manager, City of Lubbock, Texas, will be received in the office of the Purchasing Manager, Municipal Building, 162513th Street, Room L-04, Lubbock, Texas, 79401, until 2:00 'clock p.m. on the 17th day of April, 1997, or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the following described project: "LUBBOCK CIVIC CENTER CHILLER REPLACEMENT" After the expiration of the time and date above first written, said sealed bids will be opened in the office of the Purchasing Manager and publicly read aloud. It is the sole responsibility of the bidder to insure that his bid is actually in the office of the Purchasing Manager for the City of Lubbock, prior to the expiration of the date above first written. The City of Lubbock will consider the bids on the 8th day of May. 1997, at the Municipal Building, 1625 13th Street, Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities. The successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, In the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful bidder will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $25,000. Said statutory bonds should be issued by a company carrying a current Best Rating of 8 or superior, as the rating of the bond company Is a factor that will be considered In determination of the lowest responsible bidder. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without i recourse to the order of the City of Lubbock In an amount not less than 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within 10 days after notice of award of the contract to him. It shall be each bidders sole responsibility to inspect the site of the work and to inform himself regarding all local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered In the preparation of the bid submitted. There will be a pre -bid conference on 8th day of April. 1997, at 10:00 o'clock a.m., in the Purchasing Conference Room L04, Lubbock, Texas Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing Manager of the City of Lubbock, which document is specifically referred to In this notice to bidders. Each bidders attention is further directed to provision of Article 5159a, Vernon's Ann. Civil St., and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisement, minority and women business enterprises will be afforded equal opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, disability, or national origin in consideration for an award. The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -bid meetings and bid openings are available to all persons regardless of disability. If you would like bid information made available in a more accessible format or if you require assistance, please contact the City of Lubbock Human Relations Office at (806) 767-2281 at least 48 hours in advance of the meeting. C /r OFFLL,(UBBO K VICTOR KILMAN PURCHASING MANAGE Bid documents may be obtained upon request from the Purchasing Department at 1626 13th Street, Room L-04, Lubbock, Texas 79401; Telephone (806)767-2167/Fax(806)767-2164. F, GENERAL INSTRUCTIONS TO BIDDERS i r i~ r GENERAL INSTRUCTIONS TO BIDDERS "1 1. SCOPE OF WORK The contractor shall furnish all labor, superintendence, machinery, equipment and all materials necessary to complete this project in accordance with contract documents for the LUBBOCK CIVIC CENTER CHILLER REPLACEMENT. 2. CONTRACT DOCUMENTS All work covered by this contract shall be done In accordance with contract documents described in the General Conditions. All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by said contract documents. r` 3. PLANS FOR USE BY BIDDERS It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without charge of forfeiture of deposit. The contract documents, may be examined without charge as noted in the Notice to Bidders. 4. BIDDER INQUIRIES No bidder shall request any Information verbally. All written requests for additional Information or clarification concerning this bid must be addressed to: RON SHUFFIELD SENIOR BUYER CITY OF LUBBOCK P.O. BOX 2000 + LUBBOCK, TX 79457 f FAX (806)767-2164 5. TIME AND ORDER FOR COMPLETION r The construction covered by the contract documents shall be fully completed within 90 (NINTEY)consecutive calendar days from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful bidder. The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, however, the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated by the contract documents. In the event the City requires a progress schedule to be submitted, and it is determined by the City that the progress of the work is not In accordance with the progress schedule so submitted, the City may direct the Contractor to take such action as the City deems necessary to Insure completion of the project within the time specified. 6. PAYMENT All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents. C 7. AFFIDAVITS OF BILLS PAID The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. 8. MATERIALS AND WORKMANSHIP The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fall to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the site will not relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality which the Owner believes necessary to procure a satisfactory project. 9. GUARANTEES All equipment and materials incorporated In the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any — and all damages of any nature whatsoever resulting in such defects, when such defects appear within ONE year from date of final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of Lubbock). 10. PLANS FOR THE CONTRACTOR The contractor will be furnished one set of plans and specifications, and related contract documents for his use during construction. Plans and specifications for use during construction will only be fumished directly to the Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Contractor. 11. PROTECTION OF THE WORK The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to Contractor. The City reserves the right, after the bids have been opened and before the contract has been awarded, to require of a bidder the following Information: (a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by the intended contract and all work in progress with bond amounts and percentage completed. (b) A sworn statement of the current financial condition of the bidder. (c) Equipment schedule. 12. TEXAS STATE SALES TAX This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the materials to be incorporated into the work without paying the tax at the time of purchase. r r i ,r- 13. PROTECTION OF SUBSURFACE LINES AND STRUCTURES r It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construction of the project contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such underground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired j immediately by Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense. 14. BARRICADES AND SAFETY MEASURES The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, r� and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project. 15. EXPLOSIVES The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from the City. In all cases where written permission is obtained for the use of explosives, the Contractor shall assume full responsibility for all damage which may occur as a direct or indirect result of the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger life or property and the Contractor shall further use only such methods as are currently utilized by persons, firms, *- or corporations engaged in similar type of construction activity. Explosive materials shall not be stored or kept at the construction site by the Contractor. In all cases where explosives are to be used during the construction of the project contemplated by this contract, It shall be the duty of the Contractor to notify each utility company having structures (above or below the ground) In proximity to the site of the work of Contractor's intention to use explosives, and such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury. Such notice, however, shall not relieve the Contractor of responsibility for any damage resulting from his blasting operations. 16. CONTRACTOR'S REPRESENTATIVE i. The successful bidder shall be required to have a responsible local representative available at all'times while the work Is in progress under this contract. The successful bidder shall be required to furnish the name, address and = telephone number where such local representative may be reached during the time that the work contemplated by this contract is In progress. j 17. INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of !: Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business In the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverage's shall be submitted prior to contract execution. The insurance certificates furnished shall name the City as an additional insured, or in the alternative, shall be accompanied by a statement from the Contractor to the effect that no work on this particular project shall be subcontracted. It shall be the contractors responsibility to provide to the owner all proof of coverage insurance documents including workers compensation coverage for each subcontractor. 18. LABOR AND WORKING HOURS Attention of each bidder Is particularly called to the schedule of general prevailing rate of per diem wages included In these contract documents. The wage rate which must be paid on this project shall not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The bidders' attention is further directed to the requirements of Article 5159a, Vernon's Annotated Civil Statutes providing for the payment of the wage schedules above mentioned and the bidder's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in these contract documents does not release the Contractor from compliance with any wage law that may be applicable. Construction work under this contract requiring an inspector will not be performed on weekends or holidays unless the following conditions exist: (1) The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. — (2) Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract and Contractor can show he has made a diligent effort to complete the contract within the allotted time. Before construction work requiring an inspector is to be performed on weekends or holidays, the Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do work and obtain written permission from the Owner's Representative to do such work. The final decision on — whether to allow construction work requiring an Inspector on weekends or holidays will be made by the Owner's Representative. In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life. 19. PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project 7 under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not less often than once each week. The Contractor and each of his subcontractors engaged at the site of the work shall not later than the seventh day following the payment of wages, file with the Owner's -- Representative, or Engineer, a certified, sworn, legible copy of such payroll. This shall contain the name of each employee, his classification, the number of hours worked on each day, rate of pay, and net pay. The affidavit shall state that the copy is a true and correct copy of such payroll, that no rebates or deductions (except as shown) have been made, or will in the future be made from the wages paid as shown thereon. The Contractor "— must classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule Is included in the contract documents. ! I� The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, ten dollars for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such laborer, r workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem wages Included in these contract documents. r 20. PROVISIONS CONCERNING ESCALATION CLAUSES ! Bids submitted containing any conditions which provide for changes in the stated bid price due to increases or decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the f-: bidder without being considered. 21. PREPARATION FOR BID r The bidder shall submit his bid on forms fumished by the City. All blank spaces in the form shall be correctly filled in and the bidder shall state the price both in words and numerals, for which he intends to do the worts contemplated or furnish the materials required. Such prices shall be written in Ink, distinctly and legibly, or typewritten. In case of discrepancy between the price written in words and the price written in figures, the price written in words shall govern. If the bid is submitted by an individual, his name must be signed by him or his duly authorized agent. If a bid is submitted by a firm, association, or partnership, the name and address of each member must be given and the bid signed by a member of the firm, association or partnership, or person duly authorized. If the bid is submitted by a company or corporation, the company or corporate name and business address must be given, and the bid signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign bids must be properly certified and must be in writing and submitted with the bid. The bid shall be executed in ink. Each bid shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and endorsed on the outside of the envelope in the following manner. (a) Bidder's name (b) Bid for (description of the project). Bid submittals may be withdrawn and resubmitted at any time prior to the time set for opening of the bids, but no bid may be withdrawn or altered thereafter. 22. BOUND COPY OF CONTRACT DOCUMENTS Bidder understands and agrees that the contract to be executed by bidder shall be bound and include the following: (a) Notice to Bidders. (b) General Instructions to Bidders. (c) Bidder's Submittal. (d) Statutory Bond (if required). (e) Contract Agreement. (f) General Conditions. (g) Special Conditions (if any). (h) Specifications. 0 Insurance Certificates. 6) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders. If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered incorporated by reference into the aforementioned contract documents. 23. QUALIFICATIONS OF BIDDERS The bidder may be required before the award of any contract to show to the complete satisfaction of the City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service specified therein in a satisfactory manner. The bidder may also be required to give a past history and references in order to satisfy the City of Lubbock in regard to the bidder's qualifications. The City of Lubbock may make reasonable _ investigations deemed necessary and proper to determine the ability of the bidder to perform the work, and the bidder shall furnish to the City of Lubbock all information for this purpose that may be requested. The City of Lubbock reserves the right to reject any bid if the evidence submitted by, or investigation of, the bidder falls to satisfy the City of Lubbock that the bidder is properly qualified to cant' out the obligations of the contract and to complete the work described therein. Evaluation of the bidder's qualifications shall include: 1. The ability, capacity, skill, and financial resources to perform the work or provide the service required. 2. The ability of the bidder to perform the work or provide the service promptly or within the time specified, without delay or interference. 3. The character, integrity, reputation, judgment, experience, and efficiency of the bidder. 4. The quality of performance of previous contracts or services. BID SUBMITTAL I i PLACE: 1625-13th r I %TE: April 17, 1997 6. BID SUBMITTAL LUMP SUM BID CONTRACT 9ROJECT NUMBER: BID 097086 - LUBBOCK CIVIC CENTER CHILLER REPLACEMENT bidof^omiort Mastern Heating & Air Conditioning,Inc. (hereinafter called Bidder) the Honorable Mayor and_City Council City of Lubbock, Texas (hereinafter called Owner) a Gentlemen: e Bidder, in compliance with your invitation for bids for the construction of a 7ubhoc% Civic Center Chiller Replacement Inv# 97086 having carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related tract documents and the site of the intended work, and being familiar with all of the conditions surrounding the "tract of the Intended project including the availability of materials and labor, hereby intends to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications and contract documents, Whin the time set forth therein and at the price stated below. The price to cover all expenses incurred in performing the Frk required under the contract documents. , MATERIALS: Fourty five thousand four hundred sixty eighta($ $45,468.00 ) r- :RVICES:Fourty five thousand nine hundred ($ $45,900.00 ) TALBiD:Ninety one thousand three hundred sixty eight ($_$91,368.00 ) Fmount shalt be shown in both words and numerals. In case of discrepancy, the amount shown In words shall govern.) Bidder hereby agrees to commence the work on the above project on or before a date to be specified in a written 117 :)tice to Proceed" of the Owner and to fully complete the project within 901NINTEY ) consecutive calendar days thereafter as stipulated in the specifications and other contract documents. Bidder hereby further agrees to pay to Owner F, liquidated damages the sum of $500.00 (FIVE HUNDRED DOLLARS) for each consecutive calendar day in excess of time set forth hereinabove for completion of this project, all as more fully set forth in the general conditions of the contract documents. .. Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with il..:truction number 21 of the General Instructions to Bidders. Tding. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the r I' The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days F. the scheduled closing time for receiving bids. The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the ,clans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to commence work on or before the date specified In the written notice to proceed, and to substantially complete the work r-n which he has bid; as provided in the contract documents. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or rtified check Issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, yable without recourse to the order of the City of Lubbock in an amount not less than five percent (5% ) of the total mount of the bid submitted as a guarantee that bidder will enter Into a contract and execute all necessary bonds Of required) within (ten) 10 days after notice of award of the contract to him. r Enclosed with this bid Is a Cashier's Check or Certified Check for Dollars ($ ) ora Bid Bond In the sum of Five thousand nine ►undr liars ($ ), .Which it is agreed shall be collected and retained by the Owner as liquidated damages in the event the bid is accepted by i ie Owner and the undersigned fails to execute the necessary contract documents and the required bond (if any) with the .)caner within ten (10) days after the date of receipt of written notification of acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned upon demand. i Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract documents made available to him for his Inspection in accordance with the Notice to Bidders. We acknowledge four addendum. 73eal if Biddor is a Corporation) 1"TTEST: cretary r I Authorized Signature 91-ezn Davis (Printed or Typed Name) Comfort Masters Heating & Air Conditioning Company Inc. 1101 East 58th St. Address Lubbock Lubbock City, County mx , 79404 State Zip Code Telephone: - 7 4 9 -10 0 0 Fax: - 49-1002 ro 1 1. 72. LIST OF SUBCONTRACTORS Minority Owned Yes No Con -Tech ❑ gi Amco Electric ❑ El N.D. White Engineering ❑ Ei 0 0 0 ❑ 0 0 0 0 0 0 0 0 0 0 Ranger Insurance Company RIC 0226425 Houston, Texas GENERAL POWER OF ATTORNEY CONTRACTAMT: N/A BOND AMT: 95, 900 - Inn BOND No.: RTC 0226425 Know all men by these Presents, that RANGER INSURANCE COMPANY has made, constituted and appointed, and by these presents does make, constitute and appoint Lee W. Taylor its true and lawful Attomey-In-Fact, for it and in its name, place and stead to execute on behalf of the said Company, as surety, bonds, undertakings, contracts of suretyship, and other documents of a similar character issued in the course of its business, and to bind the Company thereby, provided that no bond or undertaking or contract of suretyship executed under their authority shall exceed in the amount the sum of Two Million Five Hundred Thousand and 00/100 Dollars ($2,500,000) This Powerof Attorney is granted and is signed and sealed by the authority of the following Resolution adopted by the Board of Directors of RANGER INSURANCE COMPANY on the 19th day of December, 1995. Resolved: That V. Prem Watsa, Chairman of the Board and Chief Executive Officer, Peter M. Wallner, President and Chief Operating Officer, and Senior Vice Presidents Ronald H. Bay. Michael P. Fay, John L Kenny, Arthur C. Pletz, Philip J. Quinn, or any of them, shall have the power to appoint Attomeys-In-Fact as the business of the Company may require or to authorize any persons to execute on behalf of the Company any bonds, undertakings, recognizances, stipulations, policies, contracts, agreements, deeds and release and assignment of judgments, decrees, mortgages and instruments in the nature of mortgages and also all other instruments and documents which the business of the Company may require and to affix the seal of the Company thereto. Resolved Further: Thatthe Company seal and the signature of any of the aforesaid officers maybe affixed by facsimile to any power of attorney certificate of either given for the execution of any bond, undertaking, contract or suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manusily affixed. In Witness Whereof, RANGER INSURANCE COMPANY has caused its official seal to be hereunto affixed, and these presents to be signed by one of its Vice Presidents and attested by its Secretary this 19th day of December, 1995. RANGER INSURANCE COMPANY""gu Attest: By: t+�OpP oRgr'•. o (4. SEAL :"Secretary Senior Vice President ••., Al..•r* The State of Texas County of Harris On this 3rd day of January, 1996 before me personally came Barbara Blasingame and John Kenny, to me known, who being by me duly swom, did depose and say that they are the Secretary and Senior Vice President of RANGER INSURANCE COMPANY, the Company described in and which executed the above instrument; that they know the seal of the said Company; that the seal affixed to the said instrument is such corporate seal: that it was so affixed by order of the Board of Directors of said corporation and that they signed their names thereto by like order. ' CATHERNE W. OOOM Notary Public NolalyPtbk,SWR01TOM Illy C nmksbrt E11 vs 014160 Fee — Certificate 1, the undersigned, the Senior Vice President of RANGER INSURANCE COMPANY, a Delaware corporation, DO HEREBY CERTIFY that the foregoing and attached Power of Attorney remains in full force and has not been revoked; and furthermore that the Resolution of the Board of Directors, set forth in the said Power of Attorney, is now in force. Signed and sealed in the City of Houston, in the State of Texas. Dated the 17 day of April '19 97 (RiC-GPOA 011096) (Atrur Seal Here) F S i RANGER INSURANCE COMPANY Houston, Texas . BID BOND BOND NUMBER RIC»022§§.Q§..»»• KNOW ALL MEN BY THESE PRESENTS: FIN I • That Comfort Masters Heating and fix„ �Ri)il ......•................................................. ........... r •.......................................•.•.. r.................................... »..................................... of .... &ubbrurlc,...texas.................................... ..»»...... l..... »........ .................... ».»........... .......... ........ .......... 0 as Principal, and RANGER INSURANCE COMPANY, a Delaware corporation, as Surety, are held and firmly bound unto...1.y».%i�bxica,Ck.».........».......»...»..». .......................................................... ............. .................... ..................................... ............. 0......... 0......... as Obligee, In the full and Just sum of ... E1VC...Tb=isa.ad...N1m&..Uuudxed... as>d..no..�y tt3•••--»»•- ...... Dollars, t lawful money of the United States, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, 7 executors, administrators, successors and assigns, jotnify and severally, firmly by these presents. .WHEREAS, the said Principal is herewith submitting its proposal l Replace two centrifugal chillers (owner furnished) For l civic center Lubbock , Texas. Inv. NO.97086. THE CONDITION OF THIS OBLIGATION Is such that If the aforesaid Principal shall be awarded the contract the said Principal will, within the time required. enter Into a formal contract and give a good and sufficient bond to secure the performance of the terms and conditions of the contract, then this obligation to be void; otherwise the Principal and Surety will pay unto the Obligee the difference In money between the amount of the bid of the said Principal and the amount for which the Obligee legally contracts with another party to perform the work it the latter amount be In excess of the former, but in no event shall liability here under exceed the penal sum hereof. ' Signed, sealed and delivered..1.?.,... .7 997 (Data) E , R1C•86-2 ................................................................... (Seal) ................ ,.............. RA � I�I;��IRI� By......................»����»��.....jj. :•T{oe W. Tay . » ..............(seal) 0EMPANY AttomeyIn-fact t LIST OF SUBCONTRACTORS Minority Owned Yes No f 1. ❑ 0 2. 0 0 r 3. ❑ ❑ ,.. 4. 0 ❑ 5. ❑ ❑ 6. ❑ 0 i 7. 0 ❑ . 8. 0 ❑ 9. 0 ❑ 10. 0 ❑ 4 y► s t r' i 4 �e No Text THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A312 Payment"'Bond RIC 0226440 Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): SURETY (Name and Principal Place of Business): Comfort Masters HVAC Ranger Insurance Company 1101 East 58th Street Three Riverway, Suite 960 Lubbock, Texas 79404 Houston, Texas 77056 OWNER (Name and Address): City of. -Lubbock P.O. Box 2000 Lubbock, Texas 79457 CONSTRUCTION CONTRACT Date: 5/8/97 Amount: $91 , 366. 00 Description (Name and Location): Chiller replacement for Civic Center, Lubbock, Texas, BOND Date (Not earlier than Construction Contract Date): Amount:,. $91 , 368.00 Modifications to this Bond: CbNTRA&,6R AS PRINCIPAL (Corporate Seal) otttf C Signature: N"dm¢.�Qd Tjtfe: `Glenn Davis, President (Any additional signatures appear on page 6) 5/8/97 J) None O See Page 6 SURETY Company: (Cor rate Seal) Ranger2RI.�A_ n� C a Signature: Name and Title. Lee W . Tay to , torney- i.n- f ac t 2� (FOR INFORMATION ONLY —Name, Address and Telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE (Architect, Engineer or Enterprise Bonding Agency, Inc. other party): l 14101 Jackfish Ron Shuffield ( Corpus Christi, Texas 78418 (806) 767-2167 —51 2) 242-0335 AIA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND • DEC,EMBER 1"4 ED. • AIA 9 THE AMERICAN tNST17UTE OF ARCHITECTS. 1734 NEW YORK AVE.. N.W., WASHINCTON. D.C. 21146 A312-ISU 4 i THIRO PRINTING • NIARCh 1967 WARNING: Udkenwd phetwoming 119ta" US. Wedanlari low# and It "scl 10 fit9d CmMtultan. r� a• im 1 The Contractor and the Surety. jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the perfor- mance of the Construction Contract, which is incorpo• rated herein by reference. 2 With respect to the Owner, this obligation shall be null and void if t.ie Contractor: 2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and 2.2 pefends, Indemnifies and holds harmless the Owner from claims, demands, liens or suits by any person or entity whose claim, demand, lien or suit is for the payment for labor, materials or equipment fur- nished for use In the performance of the Construction Contract, provided the Owner has promptly notified the Contractor and the Surety (at the address described in Paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety, and provided there Is no Owner Default. 3 With respect to Claimants, this obligation shall be null and void if the Contractor promptly makes pay- ment, directly or indirectly, for all sums due. 4 The Surety shall have no obligation to Claimants under this Bond until- 4.1 Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim. 42 Claimants who do not have a direct contract with the Contractor- .1 Have furnished written notice to the Con-. tractor and sent a copy, or notice thereof, to the Owner, within 90 days after having last performed labor or last furnished materials or equipment Included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed; and .2 Have either received a rejection in whole or In part from the Contractor, or not received within 30 days of furnishing the above no- tice any communication from the Contractor by which the Contractor has indicated the claim will be paid directly or indirectly, and J Not having been paid within the above 30 days. have sent a written notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof. to the Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice fumished to the Contractor. S If a notice required by Paragraph 4 is given by the Owner to the Contractor or to the Surety, that Is suffi- cient compliance. 6 When the Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions: 6.1 Send an answer to the Claimant, with a copy to the Owner, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed. 6.2 Pay or arrange for payment of any undisputed amounts. 7 The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety 6 Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the perfor- rirance of the Construction Contract and to satisfy claims, if any, under any Construction Performance Bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and the Surety under this Bond, subject to the Owner's prior- ity to use the funds for the completion of the work 9 The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelat- ed to the Construction Contract. The Owner shall not be liable for payment of any costs or expenses of any Claim- ant under this Bond. and shaf I have under this Bond no obli- gations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. 10 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts. purchase orders and other obligations. 11 No suit or action shall be commenced by a Claimant under this Bond other than In a court of competent Juris- diction in the location in which the work or part of the work is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by Subparagraph 4.1 or Clause 41.3. or (2) on which the last labor or service was performed by anyone or the last mate- rials or equipment were furnished by anyone under the Con- struction Contract. whichever of (1) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law, the minknum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12 Notice to the Surety. the Owner or the Contractor shall be mailed at delivered to the address shown on the signature page. Actual receipt of notice by Surety, the Owner or the Contractor, however Accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. , 13 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions con• forming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this AIA oOCUMENt Asti • rtItFORMANCE /OND ANO PAYMENT IOND • CKCIMOER 19" to • AiA9 TMf AMtRICAN INS71TUTE Of AkCHITICTS. Ir)S NEW PORK AVE. N.W., WASHINCTON, DC. =16 A312-1984 S TtiIRO PRINTING - MARCH 1941 WOWING. Un kwwd photoceprin9 WOW" U.E. Irrdrmuk trws and U subject 10 1*901 prormdan. If Bond shall be construed as a statutory bond and not as a common law bond_ 14 Upon requestbyany person orentity appearingtobea potential beneficiary of this Bond, the Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made. 15 DEFINITIONS t5.1 Claimant: An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor, materials or equip- ment for use in the performance of the Contract. The intent of this Bond shalt be to include without limita- tion in the terms "labor, materials or equipment" that part of water, $as, power, light, heat, oil, gasoline, telephone service or rental equipment used in the MODIFICKTIONS TO THIS BOND ARE AS FOLLOWS: Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the tabor, materials or equipment were furnished. 15.2 Construction Contract: The agreement between the Owner and the Contractor identified on the sig- nature page, including all Contract Documents and changes tlxrelo. 1S.3 Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Con- tractor as required by the Construction Contract or to perform and complete or comply with the other terms W thereof. (Space Is provided below for additional signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURM Company: (Corporate Seal) Company: (Corporate Seal) Signature: Name and Title: Address: Signature. Name and Tide: Address: AM DOCUMaO A312 o ►MORMANCE "D AND PAYMENT FOND " OECEMUR 1%4 ED. -AAA a THE AMERICAN INSTITUTE OF ARCHITECTS, IM NEW YORK AVE., N.W., WA5HWCTON, D.C. kd" THIRD PRINTING • MARCH �967 WAnNtNG ElaFwnxd ptaboaprr�F �IOIMA Y Z ptYfgwrk I/W� uM 4 wblodto k9d P/OsctyNon A312-1%4 6 r 5-20-1997 11:10AM FROM ENTERPRISE BONDING 512 949 0335 I P. 2 'RISE BONDING AGENCY, INC. 14101 Jacldish Ave_ Corpus Christi, Texas 78418 Ph:512-949-0335 Fax: 512-949-0195 May 20, 1997 The undersigned sureq company represents that it is duty qualified to do business in Texas, and hereby designates Gene OWL CPA 4616 — 34'h Street Lubbock,Texas 79410 806 795-3896 as an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising qut of such suretyship. Approved as to Form City of Lubbock $y: - - -- - -fC CiYfAttorney *Note- If signed by an officer showing that this person has as copy of power of attorney for Ranger Insurance Company Surety *By • Attoraey X*U Fart he Surety Company, there must be on file a certified extract from the by-laws rity to sign such obfigatiosi If signed by an Attorney in Fact, we must have files_ A5-20-97 12:10 RECEIVED FROM:512 949 0335 P.A2 17 Ranger Insurance Company RIC 0226440 Houston, Texas GENERAL POWER OF ATTORNEY CONTRACTANfT: $91 , 368.00 BOND AMT: $91 , 368.00 BOND No.: RIC 0226440 Know all men by these Presents, that RANGER INSURANCE COMPANY has made, constituted and appointed, and by these presents does make, constitute and appoint Lee W. Taylor Its true and lawful Attomey-In-Fact, for It and in Its name, place and stead to execute on behalf of the said Company, as surety, bonds, undertakings, contracts of suretyship, and other documents of a similar character Issued in the course of Its business, and to bind the Company thereby, provided that no bond or undertaking or contract of suretyship executed under their authority shall exceed in the amount the sum of Two Million Five Hundred Thousand and 001100 Dollars ($2,500,000) This Power of Attorney is granted and is signed and sealed by the authority of the following Resolution adopted by the Board of Directors of RANGER INSURANCE COMPANY on the 19th day of December, 1995. Resolved: That V. Prem Weise, Chairman of the Board and Chief Executive Officer, Peter M. Wallner, President and Chief Operating Officer, and Senior Vice Presidents Ronald H. Bay. Michael P. Fay, John L. Kenny, Arthur C. Pletz, Philip J. Ouldn, or any of them, shall have the power to appoint Attomeys-In-Fact as the business of the Company may require or to authorize any persons to execute on behalf of the Company any bonds, undertakings, recognlzences, stipulations, policies, contracts, agreements, deeds and release and assignment of judgments, decrees, mortgages and instruments in the nature of mortgages and also all other Instruments and documents which the business of the Company may require and to affix the seal of the Company thereto. Resolved Further: That the Company seal end the signature of any of the aforesaid officers may be affixed by facsimile to any power of attorney certNicale of either given forthe execution of any bond, undertaking, contract or suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed. In Witness Whereof, RANGER INSURANCE COMPANY has caused its official seal to be hereunto affixed, and these presents to be signed by one of its Vice Presidents and attested by its Secretary this 19th day of December, 1995. RANGER INSURANCE COMPANY pguRANOItN Attest: By: (o". �,OsroR,r p1 SEAL 'a Secretary Senior Vice President '_ The State of Texas County of Harris .. On this 3rd day of January, 1996 before me personally came Barbara Blasingame and John Kenny, to me known, who being by me duly sworn, did depose and say that they are the Secretary and Senior Vice President of RANGER INSURANCE COMPANY, the Company described in and which executed the above instrument; that they know the seat of the said Company; that the seal affixed to the said instrument is such comorate seal; that it was so affixed by order of the Board of Directors of said corporation and that they signed their names thereto by like order. CATHERINE W. C"ER �+ Notary Public e � NoWy Pft SfebeofTom i W1y fbmltifloiofl F.xpFos 01� Certificate I, the undersigned, the Senior Vice President of RANGER INSURANCE COMPANY, a Delaware corporation, DO HEREBY CERTIFY that the foregoing and attached Power of Attorney remains in full force and has not been revoked; and furthermore that the Resolution of the Board of Directors, set forth in the said Power of Attorney, is now in force. Signed and sealed in the City of Houston, in the State of Texas. Dated the 8 th day of May 19 97 (RIC-GPOA 011096) (Affix Seal Here) PERFORMANCE BOND 0 �PM THE AMiERICAN INSTITUTE OF ARCHITECTS 22rr,A��, AIA Document A312 Performance Band! RIC 0226440 Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): Comfort Masters HVAC 1101 East 58th Street Lubbock, Texas 79404 OWNER (Name and Address): City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 CONSTRUCTION CONTRACT Datt: 5/8V91,368.00 97 Amount: 91 , 368.00 Description (Name and location): Chiller SURETY (Name and Principal Place of Business): Ranger Insurance Company Three Riverway, Suite 960 Houston, Texas 77056 replacement for Civic Center, Lubbock, Texas BOND Date (Not earlier than Construction Contract Date): 5 / 8 / 9 7 r Amount: $91 , 368.00 Modifications to this Bond: FiNone -,CQNTRAL�Y43AS PRINCIPAL SURETY :CompaAy�- = (Corporate Seal) Company: Cofifo VAC Ranger 1 ftnmUre: A Signature: Name and Pit: -Glenn Davis, President Name and Title: Lee W. lAnY a dditiondl signatures appear on page 3) A- 0 See Page 3 $eab Attorney-in-fac (FOR INFORMATION ONLY --Name, Address and Telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE (Archittct, Engineer or Enterprise Bonding Agency, Inc, other party): 14101 Jackfish Ron Shuffield. Corpus Christi, Texas 78418 (806) 767-2167 (512) 949-0335 AIA DOCUMENT A312 • PERTOWNANCE BOND ANO PAVMtNT BOND • OECEMBER 19W ED. • AIA 4 Tilt AMERICAN INSTITUTE Or ARCHITECTS, 17J5 NEW 10VX AVE.. N,W., WA54INCTON, D.G. 2"" A312.1994 I TNIRp PAINTING 0 MARCN 1967 WMNIN4: Yntkensed phufaceplInp Nolalss U,S. Im t a" laws MO Is wpj"t to heal proaocutlon. r if The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract, which is Incorporated herein by reference. 2 If the Contractor performs the Construction Contract, the Surety and the Contractor shaft have ►Io obligation under this Bond, except to participate in conferences as provided in Subparagraph 3.1. 3 If there is no Owner Default, the Surety's obligation under this Bond shall arise after: 3.1 The Owner has notified the Contractor and the Surety at its address described in Paragraph 10 below that the Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with the Contractor and the Surely to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Construc- tion Contract. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reason- able time to perform the Construction Contract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare at Contractor Default; and 3.2 The Owner has declared a Contractor Default and formally terminated the Contractor's right to complete the contract. Such Contractor Default shall not be de- clared earlier than twenty days after the Contractor and the Surety have received notice; as provided in Sub- paragraph 3.1; and 3.3 The Owner has agreed to pay the Balance of the Contract Price to the Surety in accordance with the terms of the Construction Contract or to a contractor selected to perform the Construction Contract in accor- dance with the terms of the contract with the Owner. 4 When the. Owner has satisfied the conditions of Para- graph 3, the Surety shalt promptly and at the Surety's ex- pense take one of the following actions; 4.1 Arrange for the Contractor, with consent of the Owner, to perform and complete the Construction Contract; or 4.2 Undertake to perform and complete the Construc- tion Contract itself, through its agents or through inde- pendent contractors; or 4.3 Obtain bids or negotiated proposals from qual4ted contractors acceptable to the Owner for a contract for performance and completion of the Con- struction Contract, arrange for a contract to be pre- pared for execution by the Owner alid the contractor selected with the Owner's concurrence, to be secured with performance and payment bunds executed by a qualified surety equivalent to the bonds Issued on the Construction Contract, and pay to the Owner the amount of damages as described in Paragraph 6 in ex - rest of the Balance of the Contract Price incurred by the Owner resulting from the Contractor's default: or 4.4 Waive Its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: .1 After investigation, determine the amount for which It maybe liable to the Owner and, as soon as practicable after the amount is deter• mined, tender payment therefor to the Owner; or ,2 Deny liability in whole or in part and notify the Owner citing reasons therefor. S If the Surety does not proceed as provided in Paragraph 4 with reasonable promptness, the Surety shall be deemed to be in defaNlj on this Bond fifteen days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner, if the Surety proceeds at provided in Subparagraph 4.4, and the Owner reluses the payment tendered or the Surety has denied liability, to whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner. 6' After the Owner has terminated the Contractor's right to complete the Construction Contract, and if the Surety elects to act under Subparaggraph 4.1, 4.2. or 4.3 above, then the responsibilities of the Surety to the Owner shall not be greater than lhose of the Contractor under the Construction Contract, and the responsibilltie, of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract.7o the limit of the amount of this Bond, but subject to commitment by the Owner of the Balance of the Contract Price to mitigation of costs and damages on the Construction Contract, the Sure• ty is obligated without duplication for: 6.1 The responsibililiet of (fie Contractor for correc- tion of defective work and completion of the Construc- tion Contract; 6.2 Additional legal, design professional and delay costs resulting from the Contractor's Default. and re- sulting from the actions or lailure to act of the Surely under Paragraph 4; and 6.3 Liquidated. damages, or if -no liquidated damages are specified in the Construction Contract, actual dam- ages caused by delayed performance or non-perfor- mance of the Contractor. I The Surety shall not be liable to the Owner or others for obligations of Ifle Contractor that are unrelated to the Con- struction Contract, and the Balance of the Contract Price shalt not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue an this Bond to any person or entity other than the Owner or Its heirs, executors, administrators or successors. I The Surety hereby waives nwit.e of any change, lnclud- ing changes of time, to the Construction Contract or to related subcontracts, purchase ordef and other obliga- tions. A ! Any proceeding, legal or equitable,, under Chit Bond may be inoltuled in any Court of Competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever oc- curs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation avail- A1A COCUARENT Alta s FIRFORMANCe BOND ANn PAYMENT BOND • DECEMBER 11"4 ED. • AIA N T14E AMERICAN INSTITUTE Or ARCHITECTS, 1135 NEW vOAK AVE.. N.W.. WASHINGTON, D.C. I=* A312-1904 Z THIRD PRINTING a MARCH 1987 WARNING: unal:eneW pholocopytny Mtllrtel Y.B. trademaAt Ism and Is subject to Iraat irmsee►Ivon. I F r able to sureties as a defense in the jurisdiction of the suit shall be applicable. 10 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the -address shown on the sig- nature page. 11 When this Bond has been fumished to comply with a statutory or other legal requirement In the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shalt be deemed deleted herefrom and proviglons con- forming to such statutory or other legal requirement shall be deemed incorporated herein. The Intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 12 DEFINITIONS 12.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made, including allowance to the Con - MODIFICATIONS TO THIS BOND ARE AS FOLLOWS a tractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, re- duced by all valid and proper payments made to or on behalf of the Contractor under the Construction Con. tract. 12.2 Construction Contract: The agreement between the Owner and the Contractor identified on the sig- nature pap, including all Contract Documents and changes thereto. 12.3 dontractor Default: failure of the Contractor, which has neither been remedied not waived, to per. form or otherwise to comply with the terms of the Construction Contract. 12.4 Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Con. tractor as required by the Construction Contract or to perform and complete or comply with the other terms • thereof. r (Space is provided below for additional signatures of added parties, other than those appearing on1he cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: lCorporate Seal) Signature: Name and Title: Address: Signature: Name and Title: Address. I^ MA COMMENT AM - PERrORMANCE BOND AND PATMINT BOND - DECtMUR 19N tD. • AtA Qo THE AMERICAN INSTInJTE Or ARCHITECTS, 1735 NEW YORK AVE.. N.W., WASHINCTON, D.C. ?W% A312.19M 3 " THIKO PRINTINC • MARCH I"? WArIMertG: ttnbWwed OhotocMing rtaaq. U.B. Vubr lack Owe and 4 auel+cr to kVg p1swulen 1 5-20-1997 11:10AM FROM ENTERPRISE BOOING 512 949 0335 P.2 I F 'RISE BONDING AGENCY, INC. 14101 7aok ish Ave. Corpus Christi, Texas 78418 Ph:512-949-0335 Fax: 512-949-0195 I&y 20, 1997 The undersigned suretj company represents that it is duty qualified to do business in Teams, and hereby designates gtne 01dell. CPA 4616 — 3e StmELL_ubbock, Texas 79410 (OM 795-3896 as an agent resident in Lubbock County t whom any requisite notices may be delivered and on whom service of process may be had in matters arising 4ut of such suretyship. k 6 Approved as to Form r City of Lubbock /AKNUAILS *Note: If signed by an officer shovving that this person has a copy of power of attorney for r Ranger InStiMnee Company Surety Attorney in Fact he Surety Company, there must be on file a certified extract from the by-laws Thy to sign such obligation- If signed by an Attorney in Fact, we must have flies. r 05-26-97 12:10 RECEIVED FROM:512 949 0335 P.02 Ranger Insurance Company Houston, Texas RIC 022642 GENERAL POWER OF ATTORNEY cowmarAMT: NSA BOND AMT: $ 5 a 900. 00 BOND No.: RIC 02264 2 S Know all men by these Presents, that RANGER INSURANCE COMPANY has made, constituted and appointed, and by these presents does make, constitute and appoint Lee W. Taylor its true and lawful Attomey-In-Fact, for it and in its name, place and stead to execute on behalf of the said Company, as surety, bonds, undertakings, contracts of suretyship, and other documents of a similar character issued in the course of its business, and to bind the Company thereby, provided that no bond or undertaking or contract of suretyship executed under their authority shall exceed in the amount the sum of Two Million Five Hundred Thousand and 001100 Dollars ($2,500,000) This Power of Attorney is granted and is signed and sealed by the authority of the following Resolution adopted by the Board of Directors of RANGER INSURANCE COMPANY on the 19th day of December, 1995. Resolved: That V. Prem Watsa, Chairman of the Board and Chief Executive Officer, Peter M. Wallner, President and Chief Operating officer, and Senior Vice Presidents Ronald H. Bay, Michael P. Fay, John L. Kenny, Arthur C. Pletz, Philip J. ouirin, or any of them, shall have the power to appoint Attorneys -In -Fad as the business of the Company may require or to authorize any, persons to execute on behalf of the Company any bonds, undertakings, recognizances, stipulations, policies, contracts, agreements, deeds and release and assignment of judgments, decrees, mortgages and instruments in the nature of mortgages and also all other instruments and documents which the business of the Company may require and to affix the seal of the Company thereto. Resolved Further: Thai the Company seal and the signature of any of the aforesaid officers may be affixed by facsimile to any power of attorney certificate of eithar given for the execution of any bond, undertaking, contract or suretyship, orother written obligation in the nature thereof, such signature and seat when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed. In Witness Whereof, RANGER INSURANCE COMPANY has caused its official seal to be hereunto affixed, and these presents to be signed by one of its Vice Presidents and attested by its Secretary this 19th day of December, 1995. RANGER INSURANCE COMPANY Attest: By; •o�POR4r':o Z` SEAL ' Secretary Senior Vice President b, �•., t g z3,.•'R'� �f l A W pp., a� The State of Texas County of Harris On this 3rd day of January, 1996 before me personally came Barbara Blasingame and John Kenny, to me known, who being by me duly swom, did depose and say that they are the Secretary and Senior Vice President of RANGER INSURANCE COMPANY, the Company described in and which executed the above instrument; that they know the seal of the said Company; that the seal affixed to the said instrument is such corporate seal: that it was so affixed by order of the Board of Directors of said corporation and that they signed their names thereto by like order. �lll�l4lf�! CATHERINE w CWPFA Notary Public ' a NotarypiwStamofTaeafs Ily►tbmmiafort � fit,28�9 Certificate I, the undersigned, the Senior Vice President of RANGER INSURANCE COMPANY, a Delaware corporation, DO HEREBY CERTIFY that the foregoing and attached Power of Attomey remains in full force and has not been revoked; and furthermore that the Resolution of the Board of Directors, set forth in the said Power of Attorney, is now in force. Signed and sealed in the City of Houston, in the State of Texas. Dated the 17 day of April ,19 97 (RIC-GPOA 011096) (Affix Seal Here) f . i CERTIFICATE OF INSURANCE r r" _r.." ' :5;::;P:is:<is3:':i>;:8i:;;i;S;:fr+ .::. :: . ..................................x.......... .. }::- :4ii'i'•:}•'::v:•: :Q ::•: :: •: •:::: .:.:...:.ii; •..} .... .....i:•Y:;;. ..:. ...:J:Ci :.:{. .r; ...}....: .. :iY. ................ ..............:. X� :nyy.,,}}.{: •: is{�:?i{.::SiA}:r:(:ii:'viiiiiiiiii:>^}i:>:<-i :i`}::iiTi:i�i i:;riii:;:yi;:}' .... ..: :•?::: :.. .}A'..{: .., .,..;....:i:•:?Gi:•isiiiiiii:�:•i::{{•{�:J:�Y•i:J:-0:•iii:: +:.::;:::::;:::;:::;`;:.:::::?•::r;;�.;..:. DATE (MM/DD/YY) 05/18 197 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION QUISENBERRY & ASSOCIATES 4601 66TH ST STE B ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR AL E COVERAGE AFFORDED BY THE POLICIES BELOW. COMPANIES AFFORDING COVERAGE LUBBOCK TX 794i4 COMPANY A TEXAS WORKERS COMP FUND INSURED COMPANY COMFORT MASTER 1101 EAST 58TH STREET B COMMERCIAL UNION INS CO COMPANY LUBBOCK TX 79404 C COMPANY D.................... :::«.>:..g>'>»?>s'>'•<><i':•.?t>''s!s>;>;'•Ei'r'Ei>is?<?Ei>is'>'>>'<>}i1>>'EisE><>"»i>;>G3'`z2'isi.'<'�''<>>=s><>s>>>?<'s>>1>>a':z'>> #Y i?A .....::.:.......... ....... .... .......................:.:..:.::..:::::.:.::......................................................... THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD 1 INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, IXCLU IONS AND CONDITIONS F SUCH POLICIES, LIMIT SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. co LTRTYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE LATE POLICY EXPIRATION DATE (MM/DONY) LIMITS(MM/DD/YY) B GENERAL LIABILITY CRR514987 10/01/96 10/01/97 GENERAL AGGREGATE s 1,000,000 PRODUCTS - COMP/OP AGG S 1,000,000 X COMMERCIAL GENERAL LIABILITY CLAIMS MADE a OCCUR PERSONAL & ADV IN.IURY s 1,000,000 EACH OCCURRENCE s 1,000,000 OWNERS & CONTRACTORS PROT X FIRE DAMAGE (An one fire) s 50,000 L ADDITIONAL INSURED CITY OF LUBBOCK X WAIVER OF SUBROGATION MED EXP (Any one person) s 5,000 t B AUTOMOBILE LIABILITY ANY AUTO FRAB46498 03/17/97 03/17/98 COMBINED SINGLE LIMIT s 1,000,000 X BODILY IN.AIRY (Per person) s ` ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON -OWNED AUTOS X BODILY INJURY (Per eccfdeno s X X ADDL INSURED WAIVER CITY OF LUBBOCK PROPERTY DAMAGE s AUTO ONLY - EA ACCIDENT i OTHER THAN AUTO ONLY: ANY AUTO S i EXCESS LIABILITY225h4300VGARAGE LIABIL TY EACH OCCURRENCE S AGGREGATE s UMBRELLA FORM i OTHER THAN UMBRELLA FORM b A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY THE PROPRIETORI INCL PARTNE R,SEXECUTIVE SBP7033355 10/03/96 10/03/97 - WC STA1% OTIiIFR EL EACH ACCIDENT s 500,000 EL DISEASE - POLICY LIMIT s 500,000 EL DISEASE - EA EMPLOYEE s 500,000 OFFICERS ARE: EXCL OTHER B OWNERS PROTECTIVE OR CRROS12973 05/12/97 12/31/97 BODILY INJURY 250,000 CONTINGENT PUBLIC CITY OF LUBBOCK & & PROPERTY DAMAGE LIABILITY AGNEW ASSOCIATES COMBINED SINGLE LIM DESCRIPTION OF OPERATIONS,LOCATIONSMEHICLESSPECIAL ITEMS LUBBOCK CIVIC CENTER CHILLER REPLACEMENT WORKERS' COMPENSATION - WAIVER OF SUBROGATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE CITY OF LUBBOCK EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL) kV MAIL PO BOX 2000 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT LUBBOCK TX 79457 �1'ri�txxoaxax�rccDi AUTHORED REPRESENTATIVE ,-i a A -il TE9901B (Ed. Effective 3/92) ADDITIONAL INSURED This endorsement modifies insurance provided under the following: COMFORT MASTER, POLICY #FRAB46498 BUSWESS AUTO COVERAGE FORM EFFECTIVE 3/17/97 — 3/17/98 GARAGE COVERAGE FORM TRUCKERS COVERAGE FORM The provisions and exclusions that apply to LIABILITY COVERAGE also apply to this endorsement. CITY OF LUBBOCK, CIVIC CENTER PROJECT CHILLER REPLACEMENT (Enter Name and Address of Additional Insured.) is an insured, but only with respect to legal responsibility for acts or omissions of a person for whom Liability Coverage is afforded under this policy. The additional insured is not required to pay for any premiums stated in the policy or earned from the policy. Any return premium and any dividend, if applicable, declared by us shall be paid to you. You are authorized to act for the additional insured in all matters pertaining to this insurance. We will mail the additional insured notice of any cancellation of this policy. If the cancellation is by us, we will give ten days notice to the additional insured. The additional insured will retain any right of recovery as a claimant under this policy. �r i r i CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT To Be Completed by Appropriate Insurance Agent/Broker Prior to Award of Contract r• I, the undersigned Agent/Broker, certify that the insurance requirements contained in this bid document have been reviewed by me with the below identified Contractor. If the below identified Contractor is awarded this contract by the City of Lubbock, I will be able to, within ten (10) days after being notified of such award by contractor, furnish a valid insurance certificate to the City meeting all of the requirements defined in this bid/proposal. r Agent (Signature) Agent (Print) r, Name of Agent/Broker: Address of Agent/Broker: r City/StatefZip: r Agent/Broker Telephone Number. ( ) � Date: CONTRACTOR'S NAME: (Print or Type ) r' CONTRACTOR'S ADDRESS: NOTE TO AGENTIBROKER if this time requirement is not met, the City has the right to reject this bidlproposal and award the contract to another contractor. If you have any questions concerning these requirements, please contact the Purchasing Manager for the City of Lubbock at (806)767-2165. FBID #87086 - LUBBOCK CIVIC CENTER CHILLER REPLACEMENT r r I r t i F CONTRACTOR CHECKLIST A CONTRACTOR SHALL: (1) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; (4) obtain from each person providing services on a project, and provide to the governmental entity: (A) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (B) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter, (6) notify the governmental entity In writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (7) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE 'The law requires that each person working on this site or providing services related to this construction project must (see reverse) be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment and materials, or providing labor or transportation or other service related to the project, regardless of the Identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512)440- 3789 to receive information on the ' legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employers failure to provide coverage." and (8) contractually require each person with whom it contracts to provide services on a project, to: (A) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (B) provide a certificate of coverage to the contractor prior to that person beginning work on the project; (C) include in all contracts to provide services on the project the language In subsection (e) (3) of this rule; (D) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (E) obtain from each other person with whom it contracts, and provide to the contractor: (i) a certificate of coverage, prior to the other person beginning work on the project; and (H) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (F) retain all required certificates of coverage on file for the duration of the project and for one year thereafter, (G) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (H) contractually require each other person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services-0 r H U H Z O U CONTRACT STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered Into this 8th day of May,1997 by and between the City of Lubbock, I County of Lubbock, State of Texas, acting by and through Windy Sitton, Mayor, thereunto authorized to do so, hereinafter referred to as OWNER, and Comfort Masters Heating & Air Conditioning, Inc. of the City of Lubbock, County of Lubbock and the State of Texas hereinafter termed CONTRACTOR. r WITNESSETH: That for and In consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith Qf any) the CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain Improvements described as follows: BID #97086 - LUBBOCK CIVIC CENTER CHILLER REPLACEMENT - $91,368.00 and all extra work in connection therewith, under the terms as stated In the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, tabor, insurance and other accessories and services necessary to complete the said construction in accordance with the contract documents as defined In the General Condition of Agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified In the contract documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract In accordance r• with the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement In Lubbock, Lubbock County, Texas in the year and day first above written. f— D AS FORM: r` OVEAttorney 4 ATTEST: Corporate Secreta 7 w CONTRACTOR: Co rt rs ng & Air Conditioning, Inc. By: PRINTED NAME: �eri ' "S TITLE: . COMPLETE ADDRESS: Comfort Masters Heating & Air Conditioning, Inc. 1101 East 58th Street Lubbock,Texas 79404 a GENERA! CONDITIONS OF THE AGREEMENT F FGENERAL CONDITIONS OF THE AGREEMENT 1. OWNER Whenever the word Owner, or the expression Party of the First Part, or First Party, are used In this contract, it shall be understood as referring to the City of Lubbock, Texas. 2. CONTRACTOR Whenever the word Contractor, or the expression Party of the Second Part, or Second Party, is used, it shall be understood to mean the person, persons, co -partnership or corporation, to wit Comfort Masters Heating & Air Conditioning, Inc. who has agreed to perform the work embraced in this contract, or to his or their legal representative. 3. OWNER'S REPRESENTATIVE Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as r- referring to, City of Lubbock, under whose supervision these contract documents, including plans and specifications, were prepared, and FREDDY CHAVEZ, OPERATIONSIENGIN EERING SUPERINTENDENT, who will Inspect constructions; or to such other representative, supervisor, or inspector as may be authorized by said Owner to act In any particular under this agreement. Engineers, supervisor or inspectors will act for the "^ Owner under the direction of Owner's Representative, but shall not directly supervise the Contractor or persons 4 acting on behalf of the Contractor. 4. CONTRACT DOCUMENTS The contract's documents shall consist of the Notice to Bidders, General Instructions to Bidders, Bid, Signed Agreement, Statutory Bonds Of required), General Conditions of the Agreement, Special Conditions of the Agreement Of any), Specifications, Plans, Insurance Certificate, and all other documents made available to Bidder for his inspection in accordance with the Notice to Bidders. 5. INTERPRETATION OF PHRASES Whenever the words "Directed; "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed; or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. 6. SUBCONTRACTOR The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shall have no responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract documents, but said Subcontractors' will look exclusively to Contractor for any payments due Subcontractor. 7. WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is Intended, or if delivered at or sent certified mail to the last business address known to him who gives the notice. r- 6 B. WORK Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, fumish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shall be done and all materials furnished in strict conformity with the contract documents. 9. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. 10. LAYOUT Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall accomplish this work in a manner acceptable to the Owners Representative. The Owners Representative will check the Contractors layout of all major structures and any other layout work done by the Contractor at _ Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all work in accordance with the Plans and Specifications. 11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be furnished with one copies of all Plans, Profiles and Specifications without expense to him and he shall keep one copy of same consistently accessible on the job site. — 12. RIGHT OF ENTRY The Owners Representative may make periodic visits to the site to observe the progress of quality of the executed work and to determine, in general, If the work is proceeding in accordance with the contract documents. He will not be required to make exhaustive or continuous onsite Inspections to check the quality or quantity of the work, nor will he be responsible for the construction means, methods, techniques, sequences or procedures, or the safety precautions incident thereto. His efforts will be directed towards providing assurances for the Owner that the completed project will conform to the requirements of the contract documents, but he will not be responsible for the Contractors failure to perform the work in accordance with the Contract Documents. On the basis of his onsite observations, he will keep the Owner informed of the progress of the work and will endeavor to guard the Owner against defects and deficiencies in the work of the Contractor. 13. LINES AND GRADES All lines and grades shall be furnished by the Owners Representative whenever necessary for the commencement of the work contemplated by these contract documents or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend his work in order to permit Owners Representative to comply with this requirement, but such suspension will be as brief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor shall give the Owners Representative ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by him, his Subcontractors, or his employees, such stakes, marks, etc., shall be replaced by the 'Owners Representative at Contractors expense. pr - 1 14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY I Unless otherwise specified, It Is mutually agreed between the parties to this Agreement that the Owner's Representative shall review all work Included herein. He has the authority to stop the work whenever such stoppage may be necessary to insure the proper execution of the contract. In order to permit delays and r' disputes and to discourage litigation, °it is further agreed that the Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under this contract. He shall determine all questions in relation to said work and the construction thereof, and shall, in all cases, r. decide every question which may arise relative to the execution of this contract on the part of said Contractor. The Owner's Representatives' estimates and findings shall be conditions precedent to the right to any action on the contract, and to any rights of the Contractor to receive any money under this contract. The Owner's Representative shall, within a reasonable time, render and deliver to both the Owner and the Contractor a written decision on all claims of the parties hereto and on all questions which may arise relative to the execution of the work or the Interpretation of the contract, specifications and plans. 15. SUPERINTENDENCE AND INSPECTION It is agreed by the Contractor that the Owner's Representative shall be and Is hereby authorized to appoint from time to time such subordinate engineers, supervisors, or Inspectors as the said Ovmer's Representative may deem proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is furnished and said work Is done In accordance with the specifications therefore. The Contractor shall furnish all reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey the directions and Instructions of any subordinate engineers, supervisors or inspectors so appointed, when such directions and Instructions are consistent with the obligations of this Agreement and accompanying plans and specifications provided, however, should the Contractor object to any orders by any subordinate engineer, supervisor or Inspector, the Contractor may within six (6) days make written appeal to the Owner's Representative for his decision. 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during Its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent the Contractor In his absence and all directions given to him shall be binding as if given to the Contractor. Adequate supervision by competent and reasonable representatives of the Contractor Is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Contractor and all risk in connection therewith shall be bome by the Contractor. The Owner or Owner's Representatives will not be responsible for the acts or omissions of the Contractor, or any .- subcontractors, or any of his agents or employees, or any other persons performing any of the work. 17. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the nature and location of the work, the confirmation of the ground, the character, quality and quantity of materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the �• work, and the general and local conditions, and all other matters which in any way effect the work under this contract. No verbal agreement or conversation with any officer, agent, or employee of the Owner, either before or after the execution of this contract, shall effect or modify any of the terms or obligations herein contained. r i" 18. CHARACTER OF WORKMEN The Contractor agrees to employ only orderly and competent men, skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform him in writing that any man or men on the work, are, in his opinion, Incompetent, unfaithful, or disorderly, such man or men shall be discharged from the work and shall not again be employed on the work without the Owner's _ Representative's written consent. 19. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary In the prosecution and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and It is also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until It is finally completed and accepted. The building of structures for the housing of men or equipment will be permitted only at such places as the Owner's Representative shall direct, and the sanitary conditions of the grounds in or about such structure shall at all times be malntained In a manner satisfactory to the Owner's Representative. 20. SANITATION Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. 21. OBSERVATION AND TESTING The Owner or Owner's Representative shall have the right at all reasonable times to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such observation and testing at any location wherever work is in preparation or progress. Contractor shall ascertain the scope of any observation which may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each part of the work will be ready for such observation. Owner or Owner's Representative may reject any work found to be defective or not in accordance with the contract documents, regardless of the stage of its completion or the time or place of discovery of such errors and regardless of whether Owner's Observer has previously accepted the work through oversight or otherwise. If any work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination at Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representative to make observations of such work or require testing of said work, then In such event Owner or Owner's Representative may require Contractor to furnish Owner or Owner's Representative certificates of Inspection, testing or approval,made by persons competent to perforrn such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. If any work which is required to be inspected, tested, or approved is covered up without written approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, Inspections or approval, and any work which meets the requirements of any such tests or approval but does not meet the requirements of the contract documents shall be considered defective. Such defective work shall be corrected at the Contractor's expense. i Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by Owner, Owner's Representative, or other persons authorized under this agreement to make such inspections, tests, or approvals shall relieve the Contractor from his obligation to perform the work in accordance with the requirements of the contract documents. r 22. DEFECTS AND THEIR REMEDIES It is further agreed that if the work or any part thereof, or any material brought on the site of the work for use in �- the work or selected for the same, shall be deemed by the Owner or Owners' Representative as unsuitable or not In conformity with plans, specification and contract documents, the Contractor shall, after receipt of written notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with this contract. It is further agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense. 23. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make such changes or alterations as shall make useless any work already done or material already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for any actual loss occasioned by such change, due to actual expenses incurred in preparation for the work as originally planned. 24. EXTRA WORK The term "extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, alteration or addition to the work as shown on the plans and specifications or contract documents and not covered by Contractor's bid, except as provided under Changes and Alterations herein. It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representative when presented with a written work order signed by the Owner's Representative; subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined by the following methods: Method (A) - By agreed unit prices; or Method (B) By agreed lump sum; or r. Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is commenced, then the Contractor shall be paid the actual field cost of the work, plus fifteen (15%) percent. In the event said extra work be performed and paid for under Method (C), then the provisions of this paragraph shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses Incurred directly on account of such extra work, Including Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation and all r other Insurances as may be required by law or ordinances or directed by the Owner or Owners Representative, or by them agreed to. Owners Representative may direct the form in which accounts of the actual field cost shall be kept and records of these accounts shall be made available to the Owners Representative. The Ownees _ Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership — Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for the use of machinery and equipment shall be Incorporated in the written extra work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and compensate him for his profit, overhead, general superintendence and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractors Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall be Included in the "actual field cost." — No claim for extra work of any kind will be allowed unless ordered In writing by Owners Representative. In case any orders or Instructions appear to the Contractor to Involve extra work for which he should receive compensation or an adjustment In the construction time, he shall make written request to the Owners Representative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and the Owners Representative Insists upon its performance, the Contractor shall proceed with the work after making written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as provided under Method (C). The Contractor will thereby preserve the right to submit the matter of payment to arbitration as herein below provided. 25. DISCREPANCIES AND OMISSIONS It is further agreed that it Is the Intent of this contract that all work described in the bid, the specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that such price shall Include all appurtenances necessary to complete the work In accordance with the Intent of these contract documents as interpreted by Owners Representative. If the Contractor finds any discrepancies or omissions in these plans, specifications, or contract documents, he should notify the Owners' Representative and obtain a clarification before the bids are received, and if no such request is received by the Owners Representative prior to the opening of bids, then it shall be considered that the Contractor fully understands the work to be included and has provided sufficient sums in his bid to complete the work In accordance with these plans and specifications. It is further understood that any request for clarification must be submitted no later than five days prior to the opening of bids. 26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT If at any time the methods or equipment used by the Contractor are found to be Inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owners Representative may order the Contractor in writing to Increase their safety or Improve their character and efficiency and the Contractor shall comply with such order. If, at any time, the working force of the Contractor Is inadequate for securing the progress herein specified, the Contractor shall, if so ordered in writing, increase his force or equipment, or both, to such an extent as to give reasonable assurance of compliance with the schedule of progress. 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an Insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention In Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The Contractor, his sureties and insurance carriers shall defend, Indemnify and save harmless the Owner and all of its officers, agents and employees from all suits, actions, or claims of any character whatsoever, brought for or on account of any injuries or damages received or sustained by any person or persons or property, on account of any negligent act or fault of the Contractor or any subcontractor, their agents or employees, in the execution and supervision of said contract, and the project which is the subject matter of this contract, on account of the failure of Contractor or any subcontractor to provide necessary barricades, warning lights, or signs and will be required to pay any judgment with costs which may be obtained against the Owner or any of its officers, agents, or employees including attorney's fees. The safety precautions taken shall be the sole responsibility of the Contractor, in his sole discretion as an Independent Contractor, inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owners or the Owners Representative concerning omissions under this paragraph as the work progresses, are intended as reminders to the Contractor of his duty and shall not be construed as any assumption of duty to supervise safety precautions by either the Contractor or any of his subcontractors. �- 28. CONTRACTOR'S INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days In advance of cancellation or change. All policies shall contain an agreement on the part of the Insurer waiving the right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted prior to contract execution. The insurance certificates furnished shall name the City as an additional insured, or in the alternative, shall be accompanied by a statement from the Contractor to the effect that no work on this particular project shall be, subcontracted. R shall be the contractors responsibility to provide to the owner all proof of coverage insurance documents including workers compensation coverage for each subcontractor. A. Comprehensive General Liability Insurance The contractor shall have Comprehensive General Liability Insurance with limits of $250,000.00 Combined Single Limit in the aggregate and per occurrence to include: Premises and Operations Explosion & Collapse Hazard Underground Damage Hazard Products & Completed Operations Hazard Contractual Liability Independent Contractors Coverage r- Personal Injury Advertising Injury r B. Owner's Protective or Contingent Public Liability Insurance and Property Damage Liability Insurance. For bodily injuries, including accidental death and or property damage, $250,000.00 Combined Single Limit. This policy shall be submitted prior to contract execution. C. Comprehensive Automobile Liability Insurance The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than; Bodily Injury/Property, Damage, $250,000.00 Combined Single Limit, to Include all owned and nonowned cars Including: Employers Nonownership Liability Hired and Nonowned Vehicles. The City is to be named as an additional insured on this policy for this specific job and copy of the endorsement doing so Is to be attached to the Certificate of Insurance. D. Builders Risk Insurance The Contractor shall obtain a Builder's Risk policy In the amount of 0% of the total contract orice (100°% of potential loss) naming the City of Lubbock as insured. E. Umbrella Liability Insurance The Contractor shall have Umbrella Liability Insurance in the amount of $0.00 on all contracts with coverage to correspond with Comprehensive General Liability and Comprehensive Automobile Liability coverages. F. Worker's Compensation and Employers Liability Insurance Worker's Compensation Insurance covering all employees whether employed by the Contractor or any Subcontractor on the job with Employers Liability of at least $500,000.00. 1. Definitions: Certificate of coverage {"certificate's - A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC- 82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project - includes the time from the beginning of the work on the project until the contractor'stperson's work on the project has been completed and accepted by the governmental entity. — Persons providing services on the project ("subcontractor" in 0406.096) - includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless —" of whether that person has employees. This includes, without limitation, Independent contractors, subcontractors, leasing companies, motor carriers, owner -operators, employees of any such entity, or employees of. any entity which furnishes persons to provide services on the _ project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. -- 2. The contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. r 3. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. 4. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. 5. The contractor shall obtain from each person providing services on the project, and provide to the governmental entity: (a) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (b) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of r coverage ends during the duration of the project. 6 The contractor shall retain all required certificates of coverage for the duration of the project and " r, for one year thereafter. 7. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. a. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 9. The contractor shall contractually require each person with whom it contracts to provide services on the project, to: r: (a) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; r 1 (b) provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (c) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (d) obtain from each other person with whom it contracts, and provide to the contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, If the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter, (f) notify the govemmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (g) contractually require each person with whom it contracts to perform as required by paragraphs (1) - (7), with the certificates of coverage to be provided to the person for whom they are providing services. 10. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the govemmental entity that all employees of the contractor who will provide services on the project will be covered by workers compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self - Insurance Regulation. Providing false or misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. 11. The contractors failure to comply with any of these provisions is a breach of contract by the contractor which entitles the govemmental entity to declare the contract void If the contractor does not remedy the breach within ten days after receipt of notice of breach from the govemmental entity. " G. Proof of Coverage Before work on this contract is commenced, each Contractor and subcontractor shall submit to the ^ Owner for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized representative of the insurance company setting forth: (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. (3) The name of the policy and type or types of insurance in force thereunder on the date bome by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date home by such certificate. — (5) A provision that the policy may be canceled only by mailing written notice to the named insured at the address shown in the bid specifications. ` (6) A provision that written notice shall be given to the City ten days prior to any change in or cancellation of the policies shown on the certificate. (7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job specifications. No substitute of nor amendment thereto will be acceptable. (8) if policy limits are paid, new policy must be secured for new coverage to complete project. (9) A Contractor shall: (a) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (b) (c) (d) (e) (f) (9) (h) rq provide a certificate of coverage showing workers' compensation coverage to the govemmental entity prior to beginning work on the project; provide the govemmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; obtain from each person providing services on a project, and provide to the govemmental entity: (I) a certificate of coverage, prior to that person beginning work on the project, so the govemmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (ii) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; retain all required certificates of coverage on file for the duration of the project and for one year thereafter, notify the govemmental entity in writing by certified mail or personal delivery, within 10 days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed In at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This Includes persons providing, hauling, or delivering equipment and materials, or providing labor or transportation or other service related to the project; regardless of the Identity of their employer or status as an employee." 'Call the Texas Workers' Compensation Commission at 5121440-3789 to receive Information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." and contractually require each person with whom it contracts to provide services on a project, to: (i) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (II) provide a certificate of coverage to the contractor prior to that person beginning work on the project; (iii) include in all contracts to provide services on the project the language in subsection (e) (3) of this rule; Qv) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (v) obtain from each other person with whom it contracts, and provide to the contractor. (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; — (vi) retain all required certificates of coverage on file for the duration of the project and for one year thereafter, (vii) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (vii) contractually require each other person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services. 29. DISABLED EMPLOYEES Contractors having more than 15 employees agree to comply with the Americans with Disabilities Act of 1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee compensation, job training, and other terms, conditions, and privileges of employment. 30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN, AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES The Contractor agrees that he will indemnify and save the Owner harmless from all claims growing out of any demands of subcontractors, laborers, workmen, mechanics, materiaimen and furnishers of machinery and parts thereof, equipment, power tools, all suppliers, including commissary, incurred in the furtherance of the performance of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If during the progress of the work, Contractor shall allow any indebtedness to accrue for work furnished by any of those designated in the preceding paragraph and shall fail to pay and discharge any such indebtedness within five (5) days after demand is made, then Owner may, during the period for which such indebtedness shall remain unpaid, withhold from the unpaid portion of this contract, a sum equal to the amount of such unpaid indebtedness or may apply the sum so withheld to discharge any such indebtedness. ^ Any and all communications between any party under this paragraph must be in writing. t r 31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION r The contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material or process covered by letters patent or copyright by suitable legal agreement with the Patentee or Owner thereof. The Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall Indemnify and save the Owner harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is specified or required in these contract documents by Owner, provided, however, if choice of alternate design, device, material or process is allowed to r- the Contractor, then Contractor shall Indemnify and save Owner harmless from any loss on account thereof. If the material or process specified or required by Owner is an infringement, the Contractor shall be responsible for such loss unless he promptly gives written notice to the Owner of such infringement. 32. LAWS AND ORDINANCES , The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner effect the contract or the work, and shall indemnify and save harmless the Owner against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor or his employees. If the Contractor observes that the plans and specifications are at variance therewith, he shall promptly notify the Owners' Representative In writing and any necessary changes shall be adjusted as provided in the contract for changes In the work. If the Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, he shall bear all costs arising therefrom. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though embodied herein. 33. ASSIGNMENT AND SUBLETTING The Contractor further agrees that he will retain personal control and will give his personal attention to the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from his full obligations to the Owner, as provided by this contractual agreement. 34. TIME FOR COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the contract of work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in this contract shall be commenced on a date to be specified in the Notice to Proceed. If the Contractor should neglect, fail, or refuse to complete the work within the time herein specified, or any proper extension thereof granted by the Owner, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $ 500.00 (FIVE HUNDRED DOLLARS I PER DAY, not as a penalty, but as liquidated `., damages for the breach of the contract as herein set forth for each and every calendar day that the Contractor shall be in default after the time stipulated for completing the work. It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the completion of the work described herein is reasonable time for the completion of the same, taking into consideration the average climatic change and conditions and usual industrial conditions prevailing in this locality. r The amount is fixed and agreed upon by and between the Contractor and the Owner because of the impracticability and extreme difficulty in fixing and ascertaining actual damages the Owner would in such event sustain, and the amount is agreed to be damages the Owner would sustain and shall be retained by the Owner from current periodical estimates for payments or from final payment. It is further agreed and understood between the Contractor and Owner that time is of the essence of this contract. 35. TIME AND ORDER OF COMPLETION It Is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor — shall be allowed to prosecute his work at such time and sessions, in such order of precedence, and in such manner as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution shall be such that the work shall be substantially completed as a whole and in part, in accordance with this contract, the plans and specifications, and within the time of completion designated in the bid; provided, also, that when the Owner is having other work done, either by contract or by his own force, the Owner's Representative may direct the time and manner of constructing work done under this contract so that conflicts will be avoided and the construction of the various works being done for the Owner shall be harmonized. - The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, schedules which shall show the order in which the Contractor intends to cant' on the work, with dates at which the Contractor will start the several parts of the work and estimated dates of completion of the several parts. 36. EXTENSION OF TIME The Contractor agrees that he has submitted his bid in full recognition of the time required for the completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions of paragraph 33 hereinabove set forth and that he shall not be entitled to, nor will he request, an extension of time on this contract, except when his work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or other contractors employed by the owner, or by changes ordered in the work, or by strike, walkouts, acts of God or the public enemy, fire or flood. The Contractor may apply in writing for an extension of time, submitting therewith all written justification as may be required by Owner's Representative for such an extension as requested by Contractor. The Owner's Representative within ten (10) days after receipt of a written request for an extension of time by the Contractor supported by all requested documentation shall then consider such written request and respond to Contractor in writing granting or rejecting the request for an extension of time to complete the project. 37. HINDRANCE AND DELAYS In executing the contract agreement, the Contractor agrees that in undertaking to complete the work within the time herein fixed, he has taken into consideration and made allowances for all hindrances and delays incident to such work, whether growing out of delays in securing material or workmen or otherwise. No charge shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in which event, such expense as in the judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. 38. QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the specifications, plans and other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. "Where the estimated quantities are shown for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing their bids offered for the work. It is understood and agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ M i somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project. 39. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which may be injured or seriously affected by any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; and he shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent property. The Contractor r agrees to indemnify, save and hold harmless the Owner against any claim or claims for damages due to any 7 injury to any adjacent or adjoining property, arising or growing out of the performance of this contract, but such Indemnity shall not apply to any claim of any kind arising out of the existence or character of the work. 40. PRICE FOR WORK In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the bid attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses Incurred by him and for well and truly performing the same and the whole thereof in the manner and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. 41. PAYMENTS No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or In part, nor shall any certificate or payment be considered as acceptance of defective work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection with the work. Before final payment Is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there t are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner which have r,W not theretofore been timely filed as provided in this contract. 42. PARTIAL PAYMENTS r' On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application k for partial payment. Owner's Representative shall review said application for partial payment and the progress of the work made by the Contractor and if found to be in order shall prepare a certificate for partial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month; said statement shall also include the value of all sound materials delivered on site of the work that are to be fabricated into the work. The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that may be retained by Owner under the terms of this agreement. It Is understood, however, that in case the whole work be near to completion, and this fact Is certified to by Owner's Representative and some unexpected and some unusual delay occurs due to no fault or negligence on the part of the Contractor, the Owner may upon written recommendation of Owner's Representative pay a reasonable and equitable portion of the retained percentage due Contractor. 43. FINAL COMPLETION AND ACCEPTANCE Within thirty-one (31) days after the Contractor has given the Owner's Representative written notice that the work has been completed or substantially completed, the Owner's Representative and the Owner shall inspect the work and within said time, if the work be found to be completed or substantially completed in accordance with the contract documents, the Owner's Representative shall issue to the Owner and Contractor his certificate of completion, and thereupon it shall be the duty of the Owner within thirty-one (31) days to issue a certificate of acceptance of the work to the Contractor. 44. FINAL PAYMENT Upon the issuance of the certificate of completion, the Owner's Representative shall proceed to make final measurement and prepare a final statement of the value of all work performed and materials fumished under the terms of the agreement, and shall certify same to the Owner, who shall pay to the Contractor on or before the 31 st day after the date of certificate of completion, the balance due Contractor under the terms of this agreement, provided he has fully performed his contractual obligations under the terms of this contract; and said payment shall become due in any event upon said performance by the Contractor. Neither the certificate of acceptance nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required in the special conditions (if any) of this contract or required in the specifications made a part of this contract. 45. CORRECTION OF WORK BEFORE FINAL PAYMENT FOR WORK Contractor shall promptly remove from Owners' premises all materials condemned by the Owner's Representative on account of failure to conform to the contract, whether actually incorporated in the work or not, and Contractor shall at his own expense promptly replace such condemned materials with other materials conforming to the requirements of the contract. Contractor shall also bear the expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative, Owner may remove and replace it at Contractor's expense. 46. CORRECTION OF WORK AFTER FINAL PAYMENT Neither the final payment nor certificate nor any provision in this contract shall relieve the Contractor of responsibility for faulty materials or workmanship, and he shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which shall appear within a period of one (1) year from the date of substantial completion. The Owner or the Owner's Representative shall give notice of observed defects with reasonable promptness. 47. PAYMENT WITHHELD The Owner may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certificate to such extent as may be necessary to protect himself from loss on account of. (a) Defective work not remedied. (b) Claims filed or reasonable evidence indicating possible filing of claims. (c) Failure of the Contractor to make payments promptly to subcontractors or for materials or labor. r (d) Damage to another contractor. When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, which will protect the Owner in the amount withheld, payment shall be made for amounts withheld because of them. 48. TIME OF FILING CLAIMS It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) days after the Owner's Representative has given any directions, order or instruction to which the Contractor desires to take exception. The Owners' Representative shall reply to such written exceptions by the Contractor and render his final decision In writing. In case the Contractor should appeal from the decision of the Owner's Representative, any demand for arbitration shall be filed with the Owner's Representative and the Owner in writing within ten (10) days after the date of delivery to Contractor of the final decision of the Owner's Representative. It is further agreed that final acceptance of the work by the Owner and the acceptance by the Contractor of the final payment shall be a bar to any claim by either party, except where noted otherwise in the contract documents. 49. ABANDONMENT BY CONTRACTOR In case the Contractor should abandon and fail or refuse to resume work within ten (10) days after written notification from the Owner or the Owner's Representative, or if the Contractor fails to comply with the orders of r the Owner's Representative, when such orders are consistent with this contract, this Agreement, or the Specifications hereto attached, then the Surety on the bond shall be notified In writing and directed to complete the work and a copy of said notice shall be delivered to the Contractor. After receiving said notice of abandonment, the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In case the Surety should fail to commence compliance with the notice for completion hereinbefore provided for within ten (10) days after service of such notice, then the Owner may provide for completion of the work in either of the following elective manners: (a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and supplies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been completed by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been completed by said Contractor, then the Contractor and/or his Surety shall pay the amount of such excess to the Owner, or (b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspaper having a general circulation in the County of location of the work, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such Increase shall be charged to the Contractor and the Surety shall be and remain bound therefore. However, should the cost to complete any such new contract prove to be less than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. When the work shall have been substantially completed, the Contractor and his Surety shall be so notified and certificates of completion and acceptance, as provided In paragraph 42 hereinabove set forth, shall be issued. A r. complete itemized statement of the contract accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to Contractor and his Surety, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of certificate of completion. In the event the statement of accounts shows that the cost to complete the work Is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety shall pay the balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety. Such sale may be made at either public or private sale, with or without notice, as the -- Owner may elect. The Owner shall release any machinery, equipment, tools, materials, or supplies which remain on the *jobsite and belong to persons other than the Contractor or his Surety, to their proper owners. 50. ABANDONMENT BY OWNER In case the Owner shall fail to comply with the terms of this contract, and should fail or refuse to comply with said terms within ten (10) days after written notification by the Contractor, then the Contractor may suspend or wholly abandon the work, and may remove therefrom all machinery, tools, and equipment, and all materials on the ground that have not been included In payments to the Contractor and have not been incorporated into the work. Thereupon, the Owner's Representative shall make an estimate of the total amount earned by the Contractor, which estimate shall include the value of all work actually completed by said Contractor at the prices stated in the attached bid, the value of all partially completed work at a fair and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided for by the terms of this contract, and a reasonable sum to. cover the cost of any provisions made by the Contractor to carry the whole work to completion, and which cannot be utilized. The Owner's Representative shall then make a final statement of the balance due the Contractor by deducting from the above estimate all previous payments by the Owner and all other sums that may be retained by the Owner under the terms of this Agreement, and shall certify same to the Owner who shall pay to the _ Contractor on or before thirty (30) days after the date of the notification by the Contractor the balance shown by said final statement as due the Contractor, under the terms of this Agreement. 51. BONDS The successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful bidder will be required to furnish a payment bond In accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $25,000. All bonds, if required, shall be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do business In the State of Texas. And it is further agreed that this contract shall not be in effect until such bonds are so furnished. 52. SPECIAL CONDITIONS In the event special conditions are contained herein as part of the contract documents and said special conditions conflict with any of the general conditions contained In this contract, then in such event the special conditions shall control. 53. LOSSES FROM NATURAL CAUSES Unless otherwise specified herein, all loss or damage to the Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the same, or from unusual obstructions or difficulties which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. r54. INDEPENDENT CONTRACTOR r.., Contractor Is, and shall remain, an independent contractor with full, complete and exclusive power and authority to direct, supervise, and control his own employees and to determine the method of the performance of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's work during his performance and to carry out the other prerogatives which are expressly reserved to and vested P" in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. i 55. CLEANING UP Y The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at the completion of the work he shall remove all such debris and also his tools, scaffolding, and surplus materials and shall leave the work room clean or its equivalent. The work shall be left in good order and condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor. xeso.lucion No. Dizi r" March 14, 1996 Item #19 l' L RESOLUTION i WHEREAS, the City Council has heretofore established the general prevailing rate of i per diem wages for each craft or type of workmen or mechanics needed to execute public ` i works contracts for the City of Lubbock in accordance with the provisions of Vernon's (� Ann.Civ.St., Art. 5159a; and I: r" I: ! WHEREAS, such wage rates were established by Resolution No. 719 enacted February i 12, 1981, updated by Resolution No. 1590 enacted February 23, 1984, and further updated by Resolution No. 2502 enacted January 8, 1987; and WHEREAS, such rates need to be updated at the present time in order to reflect the current prevailing rate of per diem wages; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: `" ? THAT the general prevailing rate of per diem wages for public works contracts shall be as set forth in the following named exhibits, which exhibits shall be attached hereto and made ! a part hereof for all intents and purposes: Exhibit A: Building Construction Trades. .. Exhibit B: Paving and Highway Construction Exhibit C. Overtime Rate Exhibit D: Weekend and Holiday Rate ;I Such wage rates are hereby found and declared to be the general prevailing rate of per diem wages in all localities where public works are undertaken on behalf of the City of Lubbock and such wage rates shall be included in all public works contracts as provided by law. Passed by the City Council this 14th ATTEST: Betty M. Anson, City Secretary APPROVED AS TO CONTENT: avA461c�- Mary AndrVws, Managing Director of Human Resources APPROVED AS TO FORM: afold Willard; Assistant City Attorney H W :da/ccdocs/pubworks. res February 14, 1996 rch , 1996. 2 CURRENT WAGE DETERMINATIONS EXHIIBIT A City of Lubbock Building Construction Trades Prevailing Rates Cry Hourly Rate Acoustical Ceiling Installer 10.00 Air Conditioner Installer 11.00 Air Conditioner Installer -Helper 5.50 Asbestos Worker 8.00 Asbestos Supervisor 11.00 Bricklayer 11.00 Bricklayer -Helper 6.00 Carpenter 11.00 Carpenter -Helper 6.00 Cement Finisher 7.50 Drywall Hanger 10.00 Electrician 13.00 Electrician -Helper 6.00 Equipment Operator -Heavy 8.50 Equipment Operator -Light 7.50 Floor Installer 8.50 Glazier 8.00 Insulator-Piping/Boiler 9.00 Insulator -Helper 5.50 Iron Worker 8.00 Laborer -General 5.50 Mortar Mixer 5.50 Painter 9.50 Plumber 10.50 Plumber -Helper 6.00 Roofer 8.00 Roofer -Helper 5.50 Sheet Metal Worker 8.75 Sheet Metal Worker Helper 5.50 Welder -Certified 10.00 j fl i EXEO[Brr B Paving and Highway Construction Prevailing Wage .Rates Craft Hourly Rate Asphalt Heaterman 6.00 Asphalt Shoveler 5.50 Concrete Finisher 7.35 Concrete Finisher -Helper 5.75 Electrician 10.50 Flagger 5.50 Form Setter 6.50 Form Setter -Helper 5.50 Laborer -General 5.50 Laborer -Utility 6.25 Mechanic 7.25 Mechanic -Helper 5.50 Power Equipment Operators Asphalt Paving Machine 7.00 Bulldozer 7.00 Concrete Paving Machine 7.00 Front End Loader 6.50 Heavy Equipment Operator 7.00 Light Equipment Operator 6.50 Motor Grader Operator 8.50 Roller 6.00 Scraper 6.50 Tractor 6.50 Truck Driver -Light 6.00 Truck Driver -Heavy 6.50 r EXHIBIT C Prevailing Wage Rates Overtime Rate The rate for overtime (in excess of forty hours per week) is 1 1/2 times base rate. EXHIBIT D Prevailing Wage Rates Weekend and Holiday Rate The rate for weekend and holiday is 1 1/2 times base rate. 1 aft SPECIFICATIONS AGNEW ASSOCIATES, INC. PROJECT NUMBER 95118 LUBBOCK CIVIC CENTER CHILLER REPLACEMENT TABLE OF CONTENTS DMSION 15 MECHANICAL SECTION TITLE PAGE 15000 GENERAL PROVISIONS FOR MECHANICAL 1-9 15200 PIPING AND ACCESSORIES 1-4 15230 CHILLED WATER SYSTEMS 1-2 15250 CONDENSING WATER SYSTEM 1-2 15330 HANGERS AND SUPPORTS 1-2 15400 INSULATION 1-3 15500 EQUIPMENT 1-9 15600 TESTING, ADJUSTING AND BALANCING MECHANICAL SYSTEMS 1-1 15700 TEMPERATURE REGULATION 1-2 DWAYNE R.3764. AGNEW; �c ,U SECTION 15000 GENERAL PROVISIONS FOR MECHANICAL PART 1 - GENERAL 1.01 CHECKING DOCUMENTS: A. The drawings and the specifications are numbered consecutively. The Contractor shall check the drawings and specifications thoroughly and shall notify the Engineer of any discrepancies or omissions of sheets or pages. Upon notification, the Engineer will promptly provide the Contractor with any missing portions of the drawings or specifications. No discrepancies or omissions of sheets or pages of the contract documents will relieve the Contractor of his duty to provide all work required by the complete contract documents. r j 1.02 GENERAL: A. In general, the lines to be installed by the various trades under these specifications shall be run as indicated, as specified herein, as required by particular conditions at the site, and as required to conform to the generally accepted standards as to complete the work in a neat and satisfactorily workable manner. The following is a general outline concerning the running of various lines and ducts and is to be excepted where the drawings or conditions at the building necessitate deviating from these standards. B. Piping and ductwork may be run exposed in machinery and equipment spaces, where serving as connections to equipment items in finished rooms where exposed connections are required, and elsewhere as indicated on the drawings or required. C. The Contractor shall thoroughly acquaint himself with the details of the construction and finishes before submitting his bid as no allowances will be made because of the Contractor's unfamiliarity with these details. D. The mechanical plans do not give exact details as to elevations of lines and ducts, exact locations, etc., and do not show all the offsets, control lines, pilot lines and other installation details. The Contractor shall carefully lay out his work at the site to conform to the architectural and structural conditions, to provide: proper grading of lines, to avoid all obstruction, to conform to details of installation supplied by the manufacturers of the equipment to be installed, and thereby to provide an integrated, satisfactorily operating installation. E. The mechanical plans do not give exact locations of equipment items. The exact location of each item shall be determined by reference to the general plans and to all detail drawings, equipment drawings, roughing -in drawings, etc., by measurements at the building, and in cooperation with other sections. Minor relocations necessitated by the conditions at the site or as directed by the Engineer shall be made without any additional cost accruing to the Owner. 15000 - 1 r i' F. The Contractor shall be responsible for the proper fitting of his material and apparatus into the space. Should the particular equipment which any bidder proposes to install require other space conditions than those indicated on the drawings, he shall arrange for such space with the Engineer before submitting his bid. Should changes become necessary on account of failure to comply with this clause, the Contractor shall make such necessary changes at his (the Contractor's) own expense. G. The Contractor shall submit working scale drawings of all his apparatus and equipment which in any way varies from these specifications and plans, which shall be _ checked by the Engineer before the work is started, and interferences with the structural conditions shall be corrected by the Contractor before the work proceeds. H. Piping serving outlets on items of equipment shall be run in the most appropriate manner. Where the equipment is of the open type, the lines shall be run as close as possible to the underside of the top and in a neat and inconspicuous manner. I. Exceptions and inconsistencies in plans and specifications shall be brought to the Engineer's attention before the contract is signed. Otherwise, the Contractor shall be responsible for any and all changes and additions that may be necessary to accommodate his particular apparatus, material, or equipment. J. The Contractor shall distinctly understand that the work described herein and shown on the accompanying drawings shall result in a finished and working job, and any item required to accomplish this intent shall be included whether specifically mentioned or not. 1.03 DIMENSIONS: A. Before ordering any material or doing any work, the Contractor shall verify all dimensions, including elevations, and shall be responsible for the correctness of the same. No extra charge or compensation will be allowed on account of differences between actual dimensions and measurements indicated on the drawings. Any difference which may be found shall be submitted to the Engineer for consideration before proceeding with the work. 1.04 INSPECTION OF SITE: A. The accompanying plans do not indicate completely the existing mechanical installations. The bidders for the work under these sections of the specifications shall inspect the existing installations and thoroughly acquaint themselves with conditions to be met and the work to be accomplished in removing and modifying the existing 15000 -' 2 i. work, and in installing the new work in the present building and underground serving to and from that structure. Failure to comply with this shall not constitute grounds for any additional payments in connection with removing or modifying any part of the existing installations and/or installing any new work. 1.05 ELECTRICAL WIRING: A. All electric wiring, except for temperature control will be done under Division 16 of these specifications. The Contractor for each section shall erect all his motors in place ready for connections. The Contractor, under Division 16, shall mount all the starters and controls, furnishing the supporting structures and any required outlet boxes. B. Every electrical current consuming device furnished as a part of this project, or furnished by the Owner and installed in this project, shall be completely wired up under Division 16. Verification of exact location, method of connection, number and size of wires required, voltage requirements, and phase requirements is the responsibility of the Contractor under Division 16. If conflicts occur between the drawings and the actual requirements, actual requirements shall govern. 1.06 MOTORS AND CONTROLS: A. All motors furnished under any of the several sections of these specifications shall be of recognized manufacture, of adequate capacity for the loads involved and wound for the current characteristics shown on the electrical drawings. All motors shall conform to the standards of manufacture and performance of the National Electrical Manufacturers' Association as shown in their latest publications. They shall further be listed by Underwriters Laboratories. 1.07 MANUFACTURER'S DIRECTIONS: A. All manufactured articles shall be applied, installed and handled as recommended by the manufacturer. 1.08 MATERIALS AND WORKMANSHIP: A. All materials shall be new unless otherwise specified and of the quality specified. Materials shall be free from defects. All materials of a type for which the Underwriters Laboratories, Inc. have established a standard shall be listed by the !I , Underwriters Laboratories, Inc. and shall bear their label. B. Wherever the make of material or apparatus required is not definitely specified, the Contractor shall submit a sample to the Engineer before proceeding. C. The Engineer reserves the right to call for samples of any item of material offered in substitution, together with a sample of the specified material, when, in the Engineer's opinion, the quality of the material and/or the appearance is involved and it is deemed 15000 - 3 that an evaluation of the two materials may be better made by visual inspection. This shall be limited to plumbing brass, grilles, registers, ceiling outlets and similar items and shall not be applicable to major manufacturers' items of equipment. D. The Contractor shall be responsible for transportation of his materials to and on the job, and shall be responsible for the storage and protection of these materials and work until the final acceptance of the job. E. The Contractor shall furnish all necessary scaffolding, tackle, tools and appurtenances of all kinds, and all labor required for the safe and expeditious execution of his contract. F. The workmanship shall in all respects be of the highest grade and all construction shall be done according to the best practice of the trade. 1.09 SUBSTITUTION OF MATERIAL: A. Where a definite material or only one manufacturer's name is mentioned in these specifications, it has been done in order to establish a standard. The product of the particular manufacturer mentioned is of satisfactory construction and any substitution must be of quality as good as or better than the named article. No substitution shall be made without review by the Engineer, who will be the sole judge of equality. B. The Contractor shall submit for approval a complete list of the materials he proposes to use. This list shall give manufacturers' names and designations corresponding to each and every item and the submission shall be accompanied by complete descriptive literature and/or any supplementary data, drawings, etc., necessary to give full and complete details. C. Should a substitution be accepted under the provisions of the conditions of these specifications, and should this substitute prove to be defective or otherwise unsatisfactory for the service for which it is intended within the guarantee period, the Contractor who originally requested the substitution shall replace the substitute material with the specified material. 1.10 SHOP DRAWINGS: A. Wherever shop drawings are called for in these specifications, they shall be furnished by the Contractor for the work involved after review by the Engineer as to the make and type of material and in sufficient time so that no delay or changes will be caused. This is done in order to facilitate progress on the job and failure on the part of the Contractor to comply shall render him liable to stand the expense of any and all delays, changes in construction, etc., occasioned by his failure to provide the necessary details. Also, if the Contractor fails to comply with this provision, the Engineer reserves the right to go directly to the manufacturer he selects and secure any details he might deem necessary and should there be any charges in connection with this, they shall be borne by the Contractor. 15000 - 4 B. Shop drawings will be reviewed by the Engineer for general compliance with the design concept of the project and general compliance with the information given in the �.. contract documents. Review by the Engineer and any action by the..Engineer in j' marking shop drawings is subject to the requirements of the entire contract documents. Contractor will be held responsible for quantities, dimensions which shall r be confirmed and correlated at the job site, fabrication processes and techniques of construction, coordination of all trades and the satisfactory performance of his work. C. Shop drawings submitted shall not consist of manufacturers' catalogues or tear sheets r k therefrom that contain no indication of the exact item offered. Rather, the submission of individual items shall designate the exact item offered and shall clearly identify the item with the project. D. All shop drawings shall be submitted at one time and shall consist of a bound catalogue of all shop drawings under each section, properly indexed and certified that they have been checked by the Contractor. E. The omissions of any material from the shop drawings which has been shown on the contract drawings or specified, even though reviewed by the Engineer, shall not relieve the Contractor from furnishing and erecting same. 1.11 PERMITS, FEES, ETC: A. The contractor under this section of these specifications shall arrange for a building permit from the City of Lubbock for record purposes. 1.12 LAWS, CODES AND ORDINANCES: A. All work shall be executed in strict accordance with all local, state and national codes, ordinances and regulations governing the particular class of work involved, as interpreted by the inspecting authority. The Contractor shall be responsible for the final execution of the work under this heading to suit those requirements. Where these specifications and the accompanying drawings conflict with these requirements, the Contractor shall report the matter to the Engineer, shall prepare any supplemental drawings required illustrating how the work may be installed so as to comply and, on approval, make the changes at no cost to the Owner. On completion of the various portions of the work the installation shall be tested by the constituted authorities, 'r approved and, on completion of the work, the Contractor shall obtain and deliver to 0 the Owner a final certificate of acceptance. 1.13 TERMINOLOGY: A. Whenever the words "furnish", "provide", "furnish and install," "provide and install', r- and/or similar phrases occur, it is the intent that the materials and equipment described be furnished, installed and connected under this Division of the Specifications, complete for operation unless specifically noted to the contrary. B. Where a material is described in detail, listed by catalogue number or otherwise called for, it shall be the Contractor's responsibility to furnish and install the material. 15000 - 5 C. The use of the word "shall" conveys a mandatory condition to the contract. D. "This section" always refers to the section in which the statement occurs. E. "The project includes all work in progress during the construction period. F. "Concealed" areas are those areas which cannot be seen by the building occupants from the floor with all building components in place. G. "Exposed" areas are all areas which are exposed to view by the building occupants, including mechanical rooms. , H. In describing the various items of equipment, in general, each item will be described singularly, even though there may be a multiplicity of identical or similar items. 1.14 COOPERATION AND CLEANING UP: " A. The contractor for the work under each section of these specifications shall coordinate his work with the work described in all other sections of the specifications to the end that, as a whole, the job shall be a finished one of its kind, and shall carry on his work in such a manner that none of the work under any section of these specifications shall be handicapped, hindered or delayed at any time. B. At all times during the progress of the work, the Contractor shall keep the premises clean and free of unnecessary materials and debris. The Contractor shall, on direction at any time from the Engineer, clear any designated areas or area of materials and debris. On completion of any portion of the work, the Contractor shall remove from the premises all tools and machinery and all debris occasioned by the work, leaving the premises free of all obstructions and hindrances. 1.15 PAINTING: A. Painting for Division 15 shall be as follows: 1. If the factory finish on any apparatus or equipment is marred, it shall be touched up and then given one coat of half -flat -half -enamel, followed by a coat of machinery enamel of a color to match the original. Paint factory primed surfaces. 2. Paint all exposed pipe, cabinets, hangers and supports, and miscellaneous metal. 3. Paint all insulated surfaces exposed to view, including piping, equipment, etc. size surfaces until a smooth, non grainy surface is obtained. 4. Generally, painting is required on all surfaces such that no exposed bare metal or insulation surface is visible. r` 1.16 SCHEDULE OF WORK: A. The Contractor shall program his work in such manner as to interfere as little as possible with the normal routine of the Owner. It must be understood that the Owner will continue to function throughout the construction period. All water and sanitary r facilities shall therefore be continued in operation with a minimum of interruption and t the Contractor shall make any temporary connections necessary to comply with this ' requirement. 1.17 SALVAGE MATERIALS: A. All presently installed materials including pipes, valves, fittings, fixtures, etc. that are not to be reused shall be removed by the Contractor under the section in which the particular items normally fall whenever they can be taken out of service. When the work is complete, there shall be no "dead" lines left installed in any portion of the r" area being remodeled, which shall include any temporary connections. All materials shall become the property of the contractor and removed from the site. 1.18 INSTALLATION DRAWINGS: A. It shall be incumbent upon the Contractor to prepare special drawings as called for elsewhere herein or as directed by the Engineer to coordinate the work under each section, to illustrate changes in his work, to facilitate its concealment in finished spaces to avoid obstructions or to illustrate the adaptability of any item of equipment which he proposes to use. B. These drawings shall be used in the field for the actual installation of the work. Unless otherwise directed, they shall not be submitted for approval but three copies shall be provided to the Engineer for his information. 1.19 ROUGH -IN AND MAKE FINAL CONNECTION FOR EQUIPMENT: A. The shop drawings for all equipment are hereby made a part of these specifications. The Contractor under each section of the specifications shall rough -in for the exact item to be furnished on the job, whether in another section of the specifications or by the Owner. The Contractor shall refer to all drawings and other sections of the specifications for the scope of work involved for the new equipment, and by actual site examination determine the scope of the required equipment connections for the Owner furnished equipment. B. Should any of the equipment furnished require connections of a nature different from that shown on the drawings, report the matter to the Engineer and finally connect as directed by the Engineer. C. Should any shop drawings not be available for equipment furnished under other contracts or by the Owner, the Contractor under each section of these specifications shall bid the work as detailed on the drawings. D. Minor differences in the equipment furnished and that indicated on the drawings will not constitute ground for additional payment to the Contractor. 15000 - 7 1.20 MARKING OF PIPE: A. The Contractor shall mark all accessible piping systems. The identification of a piping system shall be made by a positive identification of the material content of the system by lettered legend, giving the name of the content in full or abbreviated form. This mark shall be conspicuously placed at frequent intervals on straight runs, close to all valves, at changes of direction and where pipes pass through walls, floors or ceilings. Arrows shall be used to indicate direction of flow. B. Markers shall be placed on piping at each connection to an item of equipment, at each pump, and on each drop to an outlet. Markers shall be placed on each run of piping at intervals not exceeding 50 feet where exposed in a room and 25 feet when installed above removable ceilings, except that no exposed line shall enter a room without being identified therein. Markers on lines above removable ceilings shall be applied on the undersides of the lines and in other areas shall be applied to be most visible. C. Markers shall conform completely with "The Scheme for Identification of Piping Systems (ANSI A131 1981). Markers shall have ANSI specified color coded background, color of legend and legend letter size. D. Markers shall be equal to Seton Set Mark Pipe Markers. 1.21 IDENTIFICATION AND LABELING: A. The Contractor shall make it possible for the personnel operating and maintaining the equipment and systems in this project to readily identify the various pieces of equipment, valves, piping, etc., by marking them. All items of equipment such as fans, pumps, etc., shall be clearly marked using engraved nameplates as hereinafter specified. The item of equipment shall indicate the same number as shown on the drawings. B. All items of mechanical and electrical equipment shall be identified by the attachment of engraved nameplates constructed from laminated phenolic plastic, at least 1/16" thick, 3-ply, with black surfaces and white core. Engraving shall be condensed gothic, at least 1/2" high, appropriately spaced. Nomenclature on the label shall include the name of the item, its mark number, area, space, or equipment served, and other pertinent information. 1.22 OPERATING INSTRUCTIONS: A. The Contractor for each section of the work hereunder shall, in cooperation with the representatives of the manufacturers of the various equipment items, spend a sufficient amount of time carefully instructing the Owner's representatives in the proper operation of each item of equipment and of each system. During the balancing and - adjusting of systems, the Owner's representative shall be made familiar with all procedures. r t r 7 r 1.23 OPERATING MANUALS: A. Prepare and submit 3 copies of the operating manuals bound in hard covers. Three weeks prior to completion of the work, the Engineer will check the manuals and any additional material necessary to complete the manuals shall be furnished and inserted by the Contractor. B. Manuals shall contain the following data: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 1.24 GUARANTEE: Catalogue data of all equipment. Shop drawings of all equipment. Temperature control drawings (reduced in size) Start-up instructions for major equipment. Trouble shooting procedures for major equipment. Wiring diagrams. Recommended maintenance schedule for equipment. Parts list for all items. Name and address of each vendor. Material Safety Data Sheets on all hazardous products and materials A. Unless a longer guarantee is hereinafter called for, all work, material and equipment items shall be guaranteed for a period of one year after acceptance by the Owner. All defects in labor and materials occurring during this period, as determined by the Engineer, shall be repaired and/or replaced to the complete satisfaction of the Engineer. Guarantee shall be in writing and in triplicate. 1.25 COMPLETION REQUIREMENTS: A. Before acceptance and final payment the Contractor under each Division of the specifications shall furnish: 1. Accurate record drawings, shown in red ink on blue line prints furnished for that purpose all changes from the original plans made during installation of the work. Drawings shall be filed with the Engineer when the work is completed. 2. All manufacturers' guarantees. 3. All operating manuals. 4. Guarantees. 5. Test and Balance Report. END OF SECTION r { SECTION 15200 PIPING AND ACCESSORIES PART 1 - GENERAL 1.01 NOTE: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to wort; of this section. 1.02 SUBMITTALS: A. Submit manufacturer's data on all materials. 1.03 SCOPE: A. This section of the specifications pertains to all labor, materials, equipment and service necessary for and incidental to the piping and accessories as shown on the drawings and/or specified herein. 1.04 INSPECTION: A. All pipe, valves, fittings, and other accessories shall be inspected upon delivery and during the course of the work. Any defective materials found during field inspection or during hydrostatic and leakage tests shall be removed from the site of the work and replaced by the Contractor. 1.05 PROTECTION DURING STORAGE: A. The interior of all pipe, fittings, and other accessories shall be kept free from dirt and foreign matter at all times. Valves and fittings shall be drained and stored in a manner that will protect them from damage by freezing. PART 2 - PRODUCTS 2.01 MATERIALS: A. All materials shall be manufactured or fabricated in the United States of America. B. Materials shall conform to the listed standards. Refer to specific sections for materials to be used under that section. The following tabulation is for reference only to identify the applicable standard. Steel Pipe ASTM A120, A53, A106 Butt Weld Fittings ANSI B16.9 Socket Weld Fittings ANSI B16.11 Steel Flanges ANSI B 16.5 Flange Bolt, Sets ASME Pressure Piping 15200-1 C. Gaskets in Water Lines: Equal to Garlock No. 24 Wire Insertion Red rubber sheet packing; 1/16" thick. Use full face gaskets with cast iron flanges. 2.02 VALVES: A. Butterfly Valves: Ductile iron body, flanged or with drilled and tapped lugs, bronze _ discs, stainless steel shafts with bronze bushings, resilient EPDM seats and O-rings, . "Bubble Tight" shut-off at 150 psi pressure. On valves 4" and smaller, handle shall be infinite position with memory stops. On valves 6" and larger, provide geared operators. Where valves are installed in insulated lines, provide extended stems of adequate length for the handle to clear the insulation and jacket. Norris, Keystone, Center Line, Demco or Crane valves are acceptable. 2.03 GAUGE CONNECTIONS AND GAUGES: A. Where gauge connections are installed in insulated lines, install a 1/4" ball valve on a nipple of sufficient length that the handle will be free of the pipe insulation, and position in relation to surrounding piping and equipment so that the gauge may be easily read, and so that a gauge having a 6" diameter dial can be screwed into and out of the connection. B. Pressure Gauges: Phosphor bronze, seamless Bourdon spring type with phosphor bronze bushed rotary movement and link; 3-1/2" dial, nickel plated ring, free standing cast aluminum case; equipped with micrometer adjustment pointer. Furnish each gauge with scale range suitable for the duty. C. Water Pressure Gauges: Equal to Weksler No. BA14-I with cast aluminum case; Weksler, Weiss, and Trerice acceptable. 2.04 THERMOMETER WELLS: A. Furnish and install brass or stainless steel closed separable thermometer wells for all thermometer and controller bulbs which are designated for liquid measurements. Whenever a thermometer or controller bulb is inserted in a pipe for either remote or local temperature indication or control, locate the thermometer well so that it will be completely surrounded by flowing fluid. Such thermometer locations as shown on the drawings are diagrammatic only -install thermometer wells for maximum effectiveness and in the case of locally indicating instruments, for easy readability. 2.05 MERCURIAL THERMOMETERS: A. Industrial type with Cycolac plastic cases, glass fronts, 9" scale, adjustable straight or angle pattern as required for ready readability. Furnish thermometers with 2-1/2" stem extensions where they are installed in insulated lines. Select scale ranges for maximum readability at the design temperature of the medium being measured. Thermometer equal to Weksler No. AA5H9. B. Acceptable Manufacturers: Weksler, Trerice, Weiss, Moeller. 15200-2 r e FM PART 3 - EXECUTION 3.01 INSTALLATION OF PIPING SYSTEMS: A. Install runs of piping essentially as indicated on the drawings and/or as required. The location, direction and size of the various lines are indicated on the drawings. B. Make up all systems straight and true and properly graded for correct flow of contained materials and to provide drainage. Cut pipes accurately to measurements established at the building and work into place without forcing or springing. Except as required for specified grading, run all piping above ground parallel with the lines of the building. C. Make all changes in pipe sizes with reducing fittings. Use no long screws or bushings. D. In piping systems assembled by welding, use factory -fabricated welding fittings of the same material and the same schedule or weight as the piping in which then are installed, except that branches or take -offs of sizes not exceeding 2/3 of the nominal diameter of the mains may be made with Bonney Weldolets or Thredolets. Mitering of pipe to form elbows, notching of straight runs to form tees, and any similar construction will not be permitted. E. In general, use listed materials in fabricating the various piping systems. The method of assembly may be varied only to meet special conditions where it is impossible to comply with the specified method of joining piping. Where special classes of piping are involved and are not listed, request exact instructions as to the class of material involved and the method of fabricating it before ordering materials. 3.02 FABRICATION OF PIPE JOINTS: A. Welded Joints: Make all welded joints by the metallic arc process. Use base material conforming to ANSI B31.1 for welded pipe ASTM A106 and ASTM A53. Use filler material conforming to ASTM A233 and in accordance with ANSI B31.1. Machine the ends of the material to be joined or gas cut. Make the cut smooth in order that good fit can be made and a full penetration weld made. Use direct current for welding with the electrode positive. Limit the depth of deposit to 1/8" per pass. Remove all slag or flux remaining on any bead of welding before laying down the next successive bead of welding. Remove any cracks or blow holes that appear on the surface of any bead of welding by chipping or grinding before depositing the next successive bead of welding. B. Flanged Joints: Flanged joints shall be made using bolts of Grade 5 or better and gaskets as specified. Faces of the flanges shall be cleaned of all dirt, rust or other foreign matter. The pipe, valve, or fitting shall be properly aligned and free to move while bolting, and the bolts shall be gradually tightened at a uniform rate around the entire flange. No strain shall be put on the flanges in making up the joint. 15200-3 3.03 REPAIR OF LEAKS: A. All leaks in piping systems shall be corrected as follows: 1. Repair leaks in welded joints by removing the defective weld completely through the base metal and grind smooth: Re -weld, accomplishing 100% penetration of the base metal. The repair weld should in no case be less than 4" in length. B. When any defect is repaired, retest that section of the system. END OF SECTION 15200-4 SECTION 15230 CHILLED WATER SYSTEMS PART 1 - GENERAL r 1.01 NOTE: : A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. 1.02 SUBMITTALS: A. Submit manufacturer's data on all materials. �- 1.03 SCOPE: A. This section of the specifications pertains to all labor, materials, equipment and r• service necessary for and incidental to the chilled water systems as shown on the drawings and/or specified herein. B. Install chilled water circulating piping complete and connect to chiller. Include drain lines where shown or required. PART 2 - PRODUCTS 2.01 MATERIALS: rA. Refer to Section "Piping and Accessories". B. Chilled Water Lines: Standard weight black steel. Piping shall be assembled by welding. �- PART 3 - EXECUTION it 3.01 INSTALLATION OF SYSTEMS: r� A. Lay all water circulating lines on an even slope throughout to insure freedom from air } locks and traps. Grade the system downward to the circulating pumps with valved drain connections from the low points to floor drains. Where additional low points are unavoidable, provide service drains to permit the complete drainage of the system. 3.02 CLEANING: A. Swab piping, as assembled, free from loos slag, flux, dirt, debris and foreign r material. I 15230-1 3.03 TESTING: A. Before insulating or concealing any lines, test all piping. Test all lines at 150% of the system working pressure or 100 psig, whichever is greater, for not less than 4 hours with no leaks. B. Notify Owner 24 hours prior to testing. END OF SECTION 15230-2 7 L, 7 SECTION 15250 CONDENSING WATER SYSTEM PART 1 - GENERAL k.01 NOTE: 6 A. Drawings and general provisions of Contract, including General and Supplementary r' Conditions and Division-1 Specification sections, apply to work. of this section. 6 1.02 SUBMITTALS: A. Submit manufacturer's data on all materials. r- 1.03 SCOPE: f A. This section of the specifications pertains to all labor, materials, equipment and r. service necessary for and incidental to the condensing water systems as shown on the drawings and/or specified herein. Flo B. Install condensing water circulating piping complete and connect to chiller. Include drain lines where shown or required. PART 2 - PRODUCTS 2.01 MATERIALS: A. Refer to Section PIPING AND ACCESSORIES. ( B. Condensing Water Lines: Standard weight black steel. Piping shall be assembled by welding. PART 3 - EXECUTION r� 3.01 INSTALLATION OF SYSTEMS: A. Lay all water circulating lines on an even slope throughout to insure freedom from air �i locks and traps. Grade the system downward to the circulating pumps, with valved drain connections from the low points to floor drains. Where additional low points are unavoidable, provide service drains to permit the complete drainage of the system. 3.02 CLEANING: A. Swab piping, as assembled, free from loose slag, flux, dirt, debris and foreign material. 4. k� I' 15250-1 'I 3.03 TESTING: A. Test all lines at 150% of the system working pressure or 100 psig whichever is greater, for not less than 4 hours with no leaks. B. Notify Owner 24 hours prior to testing. END OF SECTION 15250-2 Y SECTION 15330 HANGERS AND SUPPORTS PART 1 - GENERAL 1.01 NOTE: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. 1.02 SUBMITTALS: A. Submit manufacturer's data on all materials. 1.03 SCOPE: A. The Contractor for the work covered by each section of the specifications shall furnish and install all hangers, supports and isolation required by pipe or equipment included in this work. PART 2 - PRODUCTS 2.01 MATERIALS: A. Materials shall be provided for the support of all piping and equipment. The following tabulation lists materials suitable for this duty. Equal materials manufactured by Fee and Mason, Carpenter -Patterson, Grinnell or Modern will be considered. MATERIAL SERVICE FEE AND MASON CAT. Hanger Steel lines 4" and larger 239 Hanger Outside Insulation -all lines 239 Beam Clamps All 249, 254, 255, 282, 280 Adjuster All 2381 2.02 HANGER RODS: A. All individually suspended horizontal pipes shall be supported by steel rods sized as follows: Rod Diameter Size of Steel Pipe or Copper Tube Supported 5/8" 5" through 8" 15330-1 2.03 HANGER SPACING: A. All hangers shall be so located as to properly support horizontal lines without appreciable sagging of these lines. Locate a hanger within 12 inches of every elbow or tee. The following table gives minimum spacing for copper and steel lines. However, hangers shall be more closely spaced where necessitated by conditions or required by code. Size of Line Hanger Spacing in Feet 2" and larger 10 PART 3 - EXECUTION 3.01 INSTALLATION OF SUPPORTS: A. All pipes shall be adequately supported. All piping shall be installed with due regard to expansion and contraction, and the type of hanger, method of support, location of supports, etc. shall be.govemed in part by this consideration. Transmission of vibration and noise shall also be considered and any special suspension with vibration dampeners required to minimize transmissions shall be used where specified or required. 3.02 FOUNDATIONS FOR MACHINERY: A. Concrete subbases not less than 4" high unless indicated otherwise, shall be provided for all floor mounted mechanical and electrical equipment. Subbases shall rest on structural floor. B. Foundation for machines shall be a minimum of 3000 psi concrete with all exposed surfaces steel troweled smooth, reinforced with 6 x 6 No. 3 mesh. Chamfer corners of all foundations. C. Machines shall be secured to bases with anchor bolts of ample size. 'All machine having bedplates and motors shall be grouted under the full area of the bedplates with a nonshrinking, premixed grout. After grout has set, all wedges, shims, and jack bolts shall be removed and the spaces filled with grout. END OF SECTION 15330-2 r SECTION 15400 INSULATION PART 1 - GENERAL 1.01 NOTE: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. 1.02 SUBMITTALS: A. Submit manufacturer's data on all materials. 1.03 SCOPE: f F A. This section of the specifications comprises the furnishing of all labor, materials, transportation, tools and appliances and in performing all operations in connection with the installation of thermal insulation, coverings, jackets, supports, shields, etc. as described herein and/or as shown on the accompanying drawings, or reasonably implied therefrom. All surfaces which may vary from the ambient temperature shall be insulated unless specifically excepted. PART 2 - PRODUCTS 2.01 MATERIALS: A. In describing the various materials, application procedures, and finishes, each item will be described singularly, even though there may be a multiplicity of identical applications. Also where the description is only general in nature, exact dimensions, arrangements and other data shall be determined by reference to plans, schedules, and details, including those provided by equipment manufacturers. B. Where materials are described under other sections of the specifications and are pertinent to this section, they shall be installed hereunder as though they were repeated herein. C. All insulation shall have composite fire and smoke hazard ratings as tested by procedure NFPA 225, not exceeding flame spread 25, smoke developed 50. Accessories such as adhesives, mastics, cement, tape, cloth, etc. shall have these same component ratings. D. All materials installed under this section of the specifications shall be manufactured in the United States of America. E. Provide Material Safety Data Sheets on all hazardous products and materials. 15400-1 2.02 VAPOR BARRIER JACKETS: A. Factory -applied vapor -barrier jackets shall be one of the following: 1. An All Service Jacket (ASJ) laminated of flame resistant white kraft.paper, glass scrim reinforcement, and kraft paper. 2. Foil Reinforced Kraft (FRK) Jacket laminated of flame resistant 0.001" aluminum foil, glass scrim reinforcement and kraft paper. B. Where specified, insulate valves and fittings with Hamfab or approved equal molded glass fiber fitting covers equal in thickness to the adjoining pipe covering, vapor sealed with two 1/8 inch wet coats of vapor barrier mastic equal to Benjamin Foster No. 65-07 reinforced with an open mesh glass fabric. Finish with preformed Manville Zeston PVC covers with taped seams. 2.03 SHIELDS: A. Provide shield of No..16 U.S. 12 gauge pipe shield. Use a shield extending at least 6 inches on each side of the support bearing area. B. Under each shield install a high density fiberglass insert equal to Hamfab H Block, 20 lb. density, or approved equal. PART 3 - EXECUTION 3.01 INSTALLATION: A. The installation of all thermal insulation shall be performed by a recognized firm regularly engaged in the insulation business, using skilled insulation mechanics and using insulation materials which are the product of reputable manufacturer of the materials, using any special materials as required by these specifications and by those published standards. B. Any insulation which is.not applied in a workmanlike manner will be rejected and replaced. All coverings shall be smooth, flush, dressed to line and tight. Mastic shall be neatly applied and tooled. The Engineer reserves the right to reject any insulation whose appearance he deems unacceptable. -' 3.02 APPLICATION OF INSULATION: A. Apply insulation and pipe covering after all work has been tested, found to be tight and accepted as such by the Architect. Thoroughly clean and dry all surfaces to be covered. — B. On glass fiber pipe covering with factory -applied vapor -barrier jacket, lap the jacket on the longitudinal seams with a double tape, self-sealing lap, adhesive system. If a _ single tape, self-sealing lap, adhesive system is used, an additional layer of Benjamin 15400-2 i �Y Foster 82-07 vapor barrier lap adhesive must be used. Tightly butt the ends of the pipe covering and apply the 4" wide butt strips as provided by the insulation .. manufacturer. C. Provide a separate, additional, Alpha Temp Style 76281/4634 or approved equal, field applied pre -sized glass cloth cover on all portions of any insulated piping system exposed in any space, including equipment room, and in any room in the building. Exercise care to locate seams in the cloth in an inconspicuous place and apply all cloth neatly, including that on valves and fittings. Adhere the cloth in all cases with adhesive. Jackets shall be applied wrinkle free and smooth. r 3.03 INSULATION ON EQUIPMENT AND PIPING SYSTEMS: A. The following describes materials, thicknesses and finishes for insulation and coverings. B. Also included in this section is the requirement for patching and repair of existing insulation where new connections are made. C. Chilled Water Lines: Insulate with molded sectional glass fiber pipe covering with factory applied All Service Jacket (ASJ) equal to Owens-Corning ASJ/SSL-II. f.- Insulation shall be 1-1/2" thick. Insulate valves and fittings with Hamfab insulation i fittings. Cover all insulation with pre -sized glass cloth. Vapor seal all insulation. END OF SECTION 117 P"w 15400-3 r" SECTION 15500 �- WATER CHILLER PART 1 - GENERAL t: 1.01 NOTE: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. 1.02 SCOPE: r f l A. The Owner has purchased two York centrifugal water chillers and a refrigerant monitoring system. The Contractor shall take delivery of the chillers and refrigerant monitoring system, unload, and install the equipment in accordance with the manufacturer's recommentdations. The chiller start-up and warranty will be the responsibility of the Owner. t B. The following chiller specification is for information only. PART 2 - PRODUCTS 2.01 HERMETIC CENTRIFUGAL WATER CHILLER: A. Provide neoprene vibration isolation pads for chiller. r. B. The compressor shall be centrifugal with multiple -stages. C. Low pressure refrigerant machines shall be provided when available. D. Manufacturers of single stage compressors shall indicate the percent load at which hot gas is required to flow into the evaporator while maintaining constant design water temperatures. t' E. Chiller should be able to unload to 10% of design tonnage with constant entering water temperature. F. Compressor assembly shall be run -tested at the factory. Vibration shall not exceed 1.0 mil peak to peak. G. The motor shall be hermetic and either suction or liquid refrigerant cooled. Hot gas motor cooling is not acceptable. If an open drive motor is provided, a motor - compressor shaft seal leakage containment system shall be provided. 8' 1. An oil reservoir shall collect any oil and refrigerant that leaks past the seal. 2. A float device shall be provided to open when the reservoir is full, directing the refrigerant/oil mixture back into the compressor housing. k ' y 15500-1 r I 3. Manufacturer shall warrant the shaft seal, reservoir, and float valve system against leakage of oil and refrigerant to the outside of the chiller for a period of 5 years from initial start-up, including parts and labor to replace a defective seal and any refrigerant required to trim the charge to original specifications. Inspections shall be performed a minimum of once a year. H. Manufacturers with speed increasing transmissions shall not exceed 10,000 RPM compressor speeds and shall annually inspect the gears and bearings. A report shall be forwarded to the owner each year over the first five years to confirm completion. I. The impellers shall be fully shrouded and made of a high strength aluminum alloy. Impellers shall be dynamically balanced and over -speed tested at 1.25 times impeller shaft speed. The evaporator and condenser shall be built in accordance with BSR/ASHRAE 15- 1992 Safety Code for Mechanical Refrigeration. The water piping connections shall be flanged. K. Evaporator and condenser tubes shall be internally enhanced. L. Adjustable or float type refrigerant metering devices and thermal expansion valves shall be inspected and adjusted by the manufacturer at the end of each year for the first five years of operation to assure equivalent reliability and maintenance to a fixed orifice system. A written report shall be forwarded to the owner each year to confirm completion. M. Units with multi -stage compressors shall incorporate an interstage flash vessel "economizer" in the refrigerant cycle. All units with single stage compressors shall have the condensers circuited for a minimum of 10 degrees of liquid subcooling and be provided with a thermometer well to monitor the amount of subcooling. N. Supply and return head water boxes shall be designed for a working pressure of 150 psig and shall be subjected to a factory hydrostatic pressure test of 225 psig. Provide drain and vent connections in water boxes. O. Factory insulation will be 3/4" insulation and cover all low temperature surfaces to include the evaporator, water boxes, and suction elbow. Economizer and motor cooling lines are insulated with 3/8" and 1/2" insulation respectively. P. The manufacturers of low pressure machines, must provide a separate compressor type purge system. Q. The purge shall operate independently of the chiller and can be operated while the machine circulation water pump is shutdown. No external water cooling source is to be required. R. Any excess purge requirement will enable an alarm indication light at the chiller unit control panel, a contact closure at the purge shall be provided for remote alarm annunciation, and a diagnostic (with date and time of occurrence) shall be stored in the chiller unit control panel's diagnostic summary. 15500-2 F r S. The unit indication shall include: 1. Purge operating mode (ON, OFF, AUTO, AUTO ADAPTIVE) 2. Purge operating status (ON, OFF, AUTO, AUTO ADAPTIVE) 3. Elapsed time meter for total pumpout time and total run time (monitors amount of leak rate). 4. Indication of #1 and #2 as an integral part of the chiller control panel unit mounted Operator Interface Clear Language Display, and: a. Purge suction temperature b. Purge liquid temperature C. Purge pumpout rate (minutes/24 hours) d. Time to next purge (minutes) e. 30 day purge pumpout average (minutes/day) f. Last 5 purge cycles pumpout average run time, interval from shutdown to 3 hours after shutdown (minutes/day) T. At standard room operating conditions and with a condensing refrigerant temperature > 80 degrees F, the purge shall be rated for no more than .1 lb. of refrigerant per 1 lb. non-condensables. If the purge uses refrigerant absorption media, the media's design capacity must not exceed three years for typical chiller operation. The purge efficiency must not deteriorate over time. U. Units operating with refrigerant having positive pressure at 75 F (HCFC-22, HFC- 134a, etc.) shall have the capability of storing the entire refrigerant charge in the condenser or shall provide a pump -out system for each machine complete with transfer pump, condensing unit and tank constructed in accordance with ASME Code for unfired pressure vessels bearing the National Board stamp. V. Pump -out systems shall be supplied and warranted by the chiller manufacturer. W. Refrigerant monitors shall be provided with sensor located a maximum of 18" above 4, finished floor at the chiller locations and 18" above floor of tunnel pit. Provide audio and visual alarm at refrigerant monitor. Provide additional weatherproof audio and r visual alarm located above outside mechanical room door. Acceptable models are Trane Model RMWC and Mine Safety Appliances, Model "Chillgard IR". 15500-3 X. Alternate refrigerant monitors: 1. Alternate sensors shall be approved prior to bid and meet the following — criteria: a. Monitor shall be compound specific with a measurement and display range 0-1000 ppm. b. The monitor must be calibrated for the specified refrigerant. C. The display accuracy shall be +/- 1 ppm. d. Three factory -set alarm levels shall be provided, each with a front panel light and a latching binary contact closure for the control of remote devices. e. An analog output corresponding to the unit display is required for ^' connection to a BAS or other recording equipment. f. A means to automatically re -zero the instrument must be included. h. Regular maintenance of the unit shall be limited to recalibration once r' per year and monthly confirmation of clean air source for recalibration. h. Ambient temperature operating range shall be 40 to 105 F. -' g. Sensor shall be located a maximum of 18" above finished floor and 18" above floor of tunnel pit. 2.02 CHILLER CONTROL SYSTEM A. The chiller(s) shall be controlled by a stand-alone Direct Digital Control (DDC) System. A dedicated chiller control panel is to be supplied with each chiller by the chiller manufacturer. The panel shall be microprocessor -based, with factory packaging and testing of all required control components for reliable equipment operation. B. The chiller control panel shall provide control of chiller operation and monitoring of chiller modules, sensors, actuators, relays and switches. The panel shall be a complete system for stand-alone chiller control and includes controls to safely and efficiently operate the chiller. C. Safeties - The chiller control panel shall monitor such safeties as motor starting and running time between compressor/motor starts, low chilled water temperature, low evaporator refrigerant temperature, high condenser refrigerant pressure, evaporator and condenser water flow status, low oil pressure, low oil temperature, high oil temperature, high motor winding temperatures, sensor faults, and proper operation of unit controls. 1. To monitor bearing temperatures, all of the compressor motor bearings, (including high speed, low speed, and thrust bearings) shall have factory installed temperature sensors installed in the oil return lines of each motor bearing. If any oil temperature reaches or exceeds a set value, the chiller control panel shall shut down the chiller, display the diagnostic, and light the front panel alarm LED. 15500-4 2. The chiller control panel shall incorporate advanced motor protection to 6 safeguard the motor throughout the starting and running cycles from the adverse affects of: a. phase loss b. phase imbalance and severe phase imbalance C. phase reversal and loss of phase reversal protection d. over/under voltage e. motor overload r f. motor overload protection incorrectly set E h. momentary power loss protection with auto restart consisting of three- phase current sensing devices that monitor the status of the current r' h. starter contactor fault protection i. starter transition failure s" 3. Alternately, the advanced motor protection system can be furnished in the starter. �- D. The chiller control panel shall be capable of displaying system data in the following formats (and be capable of alternating between these modes on-line): r- 1. English or Metric units i 2. Numerical data as whole numbers or one digit right of decimal E. The chiller control panel is to be provided with a starts counter and running time counter. F. The front of the chiller control panel shall be capable of displaying the following in clear language, without the use of codes, look -up tables, or gauges: 1. Entering and leaving evaporator water temperature 2. Entering and leaving condenser water temperature 3. Compressor Motor Winding Temperature 1,2,3 P 4. Saturated evaporator and condenser refrigerant temperature 5. Evaporator and condenser refrigerant pressure 6. Purge compressor suction temperature j7. Oil Temperature 8. Oil Tank pressure r 9. Oil pump discharge pressure 10. Differential oil pressure 15500-5 11. Compressor motor starts and running hours 12. Compressor motor current, by phase — 13. Compressor motor percent RLA 14. Purge pumpout rate 15. Purge pumpout time last or current cycle _ 16. Total Purge pumpout time 17. Total Purge run time 18. Chilled water set point and set point source 19. Electrical current limit set point and set point source 20. Current chiller operating mode 21. Equipment room refrigerant monitor ppm levels 22. Chiller diagnostics including a time and date of occurrence (minimum 20 historical diagnostics stored in non-volatile chiller panel memory) 23. Bearing Oil Temperatures C G. The chiller control panel shall provide evaporator freeze protection and low limit control. This control shall be used to avoid low evaporator refrigerant temperature trip -outs during critical periods of chiller operation. The control shall take progressively more aggressive load limiting action in response to the severity of the _ rate of change and the actual value of the evaporator refrigerant temperature. A clear language diagnostic message, reflecting the operating status, shall be automatically displayed at the front panel whenever this control is in effect, and if the condition exists for more than 20 minutes, a limit warning alarm relay shall energize to indicate that the condition has persisted. H. The chiller control panel shall provide individual relay outputs to start/stop the chilled water pump and condenser water pump. The condenser water pump relay output can be used to enable the cooling tower temperature controls. I. The chiller control panel shall provide a relayoutput that shall energize whenever the compressor is running. J. The chiller control panel shall provide an alarm relay output that shall energize whenever a fault requiring manual reset is detected by the panel. K. The chiller control panel shall provide a relay output that shall energize whenever the chiller is operating at maximum capacity. 15500-6 I r L. The chiller control panel shall provide a head relief request relay output to indicate that the chiller is in condenser limit mode and thereby requesting condenser water r-• temperature relief. r M. The chiller control panel shall provide an analog output signal that shall indicate the Compressor Motor Percent RLA. N. The chiller control panel shall provide an analog output signal that shall indicate the Condenser Refrigerant Pressure. O. The chiller control panel shall provide condenser limit control to include a pressure transducer and interconnecting piping and wiring. This control shall be used to avoid high condenser refrigerant pressure tripouts during critical periods of chiller operation. The control shall take progressively more aggressive load limiting action in response to the severity of the rate of change and actual value of the condenser refrigerant pressure. A clear language diagnostic message, reflecting the operating status, shall be automatically displayed at the front panel whenever this control is in effect, and if the condition exists for more than 20 minutes, a limit warning alarm relay shall energize to indicate that the condition has persisted. P. The chiller control panel shall receive the leaving chilled water temperature set point in the form of a 4-20mA or 2-10 vdc signal from a remote source (i.e. generic building automation system). Q. The chiller control panel shall receive the electrical current limit set point in the form of a 4- 20mA or 2-10 vdc signal from a remote source (i.e. generic building automation system). R. The chiller control panel shall be capable of supporting a remote operator interface panel that completely duplicates the functions of the chiller mounted operator interface display and keypad. The remote operator interface panel shall communicate serially to IF the chiller mounted control panel(s) via a twisted wire pair. The remote operator interface panel shall be capable of interfacing with 1-4 UCP equipped chillers. S. The chiller control panel shall be capable of supporting a printer. The printer interface shall provide the following printing functions: 1. each printed output is stamped with the time and date of printing. 2. print on command from the operator interface keypad. 3. print based upon each occurrence of a chiller diagnostic. 4. print a standard summary report based upon an operator specified timed interval. T. The chiller control panel shall be capable of displaying the equipment room refrigerant level concentration in parts -per -million (ppm). 15500-7 r t U. The chiller control panel shall be capable of providing variable interval timers for short cycling protection. The variable timers shall adjust to the critical chiller operating parameters and the time between successive attempted starts of the compressor motor. Fixed start -to -start short cycling protection timers are not acceptable. V. The chiller control panel shall be capable of independently invoking password protection of the entire display and keypad, operator settings (e.g. chilled water set point), machine configuration settings,,and service start-up settings. W. The above specified items are required as a minimum. The contractor may select which items are covered by the equipment supplier and which are covered by the controls contractor. A combined submittal will be required where the contractor will identify which items are covered by each supplier. 2.03 CHILLER STARTER (LOW VOLTAGE) A. Motor starter shall be a Star -Delta Closed Transition and shall have a NEMA 1A gasketed enclosure. Enclosure shall be constructed of 12 gauge steel minimum with the exception of doors which shall be 14 gauge steel minimum. Unit mounted enclosures shall have ventilating louvers. Gasketing shall be 2" width minimum. Each door or enclosure more than 48" high shall have 3 point vault type Iatches with pad lockable handles. B. Motor starters shall include incoming line provisions for the number and size cables shown on the drawings. Incoming line lugs shall be copper mechanical type. Connection directly to the contactors is not permissible. All components shall be mounted to a removable steel panel of 14 gauge minimum. C. Contactors shall be sized properly to the chiller full load and locked rotor currents. Contactors shall have double break main contacts with weld resistant silver cadmium faces. Auxiliary interlocks that interface with the control panel shall be low resistance having palladium silver contacts. D. Each motor starter shall include a 3 KVA control power transformer with fused primary and secondary. Current transformers of the proper size, ratio and burden capacity shall be provided to provide a signal to the control panel and optional devices. Control relays shall be provided within the motor starter to interface with the control panel. E. Power wiring within the starter shall be type MTW copper stranded 90 degree C. Power wire bends shall show no evidence of nicking or insulation degradation. Control wire shall be type MTW copper stranded 90 degree C 14 gauge minimum. F. Starter shall include an advanced motor protection system incorporating electronic three phase overloads and current transformers. This electronic motor protection system shall monitor and protect against the following conditions: Three phase overload protection 15500-8 , r r 2. Overload protection during start-up *., 3. Phase imbalance 4. Phase loss 5. Phase reversal 6. Low voltage 7. Distribution fault protection consisting of three-phase, current sensing devices that monitor the status of the current. Distribution faults of 1-1/2 electrical r cycle duration shall be detected and the compressor motor shall be disconnected within six electrical cycles. r" G. Alternately the advanced motor protection system can be furnished in the chiller control panel. H. The starter shall be able to operate in temperatures up to 120 degrees F. {F I. All field supplied wires, bus bars, and fittings shall be copper only. w: J. The following optional starter options shall be provided: 1. A non -fused disconnect switch shall be provided. 2. Ammeters - Three ammeters shall be � one provided, Phase. Ammeters shall P per be calibrated so the inrush current can be indicated. 3. Voltmeters - Three voltmeters shall be provided, each reading phase to P g a phase voltage. 4. U.L. approval. C'r PART 3 - EXECUTION 41 3.01 MANUFACTURER'S FIELD SERVICES A. Manufacturer shall furnish a factory trained service engineer without additional charge to start the unit(s). Representatives shall provide leak testing, evacuation, dehydration, and charging of the unit(s). Chiller manufacturers shall maintain service capabilities no more than 50 miles from the jobsite. B. A start-up log shall be furnished by the manufacturer to document the chiller's start- up date and shall be signed by the owner or his authorized representative prior to i commissioning the chillers. f C. One year parts, labor, and refrigerant warranty. �., END OF SECTION 15500-9 r- a v SECTION 15600 TESTING, ADJUSTING AND BALANCING MECHANICAL SYSTEMS PART 1 - GENERAL 1.01 NOTE: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. 1.02 SCOPE: A. This section of the specifications comprises the furnishing of all labor, materials, transportation, tools and appliances and in performing all operations in connection with the testing, balancing and adjusting of various systems and portions thereof to produce proper flows of water, correct setting of regulation devices, and other end r results as more fully described hereinafter. I B. Prepare and submit to the Engineer complete reports on the balance and operation of the system. C. Before final acceptance is made, complete attached form. D. The above data shall be neatly entered on appropriate forms together with any typed supplements required to completely document all results. Written explanations of any abnormal conditions shall be included. All this shall be assembled into a suitable brochure and a total of 4 copies shall be provided. E. When opposite season modifications are made, additional data sheets indicating new settings, readings, etc., shall be prepared and submitted in quadruplicate. 1.03 INSTRUCTIONS: A. During the test periods instruct the building operating personnel in the operation and maintenance of all equipment. B. Deliver to the Owner 3 complete instruction manuals covering the maintenance and operation of the system components. Provide complete data on all equipment, including for each item a parts list, and the name and address of the vendor where replacement parts can be purchased. 15600-1 ! Date Page of Pioject CHILLERS UNIT NO. UNIT NO. r MANUFACTURER. MANUFACTURER CAPACITY CAPACITY MODEL SERIAL N0. MODEL SERIAL NO. COOLER DESIGN ACTUAL COOLER DESIGN ENT. WATER TEMP. ENT. WATER TEMP. LVG. WATER TEMP. LVG. WATER TEMP. PRESS. DROP, FT. PRESS.,PROP, FT �,.. GPM GP I ' r r CONDENSER DESIGN ACTUCONDENSER ENT. WATER TEMP. ENT. WATER TEMP. LVG. WATER TEMP. LVG. WATER TEMP. PRESS. DROP, FT. PRESS. DROP, FT. GPM GPM ELECTRICAL DESIGN ACTUAL ELECTRICAL VOLTAGE—T1—T2 VOLTAGE T1—T2 T2—T3 T2—T3 T3—Ti T3T1 AMPERAGE T1 AMPERAGE Tt T2 T2 T3 T3 r REMARKS: REMARKS: C L, is ACTUAL DESIGN — I ACTUAL DESIGN I ACTUAL SECTION 15700 �. TEMPERATURE REGULATION i ` PART 1 - GENERAL 1.01 NOTE: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. 1.02 SUBMITTALS: i A. Submit manufacturer's data on all materials and equipment. Include system schematics indicating all devices, electrical wiring and sequence of operation. ' Sequence of operation shall reference each component device by designation used on schematics. r- 1.03 SCOPE: A. This Contractor shall include in his bid an amount necessary to extend the existing r• control system and reconnect the new chiller to the existing EMS. B. The wiring and conduit shall be performed by the temperature control subcontractor in r, accordance with Division 16. C. The temperature regulation equipment shall be installed and adjusted to secure the sequences described hereinfter. The materials and equipment described herein shall be sufficient to any of the remote devices of reference elsewhere herein, but shall be ' arranged as required to operate in conjunction with those remote devices. PART 3 - EXECUTION 3.01 ELECTRICAL INTERLOCKS: A. All electrical interlocks shall be provided as specified. E, r' B. All electrical interlocks shall be made by means of motor starters or shall be accomplished by separate relays. No motor power lead shall be utilized in an interlock circuit. All interlocked starters with disconnect switches shall be provided with I' auxiliary contacts on the disconnect switch so that interlocking circuits are interrupted when the disconnect switch in thrown to the OFF position. C. This contractor shall submit wiring diagrams for his equipment which when approved " will become installation drawings. These diagrams shall show all interlock circuits and shall relate such diagrams of internal wiring of equipment items as are furnished by the manufacturers of that equipment of the system as a whole. Pam r' 15700-1 r 3.02 SEQUENCE OF OPERATION: A. Install a chiller manufacturer furnished flow switch in the chilled water supply and condensing water supply lines. Wire flow switches, chilled water pump, condensing water pump, and cooling tower fan through the chiller control panel as recommended by the chiller manufacturer. B. Exhaust fan EF #1-97 shall energize whenever the refrigerant monitor senses refrigerant or if emergency ventilation switch is tripped. Provide key operated switches, as shown on drawings, with ON/OFF/AUTO setting to operate exhaust fan. C. Upon a detection of refrigerant above allowable limits, the chiller manufacturer furnished audio and visual alarms shall be energized and the two boilers shall stop. PART 4 - EMS INPUT/OUTPUT SUMMARY 4.01 The following indicates the items of the chiller to be monitored and/or controlled by the EMS: 1. Chilled water supply temperature 2. Chilled water return temperature 3. Condensing water supply temperature 4. Condensing water return temperature 5. Alarm from chiller control panel 6. Chiller start/stop 7. Refrigerant monitor, Stage 1 8. Refrigerant monitor, Stage 2 END OF SECTION 15700-2 AGNEW ASSOCIATES, INC. DIVISION 16 PROJECT NUMBER 95118 ELECTRICAL LUBBOCK CIVIC CENTER CHILLER REPLACEMENT TABLE OF CONTENTS SECTION TITLE PAGE 16000 GENERAL PROVISIONS FOR ELECTRICAL 1-7 16060 MINOR ELECTRICAL DEMOLITION FOR REMODELING 1-2 16110 RACEWAYS AND FITTINGS 1-6 16120 CONDUCTORS 1-4 16450 GROUNDING AND BONDING 1-3 16475 CIRCUIT DISCONNECT AND OVERCURRENT PROTECTIVE DEVICES 1-3 16481 MOTOR CONTROLLERS 1-4 I r SECTION 16000 GENERAL PROVISIONS FOR ELECTRICAL PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to the work of this Section. 1.02 ELECTRICAL LINES: A. General: In general, the electrical lines to be installed under these specifications shall be run as indicated, as specified herein, as required by particular conditions at the site, and ' as required to conform to the generally accepted standards as to complete the work in a neat and satisfactorily workable manner. The following is a general outline concerning the running of electrical lines and is to be excepted where the drawings or conditions at the building necessitate deviating from these standards. B. General Construction: The Contractor shall thoroughly acquaint himself with the details of the construction and finishes before submitting his bid as no allowances will be made because of the Contractor's unfamiliarity with these details. Place all inserts in masonry walls while they are under construction. All concealed lines shall be installed as required by the pace of the general construction to precede that general construction. C. Field Conditions: The electrical plans do not give exact details as to elevations of electrical lines, exact locations, etc., and do not show all the offsets, and other installation details. The Contractor shall carefully lay out his work at the site to conform to the architectural and structural conditions, to avoid all obstruction, to conform to details of installation supplied by the manufacturers of the equipment to be installed, and thereby to provide an integrated, satisfactorily operating installation. D. Locations of Electrical Devices: The electrical plans show diagrammatically the locations of the various electrical outlets and apparatus and the method of circuiting and controlling them. Exact locations of these outlets and apparatus shall be determined by reference to l the general plans and to all detail drawings, equipment drawings, roughing -in drawings, l etc., by measurements at the building, and in cooperation with other sections, and in all cases shall be subject to the approval of the Engineer. The Engineer reserves the right to make any reasonable change in location of any outlet or apparatus before installation (within 10 feet of location shown on drawings) or after installation if an obvious conflict exists, without additional cost to the Owner. E. Space Requirements: The Contractor shall be responsible for the proper fitting of his material and apparatus into the space. Should the particular equipment which any bidder proposes to install require other space conditions than those indicated on the drawings, he t shall arrange for such space with the Engineer before submitting his bid. Should changes become necessary on account of failure to comply with this clause, the Contractor shall make such necessary changes at his (the Contractor's) own expense. 16000 - 1 i F. Working Drawings: The Contractor shall submit working scale drawings of all his apparatus and equipment which in any way varies from these specifications and plans, which shall be checked by the Engineer before the work is started, and interferences with the structural conditions shall be corrected by the Contractor before the work proceeds. G. Order of Precedence: Order of precedence shall be observed in laying out the conduit in order to fit the material into the space above the ceiling and in the chases and walls. The installation shall be coordinated with the work of all other trades. The following order shall govern: 1. Items affecting the visual appearance of the inside of the building such as lighting fixtures, outlets, panelboards, etc. Coordinate all items to avoid conflicts at the site. 2. Lines requiring grade to function such as sewers. 3. Large ducts and pipes with critical clearances. 4. Conduit, water lines, and other lines whose routing is not critical and whose function would not be impaired by bends and offsets. H. Equipment Connections: Conduits serving outlets on items of equipment shall be run in the most appropriate manner. Where the equipment has built-in chases, the lines shall be contained therein. Where the equipment is of the open type, the lines shall be run as close as possible to the underside of the top and in a neat and inconspicuous manner. I. Exceptions and Inconsistencies: Exceptions and inconsistencies in plans and specifications shall be brought to the Engineer's attention before the contract is signed. `- Otherwise, the Contractor shall be responsible for any and all changes and additions that may be necessary to accommodate his particular apparatus, material, or equipment. Intent of Drawings and Specifications: The Contractor shall distinctly understand that the work described herein and shown on the accompanying drawings shall result in a finished and working job, and any item required to accomplish this intent shall be included whether specifically mentioned or not. K. Examination of Drawings and Specifications: Each bidder shall examine the Drawings and Specifications for the General Construction. If these documents show any item requiring work under Division 16 and that work is not indicated on the respective Electrical drawings, he shall notify the Engineer in sufficient time to clarify before _ bidding. If no notification is received, the Contractor is assumed to require no clarification, and shall install the work as indicated on the General Plans in accordance with the specifications. 1.03 DIMENSIONS: A. General: Before ordering any material or doing any work, the Contractor shall verify all dimensions, including elevations, and shall be responsible for the correctness of the same. No extra charge or compensation will be allowed on account of differences between actual dimensions and measurements indicated on the drawings. Any difference which may be found shall be submitted to the Engineer for consideration before proceeding with the work. -WOO A 1.04 INSPECTION OF SITE: A. General: The accompanying plans do not indicate completely the existing electrical installations. The bidders for the work under these sections of the specifications shall inspect the existing installations and thoroughly acquaint themselves with conditions to be met and the work to be accomplished in removing and modifying the existing work, and in installing the new work in the present building and underground serving to and from that structure. Failure to comply with this shall not constitute grounds for any additional payments in connection with removing or modifying any part of the existing installations and/or installing any new work. 1.05 ELECTRICAL WIRING: A. Description: All electric wiring of every character, both for power supply, for pilot and control, for temperature control, for communications, etc. will be done under Division 16 of these specifications. Every electrical current consuming device furnished as a part of 9 this project, or furnished by the Owner and installed in this project, shall be completely wired up under Division 16. Verification of exact location, method of connection, i` number and size of wires required, voltage requirements, and phase requirements is the responsibility of the Contractor under Division 16. If conflicts occur between the drawings and the actual requirements, actual requirements shall govern. 1.06 PROGRESS OF WORK: A. General: The Contractor shall keep himself fully informed as to the progress of the work and do his work at the proper time without waiting for notification from the Engineer or Owner. 1.07 MANUFACTURER'S DIRECTIONS: A. General: All manufactured articles shall be applied, installed and handled as recommended by the manufacturer. r, 1.08 MATERIALS AND WORKMANSHIP: A. Materials: All materials shall be new unless otherwise specified and of the quality specified. Materials shall be free from defects and undamaged. All materials of a type for which the Underwriters Laboratories, Inc. have established a standard shall be listed by the Underwriters Laboratories, Inc. and shall bear their label. B. Samples: The Engineer reserves the right to call for samples of any item of material offered in substitution, together with a sample of the specified material, when, in the Engineer's opinion, the quality of the material and/or the appearance is involved and it is deemed that an evaluation of the two materials may be better made by visual inspection. This shall be limited to lighting fixtures, wiring devices, and similar items and shall not be applicable to major manufacturers' items of equipment. C. Transportation: The Contractor shall be responsible for transportation of his materials to and on the job, and shall be responsible for the storage and protection of these materials ,r• and work until the final acceptance of the job. i 16000 - 3 P' D. Appurtenances: The Contractor shall furnish all necessary scaffolding, tackle, tools and appurtenances of all kinds, and all labor required for the safe and expeditious execution of his contract. E. Workmanship: The workmanship shall in all respects be of the highest grade and all construction shall be done according to the best practice of the trade. 1.09 PROTECTION OF APPARATUS: A. General: The Contractor shall at all times take such precautions as may be necessary to properly protect his new apparatus from damage. This shall include the erection of all required temporary shelters to adequately protect any apparatus stored in the open on the site, the cribbing of any apparatus above the floor of the construction, and the covering of apparatus in the uncompleted building with tarpaulins or other protective covering. Failure on the part of the Contractor to comply with the above to the entire satisfaction of the Engineer will be sufficient cause for the rejection of the pieces of apparatus in question. 1.10 PERMITS, FEE, ETC.: A. General: The Contractor under each section of these specifications shall arrange for a permit from the local authority. The Contractor shall arrange for all utility services, including electric services. If any charges are made by any of the utility companies due to the work on this project, the Contractor shall pay these charges, including charges for metering, connection, street cutting, etc. The Contractor shall pay for any inspection fees or other fees and charges required by ordinance, law, codes and these specifications. 1.11 TESTING: A. General: The Contractor under each division shall at his own expense perform the various tests as specified and required by the Engineer and as required by the State and local authorities. The Contractor shall furnish all fuel and materials necessary for making tests. 1.12 LAWS, CODES AND ORDINANCES: A. General: All work shall be executed in strict accordance with all local, state and national codes, ordinances and regulations governing the particular class of work involved, as interpreted by the inspecting authority. The Contractor shall be responsible for the final execution of the work under this heading to suit those requirements. Where these specifications and the accompanying drawings conflict with these requirements, the Contractor shall report the matter to the Engineer, shall prepare any supplemental drawings required illustrating how the work may be installed so as to comply and, on approval, make the changes at no cost to the Owner. On completion of the various portions of the work the installation shall be tested by the constituted authorities, approved and, on completion of the work, the Contractor shall obtain and deliver to the Owner a final certificate of acceptance. r G 1.13 TERMINOLOGY: A. "Furnish, Provide, Install": Whenever the words "furnish", "provide", "furnish and install," "provide and install', and/or similar phrases occur, it is the intent that the materials and equipment described be furnished, installed and connected under this Division of the Specifications, complete for operation unless specifically noted to the contrary. B. Materials: Where a material is described in detail, listed by catalogue number or otherwise called for, it shall be the Contractor's responsibility to furnish and install the material. C. "Shall": The use of the word "shall" conveys a mandatory condition to the contract. D. "Section": "This section" always refers to the section in which the statement occurs. E. "Project": "The project" includes all work in progress during the construction period. F. Multiple Items: In describing the various items of equipment, in general, each item will be described singularly, even though there may be a multiplicity of identical or similar r� items. 1.14 COOPERATION: 1 A. General: The contractor for the work under each section of these specifications shall coordinate his work with the work described in all other sections of the specifications to r the end that, as a whole, the job shall be a finished one of its kind, and shall carry on his work in such a manner that none of the work under any section of these specifications shall be handicapped, hindered or delayed at any time. 1.15 COORDINATION OF TRADES: A. General: The Contractor shall be responsible for resolving all coordination required between trades. For example, items furnished under Division 15 which require electrical connections shall be coordinated with Division 16 for: 1. Voltage r 2. Phase 3. Ampacity 4. No. and size of wires C' S. Wiring diagrams 16. Starter size, details and location 7. Control devices and details B. Ceiling Mounted Items: Items installed in/on finished ceilings shall be coordinated with the ceiling construction. The Contractor under each section shall conform to the reflected ceiling plan and shall secure details and/or samples of the ceiling materials as necessary to insure compatibility. Any device not conforming to this requirement shall be replaced by the Contractor at his expense. 16000 - 5 C. Electrical Items: All items specified under Divisions 16 shall be installed tight, plumb, level, square and symmetrically placed in relation to the work of other trades. 1.16 CUTTING AND PATCHING: A. General: The Contractor for work specified under each section shall perform all structural and general construction modifications and cut all openings through either roof, walls, floors or ceilings required to install all work specified under that section or to repair any defects that appear up to the expiration of the guarantee. All of this cutting shall be done under the supervision of the Engineer and the Contractor shall exercise due diligence to avoid cutting openings larger than required or in wrong locations. B. Structural Members: No cutting shall be done to any of the structural members that would tend to lessen their strength, unless specific permission is granted by the Engineer to do such cutting. C. Patching: The Contractor for work under each section shall be responsible for the patching of all openings cut to install the work covered by that section and to repair the damage resulting from the failure of any part of the work installed hereunder. D. Coordination: Before bidding, the Contractor shall review and coordinate the cutting and patching required with all trades. E. Existing Surfaces: In all spaces where new work under Division 16 is installed and no other alteration or refinishing work is shown or called for, existing floors, walls and ceilings shall be restored to match existing conditions. All cutting and patching shall be done by workmen skilled in the affected trade. F. Masonry Walls: Where openings are cut through masonry walls, the Contractor under each respective section shall provide and install lintels or other structural supports to protect the remaining masonry and adequate support shall be provided during the cutting operation to prevent any damage to the masonry occasioned by the operation. All structural members, supports, etc. shall be of the size, shape, and installed as directed by the Engineer. 1.17 PAINTING: A. Painting for Division 16 shall be as follows: 1. If the factory finish on any apparatus or equipment is marred, it shall be touched up and then given one coat of half -flat -half -enamel, followed by a coat of machinery enamel of a color to match the original. Paint factory primed surfaces. 2. Paint all exposed conduit, boxes, cabinets, hangers and supports, and miscellaneous metal. 3. Generally, painting is required on all surfaces such that no exposed bare metal is visible. r 1.18 LARGE APPARATUS: A. General: Any large piece of apparatus which is to be installed in any space in the building, and which is too large to permit access through windows, doorways or shafts, shall be brought to the job by the Contractor involved and placed in the space before the enclosing structure is completed. 1.19 INSTALLATION DRAWINGS: A. General: It shall be incumbent upon the Contractor to prepare special drawings as called for elsewhere herein or as directed by the Engineer to coordinate the work under each section, to illustrate changes in his work, to facilitate its concealment in finished spaces to avoid obstructions or to illustrate the adaptability of any item of equipment which he proposes to use. These drawings shall be used in the field for the actual installation of the work. Unless otherwise directed, they shall not be submitted for approval but three copies shall be provided to the Engineer for his information. 1.20 ROUGH -IN AND MAKE FINAL CONNECTION FOR EQUIPMENT: A. General: The shop drawings for all equipment are hereby made a part of these specifications. The Contractor under each section of the specifications shall rough -in for the exact item to be furnished on the job, whether in another section of the specifications or by the Owner. The Contractor shall refer to all drawings and other sections of the specifications for the scope of work involved for the new equipment, and by actual site examination determine the scope of the required equipment connections for the Owner furnished equipment. B. Discrepancies: Should any of the equipment furnished require connections of a nature different from that shown on the drawings, report the matter to the Engineer and finally connect as directed by the Engineer. Minor differences in the equipment furnished and that indicated on the drawings will not constitute ground for additional payment to the Contractor. END OF SECTION , F 1 SECTION 16060 MINOR ELECTRICAL DEMOLITION FOR REMODELING PART 1 - GENERAL r' 1.01 RELATED DOCUMENTS: t A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to the work of this section. PART 2 - PRODUCTS 2.01 MATERIALS AND EQUIPMENT: r A. Materials and equipment for patching and extending work: As specified in individual Sections. PART 3 - EXECUTION 3.01 EXAMINATION: A. Field Measurements: Verify field measurements and circuiting arrangements are as shown on Drawings. B. Abandoned Circuits: Verify that abandoned wiring and equipment serve only abandoned facilities. C. Field Conditions: Demolition Drawings are based on casual field observation and existing record documents. Report discrepancies to Owner and Architect/Engineer before disturbing existing installation. D. Existing Conditions: Beginning of demolition means installer accepts existing conditions. 3.02 PREPARATION: A. Demolition: Disconnect electrical systems in walls, floors, and ceilings scheduled for removal. r" B. Temporary Wiring: Provide temporary wiring and connections to maintain existing systems in service during construction. When work must be performed on energized equipment or circuits, use personnel experienced in such operations. C. Existing Electrical Service: Maintain existing system in service until new system is complete and ready for service. Disable system only to make switchovers and �►•. connections. Obtain permission from Owner at least 24 hours before partially or completely disabling system. Minimize outage duration. Make temporary connections to maintain service in areas adjacent to work area. 4 1 16060 - 1 3.03 DEMOLITION AND EXTENSION OF EXISTING ELECTRICAL WORK: A. General: Demolish and extend existing electrical work under provisions of the Drawings, General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections. B. New Construction: Remove, relocate, and extend existing installations to accommodate new construction. C. Abandoned Wiring: Remove abandoned wiring to source of supply. D. Exposed Conduit: Remove exposed abandoned conduit, including abandoned conduit above accessible ceiling finishes. Cut conduit flush with walls and floors, and patch surfaces. E. Abandoned Devices: Disconnect abandoned outlets and remove devices. Remove abandoned outlets if conduit servicing them is abandoned and removed. Provide blank cover for abandoned outlets which are not removed. F. Abandoned Equipment: Disconnect and remove electrical devices and equipment serving utilization equipment that has been removed. G. Adjacent Construction: Repair adjacent construction and finishes damaged during demolition and extension work. H. Existing wiring to remain active: Maintain access to existing electrical installations which remain active. Modify installation or provide access panel as appropriate. I. Extension of existing wiring: Extend existing installations using materials and methods compatible with existing electrical installations, as specified. 3.04 CLEANING AND REPAIR: A. Existing Materials: Clean and repair existing materials and equipment which remain or are to be reused. B. Panelboards: 'Clean exposed surfaces and check tightness of electrical connections. Replace damaged circuit breakers and provide closure plates for vacant positions. Provide typed circuit directory showing revised circuiting arrangement. 3.05 INSTALLATION: A. Relocated Materials: Install relocated materials and equipment under the provisions of Division 1 of the Specifications. END OF SECTION 16060 - 2 a SECTION 16110 RACEWAYS AND FITTINGS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to the work of this section. 1.02 SUBMITTALS: A. General: Submit manufacturer's data on all materials according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data: Submit for review complete manufacturer's catalog information on all items specified herein, including materials, construction and UL listing. Provide manufacturer's catalog data on all conduit, conduit fittings, raceway, outlet boxes, pull boxes and junction boxes r 1.03 SCOPE: A. Description: The work shall include furnishing and installing all electrical raceways, 7 conduit, wireways, pull and junction boxes and outlet boxes, together with all fittings, supporting devices, and other accessories required. 1.04 REGULATORY REQUIREMENTS: A. Code Requirements: Conform to requirements of ANSI/NFPA 70 (National Electrical Code) and all applicable State and Local Electrical Ordinances. B. UL Listing: Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose specified and shown. 1.05 DELIVERY, STORAGE, AND HANDLING: A. General: Deliver, store, protect, and handle products under provisions of the General Requirements. Accept delivery of conduit, raceway, pull and junction and outlet boxes on site and inspect for damage. Report concealed damage to carrier within their required time period. Protect conduit and raceway from corrosion and entrance of debris by storing above grade protected from the weather. Provide appropriate covering. Protect PVC conduit from sunlight. 1.06 PROJECT CONDITIONS: A. Field Measurements: Verify that field measurements are as shown on the Drawings. r 16110 - 1 B. Routing of Conduit: Verify routing and termination locations of conduit prior to rough -in. Conduit routing is shown on the Drawings in approximate locations unless dimensioned. The contractor shall verify all site conditions and shall route as required to complete the wiring system. PART 2 - PRODUCTS 2.01 CONDUITS: A. Rigid Steel Conduit: Rigid, threaded, thick -wall; galvanized inside and outside or galvanized outside with a protective coating inside; UL listed and labeled according to Standard UL6; conforming to ANSI Standard C80.1; Pittsburg, Republic Steel, Robroy, Allied or approved equivalent. B. Electrical Metallic Tubing (EMT): Steel tubing, galvanized outside and provided with a slick corrosion resistant interior coating; UL listed and labeled according to Standard 797; conforming to ANSI Standard C80.3; Pittsburg, Republic Steel, Robroy, Allied or approved equivalent. C. Flexible Metal Conduit: Spirally wound with hot dip galvanized steel strips (commercial Greenfield) or interlocked aluminum construction; conforming to UL Standard UL 1 and UL listed and labeled; Triangle Conduit and Cable Company, or approved equivalent. D. Liquidtight Flexible Metal Conduit: Spirally wound with hot dip galvanized steel strips or interlocked aluminum construction as for flexible metal conduit; with polyvinyl chloride cover extruded over the exterior to make conduit liquidtight; UL listed and labeled; Electri-flex type "LA" or approved equivalent. 2.02 CONDUIT FITTINGS: A. Couplings and Terminations for Rigid Steel Conduit: Factory made steel threaded couplings conforming to ANSI/NEMA FBI; bushing at all boxes and cabinets, with locknuts inside and outside box or cabinet. B. Couplings and Terminations for Electrical Metallic Tubing (Compression Couplings): Join lengths of EMT with steel compression type couplings conforming to ANSI/NEMA FBI. Attach EMT to boxes or cabinets with steel compression -type box connectors having an insulated throat with locknuts. Where grounding bushings are requires at terminations, they shall be T&B Series 3802, or approved equivalent. Set screw type connectors or indent connectors will not be allowed. C. Couplings and Terminations for Flexible Metal Conduit: Conforming to ANSI/NEMA FBI; T & B 440 Series or approved equivalent couplings at connections between flexible and rigid conduit; T & B 3110 or 3130 Series or approved equivalent nylon insulated throat, steel connectors at box or cabinet terminations. 16110 - 2 J D. -Couplings and Terminations for Liquidtight Flexible Metal Conduit: Conforming to !� ANSI/NEMA FBI; T & B 5271 Series or approved equivalent adapters at connections between flexible and rigid conduit; T & B 5331 Series or approved equivalent nylon insulated throat, steel connectors at box or cabinet terminations. 2.03 PULL BOXES AND JUNCTION BOXES: A. Description: Sheet steel, galvanized inside and outside, with galvanized covers. B. Small Boxes: For boxes where the volume required is not over 100 cubic inches, use standard outlet boxes. C. Larger Boxes: For boxes where the volume required is over 100 cubic inches, use cabinets as specified for panelboards cabinets with covers of the same gauge as cabinets, secured with corrosion resistant bolts or screws. PART 3 - EXECUTION r } 3.01 EXAMINATION: A. General: Examine surfaces to receive raceways, boxes and enclosures for compliance with installation tolerances and other conditions affecting performance of the raceway system. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.02 WIRING METHODS: A. Description: All wiring of every description shall be run in conduit or electrical metallic tubing unless noted or specified otherwise. Conduits may be run exposed in machinery and electrical rooms and unfinished areas. All other conduits shall be run concealed unless otherwise noted. 3.03 CONDUIT REQUIREMENTS: A. Wet and Damp Locations: 1. Type: Rigid Steel Conduit. 2. Minimum size: 1/2 inch. B. Dry Locations: 1. Concealed: Electrical metallic tubing. 2. Exposed within 6 feet of finished floor: Rigid steel conduit. 3. Exposed above 6 feet of finished floor where not subject to mechanical damage: Rigid steel conduit, or electrical metallic tubing. 4. Minimum size: 1/2 inch. r 3.04 INSTALLATION OF BUILDING RACEWAYS: A. Installation: Install conduit in accordance with NECA "Standard Of Installation." Install r, raceways, boxes and enclosures according to the manufacturer's written instructions. 16110 - 3 B. Conduits: All exposed runs shall be installed level and square and at proper elevations, parallel to the surface of the building in a neat and orderly manner. Provide adequate headroom. C. Bends: Install no more than the equivalent of four 90-degree bends between boxes. Make field bends with approved bending devices. Use hydraulic one-shot bender to fabricate bends in metal conduit larger than 2 inch size. Make bends and offsets so the inside diameter is not reduced. Unless otherwise indicated, keep the legs of a bend in the same plane and the straight legs of offsets parallel. Do not install bends or offsets in which conduit is crushed, deformed or otherwise injured. D. Conduit Bodies: Use conduit bodies to make sharp changes in direction. _ E. Completion: Complete raceway installation before starting conductor installation. F. Sizes: Size and install raceways so that conductors may be drawn in without injury or excessive strain. Sizes of conduits shown on the drawings are minimum sizes to be installed. G. Connections: Use lengths of flexible metal conduit, not less than 12 inches long and not more than 24 inches long at final connections to all motors, generators, controls and other devices subject to movement because of vibration or mechanical adjustment. In -- damp or wet locations, and where installed outdoors, use liquidtight flexible metal conduit. H. Around Heat Producing Equipment: Do not install raceways within twelve inches of steam and hot water pipes, breeching and flues, except where crossings are unavoidable, and then keep raceways at least six inches from insulation on the pipe, breeching or flue crossed. Wherever possible, avoid installing raceways directly above or in close proximity to boilers and other like objects operating at high temperatures. I. Damp or Wet Locations: In damp or wet locations make every effort to avoid installing raceways in a manner which will create moisture traps. Where they must be so installed, seal both ends of raceways with an approved sealing compound to prevent "breathing" and moisture condensation within the raceways. Protection of Raceways: Seal ends of all raceways with blank discs ("pennies"), push pennies or other approved closers during construction to prevent foreign matter from entering raceway. Do not pull any conductors into raceways until all plastering in the vicinity is completed. Swab out all raceways before pulling in conductors. K. Penetrations: Wherever raceways pass through floors, walls partitions, etc., carefully fill any space between the outside of the raceway and the building material to prevent passage of air, water, smoke and fumes. Filling material shall be fire resistive and, in r- general, similar to the basic building materials through which the raceway passes. L. Pulling Devices in Empty Raceways: Provide in every empty raceway, not containing -- conductors to be installed by this Contractor, a suitable pull line to facilitate future installation of wiring. Lines shall be free from splices and shall have not less than 12 inches of slack at each end of the pull wire. Identify each end of each line with a linen 16110 - 4 , tag bearing complete information as to the purpose of the raceway and the location of its other end. All lines shall be nylon or polyethylene cord with a tensile strength not less r- than 200 pounds. 3.05 JOINING AND TERMINATING CONDUITS: A. Joining Rigid Conduits: Join with threaded couplings. Ream out all conduit ends after threading. Secure rigid conduits at panel boxes, junction boxes, pull boxes, PM switchboards, support boxes, or sheet metal outlet boxes by galvanized locknuts, inside r and outside, with insulating bushing inside. Unthreaded set screw type couplings or connectors are not acceptable in rigid conduit systems. No running threads shall be used anywhere in conduit systems. t F B. Joining Electrical Metallic Tubing: Cut conduit square using saw or pipe cutter; de -burr cut ends. Bring conduit to shoulder of fittings and fasten securely. C. Terminations: Where raceways are terminated with locknuts and bushings, align the raceway to enter squarely, and install the locknuts with dished part against the box. Where terminations cannot be made secure with one locknut, use two locknuts, one inside and one outside the box. Where terminating in threaded hubs, screw the raceway or fitting tight into the hub so the end bears against the wire protection shoulder. Where chase nipples are used, align the raceway so the coupling is square to the box, and tighten the chase nipples so no threads are exposed. 3.06 480 VOLT SYSTEMS: A. General: In systems operating at more than 300 volts between phase conductors, where different phase conductors are to be run to a common gang wall switch box, install a separate conduit for each different phase wire and its return switch leg, and provide substantial barriers between adjacent switches in the box so that two different phase wires will not be the same compartment. 3.07 CONDUIT SUPPORTS: i A. Support Spacing: Use minimum spacing as directed by National Electrical Code, but space hangers more closely where required by conditions. B. Vertical Conduit Risers: Support vertical conduits at each floor by means of riser clamps or U-bolts, clamping them to a steel channel bridging the opening in the floor. C. Individual Conduits: Support conduits running vertically or horizontally with galvanized malleable iron one hole clamps. Carry individually supported horizontal conduits 1-1/4" and larger on galvanized steel hangers. Use no perforated strap iron as hanger material. Arrange supports to prevent misalignment of conduit during wire installation. D. Above Non -removable Ceilings: Where conduits smaller than 1-1/4" are installed above metal lath and plaster ceilings or mechanically suspended dry ceilings of the non - removable type, they may be supported on ceiling runner channels. 16110 - 5 E. Above Removable Ceilings: Where conduits smaller than 1-1/4" are installed above removable ceilings, attach them to the structure or bar joists (where present) or support them on threaded hanger rods with clips. Do not use any wire to support conduits or to — attach conduits to supporting members. Do not attach conduit to ceiling support wires. Locate conduits a sufficient distance above the ceiling to permit removal of the ceiling panels. Locate them so as not to hinder access to mechanical and electrical equipment through the ceiling panels. F. Multiple Conduits: Where multiple raceways are run horizontally at the same elevations, they may be supported on trapezes formed of sections of Unistrut or approved equal angle iron or channels suspended on rods or pipes. Size trapeze members including the suspension rods for the number size and loaded weight of the conduits they are to support. Space them as required for the smallest conduit supported. Group related conduits together. Provide space on each rack for 25 percent additional conduit. 3.08 INSTALLATION OF PULL AND JUNCTION BOXES: A. Sizing: Size all pull and junction boxes in accordance with NEC, using larger sizes than required by code where job conditions so indicate. B. Mounting: Fasten all boxes securely to the building construction, independent of conduit systems. On concealed conduit systems where boxes are not otherwise accessible, set -' box covers flush with finished surfaces for access. 3.09 IDENTIFICATION OF PULL AND JUNCTION BOXES: A. Branch Circuits: Each pull and junction box shall be labeled with indelible ink to indicate the wiring contained inside the box. The label shall indicate the panel and circuit number of the wiring contained. END OF SECTION 16110 6 SECTION 16120 CONDUCTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to the work of this section. 1.02 SUBMITTALS: A. General: Submit manufacturer's data on all materials according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data: Submit for review complete manufacturer's catalog information on all items specified herein, including materials, construction and UL listing. Provide manufacturer's catalog data on conductor and insulation materials. C. Manufacturer's Instructions: Submit for review complete manufacturer's instructions. Indicate application conditions and limitations of use stipulated by Product testing agency specified under Regulatory Requirements. 1.03 SCOPE: A. Description: The work shall include the furnishing of all conductors, together with all splices, connections, terminations and identification for wiring systems rated 600 volts and less. 1.04 REGULATORY REQUIREMENTS: A. Code Requirements: Conform to requirements of ANSIINFPA 70 (National Electrical Code) and all applicable State and Local Electrical Ordinances. B. UL Listing: Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose specified and shown. 1.05 PROJECT CONDITIONS: A. Field Measurements: Verify that field measurements are as'shown on the Drawings. B. Routing of Wire and Cable: Wire and cable routing shown on the Drawings is approximate unless dimensioned. Route wire and cable as required to meet Project Conditions. Where wire and cable routing is not shown, and destination only is indicated, determine exact routing and lengths required. 16120 - 1 PART 2 - PRODUCTS 2.01 CONDUCTORS (600 VOLTS AND UNDER): A. Type: Soft drawn, annealed copper, UL listed, rated at 600 volts, continuous without weld, splice or joint, uniform cross-section, free from flaws, scale and other — imperfections. No. 8 and larger shall be stranded; No. 10 and smaller shall be solid. B. Insulation: Branch circuits shall have type THHN or THWN-2 insulation, temperature rated 90 degrees C, unless the type is specifically designated or specified. Service feeders shall be type THWN-2. Feeder circuits shall be Type THWN-2. C. Manufacturers: Okonite, Triangle, Anaconda, Simplex or approved equivalent. 2.02 JOINTS AND SPLICES: A. Stranded Copper Conductors: UL approved solderless bolted pressure connectors or compression connectors. All connectors shall be of proper sizes to match conductor sizes. All compression connectors shall be applied with properly sized dies and tools. Split -bolt connectors are not acceptable. B. Solid Copper Conductors: UL approved solderless bolted pressure connectors; or UL approved electrical spring connectors make. All connectors shall be of proper sizes to match conductor sizes. Split bolt connectors are not acceptable. 2.03 COLOR CODING: A. General: Use standardized color -coding of conductors throughout. All color coding shall be continuous for the entire length of the conductors, and shall be permanent and readily distinguished after installation. In cases where the specified colors of insulated wire and cable are unavailable, such conductors shall be color -coded, as specified above, by means of slip-on colored plastic sleeves or plastic tape at all pull boxes, support boxes, outlet boxes, panelboards, and other terminal and splicing points. B. Neutral and Grounding Conductors: Neutral conductors shall be white or natural grey. Grounding conductors shall be green, or green with one or more yellow stripes. C. 208 Volt System: Phase conductors shall be black, red and blue for phases, A, B, and C respectively in the 208 volt system. D. 480 Volt System: - Phase conductors shall be yellow, brown and orange for phases A, B, and C respectively in the 480 volt system. PART 3 - EXECUTION 3.01 EXAMINATION: A. General: Examine raceways and building finishes to receive wires and cables for compliance with installation tolerances and other conditions. Do not proceed with installation until unsatisfactory conditions have been corrected. 16120 2 3.02 WIRE PULLING: A. Preparation: Completely and thoroughly swab raceway before installing wire. Pull no conductors into conduits until all work of a nature which may cause injury to conductors is completed. B. Pulling Lines: Provide suitable installation equipment for pulling conductors into raceways or conduits. Use ropes of polyethylene, nylon or other suitable material to pull in conductors. Attach pulling lines to conductors by means of woven basket grips or by pulling eyes attached directly to conductors. C. Multiple Wires in a Raceway: All conductors to be installed in a single conduit shall be pulled in simultaneously. D. Cable Lubricant: Use an Underwriters' listed cable pulling compound for building wire No. 4 and larger. All cable lubricants shall be UL listed, and shall be certified by their manufacturer to be non -injurious to the insulation on which they are used. E. Existing Conduit: Remove existing wire from raceway before pulling in new conductors. 3.03 INSTALLATION OF BUILDING WIRE (600 VOLTS AND UNDER): A. General: Install conductors as indicated, according to manufacturer's written instructions and the NECA "Standard of Installation." B. Feeders: Run all feeders their entire length in continuous pieces without joints or splices, insofar as practicable. Make joints in branch circuits only where circuits divide as shown on drawings. Such joints shall consist of one through circuit to which shall be spliced the tap circuit. C. Branch Circuits: Not more than one power or lighting circuit shall be installed in a single conduit, except that one 3-wire circuit or one 4-wire circuit consisting of 2 different phase wires and a common neutral or 3 different phase wires and a common neutral may be installed in a single conduit. This provision shall not prohibit the installation in a single conduit of all conductors of a circuit with three- and four-way switching. D. Dedicated Neutrals: Where indicated on the drawings, branch circuits shall be installed with dedicated neutrals in a single conduit. E. Wiring at Outlets and Switches: Install with at least 12 inches of slack conductor at each outlet and wall switch. F. Terminations: Connect outlets and components to wiring and to ground as indicated and instructed by manufacturer. Tighten connectors and terminals, including screws and bolts, according to equipment manufacturer's published torque -tightening values or as specified in UL Standard 486A. 1 16120 - 3 r G. Sizes: No wire shall be smaller than No. 12 except for signal or control circuits, and except for individual lighting fixture taps as permitted by the National Electrical Code. H. Different voltages in same raceway: Power and Lighting circuits of different system voltages (e.g. 208Y/120 and 480Y/277 volts) shall not occupy the same conduit. I. Joints and Splices: Make joints and splices only where necessary and only at outlet boxes and pull boxes. All joints shall be mechanically and electrically secure. After a joint or splice is complete, insulate it with rubber tape, and friction tape to make the insulation of the joint or splice equal to that of the conductor. In lieu of this, vinyl plastic tape may be used if applied in at least four layers (half lapped in two directions), with all larger splices, terminals, sharp corners and voids being first protected by application of insulating putty. J. Wet Locations: Conductor splices in wet locations shall be made in accordance with the conductor manufacturer's recommendations. K. Identifying Tags: Non-ferrous; stamped to clearly identify each circuit. Securely fasten tags to all cables, feeders and power circuits in pull boxes, lighting, power and distribution panelboards, etc. L. Bundling Conductors: Bundle all conductors in panelboards, cabinets and the like, using marlin twine lacing or nylon straps made for the purpose. Bundle conductors larger than No. 10 in individual circuits. Bundle smaller conductors in larger groups. M. Cable Supports and Boxes: Install cable supports and boxes for all vertical conductors in accordance with National Electrical Code requirements. Boxes shall be of heavy galvanized steel plate construction, not less than No. 10 USS gauge, riveted to an angle iron frame. Removable box covers shall be secured with corrosion -resistant screws. For cables without a metallic sheath, cable supports shall be of the split wedge type which clamps each conductor firmly and tightens due to the weight of cable. For cables with metallic sheath, a basket weave or equal type of support shall be provided as approved by the cable manufacturer. END OF SECTION 16120 - 4 rw� :f SECTION 16450 GROUNDING AND BONDING PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to the work of this section. 1.02 SUBMITTALS: A. General: Submit manufacturer's data on all materials according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data: Submit for review complete manufacturer's catalog information on all items specified herein, including materials, construction and UL listing. Provide data for grounding electrodes and connections. C. Manufacturer's Instructions: Submit for review complete manufacturer's instructions. Indicate application conditions and limitations of use stipulated by Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation and installation of exothermic connectors. D. Field Test Reports: Submit for review Contractor's Field Tests of installation. Indicate overall resistance to ground and resistance of each electrode. 1.03 SCOPE: A. Description: Furnish and install the various grounding systems outlined herein in accordance with the National Electrical Code. 1.04 REGULATORY REQUIREMENTS: A. Code Requirements: Conform to requirements of ANSI/NFPA 70 (National Electrical r Code) and all applicable State and Local Electrical Ordinances. i B. UL Listing: Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose specified and shown. 1.05 PROJECT RECORD DOCUMENTS: A. General: Submit under provisions of the General Requirements. B. As -built Drawings: Accurately record actual locations of grounding electrodes. 16450 - 1 r PART 2 - PRODUCTS 2.01 CONDUCTORS: A. Material: Stranded copper as specified in Section 16120 - CONDUCTORS. PART 3 - EXECUTION 3.01 GROUNDING RACEWAYS: A. General: Assure the electrical continuity of all metallic raceway systems, pulling up all conduits and/or locknuts wrench tight. Where expansion joints or telescoping joints occur, provide bonding jumpers. Where flexible metallic conduit is employed, provide a green -insulated grounding jumper installed in the flexible conduit. Install a separate green -insulated conductor in each non-metallic conduit. Provide grounding bushings on all service and feeder raceways terminating within switchboards, motor control centers, panelboards, cabinets, and all other enclosures. Provide grounding conductors from such bushings to the frame of the enclosure and to the ground bus or equipment grounding strap. Size grounding conductors in accordance with NEC Table 250-95. 3.02 EQUIPMENT GROUNDING CONDUCTORS: A. General: Provide a separate, green -insulated copper grounding conductor, with insulation of the same rating as phase conductors, for each feeder and for each branch circuit indicated. Install the grounding conductor in the same raceway with the related phase - and neutral conductors, and connect the grounding conductor to pull boxes or outlet boxes at intervals of 100 feet or less. Where paralleled conductors in separate raceways occur, provide a grounding conductor in each raceway. Connect all grounding conductors to bare grounding bars in panelboards, and to ground buses in service equipment to the end that there will be an uninterrupted grounding circuit from the point of a ground fault back to the point of connection of the equipment ground and system — neutral. Size all of these grounding conductors per NEC Table 250-95. 3.03 CONNECTIONS: A. General: Make connections in such a manner as to minimize possibility of galvanic action or electrolysis. Select connectors, connection hardware, conductors, and connection methods so metals in direct contact will be galvanically compatible. 1. Use electroplated or hot tin coated materials to assure high conductivity and make contact points closer in order of galvanic series. 2. Make connections with clean bare metal at points of contact. 3. Coat and seal connections involving dissimilar metals with inert material such as red lead paint to prevent future penetration of moisture to contact surfaces. B. Terminations: Tighten grounding and bonding connectors and terminals, including screws and bolts, in accordance with manufacturer's published torque tightening values or to values specified in UL 486A and 486B. PON 4 C. Compression Type Connections: Use hydraulic compression tools to provide the correct a circumferential pressure for compression connectors. Use tools and dies recommended by the manufacturer of the connectors. Provide embossing die code or other standard method to make a visible indication that a connector has been adequately compressed on the ground conductor. r END OF SECTION f r- 16450 - 3 r i SECTION 16475 CIRCUIT DISCONNECT AND OVERCURRENT PROTECTIVE DEVICES PART 1 - GENERAL 6 1.01 RELATED DOCUMENTS: A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to the work of this section. 1.02 SUBMITTALS: A. General: Submit manufacturer's data on all materials according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data: Submit for review complete manufacturer's catalog information on all items specified herein, including materials, construction and UL listing. Provide data sheets showing electrical characteristics including time -current curves. C. Operation and Maintenance Manuals: Submit for review all operation and maintenance manuals for items specified herein. Indicate application conditions and limitations of use stipulated by Product testing agency specified under Regulatory Requirements. Include all operation and maintenance manuals. 1.03 SCOPE: A. Description: The work shall include all labor, material, equipment, and service necessary for and incidental to the complete electrical distribution system. 1.04 REGULATORY REQUIREMENTS: A. Code Requirements: Conform to requirements of ANSI/NFPA 70 (National Electrical r Code) and all applicable State and Local Electrical Ordinances. o G B. UL Listing: Furnish products listed and classified by Underwriters Laboratories, Inc. as r' suitable for purpose specified and shown. 1.05 MAINTENANCE MATERIALS: A. General: Provide maintenance materials according to the Conditions of the Contract and Division 1 Specification Sections. 1.06 EXTRA MATERIALS: A. General: Furnish under provisions of the General Requirements kr■ 16475 - 1 r B. Spare Fuses: Upon completion of the work provide a standard carton (but not less than 3 fuses where a carton does not contain as many as 3) of each size of each type of fuse used. These spare fuses are in addition to fuses in spare switches and replacement fuses blown during construction and testing. PART 2 - PRODUCTS 2.01 FUSES: A. General: Furnish and install all fuses necessary for leaving the installation complete and in working order, including a complete set of fuses in each spare switch. B. Fuse Identification Label: Place a fuse identification label, showing type and size of the required fuses, inside the door of each enclosure requiring fuses. C. Regulatory Standards: Fuses shall conform to the latest NEMA Standards, and shall be UL listed and labeled (except as noted otherwise) They shall conform to the UL classes listed hereinafter. Voltage ratings shall be suitable for the systems to which the fuses are applied. D. Installation: Fuses shall be shipped to the job in boxes, and shall not be installed in any -' equipment until the installation is complete, and final tests have been made prior to energizing the equipment. E. Fuse Reducers: Where the spacing of fuse clips in equipment is greater than required by the proper size of fuse, use suitable fuse reducers to fit the fuses. F. Class and Type: Fuses shall be of the classes and types listed below, the type designations referring to those indicated on the plans. 1. Class L Time Delay (601-6000 Amps): Class L; Bussmann Type KRP-C "Hi -Cap", current limiting with time delay, interrupting rating of 200,000 RMS symmetrical amperes, current rating 601-6000 amperes. 2.02 MOLDED CASE THERMAL MAGNETIC TRIP CIRCUIT BREAKERS: A. Description: NEMA AB 1, molded case, one, two and three pole, with integral thermal and instantaneous magnetic trip in each pole, UL listed. Two and three pole circuit breakers with common trip and single operating handle. Handle ties between breakers are unacceptable. Circuit breakers shall have the voltage and trip rating scheduled or indicated on the Drawings. _ B. Operation: Operating mechanism shall be over center, trip free, toggle mechanism with quick -make, quick -break action with positive handle indication. C. Trip Elements: Thermal magnetic trip element calibrated for 40 deg. C. ambient temperature. 16475 - 2 D. Terminations: Terminations for 10-30 ampere breakers shall be UL listed for use with 60 degree C. or 75 degree C. conductors. Terminations for breakers 35 ampere and greater shall be UL listed for use with 75 degree C conductors. E. Interrupting Rating: Circuit breakers shall have minimum RMS symmetrical ampere interrupting ratings as scheduled on drawings. F. Current Limiting Molded Case Circuit Breakers: Where indicated on the drawings provide molded case circuit breakers with automatically resetting current limiting elements in each pole. Interrupting rating 100,000 rms amperes symmetrical let -through current and energy level less than permitted for same size Class RK-5 fuse. G. Breakers 250 Amp Frame and Greater: Circuit breakers with frame sizes greater than 250 amperes shall have adjustable magnetic trip elements which are set by a single adjustment, push to trip button and reverse connection capability. H. Switching Duty: UL listed SWD for switching duty, 15 and 20 ampere single pole, suitable for 120 volts ac fluorescent loads. I. HACR Listing: UL listed as HACR type, 120/240 volt, 15-60 ampere, one, two and r-� three pole, to serve heating air conditioning and refrigeration equipment. Provide circuit t breakers UL listed as Type HACR for air conditioning equipment branch circuits. t J. Accessories: Provide circuit breakers with switching neutral, shunt trip, ground fault current interrupters, or remote controlled operators as scheduled on the drawings. �.. K. Motor Circuit Protectors: Where indicate on the Drawings or Specified elsewhere provide molded case circuit breaker with integral instantaneous magnetic trip element in each pole. PART 3 - EXECUTION 3.01 INSTALLATION: A. Fuses: Install fuses in accordance with manufacturer's instructions. B. Fuse Labels: Install fuse with label oriented such that manufacturer, type, and size are easily read. END OF SECTION 16475 - 3 r SECTION 16481 MOTOR CONTROLLERS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to the work of this section. 1.02 SUBMITTALS: A. General: Submit manufacturer's data on all materials according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data: Submit for review complete manufacturer's catalog information on all *' items specified herein, including materials, construction and UL listing. Provide catalog sheets showing voltage, controller size, ratings and size of switching and overcurrent protective devices, short circuit ratings, dimensions, and enclosure details. C. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of Product. 1.03 SCOPE: A. Description: The work shall include all labor, material, equipment and service necessary for and incidental to motor wiring and control as shown on the drawings and/or as specified herein. 1.04 REGULATORY REQUIREMENTS: A. Code Requirements: Conform to requirements of ANSI/NFPA 70 (National Electrical Code) and all applicable State and Local Electrical Ordinances. B. UL Listing: Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose specified and shown. 1.05 DELIVERY, STORAGE, AND HANDLING: A. General: Deliver, store, protect, and handle Products to site according to the Conditions of the Contract and Division 1 Specification Sections. Accept delivery of motor controllers on site and inspect for damage. Report concealed damage to carrier within their required time period. Protect from corrosion and entrance of debris by storing above grade protected from the weather. Provide appropriate covering. 16481 - 1 r- 1.06 PROJECT CONDITIONS: A. Field Measurements: Verify that field measurements are as shown on the Drawings. B. Location of Motor Controllers: Verify locations of motor controllers prior to installation. Motor controller locations are shown on Drawings in approximate locations unless dimensions are indicated. Locate as required to complete wiring system. 1.07 PROJECT RECORD DOCUMENTS: A. General: Submit according to the Conditions of the Contract and Division 1 Specification Sections. B... As -built Drawings: Accurately record actual locations of motor controllers. PART 2 - PRODUCTS 2.01 MOTORS: A. General: All motors will, unless otherwise noted, be furnished under other Divisions of the specifications, or will be furnished by the Owner. Where motors are mounted -- integrally with items of equipment, they will be erected in place with such equipment ready for electrical connection; such erection is not a part of the work under this Division. Where motors are to be installed as separate items, their foundations, anchor — bolts and other provisions necessary to their erection will be provided as a part of the work of the Division under which they are furnished; their erection and final setting are a part of the work of this Division, and shall be done by specially skilled millwrights or, . similar craftsmen. 2.02 MOTOR CONTROLLERS: A. Manufacturers: Motor Controllers shall be of Furnas, General Electric, Westinghouse, Square D or approved equivalent manufacture with the proper enclosures. B. General: ; Coordinate the features of each motor controller with the ratings and characteristics of the supply circuit, the motor, the required control sequence, the duty cycle of the motor, drive, and load, and the pilot device, and control circuit affecting controller functions. Provide controllers that are horsepower rated to suit the motor controlled. C. Enclosures: For individually mounted controllers and control devices, comply with NEMA Standard 250, "Enclosures for Electrical Equipment (1000 Volts Maximum)." Provide enclosures suitable for the environmental conditions at the controller location. Provide NEMA Type 1 enclosures except as otherwise indicated or required. 16481 - 2 I 2.03 MANUAL MOTOR CONTROLLERS: rA. Fractional Horsepower Manual Controller: NEMA ICS 2, AC general-purpose Class A manually operated, full -voltage controller for fractional horsepower induction motors, ,. with thermal overload unit, red pilot light, and toggle operator. B. Enclosure: NEMA ICS 6; Type 1 or 3R as required or as shown on the drawings. Where the starter is installed in public areas, it shall be in a recessed box with a stainless steel coverplate. 2.04 MAGNETIC MOTOR CONTROLLERS: A. General: All motor starters (controllers) and control equipment shall be furnished and installed under this Division of the specifications. The starters and control equipment shall conform with the schedule on the drawings if applicable. B. Full Voltage Non Reversing Controllers: NEMA ICS 2, AC general purpose Class A magnetic controller for induction motors rated in horsepower. C. Contacts: Contacts shall open each ungrounded connection to the motor. All contacts r- shall be replaceable without removing power wiring or removing starter from panel. D. Coil Operating Voltage: 120 volts, 60 Hertz. E. Solid State Overload Protection: Solid state current sensing, heaterless, control power inductively acquired from motor load current, ambient insensitive, NEMA Class 10, 20 or 30 as required by the load, 2:1 full load current adjustment, with thermal memory, manual reset, tripping accuracy pluse or minus 2 percent, short-circuit self-protection, phase loss protection trips within 3 seconds of phase loss conditions. 2.05 MOTOR CONTROLLER FEATURES: A. General: Provide pushbutton stations, pilot lights and hand -off -automatic switches in all r starters. Provide auxiliary contacts on starters to accomplish interlocks and control as specified in Division 15 or as noted elsewhere. Starter disconnecting means shall have auxiliary contacts to disconnect all control circuits when the starter is disconnected. B. Auxiliary Contacts: Provide auxiliary contacts on starters to accomplish interlocks and control as specified in Division 15 or as noted elsewhere. NEMA ICS 2, two each field !' convertible contacts in addition to seal -in contact. r C. Cover Mounted Pilot Devices: NEMA ICS 2, heavy duty type. D. Pilot Device Contacts: NEMA ICS 2, Form Z, rated A150. E. Pushbuttons: Unguarded Recessed type. F. Indicating Lights: Incandescent type. 16481 - 3 r G. Selector Switches: Rotary type. H. Relays: NEMA ICS 2. I. Control Power Transformers: Equip each starter unit with a control power transformer, 120 volt secondary, 60 va minimum. Provide fused secondary, and bond unfused leg of secondary to enclosure. 2.06 COMBINATION STARTER DISCONNECTS: A. Combination Controllers: Starter units shall be combination starter and non -fused switch units in common enclosure as scheduled on the Drawings: Provide means for locking disconnect handle, and means for defeating cover interlock. B. Non -Fusible Switch Assemblies: Non -fusible switch shall be as described in Section 16441 - CIRCUIT AND MOTOR DISCONNECT SWITCHES. PART 3 - EXECUTION 3.01 INSTALLATION: A. Preparation: Verify that surface is suitable for controller installation. Do not install controller until building environment can be maintained within the service conditions required by the manufacturer. B. General: Install enclosed controllers where indicated, in accordance with manufacturer's written instructions. Install enclosed controllers plumb. C. Wall Mounting: For control equipment at walls, bolt units to wall or mount on light weight structural steel channels bolted to the wall. Mount 5 ft. to operating handle. D. Floor Mounting: For controllers not located at walls, provide freestanding racks fabricated of structural steel members and light weight slotted structural steel channels. Use feet consisting of 3/8 inch thick steel plates, 6 inches square, bolted to the floor. Use feet for welded attachment of 1-1/2 inch by 1-1/2 inch by 1/4 inch vertical angle posts not over three feet on centers. Connect the posts with horizontal lightweight slotted steel channels and bolt the control equipment to the channels. E. Nameplates: Provide engraved plastic nameplate at each motor controller identifying the name of the equipment - i.e. EF #1-96, etc. F. Motor Data: Provide neatly typed label inside each motor controller door identifying motor served, nameplate horsepower, full load amperes, code letter, service factor, and voltage/phase rating. G. Connections: Tighten connectors, terminals, bus joints, and mountings. Tighten field connected connectors and terminals, including screws and bolts, in accordance with equipment manufacturer's published torque tightening values or as specified in UL 486A and UL 486B. END OF SECTION -- 16481 - 4