Loading...
HomeMy WebLinkAboutResolution - 5459 - Contract - Lubbock Audio Visual - Video Camera Monitoring System - 04_10_1997RESOLUTION NO. 5459 Item #23 April 10, 1997 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Contract with Lubbock Audio Visual, of Lubbock, Texas, to install and furnish all materials and services as bid for the Video Camera Monitoring System, attached hereto, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this loth day of April , 1997. O • •' ATTEST: 144L. - Am&%" - Ka a arnell, City Secretary APPROVED AS TO CONTENT: Victor Kil -an, chasing Manager APPROVED AS TO FORM: Do6ald G. Vandiver, Fi City Attorney da/ocdocs/lblcaudio.res April 1, 1997 546q CITY OF LUBBOCK SPECIFICATIONS FOR VIDEO CAMERA MONITORING SYSTEM BID #97015 --A- fl r4 a_ _" CITY OF LUBBOCK Lubbock, Texas City of Lubbock P.O. Sox 2000 Lubbock, Texas 7S457 e06-767-2167 ADDENDUM #4 ITB #97015 Video Camera Monitoring System MAILED TO VENDOR: OLD CLOSE DATE: February 28, 1997 ITB #97015, Addendum 94 Office of Purchasing March 26, 1997 @ 3:00 PM The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any item called for in the ITB documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. 1. Please change section 10.1,Vdeo Cameras (inside Cameras and Equipment), to read as follows: "The video cameras shall be color and high resolution." 2. Please change section 12.1, Camera Enclosures, to read as follows: "The camera enclosures shall be environmentally sealed and pressurized with dry nitrogen." 3. Please change section 20.1, Video Cameras (Optional Outside Cameras per site basis), to read as follows: "The video cameras shall be color and high resolution." All requests for additional information or clarification must be submitted in writing and directed to: Questions may be faxed to: or Email to: Laura Ritchie, Buyer City of Lubbock P.O. Box 2DD0 Lubbock, Texas 79457 (806)767-2164 LRitchie@mail.cl.lubbocktx.us THANK YOU, Laura Ritchie Buyer PLEASE RETURN ONE COPY OF THIS ADDENDUM WITH YOUR BID it �" 97D15ad4.doc r rrB #97015, Addendum #3 City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 B06-767-2167 ADDENDUM N ITB #97015 Video Camera Monitoring System Office of Purchasing MAILED TO VENDOR: February 18,1997 OLD CLOSE DATE: February 18, 1997 @, 3:00 PM NEW CLOSE DATE: March 26, 1997 @ 3:00 PM The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any item called for in the ITB documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. 1. The Close Date has changed From: February 18, 1997 @ 3:00 pm To: March 25, 1997 @ 3:00 pm All requests for additional infonnation or clarification must be submitted in writing and directed to: Laura Ritchie, Buyer City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 Questions may be faxed to: (806)767-2164 or Email to: LRitchie@mail.ci.lubbocktx.us THANK YOU, .�'•�. Laura Ritchie Buyer PLEASE RETURN ONE COPY OF THIS ADDENDUM WITH YOUR BID Ir C 97015ad3.doc r City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 606-767-2167 7 ADDENDUM #2 ITB #97015 Video Camera Monitoring System MAILED TO VENDOR: OLD CLOSE DATE: NEW CLOSE DATE: February 10, 1997 ITB #97015, Addendum #2 Office of Purchasing February 12, 1997 @ 3:00 PM February 18, 1997 @ 3:00 PM The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any item called for in the ITB documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. 1. Any conduit ran inside the Headworks Barscreen Room and the Solids Handling Belt Press Room must be the rigid type conduit and have conduit seal offs. 2. The MCC moms for both buildings (Headmrks & Solids Handling) will require rigid conduit. These rooms will not require conduit seal offs. 3. Conduit paths have been verified and labeled with pull strings from both buildings to the office telephone room. Conduit will have to be run from the office building telephone room to the SCADA Vas room. EMT conduit may be used in the office building. No exposed conduit will be allowed in the office building except in the telephone and Vax rooms. 4. Environmental Conditions in the Headworks Building: A. Constant 85 to 100% humidity. &.. B. Normally less than 10 ppm 1-12S but, frequently between 10 & 50 ppm. Has in the past C maxed out our detection meters which will measure up to 50 ppm. C. % Lower Explosive Limit (% LEL) normally runs less than 10%. Has run up to 35% LEL In the past. With the influent flowing directly into this building, there is a strong potential for the % LEL to be much higher. 5. Environmental Conditions in the Solids Building: A. Constant 85 to 100% humidity. B. Normally less than 10 ppm 1-12S but, depending on digester conditions there is a potential for the H2S concentrations to much higher. 6. Contractor is to provide surge protection for cameras. 7. It will be the contractors responsibility to verify the exact measurements for cable. 8. Base Bid is to include furnishing and installing the following including all necessary hardware, power supplies, cable, etc. (as specified herein): r Two (2) Inside Cameras (One in the Headworks Building, one in the Solids Handling Building) Two (2) Motorized Zoom Lens Two (2) Camera Enclosures Two (2) Pan/Tilt Units 4 97015ad2.doc ITB #97015, Addendum #2 Two (2) Camera and Pan[Tilt Controllers Two (2) Monitors One (1) VCR One (1) Sequential Switcher (Optional) One (1) 4 Channel Multiplexer (Optional) 9. Altemate #1 will include furnishing and installing the following items on a per site basis (as specified herein): One (1) Camera One (1) Motorized Lens One (1) Camera Enclosure One (1) Pan/Tilt Unit All mounting hardware to the Control Tower 10. Please provide a linear foot cost to furnish and install wiring to the Control Tower for work described in Altemate No. 1. 11. Please submit your bid on the enclosed revised Bid Submittal Form. 12. Please find the enclosed Electrical Site Plan. 13. Please find the enclosed Electrical Standard Legend and Abbreviations. 14. Please find the enclosed copy of the prebid conference attendance sheet. 15. The Close Date has changed From: February 6, 1997 @ 3:00 pm To: February 18, 1997 @ 3:00 pm All requests for additional information or clarification must be submitted in writing and directed to: Questions may be faxed to: or Email to: Laura Ritchie, Buyer City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 (806)767-2164 LRitchie@mall.ci.lubbock.tx.us THANK YOU, Qii-�i{:�L- ra Ritchie Buyer PLEASE RETURN ONE COPY OF THIS ADDENDUM WITH YOUR BID Ir Enclosures 7 97015ad2.doc r t r BID SUBMITTAL LUMP SUM BID CONTRACT PLACE: DATE: PROJECT NUMBER: 97016 -VIDEO CAMERA MONITORING SYSTEM Bid of (hereinafter called Bidder) To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Gentlemen: The Bidder, in compliance with your invitation for bids for the construction of a having carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding the construction of the intended project including the availability of materials and labor, hereby intends to furnish all labor, materials, and supplies; and to construct the project In accordance with the plans, specifications and contract documents, within the time set forth therein and at the price stated below. The price to cover all expenses incurred in performing the work required under the contract documents. Base Bid: Furnish and install Video Camera Monitoring System, as specified herein. MATERIALS: ($ ) SERVICES: ($ ) TOTAL BASE BID: ($ ) Alternate No. 1 Furnish and install Video Camera Monitoring System on a per site basis, as specified herein: MATERIALS: ($ ) SERVICES: ($ ) TOTAL ALTERNATE NO. 1 ($ ) Unit cost to furnish & install wiring to the Control Tower for work described in Alternate No. 1: Ain. ft. r (Amount shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) 1 Bidder hereby agrees to commence the work on the above project on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within 140 (One Hundred Forty) consecutive calendar days thereafter as stipulated in the specifications and other contract documents. Bidder hereby further agrees r to pay to Owner as liquidated damages the sum of $200.00 (Two Hundred) for each consecutive calendar day in excess of the time set forth hereinabove for completion of this project, all as more fully set forth in the general conditions of the contract documents. Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with instruction number 21 of the General Instructions to Bidders. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the ` bidding. The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days after the scheduled closing time for receiving bids. �. The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on which he has bid; as provided in the contract documents. r ( Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent (5% ) of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within (ten) 10 days after notice of award of the contract to him. Enclosed with this bid is a Cashier's Check or Certified Check for Dollars ($ ) or a Bid Bond in the sum of Dollars ($ J, which it is agreed shall be collected and retained by the Owner as liquidated damages in the event the bid is accepted by the Owner and the undersigned fails to execute the necessary contract documents and the required bond (if any) with the Owner within ten (10) days after the date of receipt of written notification of acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned upon demand. Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract documents made available to him for his inspection in accordance with the Notice to Bidders. Authorized Signature (Printed or Typed Name) Company Address City, County State Zip Code Telephone: - Fax: (Seal if Bidder is a Corporation) ATTEST: ca Q U U L. _ * LL L-� L:: L--� l.- L -- L-- 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. LIST OF SUBCONTRACTORS Minority Owned Yes No ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ 0 ITB #97015, Addendurrr #1 City of Lubbock P.O. Box 2000 Lubbock. Texas 79457 E106-767-2167 ADDENDUM #1 ITB #97015 Video Camera Monitoring System MAILED TO VENDOR: OLD CLOSE DATE: NEW CLOSE DATE: Office of Purchasing February 6, 1997 February 6,1997 @ 3:00 PM February 12, 1997 @ 3:00 PM The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any item called for in the ITB documents is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. 1. The Close Date has changed From: February 6, 1997 @ 3:00 pm To: February 12, 1997 C 3:00 pm All requests for additional information or clarification must be submitted In writing and directed to: Laura Ritchie, Buyer City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 Questions may be faxed to: (806)767-2164 or Email to: LRitchie@mail.ci.lubbock.tx.us THANK YOU, f eur'aaPit2ite Buyer PLEASE RETURN ONE COPY OF THIS ADDENDUM WITH YOUR BID 97015ad1.doc CITY OF LUBBOCK INVITATION TO BID FOR TITLE: VIDEO CAMERA MONITORING SYSTEM ADDRESS: LUBBOCK, TEXAS BID NUMBER: 97015 PROJECT NUMBER: 9559.9242.30000 CONTRACT PREPARED BY: PURCHASING DEPARTMENT INDEX 1. NOTICE TO BIDDERS 2. GENERAL INSTRUCTIONS TO BIDDERS 3. BID SUBMITTAL - BID FOR LUMP SUM CONTRACTS 4. PAYMENT BOND 5. PERFORMANCE BOND 6. CERTIFICATE OF INSURANCE 7. CONTRACT 8. GENERAL CONDITIONS OF THE AGREEMENT 9. CURRENT WAGE DETERMINATIONS 10. SPECIFICATIONS 11. SPECIAL CONDITION NOTICE TO BIDDERS NOTICE TO BIDDERS BID #97016 Sealed bids addressed to Victor Kilman, Purchasing Manager, City of Lubbock, Texas, will be received in the office of the Purchasing Manager, Municipal Building, 1625 13th Street, Room L-04, Lubbock, Texas, 79401, until 3:00 o'clock p.m. on the 6th day of February. 1997, or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the following described project: "VIDEO CAMERA MONITORING SYSTEM" After the expiration of the time and date above first written, said sealed bids will be opened in the office of the Purchasing Manager and publicly read aloud. It is the sole responsibility of the bidder to insure that his bid is actually in the office of the Purchasing Manager for the City of Lubbock, prior to the expiration of the date above first written. The City of Lubbock will consider the bids on the 27th day of February. 1997, at the Municipal Building, 1625 13th Street, Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities. The successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful bidder will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $25,000. Said statutory bonds should be issued by a company carrying a current Best Rating of B or superior, as the rating of the bond company is a factor that will be considered in determination of the lowest responsible bidder. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's or certified r check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within 10 days after notice of award of the contract to him. ?~ It shall be each bidders sole responsibility to inspect the site of the work and to inform himself regarding all local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the bid submitted. There will be a pre -bid conference on the !^ 30th day of January 1997, at 9:00 o'clock a.m., in the Purchasing Conference Room L-04, Lubbock, Texas i Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing Manager of the City of Lubbock, which document is specifically referred to in this notice to bidders. Each bidder's attention is further directed to provision of Article 5159a, Vernon's Ann. Civil St., and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. r4 The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisement, minority and women business enterprises will be afforded equal opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, disability, or national origin in consideration for an award. f The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -bid meetings t and bid openings are available to all persons regardless of disability. If you would like bid information made available in a more accessible format or if you require assistance, please contact the City of Lubbock Human Relations Office at (806) 767-2281 at least 48 hours in advance of the meeting. CITY OF LUBBOCK r VICTOR KILMAN PURCHASING MANAGER r Bid documents may be obtained upon request from the Purchasing Department at 1625 13th Street, Room L-04, Lubbock, Texas 79401; Telephone (806)767-2167/Fax (806)767-2164. r f GENERAL INSTRUCTIONS TO BIDDERS too {a V F GENERAL INSTRUCTIONS TO BIDDERS 1. SCOPE OF WORK The contractor shall furnish all labor, superintendence, machinery, equipment and all materials necessary to complete this project in accordance with contract documents for the VIDEO CAMERA MONITORING SYSTEM. 2. CONTRACT DOCUMENTS All work covered by this contract shall be done in accordance with contract documents described in the General Conditions. All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by t said contract documents. 7 3. PLANS FOR USE BY BIDDERS a It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without charge of forfeiture of deposit. The contract documents, may be examined without charge as noted in the Notice r to Bidders. r- 4. BIDDER INQUIRIES No bidder shall request any information verbally. All written requests for additional information or clarification concerning this bid must be addressed to: . LAURA RITCHIE BUYER CITY OF LUBBOCK 7 P.O. BOX 2000 LUBBOCK, TX 79457 r" FAX (806)767-2164 5. TIME AND ORDER FOR COMPLETION The construction covered by the contract documents shall be fully completed within 140 (One Hundred Forty) consecutive calendar days from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful bidder. The Contractor will be permitted to prosecute the work In the order of his own choosing, provided, however, the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated by the contract documents. In the event the City requires a progress schedule to be submitted, and it is determined by the City that the progress of the work is not in accordance with the progress schedule so submitted, the City may direct the Contractor to take such action as the City deems necessary to insure completion of the project within the time specified. 6. PAYMENT All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the r" contract documents. t 7. AFFIDAVITS OF BILLS PAID The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. 8. MATERIALS AND WORKMANSHIP The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the site will not relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality which the Owner believes necessary to procure a satisfactory project. 9. GUARANTEES All equipment and materials incorporated in the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the Contractor shall fumish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear within ONE year from date of final acceptance of the work as a result of defective materials or workmanship, at no cost to the — Owner (City of Lubbock). 10. PLANS FOR THE CONTRACTOR The contractor will be furnished one set of plans and specifications, and related contract documents for his use during construction. Plans and specifications for use during construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Contractor. 11. PROTECTION OF THE WORK The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to Contractor. The City reserves the right, after the bids have been opened and before the contract has been awarded, to require of a bidder the following information: (a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by the intended contract and all work in progress with bond amounts and percentage completed. (b) A sworn statement of the current financial condition of the bidder. (c) Equipment schedule. 12. TEXAS STATE SALES TAX This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the materials to be incorporated into the work without paying the tax at the time of purchase. F 71i 13. PROTECTION OF SUBSURFACE LINES AND STRUCTURES It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construction of the project contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such underground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense. 14. BARRICADES AND SAFETY MEASURES r" The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, �,. and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project. i is. EXPLOSIVES r., The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from the City. In all cases where written permission is obtained for the use of explosives, the Contractor shall assume k full responsibility for all damage which may occur as a direct or indirect result of the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger life or property and the Contractor shall further use only such methods as are currently utilized by persons, firms, or corporations engaged in similar type of construction activity. r• Explosive materials shall not be stored or kept at the construction site by the Contractor. In all cases where explosives are to be used during the construction of the project contemplated by this contract, it shall be the duty of the Contractor to notify each utility company having structures (above or below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury. Such notice, however, shall not relieve the Contractor of responsibility for any damage resulting from his blasting operations. 16. CONTRACTOR'S REPRESENTATIVE The successful bidder shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The successful bidder shall be required to furnish the name, address and telephone number where such local representative may be reached during the time that the work contemplated by this contract is in progress. 17. INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and — shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverage's shall be submitted prior to contract execution. The insurance certificates furnished shall name the City as an additional insured, or in the alternative, shall be accompanied by a statement from the Contractor to the effect that no work on this particular project shall be subcontracted. It shall be the contractors responsibility to provide to the owner all proof of coverage insurance documents including workers compensation coverage for each subcontractor. 18. LABOR AND WORKING HOURS Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in these contract documents. The wage rate which must be paid on this project shall not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The bidders' attention is further directed to the requirements of Article 5159a, Vernon's Annotated Civil Statutes providing for the payment of the wage schedules above mentioned and the bidder's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in these contract documents does not release the Contractor from compliance with any wage law that may be applicable. Construction work under this contract requiring an inspector will not be performed on weekends or holidays unless the following conditions exist: (1) The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. (2) Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract and Contractor can show he has made a diligent effort to complete the contract within the allotted time. Before construction work requiring an inspector is to be performed on weekends or holidays, the Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do work and obtain written permission from the Owner's Representative to do such work. The final decision on whether to allow construction work requiring an inspector on weekends or holidays will be made by the Owner's Representative. In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life. 19. PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not less often than once each week. The Contractor and each of his subcontractors engaged at the site of the work shall not later than the seventh day following the payment of wages, file with the Owner's Representative, or Engineer, a certified, swom, legible copy of such payroll. This shall contain the name of each employee, his classification, the number of hours worked on each day, rate of pay, and net pay. The affidavit shall state that the copy is a true and correct copy of such payroll, that no rebates or deductions (except as shown) have been made, or will in the future be made from the wages paid as shown thereon. The Contractor must classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule is included in the contract documents. l The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, ten dollars for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such laborer, f" workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the f schedule of general prevailing rate of per diem wages included in these contract documents. 20. PROVISIONS CONCERNING ESCALATION CLAUSES Bids submitted containing any conditions which provide for changes in the stated bid price due to increases or decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the bidder without being considered. 21. PREPARATION FOR BID The bidder shall submit his bid on forms furnished by the City. All blank spaces in the form shall be correctly filled in and the bidder shall state the price both in words and numerals, for which he intends to do the work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten. In case of discrepancy between the price written in words and the price written in figures, the price written in words shall govern. If the bid is submitted by an individual, his name must be signed by him or his duly authorized agent. If a bid is submitted by a firm, association, or partnership, the name and address of each member must be given and the bid signed by a member of the firm, association or partnership, or person duly authorized. If the bid is submitted by a company or corporation, the company or corporate name and business address must be given, and the bid signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign bids must be properly certified and must be in writing and submitted with the bid. The bid shall be executed in ink. Each bid shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and endorsed on the outside of the envelope in the following manner. (a) Bidder's name (b) Bid for (description of the project). Bid submittals may be withdrawn and resubmitted at any time prior to the time set for opening of the bids, but no bid may be withdrawn or altered thereafter. 22. BOUND COPY OF CONTRACT DOCUMENTS t, Bidder understands and agrees that the contract to be executed by bidder shall be bound and include the following: (a) Notice to Bidders. (b) General Instructions to Bidders. (c) Bidder's Submittal. (d) Statutory Bond (if required). (e) Contract Agreement. (f) General Conditions. (g) Special Conditions (if any). (h) Specifications. (i) Insurance Certificates. 0) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders. If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered incorporated by reference into the aforementioned contract documents. 23. .QUALIFICATIONS OF BIDDERS The bidder may be required before the award of any contract to show to the complete satisfaction of the City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service specified therein in a satisfactory manner. The bidder may also be required to give a past history and references in order to satisfy the City of Lubbock in regard to the bidder's qualifications. The City of Lubbock may make reasonable investigations deemed necessary and proper to determine the ability of the bidder to perform the work, and the bidder shall furnish to the City of Lubbock all information for this purpose that may be requested. The City of Lubbock reserves the right to reject any bid if the evidence submitted by, or investigation of, the bidder fails to satisfy the City of Lubbock that the bidder is properly qualified to carry out the obligations of the contract and to -- complete the work described therein. Evaluation of the bidder's qualifications shall include: 9. The ability, capacity, skill, and financial resources to perform the work or provide the service required. 2. The ability of the bidder to perform the work or provide the service promptly or within the time specified, without delay or interference. -- 3. The character, integrity, reputation, judgment, experience, and efficiency of the bidder. 4. The quality of performance of previous contracts or services. BID SUBMITTAL BID SUBMITTAL LUMP SUM BID CONTRACT j DATE: PROJECT NUMBER: 97015 -VIDEO CAMERA MONITORING SYSTEM Bid of T,tthl�nrrk n„rii n Vi cr,al� Tne- _ (hereinafter called Bidder) r• To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) ` Gentlemen: j� The Bidder, in compliance with your invitation for bids for the construction of a VIDEO CAMERA SYSTEM 1 having carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding the construction of the intended project including the availability of materials and labor, hereby intends to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications and contract documents, within the time set forth therein and at the price stated below. The price to cover all expenses incurred in performing the work required under the contract documents. C Base Bid: Furnish and install Video Camera Monitoring System, as specified herein. MATERIALS: EIGHTEEN THOUSAND EIGHT HUNDRED DOLLARS NO/12 --------($ 18,800.00 ) SERVICES: ELEVEN THOUSAND DOLLARS N0/100 ($ 11, 000.00 ) TOTAL BASE BID: TWENTY NINE THOUSAND EIGHT HUNDRED DOLLARS NO/100 ($ 29,800.00 ) r' I . Alternate No. 1 Furnish and install Video Camera Monitoring System on a per site basis, as specified herein: r MATERIALS:_NINE THOUSAND FOUR HUNDRED DOLLARS NO/100---- ($ '4�'� _ ) SERVICES: FIVE THOUSAND FIVE HUNDRED DOLLARS NO/100---- ($ 5,500.00 ) r- TOTAL ALTERNATE NO. 1FOURTEEN THOUSAND NINE HUNDRED DOLLARS NO/10Q$-14; 900.00 _ } rUnit cost to furnish & install wiring to the Control Tower for work described in Alternate No. 1: Ain. ft. (Amount shall be shown in both words and numerals. In case of discrepancy, the amount shown in words shall govern.) r- i. POO 1 ' t. l Bidder hereby agrees to commence the work on the above project on or before a date to be specified in a written l "Notice to Proceed" of the Owner and to fully complete the project within 140 (One Hundred Forty) consecutive calendar days thereafter as stipulated in the specifications and other contract documents. Bidder hereby further agrees r to pay to Owner as liquidated damages the sum of $200.00 (Two Hundred) for each consecutive calendar day in excess of the time set forth hereinabove for completion of this project, all as more fully set forth in the general conditions of the contract documents. l Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with t instruction number 21 of the General Instructions to Bidders. 7, Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the bidding. The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days after the scheduled closing time for receiving bids. The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the r" plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to l commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on which he has bid; as provided in the contract documents. r Bidders are required, whether or not a payment or performance bond is required, to submit a cashiers check or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent (5% ) of the total l amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if l required) within (ten) 10 days after notice of award of the contract to him. Enclosed with this bid is a Cashier's Check or Certified Check for 71 Dollars ($ � or a Bid Bond in the sum of '%,►o ' .�s.Y» nDnk✓s Dollars ogo which it is agreed shall be collected and retained by the Owner as liquidated damages in the event the bid is accepted by r the Owner and the undersigned fails to execute the necessary contract documents and the required bond (if any) with the I Owner within ten (10) days after the date of receipt of written notification of acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned upon demand. (� Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract documents made available to him for his inspection in accordance with the Notice to Bidders. 7 1 ��. Authorized Signature Brian Waanon (Printed or Typed Name) ubbock Audio Visual, Inc. 940.0%enue Q Ldoross ubbock Lubbock City, County Texas 79-d05 State Zip Code Telephone: 806 - 744--' 559 Fax: 806 7Q-6939 F(Seal if Bidder is a Corporation) ATTEST: ITB #97015, Addendum 94 City of Lubbock P.O. Box 2000 i Lubbock, Texas 79457 i e0B-767-2167 ADDENDUM #4 !TB #97015 Video Camera Monitoring System MAILED TO VENDOR: OLD CLOSE DATE: February 28, 1997 Office of Purchasing March 26,1997 @M_ 3:00 PM The following items take precedence over specifications for the above named Invitation to Bid (ITB). Where any item called for in the ITB documents Is supplemented here, the original requirements, not affected by this addendum, shall remain in effect. r• 1. Please change section 10.1, Video Cameras (inside Cameras and Equipment), to read as follows: i ` "The video cameras shall be color and high resolution." r 2. Please change section 12.1, Camera Enclosures, to read as follows: "The camera enclosures shall be environmentally sealed and pressurized with dry �.. nitrogen." 3. Please change section 20.1, Video Cameras (Optional Outside Cameras per site basis), to read as follows: "The video cameras shall be color and high resolution." All requests for additional information or clarification must be submitted in writing and directed to: Questions may be faxed to: or Email to: Laura Ritchie, Buyer City of Lubbock F.O. Box 2uob Lubbock, Texas 79457 (806)767-2164 LRitchie@mail.ci.lubbock.tx.us THANK YOU, �fatzt&-- Laura Ritchie Buyer PLEASE RETURN ONE COPY OF THIS ADDENDUM WITH YOUR BID PON Ir 97015ad4.doc MAR 25 '97 12t43 FROM 512 346 4158 TO 18067929344 PAGE.002i003 UNIVERSAL SURETY OF AMERICA 7, r UNWERSAL SURETY OF AMERICA 950 Echo Lane. Suite 250 Houston. T as 77024 Bond No_ TX 0919118 00 f 111a] *)•.1•7 KNOW ALL MEN BY THESE PBF.SEN'K'S, that we Luboetc Audio Visual, lac.. 2120 Avemue Q, Lubbock, TX 79405, as Principal, boreinaftRr caned the Principal, sad UNIVERSAL SURETY OF AMERICA. 950 Echo Lane. Suite 2W, Houston. Texas 7702A, as Surety. beremAlW called the Surety. are held and firmly bound unto City of Lubbock , as Obligee, beceinaller called ft Obligee, in tie cum of S.W1. of the amount of this bid not to exceed Two ThousaM and No/IOD**• Dothn (S2,OOO.00) for the payment of which sum well and truly to be made, the said Principal and the said Surety, bald oursehres, our heirs, exacutors, adm=suutor. Mccesvacs and as^sigas, Jointly and wvetally. firmly by these pteseats. r ! WHEREAS, the principal has ,ar Vued a bid for 097013 -video camera monitoring system_ . C4 WNOW, TEMMORE, If the colyttsuct be timely awarded to the Principal and the Principal shall within such dame as spocifled in the d bid, enter into a contract in writing, or, in the event of the failure of the principal a Ca eater am h UM= if the es.. P&cipal $ban pay to the Obfigm the difference not io exceed the penalty hereof between the amount apect ad in said bid and O such larger amount for which tie MUM may In good faith contract with another party to perfoun the work covered by said bid, >_ then this obligation gall be null emd void. odiemse to remain in tall fotu and effect. H ey PROVIDED, 110VVEVER, neither Principal nor Smutty shall be bound hereunder unless Obligee prior io execucon of the final contract 0= shall frnisb evidence of financing in a mamrer and form acceptable to principal end Surety that financing has been f� �> committed to cover use en ire can of the project "a Signed lad sealed March 25, 1997. d cn r�G W Lubeck Audio Visual. W. z BY Sue Gray,/ Title: Cozitroller U1VT F SVF,R !�L`�UR1rIY OF A �gV sties Attomey-in-Fact NIVERSAL SURETY OF AMERICA MAR 25 '97 12:43 FROM 512 346 4158 TO JE1067929344 PAGE.003/003 III UNIVERSAL, SURETY OF AMERICA i UM Wi RSAL SURETY OF AMER14gA P.0_ Box 1068 -Houston, Texas 77251-1068 GENERAL POWER OF ATTORNEY - CERTIFIED COPY 9omr+mb. TX 0919118 00 r"' Know AU Men by These present:. That UNIVERSAL SURELY OF ALIMCA. a eogmaion duly organized and cuisti ag under rho laws of the State of Texas. and having its principal office in Hovsten. Texas. does by these presents make. eonsodutto and appoint l Peggy Stfce its true and lawful Attomey(s)4n4act. with Gill power and authority hereby conkrted in its name, picas; and stead, to ata sue, add owledge and deliver bonds for: Principal: Labock Audio VisttaL Ian. t Obiigtt: City of Lubbock i Anutwet: S2;DO0.00 CU and to bind the company tlreraby as f0y and to the same wmmt as if such bonds were signed by the pt esidem se" watt} the corporate seal of rive z .� company and duly attested by its eecsemary, hereby ratifying and eoafrrtning aU that the Wd AttomeAs}in•Fact may do within the above stated tn~ 1-i—ions Said appoimokmt lz made under and by whority of do following remooltaion adopted by the Board of Directors of Uu ve w Surety of rz4 America at a meeting held on die l t th day of Inly,19M. t-n � .� `Be It Pmlved, that the Presid=L and any vice President, Sec story or any Ass�tamt Secretary tdzau be and is hereby vested with Gnu power t/' W and autbonry to appoint azy one of toots suitable persons as Attotnay(s}in-Faa to represent and act foc and on behalf of the Company.' r O t r l "RFSOLVF.D that the sigtmatntte of any officer of the t:arporation, and the seal of the ion rosy be afi'ixed or primed by i4csimiSe to any facsimilie the rn O E-- power of attorney of the corporation. and that such primed sipature tmd seal valid sad binding upon. oo[potation.* W � � � rn In Wttrtest WpettoL Utraveszal Surety of America has caused throe presents to be signed by Its pr+esldest; John. Knox, Jr. end Its corporate seal to be hereto adlf7ted d& 3day of September. A.D.,199C � ►C O � UNIVERSAL SURM OF AMERICA > tx i —!K0 ct1 uwi^1•Y� trs y => .cues+1 ir. iv Praideot > ICounty State of Texas w of 11arrai ss. r r.. On this 30tb day of Septarnber, In the year of 19K before we Rhonda Kay Wiate, a notary public, personally appeared John Knox, Jr, personally known to be the person who executed She withW instrument as Pneddent, on behalf of the corporation thereat named card acimowledged to We dW the eorpnradomt executed it. LGJCJ�'� Nou y FW)& L the a W&sigood Secretary of Universal Surety of America, hereby ratify that the above and foregoing is a fulL true and eoseot copy of the Original power of Attorney issued by said Company. and do hereby Grrtt+or certify that de said Power of Auamey is still in affect. GIVEN under my hand ad the seal of said company, at Houston, Texas, this 25M day of MARCH 19 97 i For verification of the authority of this power you may telephone (713) 722-4600, UNIVERSAL SURETY OF AMERICAI > total_ PAGE. am 7 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. LIST OF SUBCONTRACTORS Minority Owned Yes No PAYMENT BOND JUN 12 '97 09:32 FROM 512 346 415e TO ieO67929344 UNIVERSAL SURETY OF AMERICAM r 7 P" r UNIVERSAL SURETY OF AMERI:CA 950 Echo Lane, Slate 250 Houston, Texas 77024 TEXAS STATMORY PAYMENT BMI%M (Public wow) . ,fir t:ems_ s_ ITIi KNOW ALL MEN BY THESE PRESENTS: THAT, Lubbock Audio Visual, W. (hereinafter called the Principal), as prfac44 and UNWERSAL SURIr" CY OF AMHRICA, a emporanon organized and e=dng under the laves of the State of Texas, licensed to do business in the State of Texas and aftmed to write bonds, as surety, (bereinafter called the Surety), are held and firmly bound ttato City of Lubbock (hereinafter called the Obligee), in the amount of Twenty -Nine Thousand Eight Hundred and 01100 Dollars (S29,900.00) for the payment whereof. Vfe said Principal and Surety bind dmoist lves, and their heirs, administrators, executm successors, and assigns, jointly and severally. firmly by d=e presents. w WHFSEAS, the Principal has entered into a certain contract with the Obligee, dated. for Video Camera Moaimring System Bid 097015 which coatxact is hereby referred to and made a part hereof as fully and to the same extent as if copied as length herein_ 0 NOW,THEREREFORE,THECONDMON OFTEIIS OBLIGATIONIS SUCH,Tbat ifthe raid Principal shalipayall claim=wsupplying labor and material to him or a subcontractor in the prosecution of lute work provided for in said contract, dren this obligation w shall be null and void, otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed put wmt to die provisions of Chapter 2253 of the Texas Government Code and all tisbilities on this bond shall be determined in accord=ce with the provisions, conditions and limitations of said Chapter ao the same extent as if it were copied at length herein. tars IN WMES.S WEEREOF, the said Principal and Staety crave Oiled and sealed this iastr=w this June 12,1997. Ls� Principal: Lubbock Audio Visual. Inc. z � eye J.ui a ti • . 315AW.1 Peggy Stice, NIVERSAL SURETY OF AMERICA JL14 12 '97 09:33 FROM 512 346 4158 TO 18067929344 PAGE.OW10W • UNIVERSAL SURETY OF AMERICA I ion go. to1 UNIVERSAL SURETY OF AMERICA P.O. BOX 1068 -Houston, Texas 77251-1068 GENERAL POWER OF ATTORNEY - CERTIFIED COPY hwoa*m" TX 0920403 00 4 K ow Ali Mtn by Tbese Pfesenrs.11m UNWMAL SURETY OF AMERICA, a corporation duly organized and exiomg under the laws of the State of Texas, and having its principal office in Houma. Texas, does by mesa percents malt, consatum and appoint Peggy Slice its true and lawfid wttorney(s)-io-Fact, with rush power and authority hereby conferred In its acme, place and stead, to execute, acknowledge and deliver bonds for.. j11 Pgjn0pjL- Lubbock Audio visual. Inc. Obligee; City of Lubbock �^ Amount, $29,800.00 Uand to bind the company &=by as !ally and to ft same extent as if stwh bonds were t ned by the President, sealed with the eozymm seal of me ... company and duly attested by its secretary. hereby ratifying and confirming all that to said Attomey(s)-ia-Fa= may do within the above stared t� 1®it360ns. Said appointment is made under and by authwiry of Ce f llowing resolution adopted by the Board of Dkectom of Universal Surety of r Lr3 America at a meeting held on the 1 Ith day of July.19M. r err "Be It Iolved, that the President, and an Viet president, Secretary or any Assistant Secretary tract! be and is hereby vested vvisfr AM power and auftuisy to appoias any one or more suitable persons as Auomcy("-Fats to represent and act for and on behalf of the Campaony." r � 'RESOLVED that dte dgthatu a of any offua of the eo On. and the seat of the expo on may be affixed or b fa�lie to an E power of auomey of the corporation, and drat such printed = ev sigaattne and seal shall be anal binding upon on. corporati" y W � is Wittaess 'GVhereof, Universal Sure of America Darr posed them presents to be slgped by its )President, .ioDn Knox, Jr. and its coocorporane scat to be hereto affixed elrls 30th day of September, AD, Q rn UNIVERSAL SURET-Y OF AMERICA rr tea Z_• t � t Stare aiTaxas 'k County of Barris On d& 30th day of September, in the year of 1996. before we Rhonda Kxy Wilke, a notary p. trblic, personally appeared Jobn Knox, Jr.. personally kaomwn too be the person who executed the within hatrument as president. on behalf of the corporation therein named and PM acknowledged to rue that the corporation executed IL lsOtaly Ptabdc S L the undersigned Secretary of Universal Surety of America. hereby certify that the above and foregoing is a full, cave and correct copy of ft Original Power of A==y issued by said Company, and do hereby lin'tber certify tbat the said Power of Attorney is 9= in affect. OIVEN under my hand and the "of said company, at Houston, Texas, this 13TH day of JLINE 19 -E - . For verification of the authority of this power you may telephone (713) 72246W. UNIVERSAL SURETY OF AMERICAWKWW- TOTAL PAGE.085 PM i F 06/17/97 15:45 S T INSURANCE 806 792 0640 002 TheS&n11 0si ni dS �r�t��� m7any represents that it is duly qualified to do business in Texas, and hereby designates an agent resident in Lubbock Caunly to whom any requisite notices may be delivered and on whom service of process may be had In matters arising out cf such suretyship. Universal Surety of America Surety • By: (Title) y Stice Attorney in Fact Approved as to form: Cti ock t �Y: f �. rM.1 "AA c)�—> rT c y orney ' Note: if signed by an officer of the Surety Company there must be on fife a certified extract from the by-laws showing that this person has authority to sign such obilgation. If signed by an Attorney In Fact, we must have copy of power of attorney for our files. 96-17-97 15:39 RECEIVED FROM:896 792 8640 F.92 0 7 r" PERFORMANCE BOND r r STATUTORY PERFORMANCE BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNMENT CODE (CONTRACTS MORE THAN $100,000) KNOW ALL MEN BY THESE PRESENTS, that (hereinafter called the Principal(s), as Principal(s), and F �.. (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of Dollars ($ ) lawful money of the I United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. r WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the _ day of , 19_, to and said principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the �. Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said I article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this day of , 19 r�• Surety * By: r (Title) P! Principal By: (Title) By: (Title) By: (Title) The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates an agent resident in Lubbock County to whom any requisite notices may be delivered and G on whom service of process may be had in matters arising out of such suretyship. Surety `By: (Title) Approved as to Form City of Lubbock By: City Attorney Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. CERTIFICATE OF INSURANCE r DATE (MMODNY) 05/01/97 Sanford Insurance Agency P.O. Box 64720 6303 Indiana Avenue Lubbock TX 79464 Lubbock Audio Visual, Inc. P. 0. BOX 1935 Lubbock TX 79408M ONLY AND CONFERS NO RIGHTS UPON TH HOLDER. THIS CERTIFICATE DOES NOT AM ALTER THE COVERAGE AFFORDED BY THE COMPANIES AFFORDING COVE COMPANY A COMMERCIAL UNION COMPANY B COMPANY C COMPANY D EXTEND OR INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. 00 TYPE OF INSURANCE POLICY NUMBER DATE POLICY (ME M 0� POLICY PIRATION Y`� DATE iM Ulm X GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS MADE FX OCCUR OWNER'S i CONTRACTORS PROT ARR454422 09 / 21196 09 / 21 / 97 • GENERAL AGGREGATE s 1,000,000 PRODUCTS - COMP'OP AGG s 1,000,000 PERSONAL & ADV WURY s 500,000 EACH OCCURRENCE s + aw FIRE DAMAGE (Any one ire) i + MED EXP (Arty one person) s 5,000 A AUTOMOBILE LIABILITY X ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS X NON -OWNED AUTOS NRAK2301 R 09 / 21 / 96 09 / 21 / 97 COMBINED SINGLE LIMIT i 500,000 BODILY INJURY (Per person) s BODILY INJURY (Per ecddenq i PROPERTY DAMAGE i GARAGE LIABILITY ANY AUTO AUTO ONLY - EA ACCIDENT s OTHER THAN AUTO ONLY: N0""�_ s s �-EUMBRELLA EXCESS LIABILITY FORM OTHER THAN UMBRELLA FORM EACH OCCURRENCE i AGGREGATE i i WORKERS COMPENSATION AND EMPLOYERS LIABILITY THE PROPRIETOR/ NCL PARTNERSIEXECUTNE OFFICERS ARE: Rm TORY LIMITS ER „ „: ^ EL EACH ACCIDENT i EL DISEASE - POLICY LNIT s EL DISEASE - EA EMPLOYEE IS OTHER vca mirimi yr iic o *97015 Video amera Mointoring ystem City of Lubbock Purchasing Dept P. 0. Box 2000 Lubbock, TX ACORD25-S (1 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE MNG COMPANY WILL ENDEAVOR TO MAR 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, 7949 BUT FAILURE TO MAIL SUCH NOTICE SHALL lM E NO OBLIGATION OR LIABILITY OF ANYUPON THE COMPANY, ITS A S OR REPR5SENTATNES. 1988` 06/09/1997 10:51 8067476939 LUBBOCK AUDIO VISUAL PAGE 02 Lubbock Audio Visual Inc. ! P'rafr=rral VJdra, Audia &Mulnme&a Products 4 r� June 09, 1997 City of Lubbock Human Rescources Scott Snyder 767 2164 Mr. Snyder, t, Brian Wagnon, employee of Lubbock Audio Visual, Inc. will be the only person from Lubbock Audio Visual, Inc. authorized to work on the camera installation 4 at the City of Lubbock, Water Roc. Plant. I will be employing one additional independent contractor, Zane Noble, to assist me on this installation. F I am an immediate family member to the President(Stan Wagnon) of Lubbock Audio Visual, Inc. arils, t.__J c Brian Wagnon r r 2120 AVENUE Q LUBBOCK, TEXAS 79405 ` 806-744-2559 FAX 806-747-6939 06-69-97 11:49 RECEIVED FROM:8067476939 P.02 06/09/1997 10:51 8067476939 LUBBOCK AUDIO VISUAL PAGE 03 June 09, 1997 City of Lubbock Human Resoources Scott Snyder 767-2164 Mr. Snyder, I, Zane Noble, am an independent contractor working with Brian Wagnon on the camera installation at the City Water Reclamation Plant. I will be the only other person involved on the installation. Re arils ne Noble 14% 1C:� / Za-C q2 A. 06-89-97 11:56 r1ec� -- sm 1 RECEIVED FROM:8067476939 P.03 r CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT To Be Completed by Appropriate Insurance Agent/Broker Prior to Award of Contract I, the undersigned Agent/Broker, certify that the insurance requirements contained in this bid document have been reviewed by me with the below identified Contractor. If the below identified Contractor is awarded this contract by the City of Lubbock, I will be able to, within ten (10) days after being notified of such award by contractor, furnish a valid insurance certificate to the City meeting all of the requirements defined in this bid/proposal. r C' Agent (Signature) Agent (Print) Name of Agent/Broker: _ Address of Agent/Broker: City/State/Zip: I Agent/Broker Telephone Number: ( 7 Date: CONTRACTOR'S NAME: (Print or Type ) FCONTRACTOR'S ADDRESS: NOTE TO AGENTIBROKER If this time requirement is not met, the City has the right to reject this bidiproposal and award the contract to another contractor. If you have any questions concerning these requirements, please contact the Purchasing Manager for the City of Lubbock at (806)767-2165. BID #97015 - VIDEO CAMERA MONITORING SYSTEM 9 CONTRACTOR CHECKLIST A CONTRACTOR SHALL: (1) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; (4) obtain from each person providing services on a project, and provide to the governmental entity: (A) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (B) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter, (6) notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (7) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: r r. REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must (see reverse) be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment and materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512)440- 3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." and (8) contractually require each person with whom it contracts to provide services on a project, to: (A) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (B) provide a certificate of coverage to the contractor prior to that person beginning work on the project; (C) include in all contracts to provide services on the project the language in subsection (e) (3) of this rule; (D) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (E) obtain from each other person with whom it contracts, and provide to the contractor: (i) a certificate of coverage, prior to the other person beginning work on the project; and (ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (F) retain all required certificates of coverage on file for the duration of the project and for one year thereafter, (G) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (H) contractually require each other person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services.0 �- U Q F- Z O U CONTRACT STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered Into this 10th clay of April.1997 by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through Windy Sitton, Mayor, thereunto authorized to do so, hereinafter referred to as OWNER, and Lubbock Audio Visual of the City of Lubbock. County of Lubbock, and the State of Texas hereinafter termed CONTRACTOR. r• WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith Of any) the CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain Improvements described as follows: BID # 97016 - VIDEO CAMERA MONITORING SYSTEM - $29,800.00 and all extra work in connection therewith, under the terms as stated In the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, Insurance and other accessories and services necessary to complete the said construction In accordance with the contract documents as defined in the General Condition of Agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have r" been given to him and to substantially complete same within the time specified in the contract documents. r r The OWNER agrees to pay the CONTRACTOR In current funds for the performance of the contract In accordance with the bid submitted therefore, subject to additions and deductions, as provided In the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement In Lubbock, Lubbock County, Texas in the year and day first above written. e APPROVED AS TO CONTENT: ZI? C '/ 7 Owner's Represe,AStative r APPROVED AS TO'�ORM it ttomey A i f ATTEST: Corporate Secretary CONTRACTOR: LUBBOCK AUDIO VISUAL By:_ 't4k� U) L" PRINTED NAME: �2r'g 11JA6'NDi1 TITLE: COMPLETE ADDRESS: Lubbock Audio Visual 2120 Avenue Q Lubbock, TX 79405 GENERAL CONDITIONS OF THE AGREEMENT 1. OWNER 2. f 3. 4. 5. 7 7 GENERAL CONDITIONS OF THE AGREEMENT Whenever the word Owner, or the expression Party of the First Part, or First Party, are used in this contract, it shall be understood as referring to the City of Lubbock, Texas. CONTRACTOR Whenever the word Contractor, or the expression Party of the Second Part, or Second Party, Is used, it shall be understood to mean the person, persons, co -partnership or corporation, to wit: LUBBOCK AUDIO VISUAL, who has agreed to perform the work embraced In this contract, or to his or their legal representative. OWNER'S REPRESENTATIVE Whenever the word Owner's Representative or representative is used In this contract, it shall be understood as referring to, City of Lubbock, under whose supervision these contract documents, Including plans and specifications, were prepared, and CONNIE JOHNSON, INDUSTRIAL CHEMIST, who will inspect constructions; or to such other representative, supervisor, or inspector as may be authorized by said Owner to act in any particular under this agreement. Engineers, supervisor or inspectors will act for the Owner under the direction of Owner's Representative, but shall not directly supervise the Contractor or persons acting on behalf of the Contractor. Lq�Mftlfy r • The contract's documents shall consist of the Notice to Bidders, General Instructions to Bidders, Bid, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificate, and all other documents made available to Bidder for his inspection in accordance with the Notice to Bidders. Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed," or words of like import are used, It shall be understood that the direction, requirement, permission, order, designation or prescription of the Owner's Representative Is Intended; and similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. SUBCONTRACTOR The term Subcontractor, as employed herein, Includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shalt have no responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments due Subcontractor. ! � it It ■ • Written notice shall be deemed to have been duly served if delivered In person to the Individual or to a member of the firm or to an officer of the corporation for whom it is intended, or If delivered at or sent certified mall to the last business address known to him who gives the notice. 8. WORK Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shall be done and all materials furnished in strict conformity with the contract documents. 9. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. 10. LAYOUT Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall,, accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative`will check the Contractor's layout of all major structures and any other layout work done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all work in accordance with the Plans and Specifications. 11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be fumished with one copies of all Plans, Profiles and Specifications without expense to him and he shall keep one copy of same consistently accessible on the job site. 12. RIGHT OF ENTRY The Owner's Representative may make periodic visits to the site to observe the progress of quality of the executed work and to determine, in general, if the work is proceeding in accordance with the contract documents. He will not be required to make exhaustive or continuous onsite inspections to check the quality or quantity of the work, nor will he be responsible for the construction means, methods, techniques, sequences or procedures, or the safety precautions Incident thereto. His efforts will be directed towards providing assurances for the Owner that the completed project will conform to the requirements of the contract documents, but he will not be responsible for the Contractor's failure to perform the work in accordance with the Contract Documents. On the basis of his onsite observations, he will keep the Owner Informed of the progress of the work and will endeavor to guard the Owner against defects and deficiencies in the work of the Contractor. 13. LINES AND GRADES All lines and grades shall be furnished by the Owner's Representative whenever necessary for the commencement of the work contemplated by these contract documents or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend his work in order to permit Owner's Representative to comply with this requirement, but such suspension will be as brief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's Representative ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by him, his Subcontractors, or his employees, such stakes, marks, etc., shall be replaced by the Owner's Representative at Contractor's expense. r r, 14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's Representative shall review all work included herein. He has the authority to stop the work whenever such stoppage may be necessary to insure the proper execution of the contract. In order to permit delays and disputes and to discourage litigation, it is further agreed that the Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under this contract. He shall determine all questions in relation to said work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the execution of this contract on the part of said Contractor. The Owner's Representatives' estimates and findings shall be conditions precedent to the right to any action on the contract, and to any rights of the Contractor to receive any money under this contract. The Owner's Representative shall, within a reasonable time, render and deliver to both the Owner and the Contractor a written decision on all claims of the parties hereto and on all questions which may arise relative to the execution of the work or the interpretation of the contract, specifications and plans. 15. SUPERINTENDENCE AND INSPECTION It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative may i deem proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is furnished and said work is done in accordance with the specifications therefore. The Contractor shall fumish all reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey the directions and ' instructions of any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are consistent with the obligations of this Agreement and accompanying plans and specifications r" provided, however, should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within six (6) days make written appeal to the Owner's Representative for his decision. 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent the Contractor in his absence and all directions given to him shall be binding as if given to the Contractor. Adequate supervision by competent and reasonable representatives of the Contractor is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Contractor and all risk in connection therewith shall be bome by the Contractor. L The Owner or Owner's Representatives will not be responsible for the acts or omissions of the Contractor, or any subcontractors, or any of his agents or employees, or any other persons performing any of the work. 17. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the nature and I location of the work, the confirmation of the ground, the character, quality and quantity of materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, and the general and local conditions, and all other matters which in any way effect the work under this contract. No verbal agreement or conversation with any officer, agent, or employee of the Owner, either before or after the execution of this contract, shall effect or modify any of the terms or obligations herein contained. 1" 18. CHARACTER OF WORKMEN The Contractor agrees to employ only orderly and competent men, skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform him in writing that any man or men on the work, are, in his opinion, incompetent, unfaithful, or disorderly, such man or men shall be discharged from the work and shall not again be employed on the work without the Owner's Representative's written consent. 19. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted. The building of structures for the housing of men or equipment will be permitted only at such places as the Owner's Representative shall direct, and the sanitary conditions of the grounds in or about such structure shall at all times be maintained in a manner satisfactory to the Owner's Representative. 20.; SANITATION Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. 21. OBSERVATION AND TESTING The Owner or Owner's Representative shall have the right at all reasonable times to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such observation and — testing at any location wherever work is in preparation or progress. Contractor shall ascertain the scope of any observation which may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each part of the work will be ready for such observation. Owner or Owner's Representative may reject _ any work found to be defective or not in accordance with the contract documents, regardless of the stage of its completion or the time or place of discovery of such errors and regardless of whether Owner's Observer has previously accepted the work through oversight or otherwise. If any work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination �- at Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representative to make observations of such work or require testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish _ Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. If any work which is required to be inspected, tested, or approved Is covered up without written approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, inspections or approval, and any work which meets the requirements of any such tests or approval but does not meet the requirements of the contract documents shall be considered defective. Such defective work shall be corrected at the Contractor's expense. r� Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by �., Owner, Owner's Representative, or other persons authorized under this agreement to make such inspections, tests, or approvals shall relieve the Contractor from his obligation to perform the work in accordance with the requirements of the contract documents. r 22. DEFECTS AND THEIR REMEDIES It is further agreed that if the work or any part thereof, or any material brought on the site of the work for use in �.. the work or selected for the same, shall be deemed by the Owner or Owners' Representative as unsuitable or not j in conformity with plans, specification and contract documents, the Contractor shall, after receipt of written notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with this contract. It is further agreed that any remedial action r" contemplated as hereinabove set forth shall be at Contractor's expense. 23. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make such changes or alterations as shall make useless any work already done or material already furnished or used in t said work, then the Owner shall recompense the Contractor for any material or labor so used, and for any actual loss occasioned by such change, due to actual expenses incurred in preparation for the work as originally �.. planned. 24. EXTRA WORK The term "extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, alteration or addition to the work as shown on the plans and specifications or contract documents and not covered by Contractor's bid, except as provided under Changes and Alterations herein. It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representative when presented with a written work order signed by the Owner's Representative; subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined by the following methods: Method (A) - By agreed unit prices; or Method (B) - By agreed lump sum; or Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is commenced, then the Contractor shall be paid the actual field cost of the work, plus fifteen (15%) percent. .. In the event said extra work be performed and paid for under Method (C), then the provisions of this paragraph shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses incurred directly on account of such extra work, including Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation and all other insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be kept and records of these accounts shall be made available to the Owner's Representative. The Owner's — Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for the use of machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and compensate him for his profit, overhead, — general superintendence and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "actual field cost." No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. in case any orders or instructions appear to the Contractor to involve extra work for which he should receive compensation or an adjustment in the construction time, he shall make written request to the Owner's Representative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and the Owner's Representative insists _ upon its performance, the Contractor shall proceed with the work after making written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as provided under Method (C). The Contractor will thereby preserve the right to submit the matter of payment to arbitration as herein below provided. -- 25. DISCREPANCIES AND OMISSIONS It is further agreed that it is the intent of this contract that all work described in the bid, the specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that such price shall include all appurtenances necessary to complete the work in accordance with the intent of these contract documents as interpreted by Owner's Representative. If the Contractor finds any discrepancies or omissions in these plans, specifications, or contract documents, he should notify the Owners' Representative and obtain a clarification before the bids are received, and if no such request is received by the Owner's Representative prior to the opening of bids, then it shall be considered that the Contractor fully understands the work to be included _ and has provided sufficient sums in his bid to complete the work in accordance with these plans and specifications. It is further understood that any request for clarification must be submitted no later than five days prior to the opening of bids. 26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owner's Representative may order the Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall comply with such order. If, at any time, the working force of the Contractor is inadequate for securing the progress herein specified, the Contractor shall, if so ordered in writing, increase his force or equipment, or both, to such an extent as to give reasonable assurance of compliance with the schedule of progress. 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable - provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in v r— Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The Contractor, his sureties and insurance carriers shall defend, indemnify and save harmless the Owner and all of its officers, agents and employees from all suits, actions, or claims of any character whatsoever, brought for or on account of any injuries or damages received or sustained by any person or persons or property, on account of any negligent act or fault of the Contractor or any subcontractor, their agents or employees, in the execution and supervision of said contract, and the project which is the subject matter of this contract, on account of the failure of Contractor or any subcontractor to provide necessary barricades, warning lights, or signs and will be required to pay any judgment with costs which may be obtained against the Owner or any of its officers, agents, or employees including attorney's fees. r The safety precautions taken shall be the sole responsibility of the Contractor, in his sole discretion as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owners or the Owner's Representative concerning omissions under this paragraph as the work " progresses, are intended as reminders to the Contractor of his duty and shall not be construed as any assumption of duty to supervise safety precautions by either the Contractor or any of his subcontractors. 28. CONTRACTOR'S INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of I•' Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of E cancellation or any material change will be provided ten (10) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a t subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted prior to contract execution. The insurance certificates furnished shall name the City as an additional insured, or in the alternative, shall be accompanied by a statement from the Contractor to the effect that no work on this particular project shall be subcontracted. It shall be the contractors responsibility to provide to the owner all proof of coverage insurance documents including workers compensation coverage for each subcontractor. A. Comprehensive General Liability Insurance ` The contractor shall have Comprehensive General Liability Insurance with limits of $250,000 Combined Single Limit in the aggregate and per occurrence to include: Premises and Operations Explosion & Collapse Hazard Underground Damage Hazard Products & Completed Operations Hazard Contractual Liability Independent Contractors Coverage f., Personal Injury Advertising Injury r� { B. Owner's Protective or Contingent Public Liability Insurance and Property Damage Liability Insurance. For bodily injuries, including accidental death and or property damage, $250,000 Combined Single Limit. This policy shall be submitted prior to contract execution. C.. Comprehensive Automobile Liability Insurance The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than; Bodily Injury/Property Damage, $150,000 Combined Single Limit, to include all owned and nonowned cars including: Employers Nonownership Liability Hired and Nonowned Vehicles. The City is to be named as an additional insured on this policy for this specific job and copy of the endorsement doing so is to be attached to the Certificate of Insurance. D. Builder's Risk Insurance The Contractor shall obtain a Builder's Risk policy in the amount of 9.000% of the total GentFaGt (100% of potential loss) naming the -City of Lubbock as insured. E. Umbrella Liability Insurance The Contractor shall have Umbrella Liability Insurance in the amount of $0.00 on all contracts with coverage to correspond with Comprehensive General Liability and Comprehensive Automobile Liability coverages. F. ' Worker's Compensation and Employers Liability Insurance Worker's Compensation Insurance covering all employees whether employed by the Contractor or any Subcontractor on the job with Employers Liability of at least $500.000. Definitions: Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC- 82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project - includes the time from the beginning of the work on the project until the contractoes/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in 0 entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner -operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 2. The contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. { 6 i 3, The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. 4. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. 5. The contractor shall obtain from each person providing services on the project, and provide to the governmental entity: (a) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (b) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 6 The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. 7. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the contractor knew or should have known, of any change that �.. materially affects the provision of coverage of any person providing services on the project. g 8. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage 7 and report lack of coverage. 9. The contractor shall contractually require each person with whom it contracts to provide services on the project, to: (a) providecoverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (b) provide to the contractor, prior to that person beginning work on the project, a certificate ' of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (c) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current �.. certificate of coverage ends during the duration of the project; (d) obtain from each other person with whom it contracts, and provide to the contractor. (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) a new certificate of coverage showing extension of coverage, prior to the end of a the coverage period, if the coverage period shown on the current certificate of ` coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and -- (g) contractually require each, person with whom it contracts to perform as required by paragraphs (1) - (7), with the certificates of coverage to be provided to the person for whom they are providing services. 10. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self - Insurance Regulation. Providing false or misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. 11. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. G. Proof of Coverage Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized representative of the insurance company setting forth: (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. (3) The name of the policy and type or types of insurance in force thereunder on the date borne by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by such certificate. (5) A provision that the policy may be canceled only by mailing written notice to the named insured at the address shown in the bid specifications. (6) A provision that written notice shall be given to the City ten days prior to any change in or cancellation of the policies shown on the certificate. m The certificate or certificates shall be on the form (or identical copies thereof) contained in the job specifications. No substitute of nor amendment thereto will be acceptable. (8) If policy limits are paid, new policy must be secured for new coverage to complete project. (9) A Contractor shall: (a) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (b) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (c) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; (d) obtain from each person providing services on a project, and provide to the governmental entity: (i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (ii) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the contractor knew or should have known, of any change that materially r t affects the provision of coverage of any person providing services on the project; ( (g) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other r posting requirements imposed by the Act or other commission rules. This notice must be printed in at least 19 point normal type, and shall be in both English and Spanish and �. any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any t additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services t.• related to this construction project must be covered by workers' compensation a Insurance. This Includes persons providing, hauling, or delivering equipment and ` materials, or providing labor or transportation or other service related to the project, regardless of the Identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at 5121440-3789 to receive Information on the legal requirement for coverage, to verify whether your r employer has provided the required coverage, or to report an employer's failure to j i. provide coverage." and (h) contractually require each person with whom it contracts to provide services on a project, FW to: (i) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (ii) provide a certificate of coverage to the contractor prior to that person beginning t work on the project; i"' (iii) include in all contracts to provide services on the project the language in subsection (e) (3) of this rule; (iv) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (v) obtain from each other person with whom it contracts, and provide to the contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (vi) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (vii) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on r- the project; and (viii) contractually require each other person with whom it contracts, to perform as _ required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services. 29. DISABLED EMPLOYEES Contractors having more than 15 employees agree to comply with the Americans with Disabilities Act of 1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such _ individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee compensation, job training, and other terms, conditions, and privileges of employment. 30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS LABORERS MATERIALMEN AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES The Contractor agrees that he will indemnify and save the Owner harmless from all claims growing out of any demands of subcontractors, laborers, workmen, mechanics, materialmen and furnishers of machinery and parts ~; thereof, equipment, power tools, all suppliers, including commissary, incurred in the furtherance of the performance of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If during the progress of the work, Contractor shall allow any indebtedness to accrue for work furnished by any of those designated in the preceding paragraph and shall fail to pay and discharge any such indebtedness within five (5) days after demand is made, then Owner may, during the period for which such indebtedness shall remain unpaid, withhold from the unpaid portion of this contract, a sum equal to the amount of such unpaid indebtedness or may apply the sum so withheld to discharge any such indebtedness. Any and all communications between any party under this paragraph must be in writing. C` 31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION The contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material or process covered by letters patent or copyright by suitable legal agreement with the Patentee or Owner thereof. The Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and save the Owner harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is specified or required in these contract documents by Owner; provided, however, if choice of alternate design, device, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner harmless from any loss on account thereof. If the material or process specified or required by Owner is an infringement, the Contractor shall be responsible for such loss unless he promptly gives written notice to the Owner of such infringement. 32. LAWS AND ORDINANCES The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner effect the contract or the work, and shall indemnify and save harmless the Owner against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor or his employees. If the Contractor observes that the plans and specifications are at variance therewith, he shall promptly notify the Owners' Representative in writing and any necessary changes shall be adjusted as provided in the contract for changes in the work. If the Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, he shall bear all costs arising therefrom. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though embodied herein. ' 33. ASSIGNMENT AND SUBLETTING ;• The Contractor further agrees that he will retain personal control and will give his personal attention to the ' fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from his full obligations to the Owner, as provided by this contractual agreement. 34. TIME FOR COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the contract of work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in this f contract shall be commenced on a date to be specified in the Notice to Proceed. If the Contractor should neglect, fail, or refuse to complete the work within the time herein specified, or any proper extension thereof granted by the Owner, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $200.00 (TWO HUNDRED DOLLARS) PER DAY, not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every calendar day that the Contractor shall be in default after the time stipulated for completing the work. It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the r- completion of the work described herein is reasonable time for the completion of the same, taking into consideration the average climatic change and conditions and usual industrial conditions prevailing in this ` locality. a P The amount is fixed and agreed upon by and between the Contractor and the Owner, because of the impracticability and extreme difficulty in fixing and ascertaining actual damages the Owner would in such event sustain, and the amount is agreed to be damages the Owner would sustain and shall be retained by the Owner from current periodical estimates for payments or from final payment. It is further agreed and understood between the Contractor and Owner that time is of the essence of this contract. 35. TIME AND ORDER OF COMPLETION It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor shall be allowed to prosecute his work at such time and sessions, in such order of precedence, and in such manner as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution shall be such that the work shall be substantially completed as a whole and in part, in accordance with this contract, the plans and specifications, and within the time of completion designated in the bid; provided, also, that when the Owner is having other work done, either by contract or by his own force, the Owner's Representative may direct the time and manner of constructing work done under this contract so that conflicts will be avoided and the construction of the various works being done for the Owner shall be harmonized. The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which the _ Contractor will start the several parts of the work and estimated dates of completion of the several parts. 36. EXTENSION OF TIME The Contractor agrees that he has submitted his bid in full recognition of the time required for the completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions of paragraph 33 hereinabove set forth and that he shall not be entitled to, nor will he request, an extension of time on this contract, except when his work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or other contractors employed by the owner, or by changes ordered in the work, or by strike, walkouts, acts of God or the public enemy, fire or flood. The Contractor may apply in writing for an extension of time, submitting therewith all written justification as may be required by Owner's Representative for such an extension as requested by Contractor. The Owner's Representative within ten (10) days after receipt of a written request for an extension of time by the Contractor supported by all requested documentation shall then consider such written request and respond to Contractor in writing granting or rejecting the request for an extension of time to complete the project. 37. HINDRANCE AND DELAYS In executing the contract agreement, the Contractor agrees that in undertaking to complete the work within the time herein fixed, he has taken into consideration and made allowances for all hindrances and delays incident to such work, whether growing out of delays in securing material or workmen or otherwise. No charge shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in which event, such expense as in the judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. 38. QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the specifications, plans and other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing their bids offered for the work. It is understood and agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ I f somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project. 39. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way r!'" encountered, which may be injured or seriously affected by any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; "and he shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent property. The Contractor ,., agrees to indemnify, save and hold harmless the Owner against any claim or claims for damages due to any injury to any adjacent or adjoining property, arising or growing out of the performance of this contract, but such indemnity shall not apply to any claim of any kind arising out of the existence or character of the work. 40. PRICE FOR WORK In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the bid attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses incurred by him and for well and truly performing the same and the whole thereof in the manner and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. 41. PAYMENTS i No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection r.. with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner which have not theretofore been timely filed as provided in this contract. ? 42. PARTIAL PAYMENTS �. On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application for partial payment. Owner's Representative shall review said application for partial payment and the progress of the work made by the Contractor and if found to be in order shall prepare a certificate for partial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month; said statement shall also include the value of all sound materials delivered on site of the work that are to be fabricated into the work. r- The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that may be retained by Owner under the terms of this agreement. It is understood, however, that in case the whole work be near to completion, and this fact is certified to by Owner's Representative and some unexpected and some unusual delay occurs due to no fault or negligence on the part of the Contractor, the Owner may upon written recommendation of Owner's Representative pay a reasonable and equitable portion of the retained percentage r.., due Contractor. f 43. FINAL COMPLETION AND ACCEPTANCE Within thirty-one (31) days after the Contractor has given the Owner's Representative written notice that the work has been completed or substantially completed, the Owner's Representative and the Owner shall inspect the work and within said time, if the work be found to be completed or substantially completed in accordance with the contract documents, the Owner's Representative shall issue to the Owner and Contractor his certificate of completion, and thereupon it shall be the duty of the Owner within thirty-one (31) days to issue a certificate of acceptance of the work to the Contractor. — 44. FINAL PAYMENT Upon the issuance of the certificate of completion, the Owner's Representative shall proceed to make final measurement and prepare a final statement of the value of all work performed and materials furnished under the terms of the agreement, and shall certify same to the Owner, who shall pay to the Contractor on or before the 31st day after the date of certificate of completion, the balance due Contractor under the terms of this agreement, provided he has fully performed his contractual obligations under the terms of this contract; and said payment shall become due in any event upon said performance by the Contractor. Neither the certificate of acceptance nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required in the special conditions (if any) of this contract or required in the specifications made a part of this contract. 45. CORRECTION OF WORK BEFORE FINAL PAYMENT FOR WORK Contractor shall promptly remove from Owners' premises all materials condemned by the Owner's Representative on account of failure to conform to the contract, whether actually incorporated in the work or not, and Contractor shall at his own expense promptly replace such condemned materials with other materials conforming to the requirements of the contract. Contractor shall also bear the expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative, Owner may remove and replace it at Contractor's expense. 46. CORRECTION OF WORK AFTER FINAL PAYMENT , Neither the final payment nor certificate nor any provision in this contract shall relieve the Contractor of responsibility for faulty materials or workmanship, and he shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which shall appear within a period of one (1) year from the date of substantial completion.. The Owner or the Owner's Representative shall give notice of observed defects with reasonable promptness. 47. PAYMENT WITHHELD The Owner may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certificate to such extent as may be necessary to protect himself from loss on account of: (a) Defective work not remedied. (b) Claims filed or reasonable evidence indicating possible filing of claims. (c) Failure of the Contractor to make payments promptly to subcontractors or for materials or labor. (d) Damage to another contractor. When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, which will protect the Owner in the amount withheld, payment shall be made for amounts withheld because of them. I` t. r 48. TIME OF FILING CLAIMS ,. It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor ± shall be in writing and filed with the Owner's Representative within fifteen (15) days after the Owner's Representative has given any directions, order or instruction to which the Contractor desires to take exception. The Owners' Representative shall reply to such written exceptions by the Contractor and render his final decision in writing. In case the Contractor should appeal from the decision of the Owner's Representative, any demand for arbitration shall be filed with the Owner's Representative and the Owner in writing within ten (10) days after the date of delivery to Contractor of the final decision of the Owner's Representative. It is further agreed that ,,... final acceptance of the work by the Owner and the acceptance by the Contractor of the final payment shall be a bar to any claim by either party, except where noted otherwise in the contract documents. 49. ABANDONMENT BY CONTRACTOR Pft In case the Contractor should abandon and fail or refuse to resume work within ten (10) days after written notification from the Owner or the Owner's Representative, or if the Contractor fails to comply with the orders of the Owner's Representative, when such orders are consistent with this contract, this Agreement, or the Specifications hereto attached, then the Surety on the bond shall be notified in writing and directed to complete k the work and a copy of said notice shall be delivered to the Contractor. r'^ After receiving said notice of abandonment, the Contractor shall not remove from the work any machinery, f r equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or r.. another contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore f (except when used in connection with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In case the Surety should fail to commence compliance with the notice for completion hereinbefore provided for within ten (10) days after service of such notice, then the Owner may provide for completion of the work in either of the following elective manners: (a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and supplies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been completed by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been completed by said Contractor, then the Contractor and/or his Surety shall pay the amount of such excess to the Owner, or (b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspaper • having a general circulation in the County of location of the work, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain bound therefore. However, should the cost to complete any such new contract prove to be less 1 than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. When the work shall have been substantially completed, the Contractor and his Surety shall be so notified and certificates of completion and acceptance, as provided in paragraph 42 hereinabove set forth, shall be issued. A complete itemized statement of the contract accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to Contractor and his Surety, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of certificate of completion. In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety shall pay the balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery, equipment, tools, materials, or supplies which remain on the `jobsite and belong to persons other than the Contractor or his Surety, to their proper owners. 50. ABANDONMENT BY OWNER In case the Owner shall fail to comply with the terms of this contract, and should fail or refuse to comply with said terms within ten (10) days after written notification by the Contractor, then the Contractor may suspend or wholly abandon the work, and may remove therefrom all machinery, tools, and equipment, and all materials on the ground that have not been included in payments to the Contractor and have not been incorporated into the work. Thereupon, the Owner's Representative shall make an estimate of the total amount earned by the Contractor, which estimate shall include the value of all work actually completed by said Contractor at the prices stated in the attached bid, the value of all partially completed work at a fair and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided for by the terms of this contract, and a reasonable sum to cover the cost of any provisions made by the Contractor to carry the whole work to completion, and which cannot be utilized. The Owner's Representative shall then make a final statement of the balance due the Contractor by deducting from the above estimate all previous payments by the Owner and all other sums that may be retained by the Owner under the terms of this Agreement, and shall certify same to the Owner who shall pay to the Contractor on or before thirty (30) days after the date of the notification by the Contractor the balance shown by said final statement as due the Contractor, under the terms of this Agreement. 51. BONDS The successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful bidder will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $25,000. All bonds, if required, shall be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do business in the State of Texas. And it is further agreed that this contract shall not be in effect until such bonds are so fumished. 52. SPECIAL CONDITIONS In the event special conditions are contained herein as part of the contract documents and said special conditions conflict with any of the general conditions contained in this contract, then in such event the special conditions shall control. 53. LOSSES FROM NATURAL CAUSES Unless otherwise specified herein, all loss or damage to the Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the same, or from unusual obstructions or difficulties which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. r 54. INDEPENDENT CONTRACTOR f Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority r" to direct, supervise, and control his own employees and to determine the method of the performance of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's work during his performance and to carry out the other prerogatives which are expressly reserved to and vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect rthe status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. PM 55. CLEANING UP The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at the completion of the work he shall remove all such debris and also his tools, scaffolding, and surplus materials and shall leave the work room clean or its equivalent. The work shall be left in good order and condition. In case { of dispute Owner may remove the debris and charge the cost to the Contractor. 7 t, r r CURRENT WAGE DETERMINATIONS r Aeso.LuLion Lw. jid..i March 14, 1996 Item #19 i. RESOLUTION WHEREAS, the City Council has heretofore established the general prevailing rate of per them wages for each craft or type of workmen or mechanics needed to execute public PM i works contracts for the City of Lubbock in accordance with the provisions of Vernon's Ann.Civ.St., Art. 5159a; and WHEREAS, such wage rates were established by Resolution No. 719 enacted February i 12, 1981, updated by Resolution No. 1590 enacted February 23, 1984, and further updated by Resolution No. 2502 enacted January 8. 1987; and WHEREAS, such rates need to be updated at the present time in order to reflect the current prevailing rate of per them wages; NOW THEREFORE: Pm BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the general prevailing rate of per them wages for public works contracts shall be as set forth in the following named exhibits, which exhibits shall be attached hereto and made I a part hereof for all intents and purposes: Exhibit A: Building Construction Trades Exhibit B: Paving and Highway Construction Pft Exhibit C. Overtime Rate Exhibit D: Weekend and Holiday Rate Such wage rates are hereby found and declared to be the general prevailing rate of per them wages in all localities where public works are undertaken on behalf of the City of Lubbock and such wage rates shall be included in all public works contracts as provided by law. 71 i Passed by the City Council this 14th ATTEST: &d-, L I a& Betty M. Anson, City Secretary APPROVED AS TO CONTENT: avl� Mary And ws, Managing Director of Human Resources APPROVED AS TO FORM: flatold, Willard, Assistant City Attorney February 14, 1996 2 :11: City of Lubbock Building Construction Trades Prevailing Rates Acoustical Ceiling Installer Air Conditioner Installer Air Conditioner Installer -Helper Asbestos Worker Asbestos Supervisor Bricklayer Bricklayer -Helper Carpenter Carpenter -Helper Cement Finisher Drywall Hanger Electrician Electrician -Helper Equipment Operator -Heavy Equipment Operator -Light Floor Installer Glazier Insulator-Piping/Boiler Insulator -Helper T.:a Worker Laborer -General Mortar Mixer Painter Plumber Plumber -Helper Roofer Roofer -Helper Sheet Metal Worker Sheet Metal Worker -Helper Welder -Certified Houriy Rate 10.00 11.00 5.50 8.00 11.00 11.00 6.00 11.00 6.00 7.50 10.00 13.00 6.00 8.50 7.50 8.50 8.00 9.00 5.50 8.00 5.50 5.50 9.50 10.50 6.00 8.00 5.50 8.75 5.50 10.00 EXHIBIT B Paving and Highway Construction Prevailing Wage Rates Craft Hourly Rate Asphalt Heaterman 6.00 Asphalt Shoveler 5.50 Concrete Finisher 7.35 Concrete Finisher -Helper 5.75 Electrician 10.50 Flagger 5.50 Form Setter 6.50 Form Setter -Helper 5.50 Laborer -General 5.50 Laborer -Utility 6.25 Mechanic 7.25 Mechanic -Helper 5.50 Power Equipment Operators Asphalt Paving Machine 7.00 Bulldozer 7.00 Concrete Paving Machine 7.00 Front End Loader 6.50 Heavy Equipment Operator 7.00 Light Equipment Operator 6.50 Motor Grader Operator 9.50 Roller 6.00 Scraper 6.50 Tractor 6.50 Truck Driver -Light 6.00 Truck Driver -Heavy 6.50 15:4:11:1190 Prevailing Wage Rates Overtime Rate The rate for overtime (in excess of forty hours per week) is 1 1/2 times base rate. EXIT D Prevailing Wage Rates Weekend and Holiday Rate The rate for weekend and holiday is 1 1/2 times base rate. r SPECIFICATIONS I r SPECIFICATIONS FOR VIDEO CAMERA MONITORING SYSTEM FOR THE S.E. WATER RECLAMATION PLANT 1. GENERAL 1.1 The intent of these specifications is to describe a Video Camera Monitoring System to be installed at the City of Lubbock SE. Water Reclamation Plant. This system will be used to monitor personnel while working in hazardous areas of the plant, to monitor the equipment in these areas, and for plant security. The inside cameras will be placed inside the Headwork's building and the Solids Handling building. These two buildings have the potential to contain corrosive and/or explosive gases. 2. CURRENCY AND MAKE OF MODELS 2.1 All components of this video camera monitoring system shall be comprised entirely of new and current production models. Discontinued models and models about to be discontinued are not acceptable. 3. MANUALS PROVIDED r 3.1 On or prior to delivery, the vendor will provide the following: 4 a. Maintenance Procedure Manuals, Service Manuals, and Drawings b. Operations Procedure Manual. 4. WARRANTY 4.1 All equipment proposed will be covered by a full warranty against defective material and workmanship, including repair labor, material parts and freight for a period of at least one year from the date of installation. 4.2 Technical support during the warranty period shall be included in the total bid price. 5. PRODUCT DEMONSTRATION 5.1 The City of Lubbock reserves the right to receive a demonstration of all items delivered, in order to verify that all specified criteria are met. 6. DELIVERY 6.1 Delivery will not exceed ninety (90) calendar days from the receipt of a purchase order from the City. 6.2 All components of the video camera system shall arrive factory assembled, tested and ready for installation. 7. BID INSTRUCTIONS 7.1 In the case of exceptions, note the item number along with a thorough explanation as to the nature of the exception. 7.2 Items without noted exceptions will indicate specification compliance. 7.3 Submit individual unit bids along with cost breakdowns if needed for clarification. 7.4 Submit a total bid for all the components of the video monitoring system and installation. 7.5 The City of Lubbock reserves the right to reject any or all bids, or to accept the -- bid deemed most advantageous to the City. 8. BID COMPLIANCE 8.1 Quotations shall be submitted on the City of Lubbock's bid form only and all items on the form shall be addressed. Additional pages may be attached if _ necessary. 8.2 Any exception to any specification or part of a specification shall be cited and explained fully in the bid, under EXCEPTIONS. Otherwise, it is understood all -requirements will be met exactly as specified and any equipment received which does not meet the specifications will be returned for a full refimd or credit. 8.3 Quotations on items that do not meet the described Video Camera Monitoring System minimum specifications will not be considered unless those exceptions are thoroughly explained. 9. POWER REQUIREMENTS 9.1 The video camera monitoring system shall require 120 VAC power for operation. Power supplies, any necessary wiring and/or cables shall be provided for any equipment not using 120 VAC. INSIDE CAMERAS AND EQUIPMENT 10. VIDEO CAMERAS 10.1 The video cameras shall be at least a 2/3" format, color and high resolution. 10.2 The video cameras shall provide low light sensitivity, backlight compensation, automatic shutter and digital adjustment control. 11. MOTORIZED ZOOM LENSES 11.1 The appropriate motorized zoom lens shall be determined by the bidder to provide at least a 12:1 zoom capability. 12. CAMERA ENCLOSURES 12.1 The camera enclosures shall be explosion proof, environmentally sealed and pressurized with dry nitrogen. 2 1 1 12.2 The camera enclosure housings shall be comprised of Fiberglass, Type 316 Stainless Steel or Type 6061 Aluminum or better, and tempered glass lenses. 12.3 The camera enclosures shall provide corrosion resistant core nectors for video, AC power, lens control wiring, and for any auxiliary wiring. 12.4 The camera enclosures shall provide built in heaters to prevent lens fogging. 12.5 The camera enclosures shall provide any hardware needed to mount the camera and motorized zoom lens. 12.6 The camera enclosure shall provide a pressure sensor and a contact closure to trigger a low pressure alarm to the plant scada system. 12.7 The camera enclosure shall be field serviceable and provide a standard Schraeder valve, purge relief fitting and a Dry Nitrogen recharging lit. 13. PAN/ I II..T UNITS 13.1 The panhilt units shall be explosion proof in design. 13.2 The panhilt unit housings shall be comprised of Type 316 Stainless Steel or Type 6061 Aluminum or better. 13.3 The pan/tilt units shall have a pan rotation of 355° anda tilt movement of plus or minus 900. 14. MOUNTING BRACKETS AND HARDWARE 14.1 All mounting brackets and hardware shall be Type 316 Stainless Steel or better. CONTROL TOWER EQUIPMENT 15. CAMERA AND PAN/TII.,T CONTROLS 15.1 Camera and pan/tilt controls shall provide automatic and manual control for camera focus, motorized lenses, and pan/tilt units. 15.2 The camera and pan/tilt controls shall be expandable and upgradeable to allow new cameras to be added to the system.. 15.3 Option to add a Sequential Switcher and/or a 4 Channel Multiplexer. 16. VCR 16.1 The VCR shall be a four head professional grade model. 17. VIDEO MONITORS 17.1 The video monitors shall be high resolution and color. 17.2 The video monitors shall be at least 17 inch. Option of 19 inch monitors. 18. INSTALLATION { 18.1 Installation shall include all required wiring, power supplies, cables, connectors, mounting hardware, labor, and shall be completed within 45 days after delivery of the system. 3 w 19. TRAINING 19.1 Training shall include operation and maintenance of cameras, motorized lenses, pan/tilt units, camera enclosures, monitors, control equipment and VCR. OPTIONAL OUTSIDE CAMERAS PER SITE BASIS 20. VIDEO CAMERAS 20.1 The video cameras shall be at least a 2/3" format, color and high resolution. 20.2 The video cameras shall provide low light sensitivity, backlight compensation, automatic shutter and digital adjustment control. 21. MOTORIZED ZOOM LENSES 21.1 The appropriate motorized zoom lens shall be determined by the bidder to provide at least a 12:1 zoom capability. 22. CAMERA ENCLOSURES 22.1 The camera enclosures shall be environmentally sealed and pressurized with dry nitrogen. 22.2 The camera enclosures shall be comprised of Type 316 Stainless Steel or Type 6061 Aluminum or better, and tempered glass lenses. 22.3 The camera enclosures shall provide corrosion resistant connectors for video, AC power, lens control wiring, and for any auxiliary wiring. 22.4 The camera enclosures shall provide built in heaters to prevent lens fogging. 22.5 The camera enclosures shall provide any hardware needed to mount the camera and motorized zoom lens. 22.6 The camera enclosure shall provide a pressure sensor and a contact closure to trigger a low pressure alarm to the plant scada system. 22.7 The camera enclosure shall be field serviceable and provide a standard Schraeder valve, purge relief fitting and a Dry Nitrogen recharging kit. 22.8 Sun shrouds shall be provided for all outside cameras. 22.9 Lighting protection shall be provided for all outside cameras and pan/tilt units. 23. PANfMT UNITS 23.1 The panhilt unit housings shall be comprised of Type 316 Stainless Steel or Type 6061 Aluminum or better and be weather proof. 23.2 The pan/tilt units shall have a pan rotation of 355' and a tilt movement of plus or minus 90°. 24. MOUNTING BRACKETS AND HARDWARE 24.1 All mounting brackets and hardware shall be Type 316 Stainless Steel or Type 6061 Aluminum or better. 4 7 25. INSTALLATION 25.1 Installation shall include all required wiring, power supplies, cables, connectors, mounting hardware, labor, and shall be completed within 45 days after delivery of pop the system. r., 5