Loading...
HomeMy WebLinkAboutResolution - 2963 - Accept Drainage Improvements- Kerr Construction- L1-6, Kings Gate West Addition - 12_08_1988Resolution #2963 December 8, 1988 Item #12 DGV:dw RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of King's Gate - West Addition, Lots 1 through 6 made arrangements with Kerr Construction Company for the construction of drainage improvements in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above -mentioned addition, including the following: Concrete drainage slab from Lot 4 to 20 feet south of south property line of Lot 6 known as new Subdivision Unit Number 2033-70; and WHEREAS, the construction of the above improvements was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements BE and the same are hereby accepted and the City Engineer BE and he is hereby authorized to notify the developer of acceptance by the Lubbock City Council. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 8th day of December ATTEST: anettte Boyd, City Secretary APPROVED AS TO CONTENT: "rrY_D-_RArtel, City Engineer By: .tr(.cc./ Mayor Pro Tem for Wr C. McMINN, MAYOR APPROVED AS TO FORM: uanald G. Vandiver, First Assistant City Attorney CONSOLIDATED FINAL ESTIMATE KING'S GATE -WEST ADDITION Lots 1 thru 6 Accepted 12-8-88 Unit and Square yards of Sub -Unit Location concrete drainage slab 2033-70 Concrete drainage slab from lot 4 733.86 to 20 feet south of south property line of lot 6 COST 733.86 S.Y. concrete drainage slab at lump sum of $ 11,740.00 COST DISTRIBUTION Unit and Contract Developer Sub -unit Cost Cost 2033-70 $ 11,740.00 $ 11,740.00