HomeMy WebLinkAboutResolution - 2963 - Accept Drainage Improvements- Kerr Construction- L1-6, Kings Gate West Addition - 12_08_1988Resolution #2963
December 8, 1988
Item #12
DGV:dw
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of King's Gate - West Addition, Lots 1
through 6 made arrangements with Kerr Construction Company for the
construction of drainage improvements in said subdivision under the
provisions of said Ordinance prior to the recording of the subdivision plat
of the above -mentioned addition, including the following:
Concrete drainage slab from Lot 4 to 20 feet south of south
property line of Lot 6 known as new Subdivision Unit Number
2033-70; and
WHEREAS, the construction of the above improvements was performed
under the supervision of the City Engineer, and said improvements have been
completed and have been inspected and found to have been constructed in
accordance with City specifications and in accordance with the provisions of
City Ordinance 1331; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements BE and the same are hereby accepted
and the City Engineer BE and he is hereby authorized to notify the developer
of acceptance by the Lubbock City Council.
SECTION 2. THAT this Resolution shall take effect and be in force
from and after its passage.
Passed by the City Council this 8th day of December
ATTEST:
anettte Boyd, City Secretary
APPROVED AS TO CONTENT:
"rrY_D-_RArtel, City Engineer
By: .tr(.cc./ Mayor Pro Tem
for Wr C. McMINN, MAYOR
APPROVED AS TO FORM:
uanald G. Vandiver,
First Assistant City Attorney
CONSOLIDATED FINAL ESTIMATE
KING'S GATE -WEST ADDITION
Lots 1 thru 6
Accepted 12-8-88
Unit and Square yards of
Sub -Unit Location concrete drainage slab
2033-70 Concrete drainage slab from lot 4 733.86
to 20 feet south of south property
line of lot 6
COST
733.86 S.Y. concrete drainage slab at lump sum of $ 11,740.00
COST DISTRIBUTION
Unit and Contract Developer
Sub -unit Cost Cost
2033-70 $ 11,740.00 $ 11,740.00