HomeMy WebLinkAboutResolution - 5412 - Agreement - NRS Consulting Enginners Inc - Professional Engineering Services - 01_23_1997RESOLUTION NO. 5412
Item #43
January 23, 1997
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor Pro Tempore of the City of Lubbock BE and is hereby authorized
and directed to execute for and on behalf of the City of Lubbock an Agreement for
Professional Engineering Services and any related Work Orders and other documents with
NRS Consulting Engineers, Inc., attached hereto, and which shall be spread upon the
minutes of the Council and as spread upon the minutes of this Council shall constitute and be a
part of this Resolution as if fully copied herein in detail.
Passed by the City Council this 23rd day of January , 1997.
ALEX "T " COOKE
MAYOR PRO TEMPORE
ATTEST:
hmy'�L &nA--
Kay a Darnell, City Secretary
APPROVED AS TO CONTENT:
Mildred Cox, Director of Transportation
APPROVED AS TO FORM:
arold Willard, Assistant City Attorney
da/ccdocs1NRSengrs. re s
January 6, 1997
• RESOLUTION•_N0. 5412
Item #43
January 23, 1997
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES
THIS AGREEMENT made, entered into and executed this the 23rd day of January ,
1997, by and between
CITY OF LUBBOCK, TEXAS
hereinafter called the "OWNER", acting herein, by and through one of its officers, who is
duly authorized to act for and in behalf of said OWNER, and
NRS CONSULTING ENGINEERS, INC.,
hereinafter called the "ENGINEER", acting herein, by and through one of its officers, who
is duly authorized by the ENGINEER. The OWNER proposes to construct improvements to
its existing facilities. Such improvements are hereinafter called the "Project".
NOW, THEREFORE, THE OWNER and the ENGINEER, in consideration of the mutual
covenants and agreements herein contained, do mutually agree as follows:
SECTION I - EM[PLOYMENT OF ENGINEER
In the event of the employment by OWNER of the ENGINEER and the ENGINEER's
agreement to perform services in connection with any of the engineering work, construction
work, and related improvements anticipated herein, the OWNER agrees to pay to the
ENGINEER compensation as hereinafter provided. The parties acknowledge that OWNER is
under no obligation to ENGINEER to offer such employment but is free to employ any other
engineer for the performance of the anticipated Project work irrespective of whether this contract
has been terminated in accordance with Section XII. The ENGINEER will be compensated for
any work performed to develop the Project in accordance with the schedule of fees contained
1
in the appropriate Work Order in accordance with Section II.
SECTION H - WORK ORDERS
The total of all work to be performed under this Agreement shall be divided by the OWNER and
shall be authorized by the OWNER in writing to the ENGINEER in the form of Work Orders.
Such Work Orders shall be serially numbered and dated, shall set forth in reasonable detail the
scope and limitation of the engineering services desired by the OWNER thereunder, and shall
show the fee basis, approximate total amount of engineering fee, and approximate date of
completion of the services authorized. Where applicable, Work Orders shall show the estimated
cost of the construction work for which engineering services are being authorized.
The ENGINEER shall acknowledge receipt and acceptance of each Work Order in writing or
reject same, stating the reasons therefor. No commitment shall have been made by the
OWNER, and the ENGINEER is under no obligation to commence the work, until such a Work
Order has been made by the OWNER and accepted by the ENGINEER, both in writing.
SECTION III - CHARACTER AND EXTENT OF SERVICES
The ENGINEER shall render the following professional services necessary for the development
of the Project.
A. Registration Phase:
1. Attend a preliminary conference with OWNER, review OWNER's
existing records and reports, prepare a preliminary design study of
2
transfer station site, prepare and submit the necessary documents to the
Texas Natural Resource Conservation Commission (TNRCC) for
registration, assist the City in responding to registration procedures, and
other tasks more specifically described in the Work Order.
B. Preliminary Phase:
1. Attend preliminary conferences with the OWNER regarding the Project;
2. Prepare a preliminary engineering study, and report if applicable, on the
Project in sufficient detail to indicate clearly the problems involved and
the alternate solutions available to the OWNER, to include preliminary
layouts, sketches, and cost estimates for the Project, and to set forth
clearly the ENGINEER'S recommendations;
3. Furnish the OWNER a specified number of copies of the preliminary
report, if applicable (additional copies will be furnished to the OWNER
at cost of reimbursable expenses).
C. Design Phase:
1. Establish the scope of any soil foundation investigations or any special
surveys and tests which may be required for design, and arrange for such
work to be done;
2. Furnish to the OWNER, where applicable, the engineering data necessary
for applications for routine permits required by local, State, and Federal
authorities (as distinguished from detailed applications and supporting
documents for government grants, planning advances, or permits);
3. Prepare detailed contract drawings and specifications for construction
3
authorized by the OWNER;
4. Prepare detailed cost estimates and bidders' proposal forms for authorized
construction;
5. Furnish the OWNER a specified number of copies of plans, specifications,
notice to bidders, and bidders' proposals (additional copies shall be paid
for by the OWNER at cost of reimbursable expenses).
D. Construction Phase :
1. Assist the OWNER in securing bids and conduct a pre -bid meeting;
2. Assist the OWNER in the opening, tabulation, and analysis of bids, and
furnish recommendations on the award of contracts;
3. Assist in the engineering phases of the preparation of formal contract
documents for the award of contracts and conduct preconstruction
meeting;
4. Make periodic visits to the site (as distinguished from the continuous
services of a resident Project Representative) to observe the progress and
quality of the work, and to determine in general if the work is proceeding
in accordance with the Contract Documents. In performing these services,
the ENGINEER will endeavor to protect the OWNER against defects and
deficiencies in the work of contractors, but he will not be required to
guarantee the performance of their contracts, nor will he be responsible
for the actual supervision of construction operations;
5. Consult and advise with the OWNER during construction; issue all
instructions to contractors requested by the Owner; and prepare routine
4
change orders if required;
6. Review shop and working drawings furnished by contractors for
compliance with design concept and with information given in contract
documents (contractors will be responsible for dimensions to be confirmed
and correlated at job site);
7. Review laboratory, shop, and mill tests of material and equipment;
8. Prepare monthly and final estimates for payments to contractors;
9. Conduct, in company with the OWNER's representatives, a final visit of
the Project to develop a punch list and arrange for completion of
deficiencies;
10. Revise contract drawings, with the assistance of the resident Project
Representative, to show the work as actually constructed, and furnish one
(1) set of reproducible mylars or digital formatted files of the revised
drawings to the OWNER.
E. General:
The ENGINEER shall provide consultation and advice to the OWNER during the
performance of the ENGINEER's services.
SECTION IV - PERIOD OF SERVICE
The services called for in Section III -A (Registration Phase) of this agreement shall be completed
and the submittal, if applicable, submitted within the earliest reasonable period following the
receipt by the ENGINEER of notice to proceed.
5
After receipt from the OWNER of acceptance of the Registration Phase services, the OWNER
may authorize the ENGINEER to proceed with the performance of the services called for in
Section III-B (Preliminary Phase), and Section III-C (Design Phase) of this agreement, so as to
deliver completed contract drawings, specifications, and estimates of cost for all authorized
design on the Project.
Following award by the OWNER of a construction contract or contracts, the ENGINEER will
proceed with the performance of the services called for in Section III-D (Construction Phase)
of this Agreement.
The services called for in Section III-E of this agreement shall be a continuing function of the
ENGINEER for the OWNER, and shall not cease until termination of this agreement.
This agreement shall remain in force for a period which may reasonably be required for design,
award of contracts, and construction of the Project, including extra work and any required
extensions thereto.
The final acceptance by the OWNER of each construction contract in the project shall serve as
evidence of completion, on the part of the ENGINEER, of all services of the Project.
SECTION V - COORDINATION WITH THE OWNER
The ENGINEER shall hold periodic conferences with the OWNER, or his representatives, to
the end that the Project, as perfected, shall have full benefit of the OWNER's experience and
0
knowledge of existing needs and facilities and be consistent with his current policies and
construction standards. To implement this coordination, the OWNER shall make available to
the ENGINEER for use in designing and constructing the Project, all existing plans, maps, field
notes, statistics, computations, and other data in his possession relative to existing facilities and
to the Project.
SECTION VI - BASIS OF COMPENSATION
Payment for services shall be on a monthly billing interval at an agreed Schedule of Fee basis
with reimbursement for direct non -labor and subcontract expenses at invoice cost plus a fifteen
percent (15%) service charge.
A. Additional Services and Charges:
Additional services to be performed by the ENGINEER, if authorized by the
OWNER, which are not included in the above described Registration,
Preliminary, Design, and Construction Phases, and their basis of charges are
described as follows:
1. Additional Services
a. Investigations involving detailed consideration and preparation of
rate schedules, earning and expense statements, feasibility studies,
appraisals, valuations, assessment schedules, and material audits
or inventories required for certification of force account
construction performed by OWNER;
b. Preparation of applications and supporting documents for Federal
aid programs and State assistance and permits;
7
C. Preparation of any required infiltration/inflow studies, operation
and maintenance manuals, user charges, or environmental impact
assessments or statements; or performing operator training.
2. Basis of Charges
An agreed lump sum; or an agreed "Schedule of Fees" with
reimbursement for direct non -labor expense and subcontract expense at
invoice cost plus a fifteen percent (15 %) service charge.
B. Interest on Delayed Payments:
Any payments, not in dispute, not made within thirty (30) days on statements
rendered in accordance with the above provisions shall be subject to a charge for
interest at the rate of ten percent (10 %) per annum, beginning thirty (30) days
from the date the statement is received by OWNER.
C. Services Not Included:
The ENGINEER's services will not include the sampling and testing of
construction materials, such as soils, concrete, reinforced steel, sewage samples,
etc., as this is a service rendered by commercial testing laboratories, however,
the ENGINEER will recommend the type and number of such tests to the
OWNER and recommend testing agencies to perform this function. The
ENGINEER will assist in planning soil borings, foundation investigations, and
samples and tests as may be required, and in arranging for such services to be
performed on behalf of the OWNER, and in interpreting the results.
SECTION VII - EQUAL EMPLOYMENT OPPORTUNITY
E:
During the performance of this agreement:
A. The ENGINEER will not discriminate against any employee or applicant for
employment because of race, color, religion, sex, or national origin. The
ENGINEER will take affirmative action to ensure that applicants are employed
and that employees are treated during employment, without regard to their race,
color, religion, sex, or national origin. Such action shall include, but not be
limited to, the following: employment, upgrading, demotion, or transfer,
recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation, and selection for training, including apprenticeship. The
ENGINEER agrees to post in a conspicuous place, available to employees and
applicants for employment, notices setting forth the provisions of this
nondiscrimination clause.
B. The ENGINEER will, in all solicitations or advertisements for employees placed
by or on behalf of the ENGINEER, state that all qualified applicants will receive
consideration for employment without regard to race, color, religion, sex, or
national origin.
SECTION VM - REVISION TO DRAWINGS AND SPECIFICATIONS
The ENGINEER will make, without expense to the OWNER, such revisions of the preliminary
drawings as may be required to meet the needs of the OWNER, but after a definite plan has
been approved by the OWNER, if a decision is subsequently made by the OWNER, which, for
its proper execution, involves extra services and expenses for changes in, or additions to the
drawings, specifications, or other documents, or if the ENGINEER is put to labor or expense
L1
ti
by delays imposed on him from causes not within his control, such as by the delinquency or
insolvency of contractors, etc., the ENGINEER shall be compensated for such extra services and
expense, which services and expense are not to be considered as covered by the services and
charges described in Sections III and IV above. Compensation for such extra services shall be
as per the agreed "Schedule of Fees" plus reimbursement for direct non -labor expense and
subcontract expense at invoice cost plus a fifteen percent (15%) service charge.
SECTION IX - OWNERSHIP OF DOCUMENTS
All reports, documents, estimates, computer models, specifications, field notes, drawings, and
data are the property of the OWNER. ENGINEER may retain copies thereof for his use.
ENGINEER may retain original drawings upon providing OWNER with reproducible copies
which shall become the property of OWNER, who may use them for any purpose OWNER may
choose. The ENGINEER is held harmless for any reproduction or use of the plans for other
than their intended purpose.
SECTION X - LIABILITY INSURANCE; INDEMNITY
A. The ENGINEER shall provide and maintain professional liability insurance
coverage to protect the ENGINEER and the OWNER from liability arising out
of the performance of professional services under this agreement. Such coverage
shall be, in the sum of not less than One Million Dollars ($1,000,000.00). A
signed Certificate of Insurance satisfactory to the OWNER showing compliance
with the requirements of this Section shall be furnished the OWNER before any
services are performed under this Agreement.
ILI
B. The ENGINEER hereby agrees to protect, defend, indemnify, and hold harmless
the OWNER, its officers, agents, servants, and employees from and against suits,
actions, claims, losses, liability, or damage of any character, and from and
against costs and expenses, including attorney's fees, on account of injury or
death to any person or damage to property arising from any act, error, omission,
or neglect of the ENGINEER, its officers, employees, servants, agents,
subcontractors, or anyone else under the ENGINEER's direction and control, or
otherwise arising out of, occurring in connection with, resulting from or caused
by the performance or failure of performance of any work or from conditions
created by the performance or non-performance of said work.
SECTION XI - OWNERS RIGHT TO AUDIT
For all Work Orders issued to the ENGINEER, subsequent to this agreement, which amount to
$2,500.00 or more, for work to be performed on this Project or other projects in which funds
are acquired by the OWNER from a Federal agency, the ENGINEER hereby authorizes and
agrees that the OWNER, the Federal grantor agency, the Comptroller General of the United
States, or any of their duly authorized representatives, shall have access to any books,
documents, papers, and records of the ENGINEER which are directly pertinent to a specific
grant program for the purpose of making audit, examination, excerpts, and transcriptions.
SECTION X11 - TERMINATION
The OWNER may terminate this agreement at any time by a notice in writing to the
ENGINEER. Upon receipt of such notice, the ENGINEER shall, unless the notice directs
11
otherwise, immediately discontinue all services in connection with the performance of this
agreement and shall proceed to cancel promptly all existing orders and contracts insofar as such
orders or contracts are chargeable to this agreement. As soon as practicable after receipt of
notice of termination, the ENGINEER shall submit a statement showing in detail the actual
services performed under agreement to the date of termination. The OWNER shall then pay the
ENGINEER promptly that proportion of the prescribed fee for which the reasonable value
(quantum) of the service actually performed under this agreement bears to the reasonable value
of the total services called for under this agreement, less such payments on account of the fee
as have been previously made. Copies of all completed or partially completed designs, plans,
and specifications prepared under this agreement shall be delivered to the OWNER when and
if this agreement is terminated, but subject to the restrictions as to their use as set forth above.
The OWNER and the ENGINEER each binds himself and his partners, successors, executors,
administrators, and assigns to such other party, in respect to all covenants of this agreement;
except as above, neither the OWNER nor the ENGINEER shall assign, sublet, or transfer his
interest in this agreement without the written consent of the other. Nothing herein shall be
construed as creating any personal liability on the part of any officer or agent of the OWNER.
12
IN TESTIMONY OF WHICH this instrument has been executed on behalf of the above named
ENGINEER and has been executed on behalf of the OWNER in four (4) counterparts each of
equal force, on the day and year first above written.
(Seal)
ATTEST
Ka Darnell, City Secretary
APPROVED AS TO CONTENT:
Mildred Cox, Director of Transportation
APPROVED AS TO FORM:
Assistant City Attorney
NRS CONSULTING ENGINEERS, INC.
Engineer
QY4W_ BY
- unothy t. Lackey, P. . , President
ATTEST V
(Seal) Sue Valant, Administrative Assistant
13
RESOLUTION .No. 5412
Item #43
January 23, 1997
WORK ORDER FOR PROFESSIONAL ENGINEERING SERVICES
W.O. NO. LU9601
This will constitute authorization by the CITY OF LUBBOCK, TEXAS (OWNER) for NRS
CONSULTING ENGINEERS, INC., (ENGINEER) to proceed with the following described
Project:
The Project will consist of providing professional services for REGISTRATION OF A
SOLID WASTE TRANSFER STATION AT THE EXISTING CITY OF LUBBOCK
LANDFILL.
SECTION I - PROJECT DESCRIPTION
The primary purpose of the project is to acquire registration for the OWNER to construct a
solid waste transfer station to be placed in operation upon closure of the existing landfill.
The transfer station is anticipated to process -a maximum of 1350 tons per day of municipal
solid waste.
The ENGINEER will prepare documents currently required by the Texas Natural Resource
Conservation Commission (TNRCC) related to registration of the facility. The ENGINEER
will submit and support necessary documents to TNRCC on behalf of the OWNER. This
WORK ORDER will not include detailed design for construction of the transfer station.
SECTION II - SCOPE OF SERVICES
The ENGINEER shall render the following professional services necessary for the
development of the Project.
A. REGISTRATION PHASE SERVICES
1. APPLICATION
ENGINEER shall prepare and complete for submittal the registration application,
and shall include Part I of a permit application as required by §330.52 of the
Texas Administrative Code (relating to Technical Requirements of Part I of the
Application), as well as §330.60 and §330.65 thereof, including but not limited
to documentation of incoming waste rate, site plan, land use narrative, site
operating plan, legal description, evidence of competency, evidence of financial
assurance, and an applicant's statement.
1
2. MAPS
a. ENGINEER shall prepare a general location map.
b. ENGINEER shall prepare a general topographic map with a contour
interval of 1 foot.
C. ENGINEER shall prepare an ownership map of adjacent property owners.
ENGINEER shall obtain property owner listings from City and County
Tax Maps and Tax Rolls for property owners located within 500 feet of
the existing permitted solid waste disposal site.
3. DOCUMENTATION OF INCOMING WASTE RATE
a. ENGINEER shall obtain from OWNER and review all prior engineering
studies, reports, pertinent letters, documents, etc.
b. ENGINEER shall prepare preliminary design study to determine design
factors such as type of transfer station, -type of construction, preliminary
layout, equipment, operating data, and capacities. ENGINEER shall
review existing data of solid waste facilities and utilize this data and
reports to determine solid waste rate and necessary improvements that will
be needed to meet transfer station permit requirements. Report will
include opinion of probable operations costs, maintenance costs, and
capital costs.
C. ENGINEER shall prepare a tabulation of the municipal solid waste
disposal fee for the previous six reporting quarters. ENGINEER shall
incorporate documentation of new or existing recycling programs that
would reduce the waste loading for the facility. The incoming municipal
solid waste rate and recycling programs shall be supported by the
OWNER's existing records and reports.
d. An engineering presentation of the preliminary design study will be made
to OWNER's staff, and comments will be solicited which shall be
incorporated into preparation of fmal application.
e. Upon acceptance of Preliminary Design Study, ENGINEER shall
incorporate the approved incoming solid waste rate and recycling rate in
the application preparation.
4. SITE PLAN
ENGINEER shall prepare a site plan which will include general design criteria
which will later be incorporated in a set of construction plans and specifications
in subsequent phases of the Project. The site plan will include physical layout,
P
building dimensions, wall height, grades, ramp heights, drainage, water, and
waste water facilities. The site layout plan will be signed and sealed by a
registered professional engineer, and a location map shall be included in the plan.
Detailed construction plans and specifications are NOT a part of the scope of this
Work Order, and may be authorized in subsequent Work Orders or procured
separately.
5. LAND USE NARRATIVE
a. ENGINEER shall prepare a land use narrative inclusive of a description
of the surrounding land use within one-half mile of the site.
b. ENGINEER shall prepare and attach documentation of local government
approval/acceptance of the site location. The development and operation
of the facility will be in compliance with local government ordinances and
regulations.
6. SITE OPERATING PLAN
a. ENGINEER shall prepare a site operating plan including, at minimum, a
description of the solid waste data, the general facility operation, general
operational characteristics of the equipment, general facility maintenance,
general provisions for safety, emergency, fire protection, sanitation,
facility rules, operating hours, litter control, and vector control.
b. The plan shall also address alternate processing or disposal procedures of
the solid waste in the event that the facility becomes inoperable for
periods longer than 24 hours.
C. The solid waste data shall include an estimate of the amount of solid waste
to be received daily, the maximum amount of solid waste to be stored, the
maximum and average lengths of time that solid waste is to remain on the
site, and the intended destination of the solid waste received at this site.
7. LEGAL DESCRIPTION
ENGINEER shall have prepared a legal description of the property, including the
book and page number of the county deed records of the current property owner.
The legal description shall be a metes and bounds description of the site signed
and sealed by a registered professional land surveyor. A drawing of the
description, signed and sealed by the surveyor, shall also be submitted.
8. EVIDENCE OF COMPETENCY
a. ENGINEER shall prepare and submit a list of all Texas solid waste sites
which the OWNER has owned or operated within the past ten years. The
3
site name, site type, permit or registration number, county, and dates of
operation shall be included.
b. The names of the principals and supervisors of the OWNER's organization
shall be provided, together with previous affiliations with other
organizations engaged in solid waste activities.
9. EVIDENCE OF FINANCIAL ASSURANCE
ENGINEER shall assist the OWNER in preparation of evidence of financial
assurance to be provided in accordance with §330.9 and 330.280 - 330.286 of the
Texas Administrative Code.
10. STATEMENT OF APPLICANT
ENGINEER shall prepare for the OWNER's signature, a certificate for the
application that the facts set forth in the application and attachments are true and
correct, to the best of knowledge and belief, and the Project for which application
is being made will not in any way violate any law, rule, ordinance, or decree of
the duly authorized governmental entity having jurisdiction.
11. OWNER REVIEW
a. Preliminary Review
ENGINEER will present to the OWNER's staff a summary of findings in
the Preliminary Design Study with Site Layout Plan for the OWNER's
review. ENGINEER will incorporate any of OWNER's comments into
the application and attachments prior to final review.
b. Final Review
ENGINEER will present a final draft of application and attachments to
OWNER for review prior to submittal to the TNRCC.
12. SUBMITTAL TO TNRCC
ENGINEER shall submit three copies of the completed application with
attachments to TNRCC, and three copies to OWNER.
13. TNRCC TECHNICAL REVIEW RESPONSE
ENGINEER will prepare responses on the OWNER'S behalf to questions and
requests made by TNRCC during the review phase.
14. PUBLIC HEARING
4
a. The ENGINEER will assist the OWNER along with the TNRCC to
conduct a public meeting in the local area, prior to the beginning of
construction of the facility, to describe the proposed action to the general
public. The public meeting shall be held as prescribed in the Texas
Health and Safety Code, §361.0791(relating to Public Meeting and Notice
Requirements) and §305.107 of this title (relating to Public Meeting and
Notice Requirements).
b. The OWNER will be responsible for.costs associated with advertising and
reproduction incidental to any public meetings.
C. ENGINEER shall represent and defend the application to the TNRCC.
B. PRELIMINARY PHASE SERVICES - NOT A PORTION OF THIS WORK ORDER.
C. DESIGN PHASE SERVICES - NOT A PORTION OF THIS WORK ORDER.
D. CONSTRUCTION PHASE SERVICES -NOT A PORTION OF THIS WORK ORDER.
E. GENERAL PHASE SERVICES
The ENGINEER shall provide consultation and advice to the OWNER during the
performance of ENGINEER's services.
F. CONSTRUCTION PHASE PROJECT REPRESENTATION SERVICES
NOT A PORTION OF THIS WORK ORDER.
SECTION III - COMPENSATION
The above described services are to be performed in accordance with Section III of the basic
agreement covering such engineering services by and between the CITY OF LUBBOCK
(OWNER) and NRS CONSULTING ENGINEERS, INC. (ENGINEER) dated the 23zd day of
January , 1997.
For performing the services described, the ENGINEER is to be paid at hourly rates plus
reimbursable expenses according to the following schedule:
Item A. & E. Not to Exceed $ 24,000 At Hourly Rates.
Item B. Not Included
Item C. Not Included
Item D. Not Included
Item F. Not Included
The maximum fee is not to exceed the amount of $24,000 plus reimbursable expenses. The
5
hourly rates will be billed according to the prescribed rates enclosed herein and shown on
"Attachment A - Schedule of Fees". If required, a trip to Austin to meet with TNRCC during
the review phase would be billed as hourly services plus expenses.
Partial payments for services shall be made monthly, as evidenced by monthly statements
submitted by the ENGINEER and approved by .the OWNER. Monthly Invoices shall be
accompanied by a Monthly Progress Report which will describe progress to date.
The period of time estimated for completing Items 1 through 10 listed under "Section A.
SPECIAL SERVICES" of the above described SCOPE OF SERVICES, shall be FORTY-FIVE
(45) calendar days.
APPROVED:
CITY OF LUBBOCK,
LUBBOCK iCOU29TY.
Alex " Wy" Cooke
Mayor Pro Tem
A TTF, ST:
/W&' ." —
Kaythie arnell
City Se etary
APPROVED AS TO CONTENT:
'1'-V ar,
Mildred Cox
Director of Transportation
APPROVED AS TO FORM:
arold Willard
Assistant City Attorney
DATE:
ACCEPTED:
NRS CONSULTING ENGINEERS, INC.
BY:
Timothy . Lackey, P..
Principal
ATTEST:
val�
Sue Valant
Administrative Assistant
DATE: 1-;' - 31 _ '--? �->
T
"ATTACHMENT A"
SCHEDULE OF FEES
DECEMBER 1996
PROFESSIONAL SERVICE AGREEMENT FOR
CITY OF LUBBOCK
PRINCIPAL
$ 80.00/HR
PROJECT COORDINATOR
75.00/HR
REGISTERED ENGINEER
60.00/HR
DESIGN ENGINEER
55.00/HR
PLANNER
65.00/HR
REGISTERED SURVEYOR
65.00/HR
CADD DRAFTSMAN
35.00/HR
SENIOR DRAFTSMAN
30.00/HR
DRAFTSMAN
25.00/HR
ENGINEERING TECHNICIAN
40.00/HR
SECRETARY/TYPING
25.00/HR
ADMINISTRATIVE ASSISTANT
30.00/HR
FIELD PARTY (2-MAN)
70.00/HR
FIELD PARTY (3-MAN)
90.00/HR
FIELD PARTY (4-MAN)
110.00/HR
PROJECT REPRESENTATIVE
45.00/HR
TRAVEL
.31/MILE
PER DIEM
80.00/DAY
* Subject to adjustment on annual basis for inflation or deflation. Any changes must be
approved in writing by OWNER and ENGINEER.
ATTACHMENT " S "
NRS CONSULTING ENGINEERS, INC.
ENGINEERING MAN HOURS ESTIMATE
CITY OF LUBBOCK
SOLID WASTE TRANSFER STATION REGISTRATION
PREPARED 12/03/96
MANHOURS
TASK TIME COST
A. REGISTRATION PHASE
1. APPLICATION
PRINCIPAL 4
PROJECT COORDINATOR 5
REGISTERED ENGINEER 8
ENG. TECH. 8
SECRETARYITYPING 8
SUBTOTAL 33 $1,695.00
2. MAPS
a. GENERAL LOCATION MAP
REGISTERED ENGINEER
1
ENG. TECH.
1
b. GENERAL TOPOGRAPHIC MAP
PRINCIPAL
1
PROJECT COORDINATOR
1
REGISTERED ENGINEER
1
REGISTERED SURVEYOR
8
ENG. TECH.
4
FIELD PARTY
10
c. OWNERSHIP MAP
CADD DRAFTSMAN
2
ENG. TECH.
2
SECRETARY/TYPING
2
SUBTOTAL
33
3. DOCUMENTATION OF INCOMING WASTE RATE
a. OBTAIN & REVIEW PRIOR RECORDS
PRINCIPAL 1
PROJECT COORDINATOR 4
REGISTERED ENGINEER 8
ENG. TECH. 4
b. PREPARE PRELIMINARY DESIGN STUDY
PRINCIPAL
4
PROJECT COORDINATOR
8
REGISTERED ENGINEER
20
CADD DRAFTSMAN
10
ENG. TECH.
20
SECRETARYMPING
10
$2,095.00
PAGE 1
c. ENGINEERING PRESENTATION
PRINCIPAL 4
PROJECT COORDINATOR 4
d. PREPARE DOCUMENTATION
PRINCIPAL 1
PROJECT COORDINATOR 1
REGISTERED ENGINEER 8
ENG. TECH. 4
SUBTOTAL 111
4. SITE PLAN
PRINCIPAL
1
PROJECT COORDINATOR
2
REGISTERED ENGINEER
6
ENG. TECH.
8
CADD DRAFTSMAN
16
SUBTOTAL
33
5. LAND USE NARRATIVE
a. PREPARE LAND USE NARRATIVE
PRINCIPAL
1
REGISTERED ENGINEER
6
ENG. TECH.
2
b. DOCUMENT LOCAL GOV. APPROVAL/ACCEPTANCE
PRINCIPAL
1
REGISTERED ENGINEER
4
ENG. TECH.
4
SUBTOTAL
18
6. SITE OPERATING PLAN
a. PREPARE SITE OPERATING PLAN
PRINCIPAL
1
PROJECT COORDINATOR
4
REGISTERED ENGINEER
10
ENG. TECH.
5
SECRETARY/TYPING
20
b. ADDRESS ALTERNATE PROCESSING OR DISPOSAL
PRINCIPAL
1
PROJECT COORDINATOR
2
REGISTERED ENGINEER
8
ENG. TECH.
4
c. SOLID WASTE DATA
PRINCIPAL
1
PROJECT COORDINATOR
2
REGISTERED ENGINEER
16
ENG.TECH.
8
SUBTOTAL
82
PAGE 2
$5,955.00
$1,470.00
$1,000.00
$4,060.00
7. LEGAL DESCRIPTION
PRINCIPAL
1
REGISTERED SURVEYOR
6
ENG. TECH.
1
SUBTOTAL
8
$510.00
8. EVIDENCE OF COMPETENCY
a. PREPARE LIST OF OWNERS TX SOLID WASTE SITES
PRINCIPAL
1
PROJECT COORDINATOR
1
REGISTERED ENGINEER
4
ENG. TECH.
8
b. NAMES OF OWNERS PRINCIPALS & SUPERVISORS
PRINCIPAL
1
PROJECT COORDINATOR
1
REGISTERED ENGINEER
1
ENG. TECH.
1
SUBTOTAL
18
$970.00
9. EVIDENCE OF FINANCIAL ASSURANCE
PRINCIPAL
1
PROJECT COORDINATOR
1
REGISTERED ENGINEER
1
ENG. TECH.
1
SUBTOTAL
4
$255.00
10. STATEMENT OF APPLICANT
PRINCIPAL
1
PROJECT COORDINATOR
1
ENG. TECH.
2
SUBTOTAL
4
$235.00
11. CITY REVIEW
a. PRELIMINARY REVIEW
PRINCIPAL
1
PROJECT COORDINATOR
3
REGISTERED ENGINEER
4
CADD DRAFTSMAN
4
ENG. TECH.
4
SECRETARY/TYPING
5
b. FINAL REVIEW
PRINCIPAL
1
PROJECT COORDINATOR
4
REGISTERED ENGINEER
8
CADD DRAFTSMAN
5
ENG. TECH.
2
SECRETARY/TYPING
5
SUBTOTAL
46
$2,210.00
PAGE 3
12. SUBMITTAL TO T.N.R.C.C.
PROJECT COORDINATOR
1
REGISTERED ENGINEER
1
ENG. TECH.
2
SUBTOTAL
4
$215.00
13. T.N.R.C.C. TECHNICAL REVIEW RESPONSE
PRINCIPAL
10
PROJECT COORDINATOR
10
REGISTERED ENGINEER
4
ENG. TECH.
2
SUBTOTAL
26
$1,870.00
14. PUBLIC HEARING
a. ASSIST IN CONDUCTING PUBLIC MEETING
PRINCIPAL
8
PROJECT COORDINATOR
8
b. ADVERTISING & REPRODUCTION
PRINCIPAL
1
ENG. TECH.
1
SECRETARY/TYPING
4
SUBTOTAL
22
$1.460.00
B. PRELIMINARY PHASE COST ESTIMATE
NOT A PORTION OF THIS WORK ORDER
C. DESIGN PHASE SERVICES
NOT A PORTION OF THIS WORK ORDER
D. CONSTRUCTION PHASE
NOT A PORTION OF THIS WORK ORDER
E. GENERAL
NOT A PORTION OF THIS WORK ORDER
F. PROJECT REPRESENTATION
NOT A PORTION OF THIS WORK ORDER
TOTAL
442
$24,000.00
ESTIMATE OF REIMBURSABLE EXPENSES
TRAVEL TO TNRCC
$1,000.00
TRAVEL
$500.00
PRINTING
$2,000.00
POSTAGE/COURIER
$500.00
$4,000.00
PAGE 4
ATTACHMENT "C"
PROJECT TIMELINE BY TASK
NUMBER OF CALENDAR DAYS:
1 15 30 45
. . . . a . . . . . . . .
Task:
1. Application Part I (330.52) ■
2. Maps
General Location
General Topographic
Ownership
3. Waste Documentation �■
4. Site Layout Plan
5. Land Use Narrative ■■�
6. Site Operating Plan
7. Legal Description
8. Evidence of Competency
9. Evidence of Financial
Assurance
10. Statement of Application ■
11. City Review
12. Submittal to TNRCC
13. Response to TNRCC Technical Reviewa
14. Attend public hearing and/or City meetings'
a - Time frame for Items 13 and 14 determined by City and TNRCC.