Loading...
HomeMy WebLinkAboutResolution - 2520 - CO To Contract - Pharr & Company - Irrigation System, Phil Hoel Park - 02_12_1987Resolution #2520 February 12, 1987 Agenda Item #15 MH:js DG4Z(11 IITTf1Al BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order by and between the City of Lubbock and Pharr & Company for the construction of an irrigation system for Phil Hoel Park, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 12th ATTEST: nettt— syd, City Secretary APPROVED AS TO CONTENT: Rita Harmon, Assistant City Manager for Public Safety and Services APPROVED AS TO FORM: Mich le Hart, Assi'stlant City Attorney day of February , 1987. e 4BL cMINN, MAYOR �y CHANGE Distribution to: ORDER OWNER . AlA DOCUMENT G701 ARCHITECT CONTRACTOR � nn FIELD [� OTHER PROJECT: Irrigation System for Phil Hoel Park CHANGE ORDER NUMBER: 1 (name, address) INITIATION DATE: January 12, 1986 TO (Contractor): F Pharr & Company ARCHITECT'S PROJECT NO: 73-9071-44537 P.O. Box 2791 CONTRACT FOR: Construction of Lubbock, Tx. 79408 Irrigation System L CONTRACT DATE: July 24, 1986 You are directed to make the following changes in this Contract: Install additional pipe, fittings, wire, sprinkler heads, etc. to accomodate an additional 10 feet of peeimeter area as indicated on the most recent plans and to accomodate field changes necessitated by corrections to the shape of the lake, as indicated on the attached as-builts drawings and the attached schedule of increase or (decrease) in the contract quantities. Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (QJLx aoXKockkkxbtR)Ccxk was ........................... $ 34,398.75 Net change by previously authorized Change Orders ........................ $ .00 The (Contract Sum) prior to this Change Order was .......... $ 34,398.75 The (Contract Sum) (�axoaxxxldx*aot?i:=xxkxQ) will be (increased) (�t c sx�thdaaw fxzot�x� 62241.85 bythis Change Order ......................................................... $ The new (Contract Sum) (St•St7t5i!RS�'1tR CxOa)iKOt:o%a G including this Change Order will be ... $ 40, 641.40 The Contract Time will be (dtlXPC' V bCXatilf7c00Qi0 (unchanged) by ( 15) Days. The Date of Substantial Completion as of the date of this Change Order therefore is December 19, 1986. Authorized: 'Pharr & Company City of Lubbock ARCI ill ECT ) [R lY R W0ER �.�. �ox 2791 %.. Box 2000 Addre» Address Address - Lubbock, Tx Lubbock, Tx. 79457 Imi -e- �+ BY By B DATE ;9JtA fo DATE G AIA DOCUMENT G701 • CHANGE ORDEK APRI1 1978 [DI[1()N AIA-° •V 197fl TILE AMERICAN INSIIIUIL 0I' AR(IIIII(AS, 17J)NIW Y(1RK AVI., N.W , WA',IIIN(.ION 1) (' 'mnna 5211 BROWNFIELD ROAD, SUITE 101 LUBBOCK, TEXAS 79407 / (806) 799-7710 Phil.. _Hoe 1-.. Park_.:-__._-..-_-.- -- -- Irrigation System Change Order No. 1 Schedule of Increase or (Decrease) In The Contract Quantities Item Quantity Unit Total Number & Unit Description Price Amount --------------------------------------------------------------------- 1. 250 L.P. 3" PVC Pipe $ .96 $ 240.00 2. 110 L.F. 4" PVC Pipe 1.37 150.70 3. 825 L.F. 2 1/2"-PVC Pipe .76 627.00 4. (340)L: F.--- 2" PVC Pipe .48 <163. 20) 5. 220 L.F. 1 1/2" PVC Pipe .38 83.60 6. 340 L.F. 1 1/4" PVC Pipe .32 108.80 ?. 1705 L.F. 1" PVC Pipe .24 409.20 8. 3 Ea. 3" Section Valve 255.00 765.00 9. -0- Ea.- Gate Valve Box 9.50 .00 10. 3 Ea. Section Valve Box 9.50 28.50 11. -0- Ea. DCV Box 30.00 .00 ' 12. 41 Ea. Sprinkler Head #1 78.25 3,208.25 13. %-0- Ea. Controller #1 1,311.40 - .00 14. -0- Ea. Lightening Arrestor 100.00 .00 15. 4690 L.F. 12 Ga. Control Wire .16 750.40 16. -0- Ea. 1" Quick Couplers 47.50 .00 17. 240 L.F. 10 Ga. Control Wire .14 33.60 18. -0- Ea. 2" Double Check Valve 335.00 .00 19. -0- Ea. 4" Gate Valve 140.00 .00 20.. -0-L.F. Bores 25.00 .00 TOTAL AMOUNT $6,241.85 DESIGN • CONSTRUCTION • MANAGEMENT